Loading...
HomeMy Public PortalAbout06-13-1906190 office of Board of PUb1Io Works. city of Richmond, Indiana. Wednesday June "t", In^a. The Board of Public works of the City of Richmond„Indiana, wet in regular session at the Office of said Board on Wednesday, June 11th, 19ne, at 10 C C1ocv A, M. All the members of said Board being present. Viz. Messrs Zeller, Davenport and Rosa, J. F. Taggart, Clerk of said Board being absent, 1'r. Everettl, Davis Assistant Engineer acted as Clerk Pro 'Tem. The Following proceedings were had, to -wit: - A Petition was presented from A. C. Underhill, asking for rentu sion to construct a cement sidewalk on South 2nd street, and A street, running on A Street eQ Feet, Walk to be Five feet in wide Petition was granted. A Petition was Presented by A. C. Underhill requesting that all barb wire fences in the City be removed. Referred to the City Attorney. The City Attorney was ordered to prepare a Resolution fur the Improvement of South 11t1h street, from Pouth A Street to South B Street, A Petition was Presented for the construction of a cement side- walk on N W srd Street, rrom Kinsey street to Chestnut Street. Referred to the Engineer for plans. A Resolution was ordered for the improvement of sand)tary sewer k territory between Lain and South A Streets and 20th and 21st Sts. On Motion of Mr. Davenport the contract for conduitt to be bu'.lt by the Central Union Telephone Co resented by Mr, Hutton,yRr' was accepted, Same to be signed by the proper authorities and copy to be sent to Board. Office of Board of public "orV.s, City of Richmond, Irdiana. Friday June lfith, 1^'r The Board of Public, Works of the City of Rlchmnnd, Irdtera, met in regular hp j906SeatS1Caat thE: 08Clock A. MCeof All thedmembers Friday, june - Boardl being presente viz, kessrs Zeller, Davenport and Rosa, the following proceedings were had, to-witS- The matter of the vacation of a Part of Korth loth street, es provided for by Declaratory Resolution number 7, was taten ut, snd after some consideration on Lotion of L:r. Davenport final action was postponed until Thursday June 21st. at 10 O'Clock A, me l'r. Davenport moved that all the Resollstinns the.t Fre in a position to be advertised and onr which the ten days had exrired, twat the Clerk be instructed to advertise for bids for these imrrovements. Improvement Resolution number 71, providing for the imrrovem:ent of South llth street by the construction of a cement sidewalk on the West side thereof, from South "A" Street, to south "B" Str=et was adopted unanimously by the Board. Improvement Resolution number 72, Providing for the improvement of North West Third street, from Kinsey street to Chestnut street, by the construction of a cement sidewalk along the West side thereof, to a uniform width of Six (6) feet* was unanimously adopted by the Board, The Engineer Presented a report showing tie completion of t*e mid=— Imnrovement of South 9th street, By the construction of a cement "alk on the East side thereof from south E Street, to South H Street, HenrY Nolte, Contractor. The Total cost of the improvement amounted to 1791*23 Report Approved. The Engineer presented a report showing the completion of the Improvement of, South 17th street, By tre construet_or of a cement sidewalk on the East side thereof, from b'ein st•r'et to South A St, Provided for b Im rovement Resolution number 56. Daniel C, Burk- hardt, Contraetor.pThe total cost of this improvement amounted to E40^<.61 Report approved. I