Loading...
HomeMy Public PortalAbout07-26-1905 (2)p (1 July 26th, 1005. f 50 July 26th, 10o5, i of North# West «•,.• side Tlsa Claim of Z. Benfeldt & moons, (Estimate No 1.) amounting to the Vemont of the �et3t and the Last side sum of $1,P32,o0 was allowed by the Board and the City Controller ♦♦j �� St, to Chostnut St, / Tha matter of from iRandolph Avenue to Chestnut street was / from Sto to number Twentytsix (et instructod to issue a voucher or the amount, Third street, St. from Ri of said N W 'ird'improvoment Resolution than adopt°d, All the members of th Boar_ voting considered, and The matter of the improvement of the alley between North BtM, and (;{ere insert) was North 7th, streets, running North and South and intersecttns? the in the affirmative• first alley North of Main Street, running !cast and West from North both sides of South 5th, street, 6th, Street, to North 7th, Street, By cementing the roadway to a the improvamont efb the construction of cPmPnt uniform width of Ton (10) feet, beginning at the intersection with The matter of to South H St, and after hearing the report of to the first alley North of Main Street, running East and West between from South C St' ong was talc en uP, of the Property owners res- North 6th, and 7th, Streets, and terminating at North A Street, was sidewalkswhichashowud that a majority the Board decided had ramonstthe p considerod, and improvement Resolution number Twenty—seven (27) then Engineer the line thereof, for the adoption of an adopted by the Board, Messrs, Davennort and Rosa voting Aye, ident along to the Common Council lgr, Zeller not voting on account of hein[r, a nronertp caner along the to send this matter ling of proposed improvement. ordinance. Tile City Civil Engineer presented his report Resol*the itiontnumber the im rove as designated in ImPt° for the improvement of thPNorth ofWett �Main Streete of North , The Board did then adjourn. Two (g� Providing from the first alley �ho�ed the total rtaenth (lSth) street, d rh Report (Here insert pt h cost of to per to North C Strsot, Nhi A7 linear fPet, length of improvement to be 5 rovamunt to be > linoal Ft, the total cost of the irooved by thu Board and the asses The Report of the Engi eon was aPP Pr t of Board. ment Roll ordered proparoda / The Primary assessment lresolutionl in the anumbertter f ThrePthe i (7)owasoannroved Attu°t, designated in improvementClerk of Boar-- by the Board. The City Civ11 h�nt;inoor presented the following Report; Board of Public 'Works, Contlement South 4 In the matter of the extensioesuggest Bth, Strl:et Sewer as petitioned for, I wo>pld respectfullyand of merely that such extension would be of doubtful utility, temporary value.of oard The trend of public sentiment and r•obabloothottwithinhthe tnext Afew of Health render it extremely p with• flow of sewage into streams his years tlso law will prohibit the unification, t out some form of preliminary filtration or p vet I should bo done it will necessitate the construction of so a r�r of intercepting sower to take the sewal;o before reaching sew Consequently any work that mil?ht be done now on+nh}'itrthP new con' outlets would very probably have to be chnnf7od ditions and the expense accordingly increased* Very respectfully, Fred R. Charles, city E3nginoar, The Report of the Engineer was approved by the Board. 51 t,