Loading...
HomeMy Public PortalAbout2015.012 (01-20-15)RESOLUTION NO. 2015.012 A RESOLUTION OF THE CITY COUNCIL OF THE'CITY OF LYNWOOD RENEWING THE EXISTING AGREEMENT BETWEEN THE CITY AND APA ENGINEERING INC. FOR COMPLETION OF DESIGN SERVICES IN THE NOT -TO- EXCEED AMOUNT OF $85,000 FOR THE LONG BEACH BOULEVARD IMPROVEMENT DESIGN PROJECT, PROJECT NO. 4011.67.937; AUTHORIZING THE MAYOR TO EXECUTE THE AGREEMENT AND AUTHORIZING THE CITY MANAGER OR DESIGNEE TO MAKE THE NECESSARY FUND TRANSFERS AND APPROPRIATIONS ' WHEREAS, on December 2, 2008, the design contract for the Long Beach Boulevard Street Improvement Project was awarded to APA Engineering Inc. (APA); and WHEREAS, on June 2012 APA submitted to the City the final design plans for Long Beach Boulevard (Tweedy Boulevard to Magnolia Avenue); and WHEREAS, the City staff met with Caltrans regarding the project and recommended that the City submit the revised plans, specifications and cost estimate no later than January 31, 2015; and WHEREAS, the additional design work is to provide an updated set of plans and specifications that is "bid ready" for construction as well as a submittal to Caltrans for funding authorization; and WHEREAS, the Long Beach Boulevard design plans require the following revisions: 1. Checking the plans against the existing condition to verify and validate existing site conditions and features (i.e. ADA ramps, driveways, lighting, sidewalks, curb & gutter, utilities, etc.) 2. Updating the Plans, Specifications & Cost Estimates 3. Updating the Landscaping and Irrigation Plans for compliance to the current Water Ordinance, etc. 4. Updating and re- phasing the Traffic Signal Plans on Long Beach Boulevard and Josephine Street, Sanborn Avenue, and Imperial Highway; and WHEREAS, APA has submitted a proposal to update the plans to new codes and standards for a fee not to exceed $85,000; and WHEREAS, funds are available in Prop C fund and need.to be transferred to the Long Beach Boulevard Improvement Project. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LYNWOOD DOES HEREBY RESOLVE, DECLARE, DETERMINE AND ORDER AS FOLLOWS: Section 1. That the City Council hereby approves a new consulting services agreement with APA Engineering Inc. for the design services of Long Beach Boulevard Improvement Project in the amount not to exceed $85,000. Section 2. That the Mayor is authorized to execute the agreement between the City and APA Engineering Inc. in a form approved by the City Attorney. Section 3. That the City Manager or designee is authorized to make the following funds appropriation and transfer in the amount of $85,000 as follows: FROM Un- appropriated Prop C Fund $85,000 TO Long Beach Boulevard Project No. 4011.67.937.62015 $85,000 Section 4. That this Resolution shall take effect immediately upon its adoption. Section 5. The City Clerk shall certify as to the adoption of this Resolution. PASSED, APPROVED and ADOPTED this 20th day of January, 2015. ATTEST: WrdQuinonez, City Clerk APPROVED AS TO FORM: David A. Garcia, City Attorney APPROVED AS TO CONTENT: - r 1��� J. Arnoldo Beltran, City Manager 4liam E. Stracker, P.E Interim Director Public Works/ City Engineer STATE OF CALIFORNIA ) ) SS. COUNTY OF LOS ANGELES ) I, the undersigned, City Clerk of the City of Lynwood, do hereby certify that the foregoing Resolution was passed and adopted by the City Council of the City of Lynwood at a regular meeting held on the'20th day of January, 2015. AYES: COUNCIL MEMBERS ALATORRE, SANTILLAN -BEAS AND SOLACHE NOES: NONE ABSENT: NONE ABSTAIN: NONE � r Maria Quinonez, City Clerk STATE OF CALIFORNIA ) ) SS. COUNTY OF LOS ANGELES ) CASTRO, HERNANDEZ, I, the undersigned, City Clerk of the City of Lynwood, and.the Clerk of the City Council of said City, do hereby certify that the above foregoing is a full, true and correct copy of Resolution No. 2015.012 on file in my office and that said Resolution was adopted on the date and by the vote therein stated. Dated this 20th day of January, 2015. Maria Quinonez, City Clerk