Loading...
HomeMy Public PortalAboutChange Order No. 6 to Contract No. 72-2021 - Sanitation - Brackney - West side Interceptor RICHIVIOND SANITARY DISTRICT 2380 Liberty Avenue,Richmond,IN 47374 CHANGE ORDER#6 Change Order Date: September 12, 2023 ., Owner: Richmond Sanitary District Contract No.: 72-2021 Contractor: Brackney, Inc. Contract Date: May 28,2021 Project: West Side Interceptor Improvements Project, Division A Project No.: 517069 SRF Project No.: WW21098908 The Contract Documents are modified as follows upon execution of this Change Order and Approval by SRF: , Item# Description Qty Change Unit Cost/Unot Total increase/(Decrease) Add 06-13 Special Screened Backfill for Siphon on West Hillside 488 TN $ 35.10 $ 17,128.80 06-01 Granular Backfill for Open Cut 8"Diameter Sanitary Sewer 5 LE $ 40.00 $ 200.00 06-02 Granular Backfill for Open Cut 10"Diameter Sanitary Sewer (359) LF $ 45,(1)0 $ (16,155.00) 06.03 Granular Backfill for Open Cut,12" Diameter Sanitary Sewer (29) LF $ 40.00 $ (1,160.00) 06-04 Granular Backfill for Open Cut 24"Diameter Sanitary Sewer 65 LF $ 60.00 $ 3,900.00 06-05 Granular Backfill for Open Cut 30" Diameter Sanitary Sewer 9 LF $ 60.00 $ 540,00 06-06 Granular Backfill for Open Cut 36" Diameter Sanitary Sewer (27) LF $ 55.00 $ (1,485.00) 06-08 Granular Backfill for Open Cut 12"Diameter Storm Sewer 28 LF $ 8,00 $ 224,00 06-09 Granular Backfill for Sanitary Siphon Piping (249) LF $ 20.00 $ (4,980.00) 06-10 Flowable Backfill in Abandoned Pipe (55) CY $ 190.00 $ (10,450,00) 07-01 8-Inch Dia,Gravity Sanitary Sewer(PVC,CCFRPM,OR GRP) 30 LF $ 68.00 $ 2,040.00 07-02 10-Inch Dia.Gravity Sanitary Sewer(PVC,CCFRPM,OR GRP) (359) LF $ 65.00 $ (23,335,00) 07-03 12-Inch Dia.Gravity Sanitary Sewer(PVC,CCFRPM,OR GRP) (29) LF $ 73.00 $ (2,117,00) 07-04 24-Inch Dia,Gravity Sanitary Sewer(PVC,CCFRPM,OR GRP) 22 LF $ 218.00 $ 4,796.00 07-05 30-Inch Dia.Gravity Sanitary Sewer(PVC,CCFRPM,OR GRP) (9) IF $ 254.00 $ (2,286,00) 1 07-06 36-Inch Dia.Gravity Sanitary Sewer(PVC,CCFRPM,OR GRP) 3 LF $ 339.00 $ 1,017.00 08-01 6-Inch Sewer Service Laterals (388) LF $ 40.00 S (15,520.00) 14-01 12-Inch Dia.Gravity Storm Sewer(PVC) 156 LF $ 81.00 $ 12,636.00 15-01 Line'A'-Asphalt Pavement Road Replacement 33 LF $ 91,00 $ 3,003,00 15-02 Line'B'-Asphalt Pavement Road Replacement 43.16 LF $ 91.00 $ 3,927.56 15-03 Line'B-1'-Asphalt Pavement Road Replacement (343) LF $ 71.00 $ (24,353.00) 15-04 Line'C'-Asphalt Pavement Road Replacement (17,83) LF $ 120.00 $ (2,139.60) 15-05 Line'D'-Asphalt Pavement Road Replacement (8,60) LF $ 55.00 $ (473.00) 15-07 Pavement Striping (1.00) LS $ 8,500 00 $ (8,500.00) Add 15-10 Additional Mill and Pave Surface Work 8,147 SF $ 3.31 $ 26,966,57 18-01 Bore&Jack-36-Inch Diameter Casing (1,00) LF $ 1,215.00 $ (1,215,00) Add 10-07 18-Inch CIPP Lining 528 IF $ 105.00 $ 55,440.00 10-02 21-Inch CIPP Lining 307 LF $ 87.00 $ 26,709.00 10-03 24-Inch CIPP Lining (1,144) LF $ 105.00 $ (120,120,00) 5-Oct Point Repair Allowarxe (1) LS $ 15,000.00 $ (15, .00) Add 11-08 Pre-CIPP Lining Cleaning and CCTV-18-Inch Diameter 528 LF $ 18,00 $ 9,504.00 Add 11-09 Post-CIPP Lining Cleaning and CCTV-18-Inch Diameter 528 LF $ 2,00 $ 1,056,00 11-03 Pre-CIPP Lining Cleaning and CCTV-21-Inch Diameter 307 IF $ 19.00 $ 5,833,00 , 11-04 Post-CIPP Lining Cle ing and CCTV-21-Inch Diameter 307 LF $ 2.00 $ 614,00 continued on the next page . . Page 1 of 2 11 11 . , RICHMOND SANITARY DISTRICT 2380 Liberty Avenue,Richmond, IN 47374 CHANGE ORDER#6 Change Order Date: September 12, 2023 Owner: Richmond Sanitary District Contract No.: 72-2021 Contractor: Brackney, Inc. Contract Date: May 28,2021 Project: West Side Interceptor Improvements Project, Division A Project No.: S17069 SRF Project No.: WW21098908 continued from previous page Item# Description Qty Change Unit Cost/Unit Total Increase/(Decrease) 11-05 Pre-CIPP Lining Clearing and CCTV-24-Inch Diameter (811) LF $ 20.50 $ (16,625.50) 11-06 Post-CIPP Lining Cleaning and CCTV-24-Inch Diameter (1,144) LF $ 2.00 $ (2,288.00) 00-00 Business Detour Signage Allowance -1 LS $ 5,000,00 $ (5,000.00) 18-03 Railroad Insurance 0,81 LS $ 10,000.00 $ 8,100.00 11-01 Pre-CIPP Lining Clearing and CCTV-15-Inch Diameter 2 LF $ 7.00 $ 14.00 11-02 Post-CIPP Lining Cleaning and CCTV- 15-Inch Diameter 2 LF $ 2.00 $ 4.00 NET CHANGE $ (89,549.17) CHANGE IN CONTRACT PRICE Original Contract Price: $5,301,620.00 Net change from Previous Change Orders: ($513,861.55) Contract price prior to this Change Order: $4,787,758.45 Net increase/(decrease)of this Change Order: (89,549.17) Contract price with all approved Change Orders: $4,698,209.28 Percentage of increase/(decrease)with Change Orders: -1138% CHANGE IN CONTRACT COMPLETION TIME Original Completion Time(days): (485 Substantial,515 Final) Net change from Previous Change Orders: (0 Substantial,0 Final)' Completion time prior to this Change Order: (485 Substantial,515 Final) Net increase/decrease of this Change Order: (0 Substantial,0 Final) Completetion time with all approved Change Orders: (485 Substantial,515 Final) This Change Order is for complete and final settlement of all direct and indirect costs, impact costs and time extensions incurred at any time resulting from the performance of the changed work or associated claims. This Change Order is Subject to Final Approval by Funding Agency(SRF). Recommended by: 09/20/202 Richmond S nitary District Engineer Date Accepted by: Owner: Richmond Sanitary District oa President Signature Date Contractor: (41..e0 C—fZ2 -073 Brackney, Inc. AuthorizO Signature Date Page 2 of 2