Loading...
HomeMy Public PortalAbout05-27-1908478 Office of Board of Public Works, City of Richmond, Indiana, Wednesday May 27th, 1908, The Board of Public Yorks or the City Of Richmond, Indiana, met in regula2 session at the office of said Board on Wednesday May 27th, 1908, at 10 O'Clock A,II. All the members of said board being present:Messrs, Staut?ach:, Johnson, and O'Neal. The following proceedings 7^re had to -wit:- p dur,allttea r�presentiniT the Commercial Club appeared before the uoard, urging b;tt.e ''ire protection for the City, enumerating set.e r_ ,'..Wls tU the 71rn equipment, tririch in , their opinion should be added, same waa taken under uO.visement, The Y.E.O.A. were granted permission to tap the Sevier at the corner of North: 7ti- and A Streets, said work to be. done under the supervision of the City Civil Engineer, and no charge to be made therefor. A petition was presented, signed by John B.I)ougan, to construct under private contract, a cement walk five (5) feet in width and 150 feet in length, on North B street, abutting Lot 189 Elizabeth Starrs addition, the Board grants said petition, said work to be done under the direction of the City Civil Engineer. The Board approves the Bond and Contract of H.C.Bullerdick & Son for supplying Coal to the City as per Contract awarded said firm may 22nd, 1908, The Board receives bids for the construction of a sanitary sewer, between South 7th and 8th streets, from just North of South J street to South L street, as provided for by Improvement *Oesolution No.134-1908, as follows: - Schneider Bros Bid 71 cents per lineal ft ' John F.Cronin 1171 11 11 11 the above bids being a tie and at the Engineers estimate, on motion the contract was awarded to John F.Cronin, The Board receives bids for the extention oi' the Cascade Garden sewer, as provided for by Improvement Resolution N0.139-19084 as follows: - Lewis hall Bid $1150,00 Complete. the Board rejects said bid, and further action on said improve - rent postponed Indefinitely, The Board approves a Primary assessment roll in the matter of the improvement of North 21st streetby grading, feet in the roadwayand construction of cement sidewalks (5) cement curbs and gutters on both sfrom Width and ides thereof, North9E street to North F street, as provided for by Improve - meet Resolution No.132-1908. Office of Board of Public Works 47 City oi' Richmond, Indiana ' Vcdnesday May 27th, 1908, The Board providedreceives forbids hyfor planseanddape°n to Floral ?louse at Olen park p c1f1c,ticns on office of said Board, as follows:- file in the Joe N.Hodbin Bid ^ " " " .35 cents $400900 Complete W.S.Ferris ■ P.r Ilour,Clty furnish material Isaflc M.Wilcox ° 349,00 Co$S011100 Complete ■ " " " mpl.ts (Iron roof) 328,00 ■ (Shingle roof) the bid of Isaac L;.'r;llcox being the lowest and under the Engineers estimate, on motion the contract was awarded to said Isaac M.Wllcox at his bid of $349,00 Complete (Iron Roof), The Board instructs the City Civil Engineer to order certain suppliee that the City is to furnish in connection with this improvement, from Foley Mfg Cc Chicago, for which the City is to pay $89,00. The Board receives bids for the Improvement of North loth street, from Ifain street to North E street as provided for by Improvement Resolution No,138-1908, as follows: - Schnieder Bros Cement sidewalk - Cement Curb & Gutter it 11 1t ' Intersections " Crosswalk " Gutter strip Sewer ' Inlet Daniel G,Burkhardt Cement sidewalk - Cement Curb & Cutter " to " n " Gutter strip " Intersections Sewer Cross walk to Inlet Bid 9,3/4 cents per square foot (straight) 67 " " lineal to (circle) $1.15 " " ' " 12 " 11 square ^ 64 It " lineal 11 .30 to ^ $1,42 ■ ^ ■ n - $40.00 Complete Bid 11 (straight) 68 (circle) 95 .32 I2 70 $1,40 $30.00 cents per square foot ^ to lineal ° " 1 ti square " ^ " lineal ' Complete Bid B cents per snuaarre foot 10.5/^ 11 lineal .35 " 9 ^ n (straight) 69 " (circle) $1.00 " It square " 13 11 to lineal 60 n " wer _ _ _ _ $1,32 Engineers the bid of Schnieder Bros being the lowest and under the Schnieder Bros. �enttImate, on motion the contractvras awarded to sai The � rd did t/ ou rnm �g� •( John F.Cronin Cement sidewalk It Gutter strip " Curb & Gutter " to It to " Intersections " Cross_walk Se