Loading...
HomeMy Public PortalAbout07-01-1908' I Office of Board of Public Works City of Richmond, Indiana, Friday June 26th, 1908. The City civil Engineer reported the com4letion of the contract under Improvement Resolution No.134-19089 providing; for the construction of a sewer beginning at the end of the present sewer in the alley between South 7th and 8th streets, just North of South J street, oxtending thence south across J street and Lot 29, Fred Von Peins addition, and along the alley in the rear of Lots 26 to 16 in said addition to South L street, the Roard ao:epts the same and orders assessment roll prepared. The Board adopts Improvement Resolution No.145-1908, providing for the Improvement of South 12th street, from South F street to South H street, by constructing Cement sidewalks (6) feet In width, or, both sides thereof. 'rhe Loard adopts Improvement Resolution No.146-1908, providing f'or the improvement of Main street, from South First street West to the East end of the ]lain street bridge, by constructing Cement sidewalk, and Cement curb and gutter on the South side thereof. The City Civil Engineer reported the completion of the contract under Improvement Resolution No.136-1908, providing for the improvement of the first alley south of ]fain streot running east and west, between South 213t street and South 22nd street, by grading graveling and bowldering, and 3 brick center, the Board accepts the same and orders asseosment roll prepared. The City Civil Engineer reported the completion oithe contract under Improvement Resolution No.137-1908, providing for the Improvement of the alley between South 213t street and South 22nd street, running North anal. South from the first alley south of Main street to the south terminal, thence east to South 22nd street, by grading, graveling and borldering, and 3 brick center the Board accepts. the same and orders assessment roll prepared. The Board did then adjourn. /m AuAj62A� PresiBoard. Atteste &A `wG rlr_rk of Doard. Office of Board of Public Works City of Richmond, Indiana, Wednesday July 1st, 1908. The Board of Publlc seaslWorks Of the City of Richmond, Indiana, e office of said Board on we+t neda July 13t, 19 08, at 10 O'Clock A,!{, All the members of . said Boary r. being present: Messrs, Staubach, Johnson and 0+11eal, The follow1 nFr prose^d.ings I,vere had to -wit:- Pursuant to postponement the hoard taken up the matter of the proposed improvement of South A street, from South 2nd street to South 18th street, by constructing cement curb and gutters and cement sidewalks as provided for by Improvement Resolution N0,143- 1908. on notion further action under said resolution was postponed indefinitely. The Board meets to hear remonstrancea, if any, from persons primarily assessed on account of the Improvement of South 8th street, from South 11 street to South J street, by constructing Cement side- walks (G ) Feet in width on both sides, as providers for by Improvemer' Resolution No.140-1908. After hearing all persons who appeared, the Board approves a final assessment roll as heretofore approved, and orders same transmitted forthwith to the Department of Finance. The Board approves a Primary assessment roll in the matter of the construction of a sewer, beginning at the end of the present sewer in the alley between South 7th and 8th streets, just ]forth of South J street, oxtending thence south across J street and Lot 29 Fred Von Pefna addition, and along the alley in the rear of Lots 26 to 11_ In said addition to South L street, as provided for by Improvement Resolution Iio.1:54-1908. The Board approves a 13rimary assessment roll in the matter of the improvement of the alley between South a first street and South o 22nd street running North and South from the first alley Soufr. of Main strcet�to the South terminal thence East to South 22nd street, by and.3 brick center, as provided grading, graveling and bowldering, for by Improvement Resolution 1106137-1908. The Board approves a Prilaary assessment roll in therunning tter of the Isast and Improvementofthe let alley South of Bain 22nd st:1eet , by grading, Most between South 21st street and Sou center, asrProvided for by and.3 brick c graveling and bovriderine„ Improvermnt Resolution II0.136-1908' 4lttloll providing The Board approves the Bond and Contract of John B• II East of first street running East street S to first alley running for the improvers nt of the first a1leoYuth P street, by and West, thence cast to first alley t'Je�tbrickncenter, rovided as 1 grading, graveling and bowldering+aaand .3 for by Improvement Resolution 110ol4 The Board did then a,ijourn. 1 i Attest P ig d. _ Clerk of