Loading...
HomeMy Public PortalAbout06-03-1908 (1)480. PF 0 (6 _' to Office of Board of Public Works, City of Richmond, Indiana, Friday May 29th, 1908. The Board of Public Works of the City of Richmond, Indiana, met in regular session at the office of said Board on Friday May 29th, 1908, at 10 O'Clock A.ii. All the members Of said Board bean: present:Messrs, Staubach, Johnson, arni O'Neal. The followin7 proceedings were had to -wit:- j The Board meets to hear all persons interested or whose property is affected by the following described public improvement: Improvement Resolution No.142-1908, providing for the improvement of the alley between Richmond avenue and Laurel street & Sheridan and First streets, being first alley east of First street running North and South, from Laurel street south to first alley running East and West, thence East to first alley West of Sheridan street,' by grading, graveling, and bouldering, and 3 brick center, after hearing all persons interested who appeared, and being fully advie in the prenises, the Board decides that the benefits to property, liable to be assessed for said improvement are equal to the estimated cost of the same as reported by the City Civil Engineer, and thereupon takes final action on Said resolution as originally adopted, the same being confirmed by a unanimous vote of the Board without modification. The Board did then adjourn. President of Board. Attest �rA Clerk of Board. Office oard 01' Public Worka 45 City of RIchmond, Indiana ' Wednesday June.3rd, 1908, ic ,et inard of regularuslsslonrYB at the of Clty of Richmond Indiana dune •3rcl, 1908, at 10 0' Clock plaice of said Board on Wednesday being present: Messrs, Staubach, Johnaonhs members of said 'Board The following proceedings were had tp_xiLtand 0 Neal, The City Civil Engineer reported the completion of the Contract under Improvement Resolution No.135-1908, providing for the improvement of Louth 16th street, by constructing cement sidewalks on the WASside from Scuth A street to Sout'.. C street the Board accepts the same and orders assessment roll prepared. A petition was presented for the construction of a sanitary sewer in the alleys between North 17th and 18th streets and North 18th and 19th streets, from a point about 150 feet NoDth of North E street North to South line 01' P.C.C.& StL.R.R, same was referred to Engineer for plans, and resolution ordered, A petition was presented for the graveling of North 12th street, from the bridge over White Water, to the North corporation line, and the location of an Are Light on said street near the North corporation line, same was taken under advisement. The Board receives bill from P.C.C.& st L.Railway Company, dated Aay 13th, 1908, for City's proportion of Riter-Conley L:anufacturing CO's bill for ironwork furnished i'or Undergrade Crossing of Niehmond Livision of P.C.C.& St.L.Rv.,at West Second street, 226985 lbs. $;.15 - - - - $7150,03 Proportion of City of Richmond, 40� - - - - 92860,01 a190 for proportion of Pittsburgh Testing Labratorys bills for testing ironwork for Undergrade Crossings Of Richmond and Indianapolis Divisions of the P.C.C. & St.L.Ry, at West Second street, Indianapolis Division. 261180 lbs--130.59 tons, - 70 $91.40 Richmond Division. 79644 5170,85 226985 lbs--11:5.492 " Proportion of City of Richmond, 4CN 2926'35 TOTAL _ - - - Company, signed as per agreement between the City and said Railvray1. public Works and approved by the Railway Companyrand the Board by Cne yCommon 01' said city, and a proved by an Ordinance p allows said Council the 18th day July, 19)7, on notion the Board abo Of th ThevBoardlorders Resolution and plans for 8tI 9 Betiembytconstruct constructing A street, from South 2nd street to South 1lks on both avea Cement Curbs and Cutters, and Cement sideeXcept the, Portions now p thereof between the points named above, ardt ThthscoaianInstructs the Engin�er to nolfil 21st1strsetKnacrosso construct crosswalks on both sides of R0rtl: E street, same to be of cement'