Loading...
HomeMy Public PortalAboutCity Council Minutes 06-12-1979 SPECIAL EMERGENCY MEETING OF THE CITY COUNCIL June 12, 1979 • Call to order Meeting was called to order by Mayor Ragan at 8:00 P.M., present were Councilman Rodgers, Dove Councilwoman Tucker and Hollis and City Atty stavron. Larry Mullins of Folsum Investments, (R.S.F. development Co.) and representatives from Allison Bros.,Inc.(General Contractor~l, and Marvin Churchwell from Freese & Nichols. Mayor Ragan said purpose of meeting was to discuss changes of cost for drainage at the Raintree Apts. on Booth-Calloway and arriving at cost distribution between R.S. F. Dev. Co. and Richland Hills. It was pointed out that for a 5 year storm the 30" and 36" pipe would not be adequate but the 42" pipe installed at the eastern most part of the property had sufficient fall to carry the 200 C.F.S. that would flow through a 48" pipe. The City wants to scrub the 30" and 36" pipe and have it replaced by 48" pipe, also at the intersection to Booth-Calloway for this area needs to be widened ~z2' so there would be an entrance diveded by an island in the center.: On the north and south side the 20 ft. inlets the is and located 'n ~~~L the center would have a 30 ft. inlet on either side with a manhole installed for cleaning out pipe. With this arrangement this would 3c>' carry 120 CFS of water, but would still send 82 CFS down the street-vy~~ which would only run curb deep, not overflowing as it would have done otherwise. Rodgers also said we have as 16" water line belongi+~g to North • Richland Hills that runs along the east side of Booth-Calloway, along with 2 6" water lines of the City. In running the 48" pipe the City needs to arrive at some solution to be able to pass under the 16" water whenever they wish .to extend the drainage on Booth-Calloway and up Evergreen. Churchwell said the new 48" line needed to be laid to pass under the 16" line and that this could be accomplished by changing the grade. There would not be the same fall but the water would flow by pressure. Churchwell was asked if there would be any possibility of stagnant water. He assured Council there would not, that the flow would be adequate to move.the water out. Representative from Allisons said changing the elevation would mean the use of 1 piece of equipment, operator and 6 hrs time as this meant lowering the ditch 18", cost estimate of $1,200.00 City Atty. Stavron said that with the 48" stubbed out at Booth- Calloway tY~ at some future time the City could put in additional inlets since the pipe could pass under the 16", tYatt this seemed sensible as the other 80 CFS could then be carried off. Rodgers wrote total cost figures for changes as Mayor Ragan called them out. Figures as follows: $14,864.20 difference in cost of pipe 1,200.00 elevation change 4,500.00 inlet boxes 3,100.00 additional pipe • 140000 increasing size of 20' inlets to 30' inlets $25,064.20 Mullins of RSF Dev. said they would go 50/50. Representative from Allison said could probably remove $500 of the cost, that they had Spec. Called Council Mtg June 1Z, 1979 Page two • looked at the manhole again, and since the grade would be lowered that the bad portion of the manhole would be cut off. Mullins said that he could see a possibility of some miscellaneous costs that might occur; such as redoing the approach. Discussion was held again about the elevation. With the new elevations 48" will be 5' under the 16" water lines pipe. Water will flow through the 48" pipe by pressure; the .5/ grade will drain the pipe dry. Allison representative said that he would have a 10' cut at~he end of Booth-Calloway. Mullins again said there'~ae some other minor costs, that it would possibly take a day to remove the 36" pipe. He stated City could have the 36" pipe. Mullins said he would like to see the 50/50 cost be on $30,000, $15,000 each as this would allow for some contingencies. Mayor recommended we go with the cost split of $12,032.10. Council asked to talk privately. Atty. Stavron said what Mullin is suggesting is a ceiling be put on any motion made, he said that RS F Dev. Co. would not nit pick though. Rodgers said put a cei3.ing of $13,000 and no more. Mayor recommended we proceed with up grading, and on City paying its share, Folsom will pay initially and invoice the City for its portion. Motion made by Rodgers, that we do all the necessary changes in drainage, that all thepipe be changed to 48" down to the already installed 42", and all other changes as noted (elevation change, addi- tional pipe, inlet boxes, increase size of 2-20' inlet boxes to 30' inlets) and to proceed to within 6" of the 16" water main with the 48" pipe capped there, cost not to exceed $13,000.00, Folsum to give us • the 36" pipe of some 180' length and Freese & Nichols to furnish us drawing of changes, second by Tucker, Unanimously approved. Motion to adjourn at 10:30 P.M., Unanimously approved. Respectfully submitted, Lucy ~g ht City ecretary ATTEST V~ ? David L. Rag Mayor • 1 ~ t~ n ? f~~i ~~I~~~l~ .JIt~. • GE NERALCONTRACTORS • LOWELL B. ALLISON ~ 3723 FLORy STREET • FORT WORTH, TEl(AS 7ti1 ~tl ELMER P. ALLISON OFFICE PHONE Dtl9 2221 MR. LARRY MULLINS MR• MIKE KIRSCH R•S•F. DEV. CO. , CHANGE ORDER FIGURES RAINTREE APPS. RICHLAND HILLS - Remove 36" pipe already installed Install q8" pipe in lieu of 36'~ & 30„ 180, ~ 12.00 2160.00 Remove brick manhole and repour 470 ®41.33 1°425.10 • • 1000.00 TOTAL EXTRA WORK 22585.10 CREDITS : _ 3~" pipe not yet installed 110 180' 30" pipe not yet installed 30.17 3318.70 180 025:•29 8552.20 TOTAL CREDITS ~ LESS PICKUP CHARGE MADE BY SUPPLIER 7870.90 150.00 NET CREDITS 7720.90 TOTAL EXTRA CHARGES $22,585.10 LESS CREDITS 7,720.90 NET DIFFERENCE : $1~}, 84.20 NOTE: These figures are arrived at, based on Allison Brothers Inc being paid for the .180 .feet of 36'~ pipe already installed, under the original contract. NOT'E:~'I'he 180 feet of pipe to be removed, is not subject to return for credit. The disposition of this pipe is to be determined by others. NOTE: 4later line can be removed and relaid in the area close to the existing manhole- For the sum of $500.00 in lieu of moving the manhole. NOTE: If these figures are acceptable Allison Bros. Inc. urill need to present a formal bid for acceptance by the developer. ALLISON BROTHERS, INC. i. 1 j~; i _ l~ Elmer P. Allison •