HomeMy Public PortalAbout07-19-1905 (2)46
�.r
Julyr lath, 1905.
Roll in the matter of the improvement
$8ssment Resolution number Three (3) and the
The Prima Facie AsnroVement e to nronerty owners interested
ive propnr notice
as described in Im,
Clerk ordered to g
resented Plans for the constructfrom North Cn of ttoide.
tside of North 20th, streets
with the Board for
The EnginpBwest side a petition
walks on theThere being on the West side of North
North E Street, f cement sidewalk�o tine North line of Lot numbs
construction o Street,
the constru from North Ewas instructed to return these Plans
Straet, t instructed
to prepare plans for
er and the Enginoar instruc
zgtCoffins Add' he C1°r walk from North C Street, to the North
to the �giction of cement
the construction
23 Coffins Add'.
line of Dot number
Emprovemant Resolution number Seventeen (ew (Here insert) Pro-
viding front of different properties between East4fd
for the construction of cement sidewalla on the Sout aide
of Main street, in street. was adopted by the Board, all the
street, and East 12th,vatin in the affirmative*
members of said Board 8
Improvement Resolution number Eighteen (10) (Here insert) Pro-
viding for the construction of cement sidepropertieson the betweenoEastside
of Main streetdinaffr st ltth, dof if fe propertiesunanimously
adopted by trl
4th, Streets
Boards
The Engineer presented plans for the construction of cement Mlrb
o to South
and gutter on south C Street, from ad to 6thprepare Resolution ad
7th, Street, and the Clerk instructed to prep
present same at the next meeting of the Boards
The Engineer presented plans for the improvement of eth,eefirst
alley running East and West North of Main street,
6th, and 7th, streets, and the alley between ithenoNorth
o atruction of
streets, and North 6th, and 7th, Streetsr to prepare I
a cement Resolution ofor asame eand npresentp And hsame oat the tnext omeeting of the
Board.
ts
or
Mr. Davenport moved that that in the making of assessm9hallfbe
public improvements the sidewalk ffff intersectionsi'9 agsinet
charged against the property owners, and the OrossRosa voting'
the City. Motion prevailed, Messr's Davenport and
the affirmative, Mr. Zeller voting in the negative•
,ruly, 19th, 1905.
The petition for the extension of the South Rth,' St, Trunk sewer
from its present terminus to the river was referred to the City
Civil Engineer for plans and estimate of costs.
The Petition for the construction of cement sidewalks on the West
side of South West Third Street, from brain Street to south West
E Street, was referred to the Engineer for plans and estimate of
costs, and the Clerk instructed to prepare a Resolution for said
improvement and present same at the next meeting of the Board.
The petition from William Be Pearson, asking for permission to
construct a cement sidewalk along the lots numbered '59, 40, and
41 Moffitt's Add' was taken under advisement by the Board.
The petition for the construction of cement sidewalk on the West
side of South Thibteenth Street, from South E Street, to South H
Street, was referred to the City Civil Engineer for Plans and
estimate of costs.
The City Attorney presented a copy of the points to be agreed upon
between the City and the P. C. Co & St. L. Ry, in the matter of
the unaergrade crossings om North West Second Street, the Board
aecided to immediately take this matter up and arrange for a meet-
ing with the kailroad officials for the ratification of said agree-
ment.
The Board did V-ien adjourn.
Attest, J
Clerk of Board.
-
es t of oarde
,
47