HomeMy Public PortalAbout2007-33 Change Order #6 to Contract with M. Villa & Associates re: Yacht Club/Harbor DriveRESOLUTION NO. 2007-33
A CAPITAL PROJECT AUTHORIZING RESOLUTION OF
THE VILLAGE COUNCIL OF THE VILLAGE OF KEY
BISCAYNE, FLORIDA, AUTHORIZING YACHT CLUB
FRONTAGE, WEST OF WOODCREST DRIVE, PORTION OF
HARBOR DRIVE IMPROVEMENT PROJECT;
AUTHORIZING SIXTH CHANGE ORDER TO
CONSTRUCTION CONTRACT BETWEEN THE VILLAGE
AND M. VILA AND ASSOCIATES, INC., IN ORDER TO
PROVIDE FOR CERTAIN WORK ON HARBOR DRIVE AS
EXTENTION OF WORK TO BE DONE BY THE
CONTRACTOR OF THE CRANDON BOULEVARD
IMPROVEMENTS — PHASE II AND III PROJECTS;
PROVIDING FOR APPROVAL OF CHANGE ORDER NO. 6
TO CONTRACT FOR CONSTRUCTION; PROVIDING FOR
IMPLEMENTATION; AND PROVIDING FOR EFFECTIVE
DATE.
WHEREAS, pursuant to public bidding process, the Village previously entered into a
contract for construction of Crandon Boulevard Improvements — Phase II with M. Vila and
Associates, Inc.; and
WHEREAS, subsequently, the Village solicitated competitive bids for the construction of
Crandon Boulevard Improvements — Phase III (the "Crandon Project"); and
WHEREAS, no responsive bid was received by the Village concerning the construction of
Crandon Boulevard Improvements — Phase III; and
WHEREAS, accordingly, pursuant to Section 255.20(1)(c)(2), Florida Statutes, the Village
Council found that the mandatory competitive bidding requirements of that statute were rendered
non -applicable for Phase III of the Crandon Project since competitive bids were solicited but no
responsive bid was received; and
WHEREAS, the Village Council further found, upon advice of the Village Attorney, that
the Village Council may waive the competitive bidding required by the Village Code pursuant to
Village Code Section 2-85, upon the Council finding, as it did find, that it was impractical to again
apply such competitive bidding procedures in light of the need to expeditiously commence and
complete the Crandon Boulevard Improvements — Phase III, and that further efforts at competitive
bidding were not otherwise mandated by state law, as described above; and
WHEREAS, the Village Project Engineer and Owner's Representative successfully
negotiated a proposed change order with M. Vila and Associates, Inc., the Crandon Boulevard
Improvements — Phase II contractor (the "Contractor"), for the extension of the services of the
Contractor for the Crandon Boulevard Improvements — Phase III, as described in Resolution No.
2006-43; and
WHEREAS, subsequently , pursuant to further Resolutions of the Village Council,
additional work was assigned to the Contractor via Change Orders # 4 and # 5 , as described in
those Resolutions, for a portion of the Harbor Drive project which is necessary to be completed
during school recess, and for utility crossing work essential to be done to implement Phase III of
the Crandon Project and avoid disruption with the Water, Sewer, Reuse Water project; and
WHEREAS, work is presently underway for Phase III of the Crandon Project; and the
Contractor presently has work crews which are readily available; and
WHEREAS, the Village Council, upon advice from the Village Manager and the Project
Engineer ("C3TS") and the Village's Owner's Representative, now finds that it is necessary to
expeditiously implement and construct a certain final segment (the "Yacht Club Frontage Project")
of the Harbor Drive improvement project (the "Harbor Drive Project") which is an area situated
west of Woodcrest Drive; and
2
WHEREAS, the Yacht Club Frontage Project consists of heavy civil work , including
sidewalks, curb, drainage, crosswalks, asphalt, and installation of street lighting conduit , and once
completed will leave only landscaping and irrigation work remaining for the Harbour Drive
Project; and
WHEREAS, the isolation and completion of the Yacht Club Frontage Project heavy civil
work, as provided herein, will enable the Village to subsequently solicit bids for all of the necessary
landscaping and irrigation work for the Harbor Drive Project , thereby enhancing the pool of
potential bidders for that specialized landscaping and irrigation work and avoiding the necessity to
mix that work with incompatible heavy civil work ; and
WHEREAS, upon advice from the Village Attorney, the Village Council finds that the
Village Council may waive the competitive bidding required by the Village Code for the Yacht Club
Frontage Project pursuant to Village Code Section 2-85, upon the Council finding, as is hereby
found, that it is impractical to apply competitive bidding procedures in light of the need to
expeditiously commence and complete the Yacht Club Frontage Project , and that competitive
bidding is not mandated by State law for the Yacht Club Frontage Project since the cost of that
project does not exceed the bidding threshold of Sec. 255.20 (1), Florida Statutes, as adjusted by
Sec. 255.20(2), Florida Statutes; and
WHEREAS, the Village's Project Engineer and Owner's Representative have successfully
negotiated a proposed. change order (the "Change Order No. 6") with the Contractor for the extension
of the Crandon Project services of the Contractor for the Yacht Club Frontage Project, as described
herein; and
3
WHEREAS, the Village Council finds that it is in the best interest of the Village to proceed
as indicated in this Resolution.
NOW, THEREFORE, IT IS HEREBY RESOLVED BY THE VILLAGE COUNCIL
OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, AS FOLLOWS:
Section 1. Recitals Adopted. That each of the recitals stated above is hereby adopted
and confirmed.
Section 2. Agreement Approved, Specification of Funds, Conditions.
A. Change Order Approved: That the Change Order No. 6 to the Contract for
Construction (the "Agreement"), in substantially the form attached hereto, between the Contractor
and the Village for construction of the Yacht Club Frontage Project is hereby approved, and the
Village Manager is hereby authorized to execute the Agreement on behalf of the Village, once
approved as to form and legal sufficiency by the Village Attorney, and subject to the provisions and
conditions of this Resolution.
B. Funding Source:
That funding for the Yacht Club Frontage Project shall be provided through
funding allocated to the Master Plan Initiatives, and in accordance with the Village Manager's
Memorandum which accompanies this Resolution.
(ii). That the total cost of the work for the Yacht Club Frontage Project shall not
exceed the dollar amount specified in Change Order No. 6 and shall, in any event, not exceed One
Hundred Eighty Thousand ($ 180,000.00) Dollars, in the absence of further Village Council
authorization.
4
C. Conditions: That the Agreement shall be subject to the condition precedent that
Village funds are available and budgeted for the accomplishment of the Work for this Yacht Club
Frontage Project. Further, the approval of the Agreement shall be subject to the following
conditions, which shall be incorporated into the Agreement by reference, as follows:
(i)
Contractor agrees that in the event that a referendum or initiative measure is
adopted at an election by the majority of the electors of the Village voting on
such measure, which operates to prohibit the construction of the Yacht Club
Frontage Project, the Village Council shall have the authority, within thirty
(30) days after any such event, to terminate the Contract by providing written
notice of termination to the Contractor. In the event of such termination, the
Village shall not be liable to Contractor for payment of any supplemental
compensation, penalties, damages, loss of profits, termination fee or
demobilization fee as a result of such termination, and the Contractor shall
only be paid by the Village in accordance with the Contract, for the portion
of the Work for the Yacht Club Frontage Project which has been performed
by Contractor up to the time of notice of termination of the Contract. The
Contractor shall be entitled to recover from the Village payment for proven
loss with respect to materials, equipment, tools, and construction equipment
and machinery, including reasonable overhead, and profit earned on the
Yacht Club Frontage Project prior to the date of termination.
(ii) Pursuant to Village Charter Section 3.07(b), this Resolution shall serve as the
capital project authorizing Resolution for the Yacht Club Frontage Project,
and a further authorizing resolution or ordinance, as applicable, shall be
required for the remaining portions of the Harbor Drive Project.
Section 3. Implementation. That the Village Manager is hereby authorized to take any
action which is necessary to implement the purposes of this Resolution and the Agreement.
Section 4. Effective Date. That this Resolution shall be effective immediately upon
adoption hereof.
PASSED AND ADOPTED this 31st day of July , 2007.
5
AYOR ROBERT L. VERNON
CONCHITA H. ALVAREZ, CMC, VILLAGE CLERK
APPROVED AS TO FORM AND LEGAL SUFFICIEN
VILLAGE A TORNE
F:\100\103001\Resolutions\Approval of Change Order NUMBER 6 Construction Contract M Vila 07-18-07.doc
6
Village Council
Robert L. Vernon, Mayor
Jorge E. Mendia, Vice Mayor
Michael Davey
Enrique Garcia
Steve Liedman
Thomas Thornton
Patricia Weinman
VILLAGE OF KEY BISCAYNE
Department of Building, Zoning and Planning
DT: July 23, 2007
TO:
FR:
RE:
RECOMMENDATION
Director
Jud Kurlancheek, AICP
Chief Building Official
Eugenio M. Santiago, P.E.
Honorable May,.ar--a, d Members of the Village Council
{{ cr
Jud Kurlanch�ek, Interim Village Manager/BZP Director
Harbor Drive Streetscape Project: Southwest side of the
Presbyterian Church to the Southwest side of The Yacht Club
It is recommended that the attached resolution be approved which authorizes sidewalk
and curbing improvements in the above described area. The Council has previously
authorized funding for this work. ^°
EXPLANATION
The Village Council has approved funding for improvements on the north and west sides
of Harbor Drive from the Fernwood Road Circle to the north side of the Yacht Club.
These improvements have been approved by the two churches and The Yacht Club. The
area in from the churches is under construction.
In order to complete the street work during the summer in front of The Yacht Club, Staff
is requesting that the attached resolution be approved. This work includes the 8 ft. wide
sidewalk, curbing, and seating area in front of the Hacienda Canal. The balance of the
work, including landscaping and lighting, will be bid out for the entire project from
Fernwood Road Circle to the southwest side of The Yacht Club. The Landscape
Committee is assisting the Staff in selecting the plantings for the entire project.
88 West McIntyre Street • Suite 250 • Key Biscayne, Florida 33149 • (305) 365-5512 • Fax (305) 365-5556
MISSION STATEMENT: "TO PROVIDE A SAFE, QUALITY COMMUNITY ENVIRONMENT FOR ALL ISLANDERS THROUGH RESPONSIBLE GOVERNMENT."
www.keybiscaynejl.gov
CHANGE ORDER
NO. 6
Project: Crandon Boulevard Improvements Phases II / 111
Owner: Village of Key Biscayne
88 West McIntyre Street
Key Biscayne. Florida 33149
Contractor: M. Vila & Associates, Inc.
12097 NW 98th Avenue
Hialeah Gardens, Florida 33018
Contract for: Project involves full streetscape construction
including drainage, curbin, sidewalks, paver
installation, landscaping, irrigation, signalization
modifications, bus shelters, and electrical work.
Date of Issuance: 1 -Aug -07
Engineer: Corzo Castella Carballo
Thompson Selman, P.A.
901 Ponce de Leon Boulevard, Suite 900
Coral Gables, FL 33134
Engineer's Project No.: 01108-007/010
You are hereby directed to make the following changes in the Contract Documents:
Description:
Add the work covered in this change order to the Phase III work currently under construction via this contract. This change order
work was approved by Village Council on July 31, 2007. This change order is subject to each of the conditions which
are expressedly stated in the Village Council Resolution which approved this change order, as if set out in full herein.
Summary of Additional Work:
Work for this Change Order comprises demolition, drainage, curb, paver, sidewalk and asphalt work along the north side of
Harbor Drive along the yacht Club frontage (Hacienda Canal to Woodcrest Road).
Purpose of Change Order:
To incorporate the above described work as approved by Village Council.
Attachments (List of documents supporting change):
1, M. Vila proposal dated 7/13/07.
CHANGE IN CONTRACT PRICE:
Original Contract Price:
$4,778,621.35
Original Contract Time:
CHANGE IN CONTRACT TIME:
330 DAYS
Previous Change Orders:
$5,652,760,13
Net Change from Previous Orders:
558 DAYS
Contract Price Prior to this Change Order:
$10,431,381.48
Contract Time Prior to this Change
Order:
888 DAYS
Net Increase of this Change Order:
$178,827,57
Net Increase of this Change
Order:
0 DAYS
Contract Price with all approved Change Orders:
$10,610,209.05
Contract Time with all approved
Original Contract Completion
New Contract Completion date:
Change Orders:
888 DAYS
date: 6/9/2006
12/19/2007
Recommend Approval:
Approved:
Approved:
Engineer
Ramon Castella, P.E.
Owner S34 Kutidol c1M.k
Acirni Village Manager
Contractor
Miguel Vila
L:/Cterlcal/Projects/1108-007.0010/Miscefaneous/ChangeOrder ff8.xls
Page 1 of 1
PROPOSAL
Quote To:
1' one:
114,15,1,
ITEM
M. VILA & A
SOCIATES, INC.
12097 NW 98th Avers ' e
Hialeah Gardens FL. 3018
Contact: Miguel Vila
Phone: (305) 821.1225
Fax: (305) 826-0004
C3TS
Attn: Ramon Castelia
10 Mobilization
Job Name:
Date of Plans:
Revision Date:
Harbor Dr. improvements PH 1
DESCRIPTION
20 MOT
30 Existing Conc Sidewalk Demolition
35 Existing Cone Curb Demolition
40 Type "P" Catch Basin
QUANTITY UNIT
UNIT PRICE AMOUNT
1.00 LS
18,581.760 18,581.76
1.00 LS
4,663.00 SF
40.00 LF
50 Convert Exist Catch Basin to Manhol4
60 15" RCP Solid Pipe
70 Core Existing Structure
72 Concrete Flume
855.000
1.010
4.170
855.00
4,709.63
166.80
1.00 EA 2,909,290
2,909.29
1.00 EA Z072.260
2,072.26
10,00 LF
75 Adjust Exist ManholeNalve
76 Install FPL Conduit (Pipe Furnish by FPL)
77 Furnish & Install 4" PVC Sleeves
1.00 EA
155.410
1,554,10
950.260
950.26
1.00 EA
2.00 EA
529.460 529.46
225.740 451.48
1,800.00 LF
78 Asphalt Restoration at Driveways
80 Conc Curb & Gutter (Type "F")(Coioi)
90 Conc Valley Gutter (Color)
110 4" Conc Sidewalk (Color)
115 6" Conc Sidewalk (Color)
120 Cone Header Band (Color)
250.00 LF
22.450 40,410.00
29.320
7,330.00
84.00 SY
56.770
4,768.68
830.00 LF
206.00 LF
5.096.00 SF
1,080.00
22.510 18,683.30
19.970 4,113.82
5.080 25,887.68
SF
130 Pavers over 8" Limvrock, 1" Sand
145 New Asphalt Driveways w/8" Limergck & 1" Asphalt 404.00
150 1" Asphalt Overlay T 1,883.00
160 WALLS & COLUMNS AT PLAZA
65.00 LF
475,00 SF
7.710
24.020
7,000
8,326.80
1,561.30
3,325.00
GRAND TOTAL
NOTES:
1.
1.00
SY
SY
LS
32.480
6.000
13,121.92
11,298.00
7,221.030 7,221.03
$178,827.57
Page 1 of 1
to/t0 3Etid