HomeMy Public PortalAbout06-20-1906 (1)194
office of Board of Public Works,
Thursday.
Bids Continued.
1 . K. I. Motor Generator Set.................ell ,210
testinghouse 'Electric & Manf'g Cn•1-5nn K.
#g P A. C• Generator 6ol 1�n R. F. u.
1-30 K. K. Motor Generator Set ..................
Proposals on 750 K. W. Tlarbo-Unit.
The Stirling Con. Boiler Co.l-,10,5 H. P. W. T,
Boiler sole in half battery including breeching t4.1^n
office of Board
Wednesday
6 # June
of Public Worts.
20th, 1906,
Board of Public Works of the City of Richmond, Indiana,
met at the Office of said Board in regular session, Wednes-
day June 20th, 1^06, at In O'Clorw A, If, Thorp being rresent,
Messr's Davenport and Zeller, Rose beirr ebsert. TwNe follovir.R
proceedings were had, To-witi-
The Clerk called the attention of the Board to the bad conditicr.
of the Sidewalk in front of 21 South 5th Street. Sane was taken
under advisement.
195
The Westinghouse Lachine Co........ Bids were received for the improvement of the Alley between
1 Roney Randolph and Lincoln streets from West 4th Street to Kest
Mechanical Stoker ............................. 1.sSe bth street, provided for by improvement Resolution number 80,
1-Motor to operate Stoker ...................... Henry Nolte being the only bidder, Mr. Nolte Bid 97 cents per
1-750 K. to Turbo -Generator Unit...............26.775 lineal foot for said improvement. On Motion of Mr. Davenport,
the Bid of Mr. Nolte was accepted, and contract awarded to him
Westinghouse Electric & Manufacturing Co, accordingly.
1-40 K. W, Motor Generator Set 900 R. P. M.,.. 1,325 Bids were received for the construction of a sewer in the alley
between South 15th and 16th strcets, from South B Street, to
Hoover. Owen &Rentschler Cn. South E Street, Provided for by Improvement Resolution number
(F 1.'ont), Del ) + O0
„s On„ 81, John F. Cronin, being the only bidder. Mr. Cr_n_n Bid
1-750 K. W. Tirbo-Unit...... cents Der lineal foot for the whole imrrovement. This Bid being
L above the estimate On Motion of Mr. Davenport, this bid was re,'ected
General Electric Co. and the City Clerk authorized to readvertise for bids for this
1-40 K. W. Motor Generator improvement.
iSet,. I I 1 0 1 1 1 1 0 a a * 6 * a 0 6 0 1...................... le105
Co H. Wheeler Mfg Co. A Petition was presented for the imrrovecent of the first alley
1-Jet Condenser Outfit South of Main Street, known as Smith Street, frog^ month Sth street,
with Centrif Water Pump & Air Pump ( 'hithout to South 6th street By the construction of a cerent roadway
Fiping)....................................... 1.292 therein, Same was referred to the City Civil Engineer for plans
end estimate. rtr�
Wheeler Condenser & Engineeri-:g Co.
1-Jet Condenser with hertz Air Pump This being the day, The Board met to hear all persons interested
including connections.... 2.175 in the Improvement of North 9th street, from Main stye=t, to
North A Street, By the construction of cerent sidewal}_s alao�ed,
;i These Bids were ta'fen under advisement until Friday both sides thereof, After hearing all the parsons who appe
June 20th, and en that day the following Bids were on notion this matter was laid over for one week*
accepted, for 500 K, W. Turbo -Unit. In the matter of the vacation of the "Hawkins Roadway" from
General Electric Cc. North 19th street to North 27 roviaed for by Declaratory
500 K. W, Turbo,,,, ................�`15.737 <.rd street, P G ratt-
40 K. W. Exciter & Panel........... 1.737.40 Resolution number 6, on motion the Final Assessment Ro_1 in said
500 K. *. Generator Panel.......... 285.00 ell was approved,
110 H, P. Stirling Boiler.......... 40100.00
Roney Stoker.. 1,560.00
Wheeler Condenser; 901?'i:00
Foundation ... g:POnlnn
piping 1.^2nn n
Sundrwychan "494......................... 600
Total, gas ....................• 27,
4j1"�!84'
G '�" `. ..