HomeMy Public PortalAboutMaster Plan EARF he Village of Key Biscayne f I Master Plan Evaluation and Appraisal Report adopted July 2006 revised April 2007 Village of Key Biscayne Master Plan Evaluation and Appraisal Report Prepared with the assistance of Wallace Roberts a Todd, LLC Wallace Roberts & Todd, LLC ij VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Acknowledgements Village of Key Biscayne Residents, Property Owners, and Business Owners Vision Plan and Evaluation and Appraisal Report (EAR) Committee Edward Easton, Chair Alan Fein, Vice Chair Luis Arrondo Milt Berg Willie Borroto Martha Broucek Frank Caplan Bonnie Cooper Nancy Doke -Harrison Rachel Fried Dr. Henny Groschel-Becker Matthias Kammerer Debborah de Leon Dr. Bob Maggs Dr. Jorge E. Mendia Edward Meyer Ana Rasco Veronica Scharf -Garcia Village Council Robert Oldakowski, Mayor Robert L. Vernon, Vice Mayor Enrique Garcia, Councilmember Jorge E. Mendia, Councilmember Patricia Weinman, Councilmember Stephen Liedman, Councilmember Thomas Thornton, Councilmember Village Staff Jacqueline R. Menendez, Village Manager Jud Kurlancheek, AICP, Director of Building, Zoning and Planning Stephen Helfman, Weiss, Serota, Helfman et. al., P.A. Conchita H. Alvarez, CMC, Village Clerk Consultants Wallace Roberts & Todd, LLC Wallace Roberts & Todd, LLC iii VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Adopted July 2006, revised April 2007 TABLE OF CONTENTS Letters of Transmittal 1 Village Council Adoption Resolution 9 Executive Summary 13 1. Introduction 17 a. Master Plan and Initial EAR 17 b. Profile of the Community. 17 c. Purpose of the EAR. 19 d. Summary of EAR Requirements and Process. 19 e. Process for Public Involvement 21 f. Key Biscayne 2020 Vision. 22 2. Community -Wide Assessment 31 a. Population Growth and Changes in Land Area 31 b. Ethnicity and Race Components. 32 c. Population Projections. 33 d. Extent of Vacant and Developable Land 35 e. Location of Development in Relation to Master Plan. 37 f. Infrastructure Levels of Service. 39 (1) Transportation 39 (2) Sanitary Sewer and Potable Water 41 (3) Solid Waste Management 45 g. Coordination of Land Use and Public School Planning. 46 h. Coastal High -Hazard Area development mitigation strategies 48 3. Assessment of Master Plan Elements 50 a. Future Land Use 50 (1) Purpose of the Future Land Use Plan. 50 (2) Summary Assessment 50 (3) Recommended Amendments to the Future Land Use Element. 50 (4) Evaluation of Goals, Objectives, and Policies of the Traffic Circulation Plan 52 (5) Future Land Use Plan Land Development Code Ordinances 52 b. Traffic Circulation .59 (1) Purpose of the Traffic Circulation Plan. 59 (2) Summary Assessment 59 (3) Recommended Amendments to the Traffic Circulation Element. 59 (4) Evaluation of Goals, Objectives, and Policies of the Traffic Circulation Plan. 61 Wallace Roberts & Todd, LLC iv VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN (5) Traffic Circulation Plan Land Development Code Ordinances 61 c. Housing 63 (1) Purpose of the Housing Plan 63 (2) Summary Assessment .63 (3) Recommended Amendments to the Housing Element 63 (4) Evaluation of Goals, Objectives and Policies of the Housing Plan 65 (5) Housing Plan Land Development Code Ordinances 65 d. Infrastructure 67 (1) Purpose of the Infrastructure Plan. 67 (2) Summary Assessment 67 (3) Recommended Amendments to the Infrastructure Element 67 (4) Evaluation of Goals, Objectives, and Policies of the Infrastructure Plan. 68 (5) Infrastructure Plan Land Development Code Ordinances. 68 e. Conservation and Coastal Management 71 (1) Purpose of Conservation and Coastal Management Plan. 71 (2) Summary Assessment 71 (3) Recommended Amendments to the Conservation and Coastal Management Element 71 (4) Evaluation of Goals, Objectives, and Policies of the Conservation and Coastal Management Plan. 72 (5) Conservation and Coastal Management Plan Land Development Code Ordinances. 72 f. Recreation and Open Space 79 (1) Purpose of Recreation and Open Space Plan 79 (2) Summary Assessment 79 (3) Recommended Amendments to the Recreation and Open Space Element 79 (4) Evaluation of Goals, Objectives, and Policies of the Recreation and Open Space Element 80 (5) Recreation and Open Space Plan Land Development Code Ordinances. 80 g. Intergovernmental Coordination 82 (1) Purpose of Intergovernmental Coordination Plan 82 (2) Summary Assessment 82 (3) Recommended Amendments to the Intergovernmental Coordination Element. 82 (4) Evaluation of Goals, Objectives, and Policies of the Intergovernmental Coordination Plan 83 (5) Intergovernmental Coordination Plan Land Development Code Ordinances 84 h. Capital Improvements 86 (1) Purpose of Capital Improvements Plan 86 (2) Summary Assessment 86 (3) Recommended Amendments to the Capital Improvements Element. 89 (4) Evaluation of Goals, Objectives, and Policies of the Capital Improvements 89 (5) Capital Improvements Plan Land Development Code Ordinances. 89 4. Major Local Issues 93 Wallace Roberts & Todd, LLC v VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN a. Definition, Preservation and Enhancement of Key Biscayne's Unique Village Character and Quality of Life 95 (1) Assessment of success in implementing Master Plan objectives related to issue.. 95 (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated 96 (3) Recommended Amendments to the Master Plan. 96 b. The Need for Additional Local Parks, Recreation Space and Open Space 97 (1) Assessment of success in implementing Master Plan objectives related to issue:. 97 (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated 102 (3) Recommended Amendments to the Master Plan. 103 c. Calusa Park, Crandon Park, Bill Baggs Cape Florida State Park and Virginia Key - Interlocal Cooperation Relative to Village Issues 104 (1) Assessment of success in implementing Master Plan objectives related to issue.. 104 (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated 105 (3) Recommended Amendments to the Master Plan 105 d. Traffic Volume, Operations and Safety 106 (1) Assessment of success in implementing Master Plan objectives related to issue.. 106 (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated 109 (3) Recommended Amendments to the Master Plan. 110 e. Implications of Redevelopment 111 (1) Assessment of success in implementing Master Plan objectives related to issue.. 112 (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated 118 (3) Recommended Amendments to the Master Plan. 119 f. Sustainability of Local Retail and Services 121 (1) Assessment of success in implementing Master Plan objectives related to issue.. 121 (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated. 122 (3) Recommended Amendments to the Master Plan. 122 g. Vulnerability to Damage from Tropical Storms and Hurricanes 122 (1) Assessment of success in implementing Master Plan objectives related to issue.. 123 (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated 125 (3) Recommended Amendments to the Master Plan. 125 h. Need to Improve or Replace Infrastructure 126 Wallace Roberts & Todd, LLC vi VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN (1) Assessment of success in implementing Master Plan objectives related to issue.. 126 (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated 130 (3) Recommended Amendments to the Master Plan 130 i. Implications of Debt Cap 131 (1) Assessment of success in implementing Master Plan objectives related to issue.. 131 (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated 132 (3) Recommended Amendments to the Master Plan. 132 j. Conservation, Coastal Management and Environmental Protection 132 (1) Assessment of success in implementing Master Plan objectives related to issue.. 132 (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated 134 (3) Recommended Amendments to the Master Plan. 134 k. Land Development in the Context of Master Plan Goals, Objectives, and Policies 135 (1) Assessment of success in implementing Master Plan 135 objectives related to issue. 135 (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated 136 (3) Recommended Amendments to the Master Plan. 136 I. Historic, Cultural and Educational Resources and Needs 137 (1) Assessment of success in implementing Master Plan objectives related to issue... 137 (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated. 138 (3) Recommended Amendments to the Master Plan. 138 5. Consistency with Florida Growth Management Laws ,.140 a. State Comprehensive Plan, Chapter 187, F.S. 140 (1) Manner of Compliance with State Comprehensive Plan Elements 140 (2) Recommended Amendments to Achieve Compliance with the State Comprehensive Plan Elements 147 b. Local Government Comprehensive Planning and Land Development Regulation Act, Chapter 163 (Part II), F.S. 148 (1) Manner of Compliance with Local Government Comprehensive Planning and Land Development Regulation Act, Chapter 163 (Part II), F.S. 148 (2) Recommended Amendments to Achieve Compliance with the Local Government Comprehensive Planning and Land Development Regulation Act, Chapter 163 (Part II), F.S. 173 c. Rule Chapter 9J-5, F.A.0 174 (1) Manner of Compliance with Chapter 9J-5, F.A.C. 174 (2) Recommended Amendments to Achieve Compliance with 9J-5 F.A.C. 199 Wallace Roberts & Todd, LLC vii VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN d. Strategic Regional Policy Plan for South. Florida. 201 (1) Manner of Compliance with Strategic Regional Policy Plan for South Florida 201 (2) Recommended Amendments to Achieve Compliance with the Strategic Regional Policy Plan for South Florida 206 6. Conclusions and Recommendations 208 a. Recommended Amendments to the Future Land Use Element 208 b. Recommended Amendments to the Traffic Circulation Element. 209 c. Recommended Amendments to the Housing Element. 210 d. Recommended Amendments to the Infrastructure Element. 211 e. Recommended Amendments to the Conservation and Coastal Management Element 212 f. Recommended Amendments to the Recreation and Open Space Element. 213 g. Recommended Amendments to the Intergovernmental Coordination Element. 214 h. Recommended Amendments to the Capital Improvements Element. 215 Wallace Roberts & Todd, LLC viii VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN TABLES: Table 1: Ethnicity Change in Key Biscayne and Miami -Dade County, 1990- 2000 Table 2: Nativity and Place of Birth, 2000 Table 3: Annual Average Change, Population Projections for Key Biscayne and Miami Dade County, 1990 to 2025 Table 4: Population Projection Comparison Between Key Biscayne and Miami -Dade County Table 5: Key Biscayne Residential Building Permits, April 2000 - April 2005 Table 6: Key Biscayne Commercial Building Permits, April 2000 — April 2005 Table 7: WASD Water System Capacity and Demand Comparison, 1995-2020 Table 8: Key Biscayne Parks and Recreation Level of Service Table 9: Parks and Recreation Facilities Counted in 2005 Level of Service Calculations Table 10: Median Household Income by Household Size in Miami -Dade County Table 11: Affordable Housing Demand in Key Biscayne Table 12: Projected Demand of Renter- and Owner -Occupied Units by Income based on AHNA Data Table 13: Substandard Housing, 2000 Table 14: Sanitary Sewer and Water Conversion Project Progress FIGURES Figure 1: Key Biscayne Future Land Use Map Figure 2: Key Biscayne Zoning Map Wallace Roberts & Todd, LLC ix VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Letters of Transmittal July 5, 2006 Theresa Manning Senior Planner South Florida Regional Planning Council 3440 Hollywood Boulevard, Suite 140 Hollywood, FL 33021 Re: Adopted Key Biscayne Evaluation and Appraisal Report Dear Ms. Manning: Enclosed is the adopted Village of Key Biscayne Evaluation and Appraisal Report. This package contains: 1 CD -Rom with the adopted EAR, advertisement for the adoption hearing, and minutes from the adoption hearing on CD -Rom The public hearing for adoption was held on April 25, 2006. A copy of the adopted EAR is also being sent to: Department of Community Affairs Florida Department Transportation District 6 South Florida Water Management District Florida Department of Environmental Protection Florida Department of State, Historical Preservation Miami -Dade County City of Miami These packages are being sent simultaneously with this transmittal to your agency. If you have questions regarding the EAR, please contact me, or our consultants Silvia Vargas or Lindsey Withrow: Jud Kurlanchek Key Biscayne Dept. of Building, Planning, and Zoning 88 West McIntyre Street Key Biscayne, FL 33149 Tel: 305.365.8908; Fax: 305.365.5556 VKBBZP aol.com Lindsey Withrow and Silvia Vargas Wallace Roberts Todd 191 Giralda Avenue, Penthouse, Coral Gables FL, 33134 Tel: 305.448.0788; Fax: 305.443.8431 Iwithrowtcxscq.wrtdesign.com; svaraas(a�cq.wrtdesign.com The report has been posted for public review on the internet and at Key Biscayne Village Hall (88 West McIntyre Street, Key Biscayne, FL), Key Biscayne Public Library (299 Crandon Boulevard, Key Biscayne, FL), and the Key Biscayne Community Center (10 Village Way, Key Biscayne, FL) between 8:30 A.M.-12:00 PM and 1:00-4:30 P.M., weekdays, Please notify us at your earliest convenience regarding the completeness of this package. Sincerely, (cam 0-2- for Jud Kurlanchek, Director of Building, Planning and Zoning Wallace Roberts & Todd, LLC 1 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN July 5, 2006 Ray Eubanks, AICP Plan Processing Team, Division of Community Planning Florida Department of Community Affairs 2555 Shumard Oak Boulevard Tallahassee, FL 32399-2100 Re: Adopted Key Biscayne Evaluation and Appraisal Report Dear Mr. Eubanks: Enclosed is the adopted Village of Key Biscayne Evaluation and Appraisal Report. The package contains: 1 hard copy of the adopted EAR, advertisement for the adoption hearing, and minutes of from the adoption hearing 2 CD-Roms with the adopted EAR, advertisement for the adoption hearing, and minutes of from the adoption hearing The public hearing for adoption was held on April 25, 2006. A copy of the adopted EAR is also being sent to: South Florida Regional Planning Council Florida Department Transportation District 6 South Florida Water Management District Florida Department of Environmental Protection Florida Department of State, Historical Preservation Miami -Dade County City of Miami These packages are being sent simultaneously with this transmittal to your agency. If you have questions regarding the EAR, please contact me, or our consultants Silvia Vargas or Lindsey Withrow: Jud Kurlanchek Key Biscayne Dept. of Building, Planning, and Zoning 88 West McIntyre Street Key Biscayne, FL 33149 Tel: 305.365.8908; Fax: 305.365.5556 VKBBZP(cr�,aol.com Lindsey Withrow and Silvia Vargas Wallace Roberts Todd 191 Giralda Avenue, Penthouse, Coral Gables FL, 33134 Tel: 305.448.0788; Fax: 305.443.8431 Iwithrow(a)cq.wrtdesign.com; svargas(a7co.wrtdesign.com The report has been posted for public review on the Internet and at Key Biscayne Village Hall (88 West McIntyre Street, Key Biscayne, FL), Key Biscayne Public Library (299 Crandon Boulevard, Key Biscayne, FL), and the Key Biscayne Community Center (10 Village Way, Key Biscayne, FL) between 8:30 A.M.-12:00 PM and 1:00-4:30 P.M., weekdays. Please notify us at your earliest convenience regarding the completeness of this package. Sincerely, Jud Kurlanchek, Director of Building, Planning and Zoning Wallace Roberts & Todd, LLC 2 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN July 5, 2006 Jim Quinn Environmental Manager Department of Environmental Protection Office of Intergovernmental Programs 3900 Commonwealth Boulevard, Mail Station 47 Tallahassee, FL 32399 Re: Adopted Key Biscayne Evaluation and Appraisal Report Dear Mr. Quinn: Enclosed is the adopted Village of Key Biscayne Evaluation and Appraisal Report. This package contains: 1 copy of the adopted EAR 1 copy of the advertisement for the adoption hearing 1 copy of the minutes of from the adoption hearing The public hearing for adoption was held on April 25, 2006. A copy of the adopted EAR is also being sent to: Department of Community Affairs South Florida Regional Planning Council Florida Department Transportation District 6 South Florida Water Management District Florida Department of State, Historical Preservation Miami -Dade County City of Miami These packages are being sent simultaneously with this transmittal to your agency. If you have questions regarding the EAR, please contact me, or our consultants Silvia Vargas or Lindsey Withrow: Jud Kurlanchek Key Biscayne Dept. of Building, Planning, and Zoning 88 West McIntyre Street Key Biscayne, FL 33149 Tel: 305.365.8908; Fax: 305.365.5556 VKBBZPaaol.com Lindsey Withrow and Silvia Vargas Wallace Roberts Todd 191 Giralda Avenue, Penthouse, Coral Gables FL, 33134 Tel: 305.448.0788; Fax: 305.443.8431 Iwithrow(c�cq.wrtdesign. com; svargas(ccq.wrtdesign.com The report has been posted for public review on the Internet and at Key Biscayne Village Hall (88 West McIntyre Street, Key Biscayne, FL), Key Biscayne Public Library (299 Crandon Boulevard, Key Biscayne, FL), and the Key Biscayne Community Center (10 Village Way, Key Biscayne, FL) between 8:30 A.M.-12:00 PM and 1:00-4:30 P.M., weekdays. Please notify us at your earliest convenience regarding the completeness of this package. Sincerely, 0-4- for Jud Kurlanchek, Director of Building, Planning and Zoning Wallace Roberts & Todd, LLC 3 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN July 5, 2006 Susan Harp Historic Preservation Planner Department of State Bureau of Historic Preservation 500 South Bronough Street Tallahassee, FL 32399-0250 Re: Adopted Key Biscayne Evaluation and Appraisal Report Dear Ms. Harp: Enclosed is the adopted Village of Key Biscayne Evaluation and Appraisal Report. contains: This package 1 copy of the adopted EAR 1 copy of the advertisement for the adoption hearing 1 copy of the minutes of from the adoption hearing The public hearing for adoption was held on April 25, 2006. A copy of the adopted EAR is also being sent to: Department of Community Affairs South Florida Regional Planning Council Florida Department Transportation District 6 South Florida Water Management District Florida Department of Environmental Protection Miami -Dade County City of Miami These packages are being sent simultaneously with this transmittal to your agency. If you have questions regarding the EAR, please contact me, or our consultants Silvia Vargas or Lindsey Withrow: Jud Kurlanchek Key Biscayne Dept. of Building, Planning, and Zoning 88 West McIntyre Street Key Biscayne, FL 33149 Tel: 305.365.8908; Fax: 305.365.5556 VKBBZP(a,aol.com Lindsey Withrow and Silvia Vargas Wallace Roberts Todd 191 Giralda Avenue, Penthouse, Coral Gables FL, 33134 Tel: 305.448.0788; Fax: 305.443.8431 lwithrow(a co.wrtdesign.com; svargas(a�cq.wrtdesign.com The report has been posted for public review on the internet and at Key Biscayne Village Hall (88 West McIntyre Street, Key Biscayne, FL), Key Biscayne Public Library (299 Crandon Boulevard, Key Biscayne, FL), and the Key Biscayne Community Center (10 Village Way, Key Biscayne, FL) between 8:30 A.M.-12:00 PM and 1:00-4:30 P.M., weekdays. Please notify us at your earliest convenience regarding the completeness of this package. Sincerely, Jud Kurlanchek, Director of Building, Planning and Zoning Wallace Roberts & Todd, LLC 4 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN July 5, 2006 Karen McGuire Planning FDOT, District Six 1000 NW 111" Avenue Miami, FL 33172 Re: Adopted Key Biscayne Evaluation and Appraisal Report Dear Ms. McGuire: Enclosed is the adopted Village of Key Biscayne Evaluation and Appraisal Report. This package contains: 1 copy of the adopted EAR 1 copy of the advertisement for the adoption hearing 1 copy of the minutes of from the adoption hearing The public hearing for adoption was held on April 25, 2006. A copy of the adopted EAR is also being sent to: Department of Community Affairs South Florida Regional Planning Council South Florida Water Management District Florida Department of Environmental Protection Florida Department of State, Historical Preservation Miami -Dade County City of Miami These packages are being sent simultaneously with this transmittal to your agency. If you have questions regarding the EAR, please contact me, or our consultants Silvia Vargas or Lindsey Withrow: Jud Kurlanchek Key Biscayne Dept. of Building, Planning, and Zoning 88 West McIntyre Street Key Biscayne, FL 33149 Tel: 305.365.8908; Fax: 305.365.5556 VKBBZP(cx�aol.com Lindsey Withrow and Silvia Vargas Wallace Roberts Todd 191 Giralda Avenue, Penthouse, Coral Gables FL, 33134 Tel: 305.448.0788; Fax: 305.443.8431 Iwithrow(cq.wrtdesign.com; svargas(c�cq.wrtdesign.com The report has been posted for public review on the internet and at Key Biscayne Village Hall (88 West McIntyre Street, Key Biscayne, FL), Key Biscayne Public Library (299 Crandon Boulevard, Key Biscayne, FL), and the Key Biscayne Community Center (10 Village Way, Key Biscayne, FL) between 8:30 A.M.-12:00 PM and 1:00-4:30 P.M., weekdays. Please notify us at your earliest convenience regarding the completeness of this package. Si ncerely, re- Jud Kurlanchek, Director of Building, Planning and Zoning Wallace Roberts & Todd, LLC 5 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN July 5, 2006 P.K. Sharma Lead Planner South Florida Water Management District Post Office Box 24680 West Palm Beach, FL 33416-4680 Re: Adopted Key Biscayne Evaluation and Appraisal Report Dear Mr. Sharma: Enclosed is the adopted Village of Key Biscayne Evaluation and Appraisal Report. This package contains: 1 CD -Rom with the adopted EAR, advertisement for the adoption hearing, and minutes from the adoption hearing on CD -Rom The public hearing for adoption was held on April 25, 2006. A copy of the adopted EAR is also being sent to: Department of Community Affairs South Florida Regional Planning Council Florida Department Transportation District 6 Florida Department of Environmental Protection Florida Department of State, Historical Preservation Miami -Dade County City of Miami These packages are being sent simultaneously with this transmittal to your agency. If you have questions regarding the EAR, please contact me, or our consultants Silvia Vargas or Lindsey Withrow: Jud Kurlanchek Key Biscayne Dept. of Building, Planning, and Zoning 88 West McIntyre Street Key Biscayne, FL 33149 Tel: 305.365.8908; Fax: 305.365.5556 VKBBZP@aol.com Lindsey Withrow and Silvia Vargas Wallace Roberts Todd 191 Giralda Avenue, Penthouse, Coral Gables FL, 33134 Tel: 305.448.0788; Fax: 305.443.8431 Iwithrow(cq.wrtdesign.com; svargas(a?.cq.wrtdesicn.com The report has been posted for public review on the internet and at Key Biscayne Village Hall (88 West McIntyre Street, Key Biscayne, FL), Key Biscayne Public Library (299 Crandon Boulevard, Key Biscayne, FL), and the Key Biscayne Community Center (10 Village Way, Key Biscayne, FL) between 8:30 A.M.-12:00 PM and 1:00-4:30 P.M., weekdays. Please notify us at your earliest convenience regarding the completeness of this package. Sincerely, Jud Kurlanchek, Director of Building, Planning and Zoning Wallace Roberts & Todd, LLC 6 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN July 5, 2006 Mark Woerner Chief of Metropolitan Planning Section Miami -Dade County Planning and Zoning 111 N.W. 1st Street, Suite 1210 Miami, FL 33128 Re: Adopted Key Biscayne Evaluation and Appraisal Report Dear Mr. Woerner: Enclosed is the adopted Village of Key Biscayne Evaluation and Appraisal Report. This package contains: 1 CD -Rom with the adopted EAR, advertisement for the adoption hearing, and minutes from the adoption hearing on CD -Rom The public hearing for adoption was held on April 25, 2006. A copy of the adopted EAR is also being sent to: Department of Community Affairs South Florida Regional Planning Council Florida Department Transportation District 6 South Florida Water Management District Florida Department of Environmental Protection Florida Department of State, Historical Preservation City of Miami These packages are being sent simultaneously with this transmittal to your agency. If you have questions regarding the EAR, please contact me, or our consultants Silvia Vargas or Lindsey Withrow: Jud Kurlanchek Key Biscayne Dept. of Building, Planning, and Zoning 88 West McIntyre Street Key Biscayne, FL 33149 Tel: 305.365.8908; Fax: 305.365.5556 VKBBZPRaol.com Lindsey Withrow and Silvia Vargas Wallace Roberts Todd 191 Giralda Avenue, Penthouse, Coral Gables FL, 33134 Tel: 305.448.0788; Fax: 305.443.8431 Iwithrow(ucq.wrtdesign.com; svargasRcq.wrtdesign.com The report has been posted for public review on the internet and at Key Biscayne Village Hall (88 West McIntyre Street, Key Biscayne, FL), Key Biscayne Public Library (299 Crandon Boulevard, Key Biscayne, FL), and the Key Biscayne Community Center (10 Village Way, Key Biscayne, FL) between 8:30 A.M.-12:00 PM and 1:00-4:30 P.M., weekdays. Please notify us at your earliest convenience regarding the completeness of this package. Sincerely, for Jud Kurlanchek, Director of Building, Planning and Zoning Wallace Roberts & Todd, LLC 7 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN July 5, 2006 Harold Ruck Chief of Community Planning Planning Department, City of Miami 444 SW 2nd Avenue, 3rd Floor Miami, FL 33130 Re: Adopted Key Biscayne Evaluation and Appraisal Report Dear Mr. Ruck: Enclosed is the adopted Village of Key Biscayne Evaluation and Appraisal Report. This package contains: 1 CD -Rom with the adopted EAR, advertisement for the adoption hearing, and minutes from the adoption hearing on CD -Rom The public hearing for adoption was held on April 25, 2006. A copy of the adopted EAR is also being sent to: Department of Community Affairs South Florida Regional Planning Council Florida Department Transportation District 6 South Florida Water Management District Florida Department of Environmental Protection Florida Department of State, Historical Preservation Miami -Dade County These packages are being sent simultaneously with this transmittal to your agency. If you have questions regarding the EAR, please contact me, or our consultants Silvia Vargas or Lindsey Withrow: Jud Kurlanchek Key Biscayne Dept. of Building, Planning, and Zoning 88 West McIntyre Street Key Biscayne, FL 33149 Tel: 305.365.8908; Fax: 305.365.5556 VKBBZPCcaol.com Lindsey Withrow and Silvia Vargas Wallace Roberts Todd 191 Giralda Avenue, Penthouse, Coral Gables FL, 33134 Tel: 305.448,0788; Fax: 305.443.8431 Iwithrow(cr�cq.wrtdesign.com; svargas(a cq.wrtdesign.com The report has been posted for public review on the internet and at Key Biscayne Village Hall (88 West McIntyre Street, Key Biscayne, FL), Key Biscayne Public Library (299 Crandon Boulevard, Key Biscayne, FL), and the Key Biscayne Community Center (10 Village Way, Key Biscayne, FL) between 8:30 A.M.-12:00 PM and 1:00-4:30 P.M., weekdays. Please notify us at your earliest convenience regarding the completeness of this package. Sincerely, Jud Kurianchek, Director of Building, Planning and Zoning Wallace Roberts & Todd, LLC 8 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Village Council Adoption Resolution VILLAGE OF KEY BISCAYNE Office of the Village Clerk Village Council Robot Otdakoonki, Mayor Robert L. Vernon, Vice Mayor Enrique Garcia Steve liedrn n Jorge E. Mendia Thomas Thornton Watricia Weinman Village Clerk Conchita H. Alvarez, CMC CERTIFICATION STATE OF FLORIDA COUNTY OF MIAMI-DADE I, Conchita H. Alvarez, duly appointed Village Clerk of the Village of Key Biscayne, Florida, do hereby certify that the attached is a true and correct copy of; Resolution No. 2006-23 dopted by the Village Council on June 13, 2006. IN WITNESS WHEREOF, l hereunto set my hand and affix the Seal of the Village of Key Biscayne, Florida, this 22nd day of June, 2006. hita H. Alvarez, ClvMC ge Clerk age of Key Biscayne, Florida 88 West McIntyre Street • Suite 220 • Key Biscayne, Florida 33149 • (305) 365-5506 • Fax (305) 365-8914 moor $7tTE ENT TO EHOVIDL A. 5)4C. QUALITY rq,Xpic:MTY eN,INO,r T tint. Au. ISLINLJLNI THC.OUCH NN?ON\IELL t.twERNME.^r'i • uninv. ryb4way„e nE�u Wallace Roberts & Todd, LLC 9 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN RESOLUTION NO. 24126-23 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, ADOPTING THE EVALUATION AND APPRAISAL REPORT FOR THE VILLAGE OF KEY BISCAYNE MASTER PLAN; STATING THE INTENT OF THE VILLAGE COUNCIL TO AMEND THE MASTER PLAN BASED UPON RECOMMENDATIONS CONTAINED IN THE REPORT; APPROVING TRANSMITTAL OF THE REPORT TO THE DEPARTMENT OF COMMUNITY AFFAIRS IN ACCORDANCE WITH SECTION 163.3191, FLORIDA STATUTES; PROVIDING FOR EFFECTIVE DATE. WHEREAS, pursuant to Chapter 163, Part 2, Florida Statutes and Chapters 9J-5, 97-11 and 9J-12, Florida Administrative Code (F.A.C.), the Village of Key Biscayne Master Plan (the "Plan") was adopted via Ordinance No. 95-8 on September 12, 1995; and WHEREAS, the Florida Legislature intends that local planning be a continuous and ongoing process; and WHEREAS, Section 163.3191, Florida Statutes, directs local governments to periodically assess the success or failure of their adopted comprehensive plans to adequately address changing conditions and state policies and rules; and WHEREAS, Section 163.3191, Florida Statutes, directs local governments to adopt an evaluation and appraisal report once every seven (7) years assessing the progress in implementing the local government's comprehensive plan; and WHEREAS, the Village Council, in its capacity as the Local Planning Agency (the "LPA") has prepared and completed an Evaluation and Appraisal Report (the "EAR") for the Plan as provided for in Exhibit "A"; and Wallace Roberts & Todd, LLC 1 0 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN WHEREAS, on April 25, 2006, the LPA held an advertised public hearing on the proposed EAR, provided for participation by the public in the process and rendered its recommendations to the Village Council; and WHEREAS, the Village Council has reviewed the EAR, held an advertised public hearing, and provided for comments and public participation in the process in accordance with the requirements of state law and the procedures adopted for public participation in the planning process. NOW, THEREFORE, IT IS HEREBY RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYN'E, FLORIDA, AS FOLLOWS: Section 1, ecitals Mooted. That each of the recitals stated above is hereby adopted and confirmed. Section 2. Adoption, That the Evaluation and Appraisal Report, attached as Exhibit "A", is hereby adopted and approved for transmittal to the Department of Community Affairs for the purpose of a sufficiency review in accordance with Section 163.3191, Florida Statutes. Section 3. Intentto Amend Master Plan. That the Village Council does hereby state its intention to amend the Village of ley Biscayne Master Plan in accordance with the recommendations contained in the Evaluation and Appraisal Report. Section 4, Transmittal, That the Village Clerk or his or her designee is hereby directed to make the appropriate transmittals as required by law. Section 5. Effective D Ile, That this Resolution shall be effective immediately upon adoption hereof. 2 Wallace Roberts & Todd, LLC 11 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN PASSED ANA ADOPTED this 13th day of June, 2006. /gyp cd-k.ce4 MAYOR ROBERT OLDAKOWSKI CINCHITA H. ALVAREZ, CMC, VILLAGE CLERK APPROVED AS TO FORM AND LEGAL SUFFICIENC VILLAGE ATTORNEY F:1100\1030011RcsoluuoneCoancll approval of EAR 3.27.06.doc 3 Wallace Roberts & Todd, LLC 12 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Executive Summary The Village of Key Biscayne Master Plan was adopted on September 12, 1995, and accepted by the Department of Community Affairs on October 20, 1995. Preparation of Key Biscayne's first Evaluation and Appraisal Report (EAR) reveals that the Village has diligently implemented the Master Plan's goals, policies, and objectives with few exceptions. The EAR Process Key Biscayne's first EAR was prepared and adopted pursuant to Florida Statutes, Section 163.3191. This EAR was developed by a Council -appointed committee of residents, referred to as the 2020 Vision Plan/Evaluation and Appraisal Report Committee, with the assistance of the Building, Zoning and Planning, Finance; Public Works, and Parks and Recreation Department staffs, as well as the Village Manager, Village Attorneys and other Village departments, all supported by the active and engaged leadership and direction of the Village Council. In addition, consultants engaged by the Village, Wallace, Roberts & Todd, LLC, provided valuable background, structure and advice. 2020 Vision/EAR Committee Members represented a broad array of local constituencies and viewpoints, and also added relevant and valuable experience, expertise and background to the EAR process. The Committee, and a sub- committee selected to address issues related to the EAR in particular, met more than a dozen times over a period of 10 months to complete this task. Each Committee and Sub -Committee meeting was open to public attendance and comment. Further, the Committee reached out actively to the community at large, and implemented a vigorous public participation program in addressing the EAR. The result were vigorous, informed and wide -reaching debates, touching on virtually all aspects of the Master Plan, and on residents' individual and collective sensibilities about Key Biscayne, and future challenges and opportunities. This EAR was undertaken simultaneously and on a parallel track with a local "visioning" and planning exercise referred to as "2020 Vision". The 2020 Vision exercise and EAR work were mutually interconnected and supportive. The work and focus of each informed the other. The 2020 Vision Statement was adopted by the Village Council as an exercise in self-criticism and self -definition, and as a source of guidance for at least a fifteen year time horizon. The 2020 Vision Statement is printed in full in the EAR, and its tenets and possible planning implications remain under consideration for possible inclusion in future Master Plan amendments. Wallace Roberts & Todd, LLC 13 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN EAR Findings The EAR addresses the inquiries and follows the requirements specified in Florida Statutes, Section 163.3191, manifesting particular attention to the list of Major Issues presented to the Florida Department of Community Affairs (DCA) in a Letter of Understanding on March 7, 2005 and incorporating recommendations included in the DCA's response. Following an introduction, which includes a reprint of the 2020 Vision Statement, the EAR assesses current and projected conditions and changes in the community since adoption of the 1995 Master Plan. Key points include: • While Key Biscayne is an area of moderate population growth in comparison to other municipalities in Miami -Dade County, its growth rate is dropping and its population is predicted to level by 2010 according to Miami -Dade County projections. • The percentage of people over the age of 65 has dropped over the past decade as the number of family households with children under the age of 18 has grown. In the report's evaluation of the coordination of land use and public school planning, it found that increased County -wide demand on educational facilities and services emphasizes the need for cooperation and synchronization between jurisdictions. • No land has been annexed, no land is available for annexation, and no vacant lots remain in Key Biscayne. Future growth will occur in the form of redevelopment. The composition of the Village will continue to evolve as older housing stock is knocked down and replaced by larger dwelling units, a trend that is evident today and likely to continue until around 2047. • All new construction and redevelopment since 1995 has occurred in accordance with the Future Land Use Map and complies with FEMA and Coastal High Hazard Area regulations. • Assessments of current and forecasted infrastructure levels of service for transportation, sanitary sewer and potable water, and solid waste management reveal facilities adequately equipped to meet predicted demand and emphasize the need for continued interlocal cooperation. The EAR then analyzes in detail each element of the 1995 Master Plan, including successes, impediments and status, taking into account past implementation, pending work and changed conditions. Overall, the Village has very successfully implemented the Plan, either already completing projects or on track to do so. As a prelude to specific Master Plan amendments proposed in the EAR, we then analyze our principal local issues, from today's perspective but also in terms of the 1995 Master Plan objectives, policies and goals. These issues include: Wallace Roberts & Todd, LLC 14 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Definition, Preservation and Enhancement of Key Biscayne's Unique Village Character and Quality of Life. • The Need for Additional Local Parks, Recreation Space and Open Space. • Calusa Park, Crandon Park, Bill Baggs Cape Florida State Park and Virginia Key - Interlocal Cooperation Relative to Village Issues. • Implications of Redevelopment. • Traffic Volume, Operations and Safety. • Sustainability of Local Retail and Services. • Vulnerability to Damage from Tropical Storms and Hurricanes. • Need to Improve or Replace Infrastructure. • Implications of Debt Cap. • Conservation, Coastal Management and Environmental Protection. • Land Development in the Context of Master Plan Goals, Objectives, and Policies. • Historic, Cultural and Educational Resources and Needs. We then consider the extent to which our Master Plan is consistent with other Florida growth management laws, based on changes since 1995. The Master Plan is substantially in compliance with relevant changes; where not, modifications to the Master Plan have been suggested. Finally, we address our conclusions and various recommendations for Master Plan amendments. In addition to updating dates, removing obsolete policies and objectives, and making modifications to the Future Land Use map, our recommendations include: • Undertake studies of traffic congestion and levels of service. • Create a Transportation Element, which requires coordinating the Future Land Use Map and creating numerical indictors to measure achievement of mobility goals. • Place a greater emphasis on the Village's commitment to exploring innovative solutions for the provision of affordable housing, including exploring housing subsidy programs and housing feed trust fund and coordinating with the City of Miami and Miami -Dade County, and the South Florida Regional Planning Council. • Explore new ways to integrate green technologies into public facilities. Wallace Roberts & Todd, LLC 15 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Update the Master Plan within 18 months of the South Florida Water Management District updating the regional water supply plan. • Coordinate with the Miami -Dade Water and Sewer Authority regarding the availability of water to serve all proposed development projects. • Consider means of revenue -raising to support public trust acquisition of recreation lands and open space and preservation of historic landmarks. • Prepare a strategy for buying land in the Village to be dedicated as recreational space. • Negotiate use agreements with Miami -Dade County and the City of Miami for access to parkland outside Key Biscayne • Review and revise current regulations to require that any future development proposed in the Village that contains apartments or hotel condominiums provide open space to serve the demand created by the population increase. • Explore instituting an impact fee for new single-family detached and residential duplex construction • Establish criteria for updating and prioritizing projects within the CIP tied to concurrency requirements. We conclude by highlighting the ongoing nature of this work, as we continue discussion about our 2020 Vision and related ideas to protect and improve the characteristics of and aspirations for Key Biscayne that we have identified as defining and valuable. Wallace Roberts & Todd, LLC 16 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 1. Introduction a. Master Plan and Initial EAR The Village of Key Biscayne was incorporated on June 23, 1991. Previously, the community was part of unincorporated Miami -Dade County. The Village of Key Biscayne Master Plan was adopted by the Village Council, by Ordinance 95-8, on September 12, 1995, and accepted by the Department of Community Affairs on October 20, 1995. In anticipation of incorporation, committees of interested residents actively studied Key Biscayne and growth management principles beginning in approximately the fall of 1990. Active public participation resulted, focusing especially on various qualities that were thought to define Key Biscayne as it was in the past, as it had become, and as it could be in the future. Broad public interest in these questions continues today. This is Key Biscayne's first Evaluation and Appraisal Report (EAR), developed pursuant to F.S., Section 163.3191. This EAR was developed with the active participation and assistance of a committee of residents appointed by the Village Council, called the 2020 Vision/EAR Committee, and other residents, as well as Wallace Roberts & Todd, consultants to the Village. b. Profile of the Community. Bounded by Crandon Park to the north and Bill Beggs Cape Florida State Park to the south, the Village of Key Biscayne occupies approximately 1.5 square miles in the center of Key Biscayne, the southernmost sandy barrier island in a chain of islands extending along the Atlantic coast of the United States. The island's deep sands overlying coral rock differentiate Key Biscayne, positioned just southeast of downtown Miami, from the rocky Florida Keys and support distinctive beach, dune, hammock and mangrove ecosystems. Due to its relatively low elevation and direct exposure to the Atlantic Ocean, Key Biscayne is in a high -risk flood zone; it is classified by FEMA as flood elevation AE and often one of the first areas in Miami -Dade County to be evacuated in a storm emergency. The only vehicular access to and from the mainland is via the four -to -six lane Rickenbacker Causeway. The Village has experienced storm damage in the past, most recently as a result of Hurricane Wilma in October 2005. Land area covers 1.28 square miles, water area covers 0.12 square miles with a total incorporated area of 1.39 square miles. Wallace Roberts & Todd, LLC 17 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN The transformation of Key Biscayne from a coconut plantation into a quiet Miami bedroom community bordered by parks began with the dedication of the first Rickenbacker Causeway (a drawbridge) and Crandon Park in November 1947. The southern two-thirds of the island were platted in several subdivisions with different lot sizes and restrictions. The Mackie Construction Company and other developers built hundreds of modestly priced one-story homes in the 1950s and 1960s that were purchased primarily by WWII veterans and young families. The Mackles built an elementary school and Key Biscayne Hotel and Villas, which catered to tourists. The southern third of the island escaped development and became Cape Florida State Park in January 1967. Key Biscayne received international attention in 1969 when then U.S. President Richard Nixon established his "Florida White House" complex on the bay side of the island. The publicity of Presidential visits through 1973 sparked awareness of Key Biscayne as a destination. An increase in development and real estate value was triggered by the 1987 opening of the high -span William Powell Bridge, which replaced an existing drawbridge. By the late 1980s, Key Biscayne had become a mature suburb within unincorporated Miami -Dade County, known for its quiet natural beauty and small-town character. The Village of Key Biscayne was incorporated on June 23, 1991 after nine years of citizen effort toward self -governance. The vote to incorporate capped a long effort to obtain better services from the County, improved fiscal control, and local control over growth within the Village. A charter with a Council -Manager form of government was adopted to provide for local control over development, improved infrastructure and services, and better governmental process. Many improvements that were desired in 1991 have been achieved through the efforts of local government as well as the determination and commitment of Key Biscayne residents. The effectiveness of self -governance was validated by the creation of new, first-rate Fire Rescue and Police Departments and, by 1996, a Zoning Code tailored to meet the development needs of the Village. In 1995, after years of public education and participation, the Village of Key Biscayne adopted its first Master Plan, which identified deficiencies and needed or desired improvements. Many of the Plan's goals, objectives, and policies have been realized. In addition to excellent fire - rescue and police services, the Village has an attractive (and debt -free) Village Green; more local parks; a renourished beach with protective dune systems; a vastly improved stormwater drainage system; an expanded K- 8 public school; an architecturally distinguished Civic Center complex; a new, highly -used Community Center; reduced Village -wide speed limits; street -by -street tree plantings and landscaping, street lights and pavers, Wallace Roberts & Todd, LLC 18 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN sidewalks, landscaped traffic calming devices; and the lowest millage rate of any municipality in Miami -Dade County. The Village of Key Biscayne in 2005 enjoys outstanding natural beauty and the best of both worlds: a sense of separateness as a serene, secure island sanctuary coupled with convenient access to services, activities and amenities on the mainland. Key Biscayne's popularity as a destination for both daily and seasonal tourists will continue. Residential, commercial and hotel properties are largely built out, yet the community is changing again via redevelopment. c. Purpose of the EAR. The purpose of the EAR is to evaluate and assess the effectiveness, successes and failures of a local municipality's master plan in accomplishing its adopted objectives, policies, and standards as well as to suggest ensuant changes or amendments. The State of Florida's local government master planning law, Chapter 163, Part 2, Florida Statutes (F.S.) requires that all counties and municipalities throughout Florida maintain master planning programs to guide their long-range growth and development, and that master planning should be a continuous and ongoing process. As a part of this process, local governments are required to monitor numerous community characteristics relating to development, provision of services, environmental protection, and governmental activities, and to periodically prepare Evaluation and Appraisal Reports addressing implementation of the master plan. Moreover, the law provides that the EAR process shall be the principal process for updating local master plans to respond to changes in state, regional, and local policies on planning and growth management, and changing conditions and trends, to ensure effective intergovernmental coordination, and to identify major issues regarding the community's achievement of its goals. d. Summary of EAR Requirements and Process. As required by Sec. 163.3191(2), F.S., the EAR must address the following items: 1. Major local issues as identified by the local government with input from state agencies, regional agencies, adjacent local governments and the public, and the potential social, economic, and environmental impacts of these issues. 2. Location of existing development with respect to the location of development as anticipated in the Key Biscayne Master Plan, as Wallace Roberts & Todd, LLC 19 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN adopted in 1995; population growth and changes in land area, including any annexations, and the extent of vacant and developable land. 3. Effect on the Master Plan of changes to the state comprehensive plan, Chapter 163, Part 2; Chapter 9J-5, Florida Administrative Code (FAC); and the strategic regional policy plan, since the adoption of the Master Plan. 4. Whether Master Plan objectives within each element have been achieved with respect to major local issues. 5. The extent to which unanticipated and unforeseen problems or opportunities have occurred since the 1995 Master Plan adoption, or resulted in problems or opportunities with respect to the major local issues and their social, economic, and environmental impacts. 6. Identification of any corrective actions or measures, including whether plan amendments are recommended, to address the major local issues identified and analyzed in the EAR. 7. Coordination of the Master Plan with existing public schools and those identified in the applicable educational facilities plan adopted pursuant to Chapter 1013.35, F.S.; assessment of the success or failure of the coordination of the future land use map and associated planned residential development with public schools, and joint decision -making processes between the local government and the school board toward establishing appropriate population projections, and the planning and siting of public school facilities. 8. Consideration of the appropriate water management district's regional water supply plan, and revision of the potable water element to include a work plan covering at least a 10 -year planning horizon for building any water supply facilities identified as necessary to serve existing and new development, and for which the local government is responsible. 9. Evaluation of whether any reductions in land use density within the coastal high -hazard area impairs the property rights of current residents upon redevelopment, including that following a natural disaster. 10. Process for public involvement. F.S. Section 163.3191 further specifies the procedures and criteria for the preparation, transmittal, adoption, and sufficiency review of local government's EARs and EAR -based Master Plan amendments, if any. By agreement with the Department of Community Affairs (DCA), Key Biscayne's adopted EAR will be transmitted to the South Florida Regional Wallace Roberts & Todd, LLC 20 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Planning Council (SFRPC) for sufficiency review. DCA will retain ultimate review authority. If the EAR recommends Master Plan amendments, such amendments will be consistent with the findings and recommendations contained in the adopted EAR. F.S. Section 163.3191 requires EAR -based Master Plan amendments to be adopted within eighteen (18) months after the EAR is determined to be sufficient. An EAR is required to be completed every seven (7) years, subject to scheduling as determined by DCA. This constitutes the first evaluation and appraisal of the Key Biscayne Master Plan. This EAR reflects the Village's best efforts at interpreting the major issues and factors to be addressed and the scope of work contained in the Letter of Understanding between DCA and the Village (included in the Appendices of this document), as well as the Florida Statutes, Administrative Code, and other guidance documents issued by DCA. e. Process for Public Involvement This EAR was prepared and adopted pursuant to Florida Statutes, Section 163.3191. The EAR was developed by a Council -appointed committee of residents —referred to as the 2020 Vision Plan/Evaluation and Appraisal Report Committee —with the assistance of the Village staff and consultants Wallace Roberts & Todd, LLC, as well as the support and leadership of the Village Council. 2020 Vision/EAR Committee Members represented a broad array of local constituencies and viewpoints, and also added relevant and valuable experience, expertise and background to the EAR process. The Committee, and a sub -committee selected to address issues related to the EAR in particular, met more than two dozen times over a period of 10 months to complete this task. Each Committee and Sub -Committee meeting was open to public attendance and comment. Further, the Committee reached out actively to the community at large, and implemented a vigorous public participation program to address the EAR. The result was informed and wide -reaching debates that touched on virtually all aspects of the Master Plan —on residents' individual and collective sensibilities about Key Biscayne, and on future challenges and opportunities. This EAR process was undertaken simultaneously and on a parallel track with a local "visioning" and planning exercise referred to as "2020 Vision". The 2020 Vision exercise and EAR work were mutually interconnected Wallace Roberts & Todd, LLC 21 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN and supportive. The work and focus of each informed the other. The 2020 Vision Statement was adopted by the Village Council as an exercise in self-criticism and self -definition, and as a source of guidance for at least a fifteen year time horizon. The 2020 Vision Statement is printed in full in the following section, and its tenets and possible planning implications remain under consideration for possible inclusion in future Master Plan amendments. f. Key Biscayne 2020 Vision. The preparation of this EAR was conducted in close coordination with an ambitious community visioning process, which began in April 2005. To ensure a fully coordinated, consensus -driven outcome, the Village Council appointed a broadly representative residents' steering committee —the 2020 Vision/EAR Committee —to guide both processes. The visioning process is intended to create a framework for strategic decision -making to guide the long term future of the community. The 2020 Vision process began with a series of public committee and sub- committee meetings culminating in SWOT (Strengths, Weaknesses, Opportunities and Threats) exercises conducted with the 2020 Vision/EAR Committee (April 11, 2005), the Village Council (June 28, 2005), and the community at large (June 9 and June 11, 2005). In all, approximately 150 individuals took part in this step, providing extensive input about the community's concerns, values, aspirations, and priorities. The exercises sought responses from participants on two questions pertaining to present conditions in the Village, and two questions pertaining to perceptions or expectations about future conditions, as follows: Present Strengths and Weaknesses: • What present characteristics of Key Biscayne do we consider strengths (qualities worth retaining) and attributes that define our character and quality of life? • What characteristics can we categorize as weaknesses (problems or deficiencies requiring attention)? Future Opportunities and Threats • What opportunities should we seize to improve character and quality of life of the Village in the future? • Which conditions or trends can we interpret as threats to our character or quality of life which we should prevent? Wallace Roberts & Todd, LLC 22 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Although hundreds of ideas and comments were recorded, a reasonably clear consensus emerged on the top priority issues in each of the discussion topics, which are summarized below. KEY AREAS OF COMMUNITY CONSENSUS Strengths 1. Strong Sense of Community: the island's history; the neighborliness and friendliness of its residents; an engaged citizenry; and the physical smallness of the community —create a strong sense of community self- awareness and a desirable "small-town" environment. 2. Quality of Life: the community's self-reliance; a safe, peaceful, and quiet setting; the beauty, environmental value, and quality of government, services and amenities contribute to an exceptional quality of life. 3. Location: the advantages of convenient proximity to major employment and activity centers in Miami -Dade County, coupled with the separation and distinct island identity. 4. Natural setting/Environment: the beauty, amenity, and environmental value of a barrier island with a tropical landscape and climate, the scenic open space and dual waterfront, on the bay and ocean. 5. Community Services and Facilities: the elemiddle (K-8) school, Village Green, civic center, public safety, and myriad recreational opportunities. Weaknesses 9. Community Facilities and Services: recreational opportunities abound, but insufficient parks and playing fields and a lack of land for future public facilities, deficient maintenance of the community's public spaces. 2. Mobility, Transportation and Parking: traffic congestion, lack of pedestrian/bike/golf cart provisions and related safety concerns, lack of connectivity between individual commercial uses, as well as between the commercial and residential areas, and issues related to what is perceived as unsatisfactory performance of existing traffic calming treatments/poor execution of traffic calming techniques. Wallace Roberts & Todd, LIC 23 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 3. Growth and Development Impacts: perception of excessive density, the construction of new homes which are out of scale with the size of lots and with the surrounding development, blocked views of the water, and overcrowded facilities. 4. Changing Community: a growing non-permanent/transient population; the loss of "island spirit," which is manifest in, among other things, a lack of respect for the community's public areas, apathy/lack of involvement, and seeming elitism and sense of entitlement. 5. Infrastructure: deficiencies cited include the incomplete central sewer, the presence of overhead utilities, storm drainage problems, and poor road maintenance. 6. Planning/Zoning/Regulations: weak or ineffective planning and regulations; lack of long-term "vision"; lack of or inconsistent enforcement. 7. High Cost of Living: higher costs associated with living in a coastal community, from disaster insurance to construction costs, increasing property values, and lack of affordable housing; all have the effect of decreasing the diversity of the community. 8. Limited Range of Retail and Services: in particular, the small number and variety of restaurants, the narrow range of retailers and services, and limited cultural/entertainment features and venues. Opportunities 1. Parks and Open Space: to acquire land for additional parks, to expand ocean/bay access, to develop trails and protect natural areas. 2. Community Services/Facilities/Amenities: to expand the recreation center, to build a community theater and other cultural facilities, to improve education and consider a high school. 3. Improve Transportation/Circulation: to reduce vehicular congestion, provide additional facilities/improve connectivity for pedestrian, cyclists and golf carts, provide commercial area access from Fernwood, and expand public transportation and traffic calming. Wallace Roberts & Todd, LLC 24 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 4. Development/Redevelopment Controls: to control density and intensity, preserve needed services and businesses, control building scale, and improve landscape requirements. 5. Community Interactions: to improve communication/dialogue among diverse community groups as well as between the Village and its residents, to improve civic involvement. 6. Seniors and Families: to provide for elder care on island, encourage affordable housing. 7. Infrastructure: to improve road conditions, expand/complete the sewer system, to upgrade lighting, signage, landscaping, and stormwater. Threats 1. Overpopulation/Unfettered Development: rezonings to increase density, oversized homes impacting older neighborhoods, loss of "small town" character. 2. Impacts of External Development: excessive development/traffic generation from Virginia Key and causeway development. 3. Degradation of the Environment: beach erosion, pollution, and the loss of biological diversity, open space and scenic beauty. 4. Traffic/Mobility/Parking: congestion and delays related to the single island accessway, increased traffic, safety problems. 5. Village Government: unresponsive, bureaucratic, over -restrictive, fiscal limitations, lack of intergovernmental coordination. 6. Loss of Community Character/Identity: degraded aesthetics, loss of community spirit, factionalism, excess tourism/visitation. 7. Hurricanes/Natural Threats: lack of preparedness, failure to evacuate, power failures, storm surge. 8. High Cost of Living: ever -escalating property values and taxes are perceived as a potential threat to the quality of life and socioeconomic diversity of the community. 9. Schools: lack of high school, overcrowded classrooms. Wallace Roberts & Todd, LLC 25 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 10. Crime/Illegal Activity The input received through the SWOT exercises, and the resulting areas of community consensus identified in the above summary, provided the "raw material" for the articulation of the Key Biscayne 2020 Vision Statement, which follows: 2020 Vision Statement Key Biscayne in 2005: What We Value Surrounded by parks, Biscayne Bay and the Atlantic Ocean, the Village of Key Biscayne enjoys outstanding natural beauty, a compelling sense of place, lush landscaping, and a unique small-town ambiance that leads many residents and visitors to call it "Island Paradise". Our close proximity to metropolitan Miami -Dade County allows us to enjoy the best of both worlds: a sense of separateness as a serene, secure island sanctuary coupled with convenient access to services, activities and amenities on the mainland. Our relaxed island style is evident in our people, our active lifestyles, and our shared enjoyment of living "across the bridge" in a close-knit, nurturing community. The Village is a vibrant and interactive place made more interesting by our cultural diversity, neighborliness and commitment to fellowship and community spirit. The Past as Prologue: Aspirations and Accomplishments The Village of Key Biscayne was incorporated on June 23, 1991 to provide for local control over development, improved infrastructure and services, and better governmental process. We adopted a charter, elected our first Village Council (then called the Board of Trustees), hired a manager, and built our local government from scratch. In turn, we established fire -rescue, police and other departments and adopted zoning and other municipal codes. In 1995, after years of public education and participation, we adopted our first Master Plan. Our Master Plan identified deficiencies and provided for many needed or desired improvements. Because of our early vision, planning and follow through, we now enjoy excellent fire -rescue and police services, a debt -free Village Green, an architecturally distinguished Civic Center complex including a well -used Community Center, more local Wallace Roberts & Todd, LLC 26 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN parks, a renourished beach with protective dune system, a vastly improved stormwater drainage system, an expanded K-8 public school, street -by -street tree plantings and landscaping, street lights and pavers, sidewalks, landscaped traffic calming devices, reduced Village -wide speed limits, and the lowest millage rate of any municipality in Miami -Dade County. 2020 Vision Statement: Keeping the "Village" in our Village Now, a decade after adopting our Master Plan, we are developing our first Master Plan Evaluation and Appraisal Report, as required by law. As an interconnected exercise, we also are developing this Vision Statement as the first part of a Vision Plan for 2020. Recognizing that the 1995 Master Plan benefited from prior years of study, visioning and community participation, we sought extensive public input for our 2020 Vision, engendering lively debates. We speak about "Keeping The 'Village' in Our Village". This means that we wish the Village to retain the intrinsically positive qualities described herein. Our 2020 Vision is meant to supplement our Master Plan by communicating our values and goals and by suggesting strategies and actions to achieve those goals. By implementing our Vision Plan, in the ensuing years through 2020 we will have: Community Character and Quality of Life • Maintained our small-town, island character by managing the scale and density of development on a neighborhood -by -neighborhood basis. Enhanced our streetscapes, parks, civic realm and open spaces with a well -maintained subtropical plant palette suited to our island. • Practiced responsible stewardship of our natural environment by protecting our tree canopy, natural habitats, beaches, dunes, and nearshore water quality. • Expanded our array of passive parks, open spaces and active recreation facilities through carefully directed property acquisition and redevelopment, to include small-scale neighborhood parks, a restored, protected Calusa Park with improved pedestrian access, additional playing fields and bikeways and trails. Wallace Roberts & Todd, LLC 27 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Enhanced local high -quality education from early childhood programs to lifelong learning for adults, in close coordination with public and private schools. • Expanded our cultural facilities, activities, special events and historic preservation efforts, and provided a physical setting for a cultural center, theater and local history museum. • Maintained extremely high levels of quality and responsiveness in our government departments, including police, fire and emergency medical services. • Worked effectively with the State of Florida, Miami -Dade County and the City of Miami to influence and mitigate the impact of new development on Virginia Key and of visitors to the regional attractions and parks that surround the Village. Expanded and improved visual and physical access to Biscayne Bay and the Atlantic Ocean. • Recognized the positive economic impact of tourism and the role of hotels in providing amenities to residents and as community partners. Sustainable Community Structure • Encouraged redevelopment of outdated commercial areas to preserve and expand local -serving retail and professional businesses and services in well -designed, accessible and interconnected centers. • Attained safe, pleasant and convenient pedestrian and cycling linkages between neighborhoods, schools, parks, civic and recreational sites and commercial properties. • Established a well -integrated vehicular transportation system that: provides for maximum safety considerations; - successfully manages traffic congestion from residents, day visitors, workers, and special events; reduces local use of automobiles by encouraging pedestrian, bicycle and golf cart transport; - expands transit use, including off -island bus routes and on -island shuttles; Wallace Roberts & Todd, LLC 28 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN - incorporates well -designed and constructed traffic calming applications; improves local access to Crandon Boulevard commercial areas from Fernwood Road; and - includes a proactive street maintenance program. • Upgraded our infrastructure where feasible and affordable by expanding sewer service in areas formerly served by septic systems, by replacing antiquated water pipe systems, and by burying overhead utilities. People and Relationships • Encouraged volunteerism and community involvement, and included citizens as active participants in civic affairs and community service. • Provided our multi -generational community with rich civic, cultural, recreational, and educational opportunities for children, youth, adults and seniors. • Promoted effective and respectful communication among residents who have different opinions. • Encouraged and provided programs and solutions by which young adults and senior citizens can remain residents of the Village. Governance • Operated our government in a transparent, respectful, responsive and efficient manner, using innovative communication methods to raise citizen' awareness. • Managed judiciously our tax revenues, public spending, debt and capital projects, and identified clear criteria for spending priorities. • Provided excellent public safety services for our residents and visitors. • Maintained Village property and landscaping at high levels of excellence. Wallace Roberts & Todd, LLC 29 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Effectively engaged the City of Miami, Miami -Dade County and the State of Florida on regional issues that influence the quality of life in the Village. • Partnered with the City of Miami and Miami -Dade County to implement a Virginia Key Master Plan that ensures environmentally sensitive development, a new high school, lighted playing fields, and traffic mitigation along the Causeway. Conclusion: Changes, Opportunities and Challenges The 2020 Vision Statement is being drafted at a time of continued change in the Village of Key Biscayne. The commercial properties at our Village entrance, the oceanfront Silver Sands Motel, and various apartment and condominium properties are susceptible to near -term redevelopment. The ultimate use of the Village owned property facing Crandon Boulevard and the Civic Center is undetermined. Starting in 2006, the existing Sonesta Beach Resort will be demolished and rebuilt. Comprehensive new development is planned for Virginia Key and must be closely monitored to assure compatible uses and manageable Causeway impacts. Without foresight and planning, many improvements we value and even take for granted today may not have come about. We recognize the successes that came from our previous planning efforts and we will continue to plan and act for our best future. The attention we give to the future strengthens our community today and helps instill in our children and neighbors a valued ethic of citizenship. These are worthy goals in themselves. Change is both inevitable and not entirely predictable, and "Keeping The `Village' in Our Village" is not necessarily assured. With this in mind, we hope the vision and planning contained in this document will be of lasting value to the Village by informing the decisions, and guiding the actions, of future residents and Village Councils. Above all, we mean to preserve those values, standards and ideals that define our vision of Island Paradise. Wallace Roberts & Todd, LLC 30 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 2. Community -Wide Assessment a. Population Growth and Changes in Land Area. The Miami -Dade County Department of Planning and Zoning (MDCDPZ) identifies Key Biscayne as an area of moderate growth in comparison to other municipalities in the County. According to the U.S. Census, the population of Key Biscayne increased from 8,854 people and 3,831 households in 1990 to 10,507 individuals and 4,529 households in 2000. The additional 1,653 persons equate to a 19 percent growth in population, or about 1.9% per year. By comparison, during the same decade the total population of the County —the eighth largest in the nation by population — increased by 316,268 individuals and 84,419 new households, a growth rate of approximately 16%. The University of Florida reported the 2004 population of the Village to be 11,160, producing an average yearly growth rate between 2000 and 2004 of 1.6 percent. This drop in the growth rate compared to the preceding decade mirrors an increasingly limited supply of undeveloped land on the island. The average size of families in the Village increased from 2.85 persons per family in 1990 to 2.99 persons per family in 2000; the average household size grew from 2.31 to 2.47 over the same period. These increases may be correlated to an overall worsening in traffic congestion, perhaps due to an informally observed increase in the number of cars per household in the Village. According the State Department of Motor Vehicles, the number of registered vehicles in January 2006 is 10,582. The Department is currently unable to provide historical data for the purposes of comparison.2 However, the figure provided may serve as the basis for a future study analyzing the patterns in internally -generated traffic congestion. Family households with children under the age of 18 grew from 939 in the 1990 U.S. Census, to 1,404 in 2000 (approximately 32% of the total households), an increase of 465 families with children. Overall, the population under the age of 18 years in the Village grew by almost 55% between 1990 and 2000 (from 1,646 to 2,547). Today, children under the 2 According to the DMV, due to the prior configuration of its database, historic registered vehicle counts derived from addresses or zip codes may be inaccurate. It was possible for a vehicle to mistakenly be counted more than once: the address field was associated with the customer, not to the vehicle record; therefore, if a customer changed his or her address more than once in a calendar year, the vehicle record would have been double -counted. Wallace Roberts & Todd, LLC 31 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN age of 18 years represent 24.2% of the total population. This trend has burdened the capacity of local schools and is critical to short, medium, and long term educational facility planning. To address this problem, in February 2003, Key Biscayne signed an interlocal agreement with Miami - Dade County Public Schools and 24 municipalities to coordinate region - wide educational facilities planning, site selection and acquisition, and construction. The percentage of people over the age of 65 has dropped over the past ten years. Whereas in 1990, persons 65 years or old comprised 17.2 percent of the population, in 2000 they were 15.6 percent. Despite its overall decrease in percentage of total population composition, the aging population continues to be particularly affected by the island's limited supply of affordable housing —Key Biscayne's long-term elderly residents are often not able to afford the increase in taxes when they attempt to downsize—and evacuation during tropical storms and hurricanes. To address the latter issue, in early 2006, a committee will convene to explore the vulnerability of residents during and after severe storms. Comprised of residents and led by the fire chief, the Committee will emphasize assisting the elderly and others who may have restricted mobility and health needs. Census figures support a related trend anecdotally reported by residents: formerly transient apartments and condominiums once occupied by retirees and empty -nesters are now occupied by families who live in Key Biscayne year round. A comparison of the percentage of total households in 1990 and 2000 comprised of a person age 65 or older living alone dropped from 9.1 to 8.9, respectively. Key Biscayne's population growth has caused no changes in land area, in large part because natural geographic boundaries prevent the opportunity for annexation. b. Ethnicity and Race Components. The 2000 U.S. Census describes the racial makeup of the Village as 95.46% White, 0.46% African American, 0.01% Pacific Islander, 0.14% Native American, 0.92% Asian, 1.49% from other races, and 1.52% from two or more races. In the year 2000, 49.79% of the Village's population was classified as "of Hispanic origin of any race." This represents an increase of 38%, or 1,441 persons of Hispanic or Latino origin, since 1990. Wallace Roberts & Todd, LLC 32 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Notably, as recently as 1980, there was no majority group in Miami -Dade County. Rather, there were three large ethnic groups: non -Hispanic Whites, Hispanics and Blacks. This balance began to shift, and became very evident in the 1990s. In 2000, Miami -Dade County was the first and only county in Florida with a Hispanic majority (57%). Although Key Biscayne has not yet crossed that threshold, it is very close. Table 1: Ethnicity Change in Key Biscayne and Miami -Dade County, 1990-2000 Ethnicity 1990 2000 Key Biscayne Miami -Dade Co. Key Biscayne Miami -Dade Co. White (Non-Hispanic)1% 4,897/55% 585,607/30% 5,059/48% 465,772/21% Black (Non- Hispanic)/% 36/<1% 369,621/20.5% 28/<1% 427,140/20% Other (Non-Hispanic}1% 131/1% 28,459/1% 190/2% 68,713/3% Hispanic%/ 3,790/43% _ 953,407/49% 5,236/50% 1,291,737/57% Total 8,854 1,937,094 10,513 2,253,362 Sources: U.S. Census Bureau, 1990 and 2000 Census, 2003 Miami -Dade County EAR Over 54%, or 5,723 persons, of the 2000 Key Biscayne population were born outside the U.S.—although 46% of that number is comprised of naturalized or native citizens. Of those born abroad, 76.6% were natives of Latin America. Table 2: Nativity and Place of Birth, 2000 Key Biscayne °1d Increase Native 5,199 49.6 Born in U.S. 4,754 4.5.4 Born in Florida 2,054 19.6 Born in different state 2,700 25.8 Born outside U.S. 445 4.2 Naturalized citizen 2,224 21.2 Not a citizen 3,054 29.2 Total 10,477 Sources: 2000 U.S. Census, ePodunk Nearly 59% of the total population of Key Biscayne speaks Spanish at home, but only 14.4% of this group described their command of the English language as less than proficient, according to the 2000 U.S. Census. c. Population Projections. Wallace Roberts & Todd, LLC 33 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN This EAR will rely primarily on population projections generated by MDCDPZ. The projections were updated in 2003 to reflect Census 2000 data, and were used by Miami -Dade County in the preparation of its own EAR, which was adopted in 2003 as the basis for the County's Comprehensive Development Master Plan amendments. According to the Miami -Dade County EAR, the 2003 projections were developed in the same manner as previous series with estimates for births, deaths, and net migration made separately, and then combined to arrive at the totals used in this report. As with all projections, assumptions are made about a number of factors —in particular those related to net migration flows. Based on observable trends, countywide immigration, comprised of mostly foreign migrants, is expected to be constant and to remain at fairly high levels. For Key Biscayne, the projections generated by MDCDPZ indicate that, while the population will continue to increase in the County as a whole, the local rate of growth will trend toward zero after 2010 as the Village approaches build -out capacity (estimated at approximately 5,800 dwelling units at current zoned densities. Using average family size reported by the 2000 Census, the build -out population would be approximately 17,400. Using average household size, the build -out population is projected to be 14,326). Table 3: Annual Average Change, Population Projections for Key Biscayne and Miami -Dade County, 1990 to 2025 Area Change 1990-00 Change 2000-03 Change 20 00-1 0 Change 2010-15 Change 2015-20 Change 2020-25 Remaining Capacity Population at Capacity Key Biscayne 166 216 109 -35 0 0 0 11,425 Miami -Dade Co. 31,608 29,729 29,792 30,366 31,014 32,320 30,778 3,050,563 ource: Miami -Dade County Department of Planning and Zoning, Research Section, 2003. Table 4: Population Projection Comparison Between Key Biscayne and Miami -Dade County 2000 2003 2010 2015 2020 2025 Key Biscayne 10,507 11,160 11,600 11,425 11,425 11,425 Increase -- 647 440 -175 0 0 Percent Increase -- 6.2% 3.9% -0.98% 0 0 Miami -Dade County 2,253,362 2,342,551 2,551,283 2,703,114 2,858,184 3,019,785 Increase -- 89,189 208,732 151,831 155,070 161,601 Percent Increase -- 3.9% 8.9% 5.9% 5.7% 5.7% ource: 2000 Census; Mlam- Dade County Department of Planning and Zoning, Planning Research, 2003. Wallace Roberts & Todd, LLC 34 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Reaching build -out capacity does not imply no further development will take place. Rather, as the Village arrives at this stage, future growth will be in the form of redevelopment. Therefore, the Village should capitalize on opportunities to guide this redevelopment in a manner consistent with the community's vision, to explore ways to retain and enhance existing development, and to introduce new, activities that expand the self- sufficiency of the Village. d. Extent of Vacant and Developable Land. In 1995, there were 86 acres of vacant land according to the 1995 Key Biscayne Master Plan. No land has been annexed since that time —Bill Baggs Cape Florida State Park extends along the entire southern border of the island community; Miami -Dade County's Crandon and Calusa Parks span the entire northern edge; Biscayne Bay fronts the western border; and the eastern border faces the Atlantic Ocean —and today all of those original vacant lots have been developed or have permits for development. The Village, though almost entirely built out, is slightly below capacity by measure of densities permitted by the Land Development Code. This gap is not large enough to allow any major increases in density, but the composition of the Village will continue to evolve as older housing stock is knocked down and replaced by larger dwelling units, a trend evident today. Examination of residential certificates of occupancy records indicates that since 1997 approximately 26 new residential units per year have been built either on vacant lots or in place of demolished units (See Table 5). Since there are no vacant lots remaining as of March 2006, all future new construction will occur in the form of replacement of older units. If the average rate of replacement remained constant, the stock of original housing would be completely replaced by around 2047.` While the density of units is presumed to remain relatively constant, the population could continue to increase in the single family realm since many existing, modestly sized, residential structures are being 3 A sizeable parcel -9.5 acres —of formerly vacant land along Crandon Boulevard (previously known as the "Tree Farm") has been dedicated as Public Recreation and Open Space in the form of the Village Green. A bandstand and gazebo were added to the Village Green in 2000. Today, this open space serves as the primary location for most of the holiday and other special events celebrated by the community throughout the year. 4 There are approximately 1300 single and duplex lots in the Village. Since 1997, 232 units on those lots have been replaced, leaving 1068 units of the original housing stock. Dividing 1068 units by the average rate of replacement, 26 units per year, yields a duration of approximately 41 years until the residential character completely shifts from small-scale to large-scale development. Wallace Roberts & Todd, LLC 35 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN redeveloped into substantially larger homes containing additional bedrooms. Although no study has been conducted to evaluate the actual occupancy of these units, if each bedroom were filled, the Village's population could increase significantly, with potentially dire consequences on the demand for infrastructure and services. Table 5: Key Biscayne Residential Certificates of Occupancy, 1995 - 2005 Year Single Family Duplex Total Permits 1997 3 0 3 1998 22 0 22 1999 32 0 32 2000 35 0 35 2001 40 2 42 2002 22 0 22 2003 30 1 31 2004 22 1 23 2005 19 3 22 Total 225 7 232 * As of February 13, 2006; Figures represent new construction on vacant land or following complete demolition. Source: Village of Key Biscayne Department of Building, Zoning and Planning, February 2006. Any redevelopment of the two largest and most influential developments of residential composition over the past ten years —the Grand Bay Residences and Ritz -Carlton Hotel (799 units) and Ocean Club (1,032 units) —would be subject to a rigorous approval process by the Village Council, which is required to comply with state -mandated density restrictions for Coastal High Hazard Areas. Because both of the projects' original permits have since expired, redevelopment density could not exceed current density. The Village inherited the two Developments of Regional Impact from Miami -Dade County when it incorporated in 1991. Setting a precedent for density allowance, the Village immediately and successfully pursued the reduction of the projects' permitted capacity on the basis of insufficient parks and recreation space and an undue burden on infrastructure. Due to natural market forces, there has been little new construction on the Village's 25.8 acres zoned for low -intensity commercial use, and minimal redevelopment of its approximately 400,000 square feet of existing commercial space since the adoption of the Master Plan in 1995 (See Table 6). One noteworthy exception is 200 Crandon Boulevard, known as Key Colony Place. In the process of being completed as of March 2006, Wallace Roberts & Todd, LLC 36 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN the shopping plaza will incorporate pedestrian -oriented design features promoted by the Village. Table 6: Key Biscayne Commercial Building Permits, April 2000 — April 2005 Year New Construction Complete Demolition Other Permits (renovations, additions, etc.) Total Permits 2000 3 1 40 44 2001 1 0 48 49 2002 2 1 46 49 2003 1 3 26 30 2004 1 0 31 32 2005 0 0 7 7 Total 8 5 198 211 Source: Village of Key Biscayne Department of Building, Zoning and Planning, May 2005. e. Location of Development in Relation to Master Plan. All new construction and redevelopment since 1995 has occurred in accordance with the Future Land Use Map and designations adopted in the Key Biscayne Master Plan. There have been three amendments to the Future Land Use section since the Master Plan was adopted: ■ Ord. 95-8 amended densities permitted within the "Medium Density Multifamily and Ocean Resort Hotel" land use category in the Master Plan, separating the tabulation of density for multifamily residential uses and hotel uses located on the same lot. ■ Ord. 97-17 amended the land use designation on the Future Land Use Map from Medium Density Single Family Residential to Two Family Residential for seventeen parcels of property on Fernwood Road specified in the appendix of that ordinance. ■ Ord. 2000-1 amended the Future Land Use Map for the property at 800 Crandon Boulevard, changing it from the "office" to "commercial" category. Commercial development along Crandon Boulevard since the 1995 Master Plan includes the Pankey Institute along the east side of the entry block and the following developments along the west side: Suntrust Bank at 500 Crandon Boulevard (10,750 square feet), Wachovia Bank at 100 Crandon Boulevard (4,426 square feet), and Ace Hardware commercial/office building at 800 Crandon Boulevard (8,000 square feet). As of March 2006, construction of Key Colony Place (28,000 square feet), Wallace Roberts & Todd, LLC 37 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN a new commercial complex located at 200 Crandon Boulevard, is in progress. A new fire station, Village Hall (Administration/Police), and Community Center have been constructed during the past five years on the blocks immediately south of the Village Green. This complex is now recognized as the community's "Civic Center". The 1995 Master Plan projected that the "Civic Center," purposefully located at the geographic center of the community, would help establish linkages from the existing commercial district and east -of -Crandon multi -family neighborhoods to the then Key Biscayne Community School (now Key Biscayne K-8 Center) and its surrounding single-family residences. The creation of the Civic Center provided opportunities to implement urban design and architectural practices and techniques that embody the strong sense of place and unique identity and character of the Village of Key Biscayne. The largest -scale projects in the Village have been the Ocean Club and Grand Bay Residences and Ritz -Carlton Hotel projects. Both are located on the Atlantic Ocean on the east side of the island, and are designated as Developments of Regional Impact. The 38 -acre Grand Bay project, consisting of two condominium towers, 49 detached residences, and what is now the Ritz -Carlton Hotel totals 707 units. It was completed in 2001 and issued its final Certificate of Occupancy by the Village in the same year. The Ocean Club, occupying 52 oceanfront acres, consists of 800 condominium residences in six mid -rise buildings with four to seven stories each (known as Lake Villas), plus five high-rise buildings with 14 to 18 stories each. The property also includes a 5 -acre private lake, tennis club, beach club, cabanas, restaurant, and other amenities. The Master Plan for The Ocean Club was approved by the Village of Key Biscayne in July 1995. Four of these buildings were permitted by the Village and built between 2001 and 2002. Although some residential development has occurred as infill on vacant platted lots, permit records indicate that the bulk of the Village's residential construction is taking place on previously developed lots (refer to Table 5), The 1995 Master Plan also recommended setback, height, minimum pervious area requirements and other controls to mitigate the impact of larger new construction (typically 3,500-4,000 sq, ft. 2 to 3 story houses) on smaller adjacent homes (typically 1,200-1,500 sq. ft. 1 story houses). s The projects are identified in South Florida Regional Planning Council records as Key Biscayne Hotel and Villas, and Hemmeter/Continental Resort, respectively. Wallace Roberts & Todd, LLC 38 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN RESOLUTION NO. 2006-23 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, ADOPTING THE EVALUATION AND APPRAISAL REPORT FOR THE VILLAGE OF KEY BISCAYNE MASTER PLAN; STATING THE INTENT OF THE VILLAGE COUNCIL TO AMEND THE MASTER PLAN BASED UPON RECOMMENDATIONS CONTAINED IN THE REPORT; APPROVING TRANSMITTAL; OF THE REPORT TO THE DEPARTMENT OF COMMUNITY AFFAIRS IN ACCORDANCE WITH SECTION 163.3191, FLORIDA STATUTES; PROVIDING FOR EFFECTIVE DATE. WHEREAS, pursuant to Chapter 163, Part 2, Florida Statutes and Chapters 9J-5, 9J-11 and 93-12, Florida Administrative Code (F.A.C.), the Village of Key Biscayne Master Plan (the "Plans') was adopted via Ordinance No. 95-8 on September 12, 1995; and WHEREAS, the Florida Legislature intends that local planning be a continuous and ongoing process; and WHEREAS, Section 163.3191, Florida Statutes, directs local governments to periodically assess the success or failure of their adopted comprehensive plans to adequately address changing conditions and state policies and rules; and WHEREAS, Section 163.3191, Florida Statutes, directs local governments to adopt an evaluation and appraisal report once every seven (7) years assessing the progress in implementing the local government's comprehensive plan; and WHEREAS, the Village Council, in its capacity as the Local Planning Agency (the "LPA") has prepared and completed an Evaluation and Appraisal Report (the "EAR") for the Plan as provided for in Exhibit "A"; and Wallace Roberts & Todd, LLC 10 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN WHEREAS, on April 25, 2006, the LPA held an advertised public hearing on the proposed EAR, provided for participation by the public in the process and rendered its recommendations to the Village Council; and WHEREAS, the Village Council has reviewed the EAR, held an advertised public hearing, and provided for comments and public participation in the process in accordance with the requirements of state law and the procedures adopted for public participation in the planning process. NOW, THEREFORE, IT IS HEREBY RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE OF KEY BISCAYNE, FLORIDA, AS FOLLOWS: Section 1, Recitals Adopted. That each of the recitals stated above is hereby adopted and confirmed. Section 2. Adoption, That the Evaluation and Appraisal Report, attached as Exhibit "A", is hereby adopted and approved for transmittal to the Department of Community Affairs for the purpose of a sufficiency review in accordance with Section 163.319I, Florida Statutes. Section 3. Intent tQAw.end Master Plan. That the Village Council does hereby state its intention to amend the Village of Key Biscayne Master Plan in accordance with the recommendations contained in the Evaluation and Appraisal Report. SeeListn_4. Transmittal. That the Village Clerk or his or her designee is hereby directed to make the appropriate transmittals as required by law. Section 5. J22ffective Date, That this Resolution shall be effective immediately upon adoption hereof. 2 Wallace Roberts & Todd, LLC 11 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN PASSED AND ADOPTED this 13th day of June, 2006. /dip ccb.cr4 L_.:. MAYOR ROBERT OLDAKOWSKI C*NCHITA H. ALVAREZ, CMC, VILLAGE CLERK APPROVED AS TO FORM AND LEGAL SUFFICIEN,C WiA VILLAGE ATTORNEY F:410041030014Rcsolu[ioos\Council approval of EAR 3.27,0L.doc 3 Wallace Roberts & Todd, LLC 12 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Executive Summary The Village of Key Biscayne Master Plan was adopted on September 12, 1995, and accepted by the Department of Community Affairs on October 20, 1995. Preparation of Key Biscayne's first Evaluation and Appraisal Report (EAR) reveals that the Village has diligently implemented the Master Plan's goals, policies, and objectives with few exceptions. The EAR Process Key Biscayne's first EAR was prepared and adopted pursuant to Florida Statutes, Section 163.3191. This EAR was developed by a Council -appointed committee of residents, referred to as the 2020 Vision Plan/Evaluation and Appraisal Report Committee, with the assistance of the Building, Zoning and Planning, Finance; Public Works, and Parks and Recreation Department staffs, as well as the Village Manager, Village Attorneys and other Village departments, all supported by the active and engaged leadership and direction of the Village Council. In addition, consultants engaged by the Village, Wallace, Roberts & Todd, LLC, provided valuable background, structure and advice. 2020 Vision/EAR Committee Members represented a broad array of local constituencies and viewpoints, and also added relevant and valuable experience, expertise and background to the EAR process. The Committee, and a sub- committee selected to address issues related to the EAR in particular, met more than a dozen times over a period of 10 months to complete this task. Each Committee and Sub -Committee meeting was open to public attendance and comment. Further, the Committee reached out actively to the community at large, and implemented a vigorous public participation program in addressing the EAR. The result were vigorous, informed and wide -reaching debates, touching on virtually all aspects of the Master Plan, and on residents' individual and collective sensibilities about Key Biscayne, and future challenges and opportunities. This EAR was undertaken simultaneously and on a parallel track with a local "visioning" and planning exercise referred to as "2020 Vision". The 2020 Vision exercise and EAR work were mutually interconnected and supportive. The work and focus of each informed the other. The 2020 Vision Statement was adopted by the Village Council as an exercise in self-criticism and self -definition, and as a source of guidance for at least a fifteen year time horizon. The 2020 Vision Statement is printed in full in the EAR, and its tenets and possible planning implications remain under consideration for possible inclusion in future Master Plan amendments. Wallace Roberts & Todd, LLC 13 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN EAR Findings The EAR addresses the inquiries and follows the requirements specified in Florida Statutes, Section 163.3191, manifesting particular attention to the list of Major Issues presented to the Florida Department of Community Affairs (DCA) in a Letter of Understanding on March 7, 2005 and incorporating recommendations included in the DCA's response. Following an introduction, which includes a reprint of the 2020 Vision Statement, the EAR assesses current and projected conditions and changes in the community since adoption of the 1995 Master Plan. Key points include: • While Key Biscayne is an area of moderate population growth in comparison to other municipalities in Miami -Dade County, its growth rate is dropping and its population is predicted to level by 2010 according to Miami -Dade County projections. • The percentage of people over the age of 65 has dropped over the past decade as the number of family households with children under the age of 18 has grown. In the report's evaluation of the coordination of land use and public school planning, it found that increased County -wide demand on educational facilities and services emphasizes the need for cooperation and synchronization between jurisdictions. • No land has been annexed, no land is available for annexation, and no vacant lots remain in Key Biscayne. Future growth will occur in the form of redevelopment. The composition of the Village will continue to evolve as older housing stock is knocked down and replaced by larger dwelling units, a trend that is evident today and likely to continue until around 2047. • All new construction and redevelopment since 1995 has occurred in accordance with the Future Land Use Map and complies with FEMA and Coastal High Hazard Area regulations. • Assessments of current and forecasted infrastructure levels of service for transportation, sanitary sewer and potable water, and solid waste management reveal facilities adequately equipped to meet predicted demand and emphasize the need for continued interlocal cooperation. The EAR then analyzes in detail each element of the 1995 Master Plan, including successes, impediments and status, taking into account past implementation, pending work and changed conditions. Overall, the Village has very successfully implemented the Plan, either already completing projects or on track to do so. As a prelude to specific Master Plan amendments proposed in the EAR, we then analyze our principal local issues, from today's perspective but also in terms of the 1995 Master Plan objectives, policies and goals. These issues include: Wallace Roberts & Todd, LLC 14 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Definition, Preservation and Enhancement of Key Biscayne's Unique Village Character and Quality of Life. • The Need for Additional Local Parks, Recreation Space and Open Space. • Calusa Park, Crandon Park, Bill Baggs Cape Florida State Park and Virginia Key - Interlocal Cooperation Relative to Village Issues. • Implications of Redevelopment. • Traffic Volume, Operations and Safety. • Sustainability of Local Retail and Services. • Vulnerability to Damage from Tropical Storms and Hurricanes. • Need to Improve or Replace Infrastructure. • Implications of Debt Cap. • Conservation, Coastal Management and Environmental Protection. • Land Development in the Context of Master Plan Goals, Objectives, and Policies. • Historic, Cultural and Educational Resources and Needs. We then consider the extent to which our Master Plan is consistent with other Florida growth management laws, based on changes since 1995. The Master Plan is substantially in compliance with relevant changes; where not, modifications to the Master Plan have been suggested. Finally, we address our conclusions and various recommendations for Master Plan amendments. In addition to updating dates, removing obsolete policies and objectives, and making modifications to the Future Land Use map, our recommendations include: • Undertake studies of traffic congestion and levels of service. • Create a Transportation Element, which requires coordinating the Future Land Use Map and creating numerical indictors to measure achievement of mobility goals. • Place a greater emphasis on the Village's commitment to exploring innovative solutions for the provision of affordable housing, including exploring housing subsidy programs and housing feed trust fund and coordinating with the City of Miami and Miami -Dade County, and the South Florida Regional Planning Council. • Explore new ways to integrate green technologies into public facilities. Wallace Roberts & Todd, LLC 15 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Update the Master Plan within 18 months of the South Florida Water Management District updating the regional water supply plan. • Coordinate with the Miami -Dade Water and Sewer Authority regarding the availability of water to serve all proposed development projects. • Consider means of revenue -raising to support public trust acquisition of recreation lands and open space and preservation of historic landmarks. • Prepare a strategy for buying land in the Village to be dedicated as recreational space. Negotiate use agreements with Miami -Dade County and the City of Miami for access to parkland outside Key Biscayne • Review and revise current regulations to require that any future development proposed in the Village that contains apartments or hotel condominiums provide open space to serve the demand created by the population' increase. • Explore instituting an impact fee for new single-family detached and residential duplex construction • Establish criteria for updating and prioritizing projects within the CIP tied to concurrency requirements. • We conclude by highlighting the ongoing nature of this work, as we continue discussion about our 2020 Vision and related ideas to protect and improve the characteristics of and aspirations for Key Biscayne that we have identified as defining and valuable. Wallace Roberts & Todd, LLC 16 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 1. Introduction a. Master Plan and Initial EAR The Village of Key Biscayne was incorporated on June 23, 1991. Previously, the community was part of unincorporated Miami -Dade County. The Village of Key Biscayne Master Plan was adopted by the Village Council, by Ordinance 95-8, on September 12, 1995, and accepted by the Department of Community Affairs on October 20, 1995. In anticipation of incorporation, committees of interested residents actively studied Key Biscayne and growth management principles beginning in approximately the fall of 1990. Active public participation resulted, focusing especially on various qualities that were thought to define Key Biscayne as it was in the past, as it had become, and as it could be in the future. Broad public interest in these questions continues today. This is Key Biscayne's first Evaluation and Appraisal Report (EAR), developed pursuant to F.S., Section 163.3191. This EAR was developed with the active participation and assistance of a committee of residents appointed by the Village Council, called the 2020 Vision/EAR Committee, and other residents, as well as Wallace Roberts & Todd, consultants to the Village. b. Profile of the Community. Bounded by Crandon Park to the north and Bill Baggs Cape Florida State Park to the south, the Village of Key Biscayne occupies approximately 1.5 square miles' in the center of Key Biscayne, the southernmost sandy barrier island in a chain of islands extending along the Atlantic coast of the United States. The island's deep sands overlying coral rock differentiate Key Biscayne, positioned just southeast of downtown Miami, from the rocky Florida Keys and support distinctive beach, dune, hammock and mangrove ecosystems. Due to its relatively low elevation and direct exposure to the Atlantic Ocean, Key Biscayne is in a high -risk flood zone; it is classified by FEMA as flood elevation AE and often one of the first areas in Miami -Dade County to be evacuated in a storm emergency. The only vehicular access to and from the mainland is via the four -to -six lane Rickenbacker Causeway. The Village has experienced storm damage in the past, most recently as a result of Hurricane Wilma in October 2005. Land area covers 1.28 square miles, water area covers 0.12 square miles with a total incorporated area of 1.39 square miles. Wallace Roberts & Todd, LLC 17 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN The transformation of Key Biscayne from a coconut plantation into a quiet Miami bedroom community bordered by parks began with the dedication of the first Rickenbacker Causeway (a drawbridge) and Crandon Park in November 1947. The southern two-thirds of the island were platted in several subdivisions with different lot sizes and restrictions. The Mackie Construction Company and other developers built hundreds of modestly priced one-story homes in the 1950s and 1960s that were purchased primarily by WWII veterans and young families. The Mackles built an elementary school and Key Biscayne Hotel and Villas, which catered to tourists. The southern third of the island escaped development and became Cape Florida State Park in January 1967. Key Biscayne received international attention in 1969 when then U.S. President Richard Nixon established his "Florida White House" complex on the bay side of the island. The publicity of Presidential visits through 1973 sparked awareness of Key Biscayne as a destination. An increase in development and real estate value was triggered by the 1987 opening of the high -span William Powell Bridge, which replaced an existing drawbridge. By the late 1980s, Key Biscayne had become a mature suburb within unincorporated Miami -Dade County, known for its quiet natural beauty and small-town character. The Village of Key Biscayne was incorporated on June 23, 1991 after nine years of citizen effort toward self -governance. The vote to incorporate capped a long effort to obtain better services from the County, improved fiscal control, and local control over growth within the Village. A charter with a Council -Manager form of government was adopted to provide for local control over development, improved infrastructure and services, and better governmental process. Many improvements that were desired in 1991 have been achieved through the efforts of local government as well as the determination and commitment of Key Biscayne residents. The effectiveness of self -governance was validated by the creation of new, first-rate Fire Rescue and Police Departments and, by 1996, a Zoning Code tailored to meet the development needs of the Village. In 1995, after years of public education and participation, the Village of Key Biscayne adopted its first Master Plan, which identified deficiencies and needed or desired improvements. Many of the Plan's goals, objectives, and policies have been realized. In addition to excellent fire - rescue and police services, the Village has an attractive (and debt -free) Village Green; more local parks; a renourished beach with protective dune systems; a vastly improved stormwater drainage system; an expanded K- 8 public school; an architecturally distinguished Civic Center complex; a new, highly -used Community Center; reduced Village -wide speed limits; street -by -street tree plantings and landscaping, street lights and pavers, Wallace Roberts & Todd, LLC 18 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN sidewalks, landscaped traffic calming devices; and the lowest millage rate of any municipality in Miami -Dade County. The Village of Key Biscayne in 2005 enjoys outstanding natural beauty and the best of both worlds: a sense of separateness as a serene, secure island sanctuary coupled with convenient access to services, activities and amenities on the mainland. Key Biscayne's popularity as a destination for both daily and seasonal tourists will continue, Residential, commercial and hotel properties are largely built out, yet the community is changing again via redevelopment. c. Purpose of the EAR. The purpose of the EAR is to evaluate and assess the effectiveness, successes and failures of a local municipality's master plan in accomplishing its adopted objectives, policies, and standards as well as to suggest ensuant changes or amendments. The State of Florida's local government master planning law, Chapter 163, Part 2, Florida Statutes (F.S.) requires that all counties and municipalities throughout Florida maintain master planning programs to guide their long-range growth and development, and that master planning should be a continuous and ongoing process. As a part of this process, local governments are required to monitor numerous community characteristics relating to development, provision of services, environmental protection, and governmental activities, and to periodically prepare Evaluation and Appraisal Reports addressing implementation of the master plan. Moreover, the law provides that the EAR process shall be the principal process for updating local master plans to respond to changes in state, regional, and local policies on planning and growth management, and changing conditions and trends, to ensure effective intergovernmental coordination, and to identify major issues regarding the community's achievement of its goals. d. Summary of EAR Requirements and Process. As required by Sec. 163.3191(2), F.S., the EAR must address the following items: 1. Major local issues as identified by the local government with input from state agencies, regional agencies, adjacent local governments and the public, and the potential social, economic, and environmental impacts of these issues. 2. Location of existing development with respect to the location of development as anticipated in the Key Biscayne Master Plan, as Wallace Roberts & Todd, LLC 19 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN adopted in 1995; population growth and changes in land area, including any annexations, and the extent of vacant and developable land. 3. Effect on the Master Plan of changes to the state comprehensive plan, Chapter 163, Part 2; Chapter 9J-5, Florida Administrative Code (FAG); and the strategic regional policy plan, since the adoption of the Master Plan. 4. Whether Master Plan objectives within each element have been achieved with respect to major local issues. 5. The extent to which unanticipated and unforeseen problems or opportunities have occurred since the 1995 Master Plan adoption, or resulted in problems or opportunities with respect to the major local issues and their social, economic, and environmental impacts. 6. Identification of any corrective actions or measures, including whether plan amendments are recommended, to address the major local issues identified and analyzed in the EAR. 7. Coordination of the Master Plan with existing public schools and those identified in the applicable educational facilities plan adopted pursuant to Chapter 1013.35, F.S.; assessment of the success or failure of the coordination of the future land use map and associated planned residential development with public schools, and joint decision -making processes between the local government and the school board toward establishing appropriate population projections, and the planning and siting of public school facilities. 8. Consideration of the appropriate water management district's regional water supply plan, and revision of the potable water element to include a work plan covering at least a 10 -year planning horizon for building any water supply facilities identified as necessary to serve existing and new development, and for which the local government is responsible. 9. Evaluation of whether any reductions in land use density within the coastal high -hazard area impairs the property rights of current residents upon redevelopment, including that following a natural disaster. 10. Process for public involvement. F.S. Section 163.3191 further specifies the procedures and criteria for the preparation, transmittal, adoption, and sufficiency review of local government's EARs and EAR -based Master Plan amendments, if any. By agreement with the Department of Community Affairs (DCA), Key Biscayne's adopted EAR will be transmitted to the South Florida Regional Wallace Roberts & Todd, LLC 20 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Planning Council (SFRPC) for sufficiency review. DCA will retain ultimate review authority. If the EAR recommends Master Plan amendments, such amendments will be consistent with the findings and recommendations contained in the adopted EAR. F.S. Section 163.3191 requires EAR -based Master Plan amendments to be adopted within eighteen (18) months after the EAR is determined to be sufficient. An EAR is required to be completed every seven (7) years, subject to scheduling as determined by DCA. This constitutes the first evaluation and appraisal of the Key Biscayne Master Plan. This EAR reflects the Village's best efforts at interpreting the major issues and factors to be addressed and the scope of work contained in the Letter of Understanding between DCA and the Village (included in the Appendices of this document), as well as the Florida Statutes, Administrative Code, and other guidance documents issued by DCA. e. Process for Public Involvement This EAR was prepared and adopted pursuant to Florida Statutes, Section 163.3191. The EAR was developed by a Council -appointed committee of residents —referred to as the 2020 Vision Plan/Evaluation and Appraisal Report Committee —with the assistance of the Village staff and consultants Wallace Roberts & Todd, LLC, as well as the support and leadership of the Village Council. 2020 Vision/EAR Committee Members represented a broad array of local constituencies and viewpoints, and also added relevant and valuable experience, expertise and background to the EAR process. The Committee, and a sub -committee selected to address issues related to the EAR in particular, met more than two dozen times over a period of 10 months to complete this task. Each Committee and Sub -Committee meeting was open to public attendance and comment. Further, the Committee reached out actively to the community at large, and implemented a vigorous public participation program to address the EAR. The result was informed and wide -reaching debates that touched on virtually all aspects of the Master Plan —on residents' individual and collective sensibilities about Key Biscayne, and on future challenges and opportunities. This EAR process was undertaken simultaneously and on a parallel track with a local "visioning" and planning exercise referred to as "2020 Vision". The 2020 Vision exercise and EAR work were mutually interconnected Wallace Roberts & Todd, LLC 21 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN and supportive. The work and focus of each informed the other. The 2020 Vision Statement was adopted by the Village Council as an exercise in self-criticism and self -definition, and as a source of guidance for at least a fifteen year time horizon. The 2020 Vision Statement is printed in full in the following section, and its tenets and possible planning implications remain under consideration for possible inclusion in future Master Plan amendments. f. Key Biscayne 2020 Vision. The preparation of this EAR was conducted in close coordination with an ambitious community visioning process, which began in April 2005. To ensure a fully coordinated, consensus -driven outcome, the Village Council appointed a broadly representative residents' steering committee —the 2020 Vision/EAR Committee —to guide both processes. The visioning process is intended to create a framework for strategic decision -making to guide the long term future of the community. The 2020 Vision process began with a series of public committee and sub- committee meetings culminating in SWOT (Strengths, Weaknesses, Opportunities and Threats) exercises conducted with the 2020 Vision/EAR Committee (April 11, 2005), the Village Council (June 28, 2005), and the community at large (June 9 and June 11, 2005). In all, approximately 150 individuals took part in this step, providing extensive input about the community's concerns, values, aspirations, and priorities. The exercises sought responses from participants on two questions pertaining to present conditions in the Village, and two questions pertaining to perceptions or expectations about future conditions, as follows: Present Strengths and Weaknesses: • What present characteristics of Key Biscayne do we consider strengths (qualities worth retaining) and attributes that define our character and quality of life? • What characteristics can we categorize as weaknesses (problems or deficiencies requiring attention)? Future Opportunities and Threats • What opportunities should we seize to improve character and quality of life of the Village in the future? • Which conditions or trends can we interpret as threats to our character or quality of life which we should prevent? Wallace Roberts & Todd, LLC 22 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Although hundreds of ideas and comments were recorded, a reasonably clear consensus emerged on the top priority issues in each of the discussion topics, which are summarized below. KEY AREAS OF COMMUNITY CONSENSUS Strengths 1. Strong Sense of Community: the island's history; the neighborliness and friendliness of its residents; an engaged citizenry; and the physical smallness of the community —create a strong sense of community self- awareness and a desirable "small-town" environment. 2. Quality of Life: the community's self-reliance; a safe, peaceful, and quiet setting; the beauty, environmental value, and quality of government, services and amenities contribute to an exceptional quality of life. 3. Location: the advantages of convenient proximity to major employment and activity centers in Miami -Dade County, coupled with the separation and distinct island identity. 4. Natural setting/Environment: the beauty, amenity, and environmental value of a barrier island with a tropical landscape and climate, the scenic open space and dual waterfront, on the bay and ocean. 5. Community Services and Facilities: the elemiddle (K-8) school, Village Green, civic center, public safety, and myriad recreational opportunities. Weaknesses 1. Community Facilities and Services: recreational opportunities abound, but insufficient parks and playing fields and a lack of land for future public facilities, deficient maintenance of the community's public spaces. 2. Mobility, Transportation and Parking: traffic congestion, lack of pedestrian/bike/golf cart provisions and related safety concerns, lack of connectivity between individual commercial uses, as well as between the commercial and residential areas, and issues related to what is perceived as unsatisfactory performance of existing traffic calming treatments/poor execution of traffic calming techniques. Wallace Roberts & Todd, LLC 23 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 3. Growth and Development Impacts: perception of excessive density, the construction of new homes which are out of scale with the size of lots and with the surrounding development, blocked views of the water, and overcrowded facilities. 4. Changing Community: a growing non-permanent/transient population; the loss of "island spirit," which is manifest in, among other things, a lack of respect for the community's public areas, apathy/lack of involvement, and seeming elitism and sense of entitlement. 5. Infrastructure: deficiencies cited include the incomplete central sewer, the presence of overhead utilities, storm drainage problems, and poor road maintenance. 6. Planning/Zoning/Regulations: weak or ineffective planning and regulations; lack of long-term "vision"; lack of or inconsistent enforcement. 7. High Cost of Living: higher costs associated with living in a coastal community, from disaster insurance to construction costs, increasing property values, and lack of affordable housing; all have the effect of decreasing the diversity of the community. 8. Limited Range of Retail and Services: in particular, the small number and variety of restaurants, the narrow range of retailers and services, and limited cultural/entertainment features and venues. Opportunities 1. Parks and Open Space: to acquire land for additional parks, to expand ocean/bay access, to develop trails and protect natural areas. 2. Community Services/Facilities/Amenities: to expand the recreation center, to build a community theater and other cultural facilities, to improve education and consider a high school. 3. Improve Transportation/Circulation: to reduce vehicular congestion, provide additional facilities/improve connectivity for pedestrian, cyclists and golf carts, provide commercial area access from Fernwood, and expand public transportation and traffic calming. Wallace Roberts & Todd, LLC 24 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 4. Development/Redevelopment Controls: to control density and intensity, preserve needed services and businesses, control building scale, and improve landscape requirements. 5. Community Interactions: to improve communication/dialogue among diverse community groups as well as between the Village and its residents, to improve civic involvement. 6. Seniors and Families: to provide for elder care on island, encourage affordable housing. 7. Infrastructure: to improve road conditions, expand/complete the sewer system, to upgrade lighting, signage, landscaping, and stormwater. Threats 1. Overpopulation/Unfettered Development: rezonings to increase density, oversized homes impacting older neighborhoods, loss of "small town" character. 2. Impacts of External Development: excessive development/traffic generation from Virginia Key and causeway development. 3. Degradation of the Environment: beach erosion, pollution, and the loss of biological diversity, open space and scenic beauty. 4. Traffic/Mobility/Parking: congestion and delays related to the single island accessway, increased traffic, safety problems. 5. Village Government: unresponsive, bureaucratic, over -restrictive, fiscal limitations, lack of intergovernmental coordination. 6. Loss of Community Character/Identity: degraded aesthetics, loss of community spirit, factionalism, excess tourism/visitation. 7. Hurricanes/Natural Threats: lack of preparedness, failure to evacuate, power failures, storm surge. 8. High Cost of Living: ever -escalating property values and taxes are perceived as a potential threat to the quality of life and socioeconomic diversity of the community. 9. Schools: lack of high school, overcrowded classrooms. Wallace Roberts & Todd, LLC 25 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 10. Crime/Illegal Activity The input received through the SWOT exercises, and the resulting areas of community consensus identified in the above summary, provided the "raw material" for the articulation of the Key Biscayne 2020 Vision Statement, which follows: 2020 Vision Statement Key Biscayne in 2005: What We Value Surrounded by parks, Biscayne Bay and the Atlantic Ocean, the Village of Key Biscayne enjoys outstanding natural beauty, a compelling sense of place, lush landscaping, and a unique small-town ambiance that leads many residents and visitors to call it "Island Paradise". Our close proximity to metropolitan Miami -Dade County allows us to enjoy the best of both worlds: a sense of separateness as a serene, secure island sanctuary coupled with convenient access to services, activities and amenities on the mainland. Our relaxed island style is evident in our people, our active lifestyles, and our shared enjoyment of living "across the bridge" in a close-knit, nurturing community. The Village is a vibrant and interactive place made more interesting by our cultural diversity, neighborliness and commitment to fellowship and community spirit. The Past as Prologue: Aspirations and Accomplishments The Village of Key Biscayne was incorporated on June 23, 1991 to provide for local control over development, improved infrastructure and services, and better governmental process. We adopted a charter, elected our first Village Council (then called the Board of Trustees), hired a manager, and built our local government from scratch. In turn, we established fire -rescue, police and other departments and adopted zoning and other municipal codes. In 1995, after years of public education and participation, we adopted our first Master Plan. Our Master Plan identified deficiencies and provided for many needed or desired improvements. Because of our early vision, planning and follow through, we now enjoy excellent fire -rescue and police services, a debt -free Village Green, an architecturally distinguished Civic Center complex including a well -used Community Center, more local Wallace Roberts & Todd, LLC 26 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN parks, a renourished beach with protective dune system, a vastly improved stormwater drainage system, an expanded K-8 public school, street -by -street tree plantings and landscaping, street lights and pavers, sidewalks, landscaped traffic calming devices, reduced Village -wide speed limits, and the lowest millage rate of any municipality in Miami -Dade County. 2020 Vision Statement: Keeping the "Village" in our Village Now, a decade after adopting our Master Plan, we are developing our first Master Plan Evaluation and Appraisal Report, as required by law. As an interconnected exercise, we also are developing this Vision Statement as the first part of a Vision Plan for 2020. Recognizing that the 1995 Master Plan benefited from prior years of study, visioning and community participation, we sought extensive public input for our 2020 Vision, engendering lively debates. We speak about "Keeping The `Village' in Our Village". This means that we wish the Village to retain the intrinsically positive qualities described herein. Our 2020 Vision is meant to supplement our Master Plan by communicating our values and goals and by suggesting strategies and actions to achieve those goals. By implementing our Vision Plan, in the ensuing years through 2020 we will have: Community Character and Quality of Life • Maintained our small-town, island character by managing the scale and density of development on a neighborhood -by -neighborhood basis. • Enhanced our streetscapes, parks, civic realm and open spaces with a well -maintained subtropical plant palette suited to our island. • Practiced responsible stewardship of our natural environment by protecting our tree canopy, natural habitats, beaches, dunes, and nearshore water quality. • Expanded our array of passive parks, open spaces and active recreation facilities through carefully directed property acquisition and redevelopment, to include small-scale neighborhood parks, a restored, protected Calusa Park with improved pedestrian access, additional playing fields and bikeways and trails. Wallace Roberts & Todd, LLC 27 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Enhanced local high -quality education from early childhood programs to lifelong learning for adults, in close coordination with public and private schools. • Expanded our cultural facilities, activities, special events and historic preservation efforts, and provided a physical setting for a cultural center, theater and local history museum. • Maintained extremely high levels of quality and responsiveness in our government departments, including police, fire and emergency medical services. • Worked effectively with the State of Florida, Miami -Dade County and the City of Miami to influence and mitigate the impact of new development on Virginia Key and of visitors to the regional attractions and parks that surround the Village. • Expanded and improved visual and physical access to Biscayne Bay and the Atlantic Ocean. • Recognized the positive economic impact of tourism and the role of hotels in providing amenities to residents and as community partners. Sustainable Community Structure • Encouraged redevelopment of outdated commercial areas to preserve and expand local -serving retail and professional businesses and services in well -designed, accessible and interconnected centers. • Attained safe, pleasant and convenient pedestrian and cycling linkages between neighborhoods, schools, parks, civic and recreational sites and commercial properties. • Established a well -integrated vehicular transportation system that: provides for maximum safety considerations; - successfully manages traffic congestion from residents, day visitors, workers, and special events; - reduces local use of automobiles by encouraging pedestrian, bicycle and golf cart transport; expands transit use, including off -island bus routes and on -island shuttles; Wallace Roberts & Todd, LLC 28 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN incorporates well -designed and constructed traffic calming applications; improves local access to Crandon Boulevard commercial areas from Fernwood Road; and - includes a proactive street maintenance program. • Upgraded our infrastructure where feasible and affordable by expanding sewer service in areas formerly served by septic systems, by replacing antiquated water pipe systems, and by burying overhead utilities. People and Relationships • Encouraged volunteerism and community involvement, and included citizens as active participants in civic affairs and community service. • Provided our multi -generational community with rich civic, cultural, recreational, and educational opportunities for children, youth, adults and seniors. • Promoted effective and respectful communication among residents who have different opinions. • Encouraged and provided programs and solutions by which young adults and senior citizens can remain residents of the Village. Governance • Operated our government in a transparent, respectful, responsive and efficient manner, using innovative communication methods to raise citizen awareness. • Managed judiciously our tax revenues, public spending, debt and capital projects, and identified clear criteria for spending priorities. • Provided excellent public safety services for our residents and visitors. • Maintained Village property and landscaping at high levels of excellence. Wallace Roberts & Todd, LLC 29 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Effectively engaged the City of Miami, Miami -Dade County and the State of Florida on regional issues that influence the quality of life in the Village. • Partnered with the City of Miami and Miami -Dade County to implement a Virginia Key Master Plan that ensures environmentally sensitive development, a new high school, lighted playing fields, and traffic mitigation along the Causeway. Conclusion: Changes, Opportunities and Challenges The 2020 Vision Statement is being drafted at a time of continued change in the Village of Key Biscayne. The commercial properties at our Village entrance, the oceanfront Silver Sands Motel, and various apartment and condominium properties are susceptible to near -term redevelopment. The ultimate use of the Village owned property facing Crandon Boulevard and the Civic Center is undetermined. Starting in 2006, the existing Sonesta Beach Resort will be demolished and rebuilt. Comprehensive new development is planned for Virginia Key and must be closely monitored to assure compatible uses and manageable Causeway impacts. Without foresight and planning, many improvements we value and even take for granted today may not have come about. We recognize the successes that came from our previous planning efforts and we will continue to plan and act for our best future. The attention we give to the future strengthens our community today and helps instill in our children and neighbors a valued ethic of citizenship. These are worthy goals in themselves. Change is both inevitable and not entirely predictable, and "Keeping The `Village' in Our Village" is not necessarily assured. With this in mind, we hope the vision and planning contained in this document will be of lasting value to the Village by informing the decisions, and guiding the actions, of future residents and Village Councils. Above all, we mean to preserve those values, standards and ideals that define our vision of Island Paradise. Wallace Roberts & Todd, LLC 30 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 2. Community -Wide Assessment a. Population Growth and Changes in Land Area. The Miami -Dade County Department of Planning and Zoning (MDCDPZ) identifies Key Biscayne as an area of moderate growth in comparison to other municipalities in the County. According to the U.S. Census, the population of Key Biscayne increased from 8,854 people and 3,831 households in 1990 to 10,507 individuals and 4,529 households in 2000. The additional 1,653 persons equate to a 19 percent growth in population, or about 1.9% per year. By comparison, during the same decade the total population of the County —the eighth largest in the nation by population — increased by 316,268 individuals and 84,419 new households, a growth rate of approximately 16%. The University of Florida reported the 2004 population of the Village to be 11,160, producing an average yearly growth rate between 2000 and 2004 of 1.6 percent. This drop in the growth rate compared to the preceding decade mirrors an increasingly limited supply of undeveloped land on the island. The average size of families in the Village increased from 2.85 persons per family in 1990 to 2.99 persons per family in 2000; the average household size grew from 2.31 to 2.47 over the same period. These increases may be correlated to an overall worsening in traffic congestion, perhaps due to an informally observed increase in the number of cars per household in the Village. According the State Department of Motor Vehicles, the number of registered vehicles in January 2006 is 10,582. The Department is currently unable to provide historical data for the purposes of comparison.2 However, the figure provided may serve as the basis for a future study analyzing the patterns in internally -generated traffic congestion. Family households with children under the age of 18 grew from 939 in the 1990 U.S. Census, to 1,404 in 2000 (approximately 32% of the total households), an increase of 465 families with children. Overall, the population under the age of 18 years in the Village grew by almost 55% between 1990 and 2000 (from 1,646 to 2,547). Today, children under the 2 According to the DMV, due to the prior configuration of its database, historic registered vehicle counts derived from addresses or zip codes may be inaccurate. It was possible for a vehicle to mistakenly be counted more than once: the address field was associated with the customer, not to the vehicle record; therefore, if a customer changed his or her address more than once in a calendar year, the vehicle record would have been double -counted. Wallace Roberts & Todd, LLC 31 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN age of 18 years represent 24.2% of the total population. This trend has burdened the capacity of local schools and is critical to short, medium, and long term educational facility planning. To address this problem, in February 2003, Key Biscayne signed an interlocal agreement with Miami - Dade County Public Schools and 24 municipalities to coordinate region - wide educational facilities planning, site selection and acquisition, and construction. The percentage of people over the age of 65 has dropped over the past ten years. Whereas in 1990, persons 65 years or old comprised 17.2 percent of the population, in 2000 they were 15.6 percent. Despite its overall decrease in percentage of total population composition, the aging population continues to be particularly affected by the island's limited supply of affordable housing —Key Biscayne's long-term elderly residents are often not able to afford the increase in taxes when they attempt to downsize—and evacuation during tropical storms and hurricanes. To address the latter issue, in early 2006, a committee will convene to explore the vulnerability of residents during and after severe storms. Comprised of residents and led by the fire chief, the Committee will emphasize assisting the elderly and others who may have restricted mobility and health needs. Census figures support a related trend anecdotally reported by residents: formerly transient apartments and condominiums once occupied by retirees and empty -nesters are now occupied by families who live in Key Biscayne year round. A comparison of the percentage of total households in 1990 and 2000 comprised of a person age 65 or older living alone dropped from 9.1 to 8.9, respectively. Key Biscayne's population growth has caused no changes in land area, in large part because natural geographic boundaries prevent the opportunity for annexation. b. Ethnicity and Race Components. The 2000 U.S. Census describes the racial makeup of the Village as 95.46% White, 0.46% African American, 0.01% Pacific Islander, 0.14% Native American, 0.92% Asian, 1.49% from other races, and 1.52% from two or more races. In the year 2000, 49.79% of the Village's population was classified as "of Hispanic origin of any race." This represents an increase of 38%, or 1,441 persons of Hispanic or Latino origin, since 1990. Wallace Roberts & Todd, LLC 32 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Notably, as recently as 1980, there was no majority group in Miami -Dade County. Rather, there were three large ethnic groups: non -Hispanic Whites, Hispanics and Blacks. This balance began to shift, and became very evident in the 1990s. In 2000, Miami -Dade County was the first and only county in Florida with a Hispanic majority (57%). Although Key Biscayne has not yet crossed that threshold, it is very close. Table 1: Ethnicity Change in Key Biscayne and Miami -Dade County, 1990-2000 Ethnicity 1990 2000 Key Biscayne Miami -Dade Co. Key Biscayne Miami -Dade Co. White (Non-Hispanic)1% 4,897/55% 585,607/30% ' 5,059/48% 465,772/21% Black (Non- Hispanic)I% 361<1% 369,621120.5% 28/<1% 427,140/20% Other (Non-Hispanic)1% 131/1% 28,459/1% 190/2% 68,71313% Hispanic%/ 3,790/43% 953,407/49% 5,236/50% 1,291,737/57% Total 8,854 1,937,094 10,513 2,253,362 ources: U.S. Census Bureau, 9990 and 2000 Census, 2003 Miami -Dade County EAR Over 54%, or 5,723 persons, of the 2000 Key Biscayne population were born outside the U.S.—although 46% of that number is comprised of naturalized or native citizens. Of those born abroad, 76.6% were natives of Latin America. Table 2: Nativity and Place of Birth, 2000 Key Biscayne 0/0 Increase Native 5,199 49.6 Born in U.S. 4,754 45.4 Born in Florida 2,054 19.6 Born in different state 2,700 25.8 Born outside U.S. 445 4.2 Naturalized citizen 2,224 21.2 Not a citizen 3,054 29.2 Total 10,477 Sources: 2000 U.S. Census, ePodunk Nearly 59% of the total population of Key Biscayne speaks Spanish at home, but only 14.4% of this group described their command of the English language as less than proficient, according to the 2000 U.S. Census. c. Population Projections. Wallace Roberts & Todd, LLC 33 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN This EAR will rely primarily on population projections generated by MDCDPZ. The projections were updated in 2003 to reflect Census 2000 data, and were used by Miami -Dade County in the preparation of its own EAR, which was adopted in 2003 as the basis for the County's Comprehensive Development Master Plan amendments. According to the Miami -Dade County EAR, the 2003 projections were developed in the same manner as previous series with estimates for births, deaths, and net migration made separately, and then combined to arrive at the totals used in this report. As with all projections, assumptions are made about a number of factors —in particular those related to net migration flows. Based on observable trends, countywide immigration, comprised of mostly foreign migrants, is expected to be constant and to remain at fairly high levels. For Key Biscayne, the projections generated by MDCDPZ indicate that, while the population will continue to increase in the County as a whole, the local rate of growth will trend toward zero after 2010 as the Village approaches build -out capacity (estimated at approximately 5,800 dwelling units at current zoned densities. Using average family size reported by the 2000 Census, the build -out population would be approximately 17,400. Using average household size, the build -out population is projected to be 14,326). Table 3: Annual Average Change, Population Projections for Key Biscayne and Miami -Dade County, 1990 to 2025 Area Change 1990-00 Change 2000-03 Change 2000-10 Change 2010-15 Change 2015-20 Change 2020-25 Remaining Capacity 0 Population at Capacity 11,425 Key Biscayne 166 216 109 -35 0 0 Miami -Dade Co. 31,608 29,729 29,792 30,366 31,014 32,320 30,778 3,050,563 ource: nntamt-uaoe county Department of Planning and Zoning, Research Section, 2003. Table 4: Population Projection Comparison Between Key Biscayne and Miami -Dade County 2000 2003 2010 2015 2020 2025 Key Biscayne 10,507 11,160 11,600 11,425 11,425 11,425 Increase -- 647 _ 440 -175 0 0 Percent Increase -- 6.2% 3.9% -0.98% 0 0 Miami -Dade County 2,253,362 2,342,551 2,551,283 2,703,114 2,858,184 3,019,785 Increase -- _ 89,189 208,732 151,831 155,070 161,601 Percent Increase -- 3.9% 8.9% 5.9% 5.7% 5,7% ource: 2000 Census; Mlam- Dade County Department of Planning and Zoning, Planning Research, 2003. Wallace Roberts & Todd, LLC 34 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Reaching build -out capacity does not imply no further development will take place. Rather, as the Village arrives at this stage, future growth will be in the form of redevelopment. Therefore, the Village should capitalize on opportunities to guide this redevelopment in a manner consistent with the community's vision, to explore ways to retain and enhance existing development, and to introduce new, activities that expand the self- sufficiency of the Village. d. Extent of Vacant and Developable Land. In 1995, there were 86 acres of vacant land according to the 1995 Key Biscayne Master Plan. No land has been annexed since that time —Bill Baggs Cape Florida State Park extends along the entire southern border of the island community; Miami -Dade County's Crandon and Calusa Parks span the entire northern edge; Biscayne Bay fronts the western border; and the eastern border faces the Atlantic Ocean —and today all of those original vacant lots have been developed or have permits for development.3 The Village, though almost entirely built out, is slightly below capacity by measure of densities permitted by the Land Development Code. This gap is not large enough to allow any major increases in density, but the composition of the Village will continue to evolve as older housing stock is knocked down and replaced by larger dwelling units, a trend evident today. Examination of residential certificates of occupancy records indicates that since 1997 approximately 26 new residential units per year have been built either on vacant lots or in place of demolished units (See Table 5). Since there are no vacant lots remaining as of March 2006, all future new construction will occur in the form of replacement of older units. If the average rate of replacement remained constant, the stock of original housing would be completely replaced by around 2047.4 While the density of units is presumed to remain relatively constant, the population could continue to increase in the single family realm since many existing, modestly sized, residential structures are being 3 A sizeable parcel -9.5 acres —of formerly vacant land along Crandon Boulevard (previously known as the "Tree Farm") has been dedicated as Public Recreation and Open Space in the form of the Village Green. A bandstand and gazebo were added to the Village Green in 2000. Today, this open space serves as the primary location for most of the holiday and other special events celebrated by the community throughout the year. 4 There are approximately 1300 single and duplex lots in the Village. Since 1997, 232 units on those lots have been replaced, leaving 1068 units of the original housing stock. Dividing 1068 units by the average rate of replacement, 26 units per year, yields a duration of approximately 41 years until the residential character completely shifts from small-scale to large-scale development. Wallace Roberts & Todd, LLC 35 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN redeveloped into substantially larger homes containing additional bedrooms. Although no study has been conducted to evaluate the actual occupancy of these units, if each bedroom were filled, the Village's population could increase significantly, with potentially dire consequences on the demand for infrastructure and services. Table 5: Key Biscayne Residential Certificates of Occupancy, 1995 - 2005 Year Single Family Duplex Total Permits 1997 3 0 3 1998 22 0 22 1999 32 0 32 2000 35 0 35 2001 40 2 42 2002 22 0 22 2003 30 _ 1 31 2004 22 1 23 2005 19 3 22 Total 225 7 232 As of February 13, 2006; Figures represent new construction on vacant land or following complete demolition. Source: Village of Key Biscayne Department of Building, Zoning and Planning, February 2006. Any redevelopment of the two largest and most influential developments of residential composition over the past ten years —the Grand Bay Residences and Ritz -Carlton Hotel (799 units) and Ocean Club (1,032 units) —would be subject to a rigorous approval process by the Village Council, which is required to comply with state -mandated density restrictions for Coastal High Hazard Areas. Because both of the projects' original permits have since expired, redevelopment density could not exceed current density. The Village inherited the two Developments of Regional Impact from Miami -Dade County when it incorporated in 1991. Setting a precedent for density allowance, the Village immediately and successfully pursued the reduction of the projects' permitted capacity on the basis of insufficient parks and recreation space and an undue burden on infrastructure. Due to natural market forces, there has been little new construction on the Village's 25.8 acres zoned for low -intensity commercial use, and minimal redevelopment of its approximately 400,000 square feet of existing commercial space since the adoption of the Master Plan in 1995 (See Table 6). One noteworthy exception is 200 Crandon Boulevard, known as Key Colony Place. In the process of being completed as of March 2006, Wallace Roberts & Todd, LLC 36 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN the shopping plaza will incorporate pedestrian -oriented design features promoted by the Village. Table 6: Key Biscayne Commercial Building Permits, April 2000 — April 2005 Year New Construction Complete Demolition Other Permits (renovations, ' additions, etc.) Total Permits 2000 3 1 40 44 2001 1 0 48 49 2002 2 1 46 49 2003 1 3 26 30 2004 1 0 31 32 2005 0 0 7 1 7 Total 8 5 198 211 ource: Village of Key Biscayne Department of Building, Zoning and Planning, May 2005. e. Location of Development in Relation to Master Plan. All new construction and redevelopment since 1995 has occurred in accordance with the Future Land Use Map and designations adopted in the Key Biscayne Master Plan. There have been three amendments to the Future Land Use section since the Master Plan was adopted: • Ord. 95-8 amended densities permitted within the "Medium Density Multifamily and Ocean Resort Hotel" land use category in the Master Plan, separating the tabulation of density for multifamily residential uses and hotel uses located on the same lot. • Ord. 97-17 amended the land use designation on the Future Land Use Map from Medium Density Single Family Residential to Two Family Residential for seventeen parcels of property on Fernwood Road specified in the appendix of that ordinance. • Ord. 2000-1 amended the Future Land Use Map for the property at 800 Crandon Boulevard, changing it from the "office" to "commercial" category. Commercial development along Crandon Boulevard since the 1995 Master Plan includes the Pankey Institute along the east side of the entry block and the following developments along the west side: Suntrust Bank at 500 Crandon Boulevard (10,750 square feet), Wachovia Bank at 100 Crandon Boulevard (4,426 square feet), and Ace Hardware commercial/office building at 800 Crandon Boulevard (8,000 square feet). As of March 2006, construction of Key Colony Place (28,000 square feet), Wallace Roberts & Todd, LLC 37 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN a new commercial complex located at 200 Crandon Boulevard, is in progress. A new fire station, Village Hall (Administration/Police), and Community Center have been constructed during the past five years on the blocks immediately south of the Village Green. This complex is now recognized as the community's "Civic Center". The 1995 Master Plan projected that the "Civic Center," purposefully located at the geographic center of the community, would help establish linkages from the existing commercial district and east -of -Crandon multi -family neighborhoods to the then Key Biscayne Community School (now Key Biscayne K-8 Center) and its surrounding single-family residences. The creation of the Civic Center provided opportunities to implement urban design and architectural practices and techniques that embody the strong sense of place and unique identity and character of the Village of Key Biscayne. The largest -scale projects in the Village have been the Ocean Club and Grand Bay Residences and Ritz -Carlton Hotel projects5. Both are located on the Atlantic Ocean on the east side of the island, and are designated as Developments of Regional Impact. The 38 -acre Grand Bay project, consisting of two condominium towers, 49 detached residences, and what is now the Ritz -Carlton Hotel totals 707 units. It was completed in 2001 and issued its final Certificate of Occupancy by the Village in the same year. The Ocean Club, occupying 52 oceanfront acres, consists of 800 condominium residences in six mid -rise buildings with four to seven stories each (known as Lake Villas), plus five high-rise building_ s with 14 to 18 stories each. The property also includes a 5 -acre private lake, tennis club, beach club, cabanas, restaurant, and other amenities. The Master Plan for The Ocean Club was approved by the Village of Key Biscayne in July 1995. Four of these buildings were permitted by the Village and built between 2001 and 2002. Although some residential development has occurred as infill on vacant platted lots, permit records indicate that the bulk of the Village's residential construction is taking place on previously developed lots (refer to Table 5). The 1995 Master Plan also recommended setback, height, minimum pervious area requirements and other controls to mitigate the impact of larger new construction (typically 3,500-4,000 sq, ft. 2 to 3 story houses) on smaller adjacent homes (typically 1,200-1,500 sq. ft. 1 story houses). S The projects are identified in South Florida Regional Planning Council records as Key Biscayne Hotel and Villas, and Hemmeter/Continental Resort, respectively. Wallace Roberts & Todd, LLC 38 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN However, these efforts to control bulk intersected with Federal Emergency Management Agency (FEMA) rules concerning rebuilding of homes in flood hazard areas. Increased enforcement of these regulations occurred after Hurricane Andrew hit South Florida in 1992. For areas such as Key Biscayne with an AE flood hazard rating, FEMA requires the first finished floor of new construction to be elevated 5 feet above base flood elevation, adding to the building height. Following Hurricane Andrew, while Key Biscayne was still operating under the Dade County Code, there was a frenzy of residential redevelopment in the Village. Much of it was relatively massive in scale and constructed on fill, which resulted in a disparities in elevation and stormwater runoff problems for the older housing stock. When the Village adopted its own zoning code, it tailored regulations to prevent this type of development from occurring. While many long-time residents lament the loss of original, small-scale Key Biscayne homes, they also realize that change in housing styles is inevitable based on property values, to meet the needs of today's families and to comply with FEMA regulations. The 1995 Master Plan and subsequently enacted zoning code included provisions that afford owners of older housing stock opportunities to expand their homes, recognizing this may be the only feasible option for some. The zoning code also contained incentives intended to reduce the bulk and lot coverage of newly constructed residences. Key Biscayne does not have a working waterfront that meets the definition in Florida State House Bill 955 and therefore it is not subject to the related requirements of that House Bill. f. Infrastructure Levels of Service. (1) Transportation The Village of Key Biscayne sets forth Level of Service standards for transportation in Objective 1.2 of the Master Plan's Capital Improvements element. The timing of development will be regulated to maintain the following peak hour LOS standards: Arterial: Collectors: LOS "E"; LOS along Crandon Boulevard could potentially fall slightly below "E" near north Village limits LOS "B" Local Service Streets: LOS "A" Wallace Roberts & Todd, LLC 39 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN The 1995 Comprehensive Plan identified four significant road segments in its level of service capacity analysis: Crandon Boulevard N. of Harbor Drive; Crandon Boulevard from Harbor Drive to Village Limits; Harbor Drive from Crandon Boulevard to Mashta Drive, and Mashta Drive from Harbor Drive to Crandon Boulevard. All four were operating at a peak -hour weekday LOS of D or better. The data indicated that there were no existing deficiencies with respect to the Key Biscayne quality of traffic flow. Because of this, no roadway improvements were scheduled for Key Biscayne in the Miami -Dade County Transportation Improvement Program. The Crandon Boulevard Master Plan study, completed in February 2004, examined county -owned Crandon Boulevard, the only major arterial in the Village of Key Biscayne (other local roads belong to the Village). The study analyzed the usage patterns and volumes of vehicular traffic along to determine if any deficiencies existed, assessed the extent and nature of any deficiencies and recommended appropriate geometric and operational improvements. The traffic analysis utilized the concept of level of service as the measure of traffic performance. Pursuant to classifications determined by the Florida Department of Transportation 6 and the Transportation Research Board, Crandon Boulevard must be maintained at a Level of Service D. According to the Crandon Boulevard Master Plan, the arterial is in compliance at the segment carrying the highest traffic load within the Village— the Crandon Boulevard corridor north of the Crandon/Harbor Drive/Ocean Lane signalized intersection —at three of the six signalized intersections. Ocean Lane Drive itself is LOS B. However, the road's remaining three signalized intersections operate at a Level of Service E or worse during peak times of the day. According to the Crandon Boulevard Master Plan, improvements, which are currently underway, will elevate these deficient areas to meet or exceed state standards. Crandon Boulevard and Harbor Drive will be improved from LOS E to LOS D; Crandon Boulevard and Key Colony Entrance will be improved from LOS E to at least an LOS D; and Crandon Boulevard at West Wood Drive will be improved from an LOS F to at least an LOS D when the Village completes its conversion of all roads earmarked in the Crandon Boulevard Master Plan. The following policies should be added to the Master Plan: 6 Source: FDOT Quality/Level of Service Handbook, November 2002, p 129. Wallace Roberts & Todd, LLC 40 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Schedule a traffic study to assess the impact of internally generated traffic congestion. • Schedule a traffic study to assess the LOS of collector and local streets. • In Policy 1.1.1, change the designation for arterial roadways from LOS "E" to LOS "D." • Designate Fernwood Road as a transitional road between residential and commercial. At the rear lot line of specific commercial centers on Crandon Boulevard, require that access points be opened where appropriate to pedestrians, golf carts and, on a limited basis, to vehicular traffic. • To better encompass the spectrum of transportation facilities, the Traffic Circulation Element shall be renamed the Transportation Element. • Coordinate the Future Land Use Map with the transportation system. • Establish numerical indicators to measure achievement of mobility goals. • Conduct a public transit feasibility study. (2) Sanitary Sewer and Potable Water The Master Plan sets the following standards for the sanitary sewer and potable systems in Objective 1.2 of the Capital Improvements element. Sanitary Sewers in Not to exceed 98% of County treatment Sewered Areas: system's rated capacity. Average sewage generation standard of 140 gallons per capita per day. Sanitary Sewers in Unsewered Areas**: Potable Water: Permit septic tanks only in compliance with county and state standards. Not to exceed 98% of County treatment and storage system's rated capacity, with at least 20 lbs. per sq. inch at property line and average 280 gallons per capita per day. Wallace Roberts & Todd, LLC 41 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN **The second standard for sanitary sewers (in unsewered areas) will become obsolete when the Village completes its conversion of all remaining residential parcels on septic to sewer. At the time the Comprehensive Plan was written, there was no master meter that enabled WASD to calculate average Village sewage generation or the percent of the total system flow coming from Key Biscayne. Instead, the County estimated that the Village was adding about 1,187,000 gallons per day into the WASD collection system. Although there have been no acute problems with sewage, from time to time there has been evidence of septic tank effluent percolating to the surface. The Comprehensive Plan recommended that the entire Village be served by sanitary sewers, with the first priority being the residential streets adjacent to Biscayne Bay. The Plan estimated that approximately 300,000 per day would be generated by the Village's 2003 permanent plus seasonal population after the sewer was extended. The existing county -wide system treatment capacity at the time was 298,000,000 gallons per day and the WASD indicated sufficient capacity to serve Key Biscayne. In 1995, the entire Village was served by the WASD water distribution system. A pair of mains (one 12 inch and one 24 inch) follow Crandon Boulevard into the Village. The WASD treatment and distribution system is interconnected and therefore considered a single system, whose capacity is calculated as the sum of the capacity of all three treatment plants. The combined capacity of this system was 403,000,000 gallons per day with a maximum daily flow of 306,000,000 in 1991. As in the case of sewage, there was no master water meter. The County estimated that the Village consumed an average of 2,374,000 gallons per day. There were no problems or projected needs related to potable water demands in Key Biscayne. The projected permanent plus seasonal population increase was expected to increase water consumption by 470,000 gallons per day by 2003 and half that amount by 1998. Key Biscayne continues to be identified as a Miami -Dade Water and Sewer Authority Collection Areas in Miami -Dade County's 2003 EAR. According to Objective 2 of the MDC Master Plan Water and Sewer Sub -element 2.5.1, the County has guaranteed that it will maintain procedures to ensure that any facility deficiencies are corrected and that adequate facility capacity will be available to meet future needs; Key Biscayne assists the County in achieving this endeavor by cooperating to biannually update estimates of system demand and capacity. Wallace Roberts & Todd, LLC 42 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN According to the County's EAR, system -wide wastewater treatment facilities have the capacity to process 352.50 million gallons per day, which surpasses the average daily demand of 310.81 million gallons per day. An evaluation of the projected rated system water capacities and the estimated maximum demand shows that capacity is available in Key Biscayne's service district through 2020 at a level that would satisfy the Village's own service standards. See Table 7. However, to ensure continued provision of adequate sanitary sewer service, the County has allocated $1.3 billion in capital sanitary sewer projects. Table 7: WASD Water System Capacity and Demand Comparison, 1995-2020 Year 1995 2000 2005 2010 2015 2020 Maximum Day Capacity (MGD) 427.60 454.77 495.03 520.03 563.03 563.03 102 Pct. Of Max. Day Demand (MGD) for the Preceding Year 396.78 399.13 451.55 487.36 517.34 547.74 MGD = Million Gallons per Day Source: Miami -Dade Water and Sewer Department WASA operates three regional wastewater treatment plants in the North, Central, and South Districts. Geographically, Key Biscayne falls within Service District 2, "Central." However, according to the Miami - Dade County EAR, the boundaries of the districts are flexible; the system is interconnected, allowing flows from one district to be diverted to other plants in the system. This flexibility, along with a significant reduction in average flow into the regional system due to extensive infiltration and inflow prevention work since 1994, has allowed the County to meet demands7 and is expected to permit the Village to meet its own Level of Service Standards for sanitary sewer. The potable water to Key Biscayne is circulated as part of an interconnected County -wide system. Similar to the sewer system, the Village cooperates with the County and other affected agencies to estimate system demand and capacity. Source: 2003 MDC EAR 2-152. In the mid -1990s, the County agreed to undertake more than $1.169 billion worth of improvements to its wastewater treatment plants, transmission mains and sewage collection system. Major improvements include construction of a new Biscayne Bay sewer line, a force main interceptor in Flagler Street, a South Miami -Dade transmission main and new mains in North Miami -Dade. The County is subject to fines of $10,000 per day if it fails to complete the project on schedule. Wallace Roberts & Todd, LLC 43 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN According to Miami -Dade County's 2003 EAR, in 2003 the capacity of the County's water system is 454.77 million gallons per day, surpassing the average daily demand of 346.10 million gallons per day and the Village's aforementioned Level of Service Standard. Miami - Dade County currently has programmed $883 million in water capital improvements projects to ensure its ability to continue to provide capacity to meet system -wide existing and projected demand. The County's programmed capital improvements and the Village's continued prudent provision of land development regulations and the concurrency system should allow for the Potable Water Level of Service to be met. According to the Miami -Dade County EAR, the County has continued to maintain sufficient capacity in both the regional water and wastewater system to meet demand. Levels of Service standards have generally been met throughout the reporting period, and additional policies under the objective have also exhibited progress. Water Supply (with respect to the long-range water supply facilities work plan of the South Florida Water Management District (SFWMD)) Chapter 163, Florida Statutes, requires the preparation of a 10-yaer Water Supply Facilities Work Plan by local governments with water supply facility responsibilities. Key Biscayne does not have water supply facility responsibilities. However, it will comply by continuing to participate in intergovernmental coordination efforts and amending the Master Plan as necessary upon the adoption of the Lower East Coast Water Supply Plan. In light of MDWASA's recently publicized projected inability to meet long term demand of services, the Village of Key Biscayne will closely monitor any updates to capacity, support MDWASA in achieving its goals in any way feasible, and, if necessary, explore alternative mechanisms and sources for the provision of water and sewer. It is recommended that the Village add new policies to the Master Plan regarding intergovernmental coordination: • Seek and obtain a written statement from the Miami -Dade Water and Sewer Authority regarding the availability of water to serve all proposed development projects, including current and projected demand, remaining permitted water withdrawals, facility capacity, and scheduled capital improvement projects. Wallace Roberts & Todd, LLC 44 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Update the Master Plan within 18 months of the South Florida Water Management District updating its regional water supply plan, highlighting alternative water supply projects. • Establish a single -point -of -contact at the South Florida Water Management District and Miami -Dade Water and Sewer Authority to determine the extent to which the Village will be involved in the planning, financing, construction, and operation of water supply facilities that will serve the community. • Verify with the Miami -Dade Water and Sewer Authority the availability of water before making changes to the Future Land Use Map. (3) Solid Waste Management The Master Plan sets the following standards for solid waste in Objective 1.2 of the Capital Improvements element. Solid Waste: County system maintains a minimum of 5 years capacity; Village use generation rate of 5.2 lbs. per person per day. At the time the Comprehensive Plan was written, the Dade Count Solid Waste Management Department was responsible for the collection of solid waste from single-family residential areas. A number of private firms served the multi -family and non-residential uses. The County's resource recovery facility on N.W. 58"' Street was the disposal facility for Key Biscayne. The County projected that there would be adequate landfill capacity remaining at the facility until the Year 2009. The capacity of the Central transfer station was 4,000 tons with an average daily demand of 900 tons. No precise data indicating the existing Village solid waste generation was available at the time. However, the County estimated that the Village was generating about 31 tons per day. Miami -Dade County continues to be responsible for processing solid waste delivered by a private hauler from the Village of Key Biscayne. It measures its Level of Service based on a combination of factors: the annual amount of waste processed at each County disposal facility; the annual amount of waste disposed of at each County transfer facility; and the amount of waste processed at private disposal facilities or exported out of the County. Wallace Roberts & Todd, LLC 45 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN g. According to the County's EAR, the County has committed to implement procedures to ensure that adequate solid waste facility capacity will be available to meet future needs. Based on a facility capacity analysis prepared by the Miami -Dade County Department of Solid Waste Management in 1999, the three disposal facilities owned and operated by Miami -Dade County through the year 2039 have the capacity to adequately meet internally generated LOS standards until 2011. According to the complete capacity analysis conducted by DSWM in 1999, Miami -Dade County in 2003 has some but not complete capacity for disposing of projected waste streams until the year 2032. In April 2005, the Village increased revenues and appropriations for expenditures between October 1st 2004 and September 30, 2005 within the solid waste fund. The new total of $545,162.00 was in accordance with its new contract with its service provider. Coordination of Land Use and Public School Planning. Interlocal Agreement In February 2003, Key Biscayne cosigned an interlocal agreement with Miami -Dade County Public Schools and 24 regional municipalities. The agreement mandates semi-annual meetings attended by the County Mayor or designated representative, the Mayor or designated representative for each municipality, the School Board Superintendent to coordinate educational facilities planning, including site selection and acquisition, and construction. Furthermore, the committee discusses issues and formulates recommendations ■ Population and student projections; ■ Development trends; and ■ A work program for five, ten, and twenty year intervals. This includes the school district's relationship to local government master plans, particularly as it relates to the identification of potential school sites in the master plan's future land use map series, schools needs (school capacity and school funding), collocation and joint use opportunities, and ancillary infrastructure improvements needed to support the school and ensure safe student access. Inventory of Local Schools There is a total of five public and private schools in the Village of Key Biscayne. Wallace Roberts & Todd, LLC 46 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Key Biscayne K-8 Center8 • Public • K -8t" grade Key Biscayne International Christian School ▪ Private • Pre -K through 6th grade St. Agnes Academy • Private (Catholic) • Pre -K through 8t" grade St. Christopher's By -the -Sea Montessori School • Private • Pre -School through 6t" grade MAST Academy • Public magnet school focused on marine science and technology; not physically in Village, but rather in Virginia Key. • 9-12t" grade All high school students commute to schools outside of the Village boundaries by public school bus, private vehicle, or private van service. Coral Gables Senior High is the feeder pattern (default) public high school for the Village. Students may apply for magnet public high schools where admissions are merit -based and lottery. Applications are made in the 8t" grade for 9t" grade admission, MAST Academy, located on nearby Virginia Key, is a desirable magnet school whose combined merit -based and lottery admissions process does not give preference to Key Biscayne residents. Many students attend private high schools located in Miami -Dade County. Changes in School Demand Key Biscayne's demand on the public school system at large is growing. According to Census figures, the proportion of young children in Key Biscayne is increasing: in 1990, five to thirteen year -olds comprised 9,0 percent of the population, while in 2000 they made up 13.1 percent. Enrollment figures from Key Biscayne K-8 Center reflect this trend. Total school enrollment for the 2005 through 2006 school year is 1,028, up from 981 students during 2004-2005 and 976 during 2003-2004. To address deficient capacity (enrollment was at 155% of 8 Previously known as Key Biscayne Community School Wallace Roberts & Todd, LLC 47 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN capacity during the 2004-2005 school year and at 122% of capacity between 2003-2004), the facility was expanded. In October 2005, the Miami -Dade County Public Schools Department and the City of Miami jointly announced an initiative to improve public education in South Florida. Plans include the creation of a "commuter high school" as part of the City's five year "Education Compact" to address County -wide rapidly growing enrollment. Officials identified Virginia Key as a potential site. The next step is for the Virginia Key Master Plan committee to locate six -acre parcels of land on Virginia Key suitable for a school. Key Biscayne is fully engaged in this process: in addition to Key Biscayne's current mayor's active involvement in high-level interlocal talks to locate a high school on Virginia Key, the Village Manager is a member of the group that selected the consultant of the Master Plan. h. Coastal High -Hazard Area development mitigation strategies. The Village of Key Biscayne is located within a Coastal High Hazard Area that also is designated an AE flood zone. Section 163.3191(2)(m), F.S., requires that local governments "evaluate whether past reductions in land use densities in coastal high hazard areas have impaired property rights of current residents where redevelopment occurs." Goal 1 of the Master Plan's Future Land Use Section states, in part, "future residential development should be at the lowest densities consistent with protection of reasonable property rights." Objective 1.1 follows that the Village must "maintain existing development and achieve new development and redevelopment which is consistent with the community character statement articulated as Goal 1." The Village has almost no vacant land and only redevelopment is anticipated to occur in residential areas. The island currently has four single family residential zoning designations. Island Residential includes 100 properties; Parkside Residential includes 51 properties; Village Estate includes 247 properties; and Village Residential includes 932 properties for a total of 1330 single family residences. There are three multi -family residential designations: Low, Medium, and High Density. No density reductions adversely impacting property rights have occurred or are projected to occur. However, the Village will continue to deny any development applications that would serve to Wallace Roberts & Todd, LLC 48 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN increase density beyond what exists or is allowed by current zoning and/or vested rights. Wallace Roberts & Todd, LLC 49 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 3. Assessment of Master Plan Elements a. Future Land Use (1) Purpose of the Future Land Use Plan. The purpose of the Future Land Use Chapter is to: "...prioritize the protection and enhancement of the Village's residential character, while remaining sensitive to the Key Biscayne's natural and commercial resources." (2) Summary Assessment The Master Plan for Key Biscayne was adopted shortly after the Village's incorporation. The Plan's Future Land Use section reflects its effort to create a formal framework to protect and maintain its residential character while complying with external standards. The Master Plan was written prior to the adoption zoning ordinances; therefore, many of its policies are directives for the Village to include and enforce specific provisions in the future Land Development Code. All such policies have been incorporated into the Land Development Code. There have been no recent major changes to the Future Land Use Map, but new zoning categories have been added and used as necessary. See Future Land Use and Zoning Maps (Figures 1 and 2) on the following pages. There is no immediate foreseeable need for additional zoning or land use categories as future growth is forecasted to be minimal and consistent with current patterns. The Village completed policies requiring an improvement of service and the drafting and implementation of a plan with moderate success; all of the projects are, at the very least, in progress. Amendments should be made to adjust the deadlines to coordinate with revised projected timelines. (3) Recommended Amendments to the Future Land Use Element. The following ordinances affecting the Future Land Use Element have been passed since the Comprehensive Plan was adopted. Ord. 95-8 amended densities permitted within the "Medium Density Multifamily and Ocean Resort Hotel" land -use category in the Master Plan, separating the tabulation of density for multifamily residential uses and hotel uses located on the same lot. Wallace Roberts & Todd, LLC 50 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Ord. 97-17 amended the land use designation on the Future Land Use Map from Medium Density Single Family Residential to Two Family Residential for seventeen parcels of real property on Fernwood Road specified in an appendix (Ordinance 97-17). The following amendments to the Future Land Use Element are being suggested as part of the Evaluation and Appraisal Report. (See Section 6 Conclusions and Recommendations) • The language in Goal 1 of the Future Land Use should be strengthened to read, in part: • "Future residential development shall be at the lowest densities consistent with protection of reasonable property rights." (See Section 6 Conclusions and Recommendations, Recommendation FLU1) • The following changes should be made to the future land use map to reflect current and anticipated uses. Government and Civic Center parcels at West McIntyre Street and Village Green Way should be reclassified from Commercial to Public and Institutional. ▪ The Pankey Building (1 Crandon Boulevard) should be changed from Medium Density Multi -Family to Office. • The Esplanade should be changed from Office to Commercial • The Library (299 Crandon Boulevard) should be changed from Medium Density Multi -Family to Public and Institutional • The Beach Park should be changed from Medium Density Multi -Family to Public Recreational and Open Space • A portion of the Key Biscayne K-8 Center designated as Public Recreation and Open Space and should be adjusted. The eastern third should remain as Public Recreation and Open Space, but the remaining two-thirds should be categorized as Public and Institutional. • The 700 block of Fernwood Road should be recategorized from Two Family Residential to Single Family Medium Density Residential. • Village Lake Park should be recategorized from Low Density Multi -Family to Public Recreation and Open Space. Wallace Roberts & Todd, LLC 51 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN (See Section 6 Conclusions and Recommendations, Recommendation FLU2) • Language and dates referenced in the following policy and objective should be updated to read: ■ Policy 2.1.1: Complete (sanitary sewer extension) plan by 2008. ■ Objective 2.2 and Objective 2.3: Continue to upgrade drainage system so outfalls in Biscayne Bay (and adjacent canals) fully meet NPDES standards and Chapters 17-25 and 17-302.500, F.A.C. Continue to updgrade private property on -site drainage standards to ensure retention of at least the first one inch of stormwater, and no more runoff after development than before. ■ Objective 2.6: Historic Preservation: prepare a list and strategy for preservation of potentially significant historic structures by 2010. • (See Section 6 Conclusions and Recommendations, Recommendation FLU3) (4) Evaluation of Goals, Objectives, and Policies of the Traffic Circulation Plan. See matrix on following page. (5) Future Land Use Plan Land Development Code Ordinances. Section 10-61(10): Adequate drainage paths shall be provided around structures to guide stormwater runoff away from them. Section 16-64(c): All subdivision proposals shall have adequate drainage provided to reduce exposure to flood hazards. Section 29 Stormwater Utility System: The Village desires to create a stormwater management system to maintain and improve water quality, to control flooding that results from rainfall events, to deter unmanaged rainwater from eroding sandy soils, to deter the disruption of the habitat of aquatic plants and animals and to provide for the collection of stormwater utility fees for those expenses connected with the planning, constructing, operating and maintaining of a stormwater management system. Wallace Roberts & Todd, !LC 52 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Section 30-80(f)(6)h.2 Site Plan Review Procedures: A map of the area showing where runoff presently goes and size, location, topography and land use of off -site areas which drain through, onto, and from the project. Section 30-18(g): Drainage for all off-street parking facilities shall meet the requirements of the Metropolitan Miami -Dade County Planning, Development, and Regulation Landscape Manual. Figure 1: Key Biscayne Future Land Use Map Future Land Use Categories Waterfront Rec. and Open Space Public Rec. and Open Space Dune Restoration Area Pedestrian Bicycle Way T Multi -Far. -Ocean Resort Hotel Two-Fam. Residential Multi -Far. -Low Density Multi-Fam.-Med. Density Multi-Fam.-High Density Single Fam.-Low Density Single Fam.-Med. Density Public -Institutional Commercial Office Key Biscayne Master Plan Evaluation & Appraisal Report Wallace Roberts & Todd, LLC 53 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Figure 2: Key Biscayne Zoning Map Village Zoning Public Rec. and Open Space (PROS) Parks and Recreation County and State Parks Low Intensity Commericial (C-1) Low Intensity Office (O-1) Institutional (I) Government Use (GU) Private Club (PC) Hotel Resort (HR) Village Residential (VR) Village Estate (VE) Island Residential (IR) Parkside Residential (PR) Res. Multi -10 (RM-10) Res. Multi -16 (RM-16) Res. Multi -30 (RM-30) PUD-1 PUD-2 PUD-3 Key Biscayne Master Plan Evaluation & Appraisal Report 54 Wallace Roberts & Todd, LLC VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Section 30-80(g)(4): Community services and utilities. All proposed developments shall be designed and located in such a manner as to insure the adequate provision, use and compatibility of necessary community services and utilities. An adequate sanitary sewer collection system including all necessary extensions and connections, shall be provided in accordance with Village standards for location and design. Where necessitated by the size of the development and/or by the unavailability of Village treatment facilities, sanitary sewage treatment and disposal systems must be provided in accordance with Village and State standards and regulations. Section 30-80(g)(6): Level of service standards. For the purpose of the issuance of development orders and permits, the Village has adopted level of service standards for public facilities and services which include roads, sanitary sewer, solid waste, drainage, potable water, and parks and recreation. All applicants are required to prove concurrency pursuant to the Land Development Regulations. Section 30-100: Minimum pervious area percentages for Single Family and Two Family Districts; Grand Bay Villas and Estates. Section 30-100(d): Lot elevation. Section 30-100(f)(3)a.4: Mooring piles and dolphins may not extend more than 20 feet from a dock. Mooring piles and dolphins on Biscayne Bay shall not extend more than 25 feet from the bulkhead. Section 30-100(f)(3)a.5: No dock shall extend from a bulkhead into any canal, lake, or waterway a distance greater than ten feet, or ten percent of the width of the waterway, whichever is less. Notwithstanding the foregoing, no dock or mooring pile shall extend into Biscayne Bay a distance of more than 25 feet from the bulkhead. Sec. 30-163. Level of service standards. For the purpose of concurrency determinations, the Village has adopted a master plan that provides the LOS for public facilities and services: roads, sanitary sewer, solid waste, drainage, potable water, and parks and recreation. All developments that are subject to a finding of concurrency must be consistent with these standards. (Ord. No. 2000-5, § 2, 5-9-00) Section 30-230(f): (The purpose and intent of establishing landscape standards is to:) Contribute to the processes of air movement, air purification, oxygenation regeneration, ground water recharge, Wallace Roberts & Todd, LLC 55 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN stormwater runoff retention, while aiding in the abatement of noise, glare, heat, air pollution and dust generated by impervious areas. Drainage Plan: Unless the Village Engineer determines that major drainage improvements are not feasible due to existing improvements on the property, site plan submittals shall contain a separate paving and drainage sheet(s) containing the following: Details of the proposed drainage system, including drainfield cross sections and lengths, catch basin types and sizes, designated retention, detention area cross sections, and the like. Wallace Roberts & Todd, LLC 56 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Goats, Objectives, and Policies Element FUTURE LAND USE Implementation Status Land Development Code reference Goal 1 Achieve desired community character: Key Biscayne should be a resident/. community. Development policies should protect residential character. Fu l residential development should be at the lowest densities consistent with protection of reasonable property rights. Hotels should be permitted in orde to provide ocean access opportunities and respect an established land use pattern; however, they should be modest in size so as to not overpower the community's residential character. Other commercial development should �. . sized to meet the needs of residents and hotel guests. Office development should be limited to the minimum amount practical in light of existing • development patterns. Objective 1.1 Future Land Ilse Categories: Maintain existing development and achieve new development and redevelopment which is consistent with the community character statement articulated as Goal 1. Implemented. The Land Development Code is consistent with the Master Pier. Policy 11.1 By statutory deadline or sooner, enact and enforce land development code consistent with the Future Land Use Map (FLUM). Implemented: Ongoing. At the lime of adoption of the Master Plan the Lard Development Code was based on County Zoning. However, VK8 Single Family -Residential (SF -R) and remaining zoning districts were amended on 10124100 and 5/9/00, respectively to be made consistent with the Master Plan. Policy 1.1.2 Unlit adoption of a Land Development Code (LDC), regulate development according to the FLUM, including specified land uses, densities and intensities. Implemented. Policy 1.1.3 By statutory deadline or sooner, enact and enforce provisions governing subdivisions, signs and floodplain protection consistent with the Master Plan (MP(. implemented. See below, Subdivision regulation. Implemented. VKB uses the County's subdivision regulations. Sign regulations. Implemented. Sign regulations were based on County standards until they were amended to meet the needs of the VKB on 5/9/00 and again on 5/20/02 Ordinances: Section 20: Signs Floodplain protection provisions. Implemented. Floodplain regulations are based on FEMA requirements as specified in the Master Plan. Additionally, the LDC was amended on 10/24/00 to establish maximum lot elevations for SF -R. Ordinances: 30-100(d). Policy 1.1.4 Establish a street tree master plan. implemented. Hurricanes Katrina and Wilma damaged many of the trees planted as part of the Village's Street Tree Plan. objective 1.2 Commercial Redevelopment: By 2004, achieve private revitatizatkm of at least one Crandon Boulevard property that has a blighting impact on the Village. Implemented. The CVS shopping center was previously a vacant grocery store before being renovated in 2603. The parking lot, landscaping, and facades were all redone. The building at 800 Crandon Boulevard was a decaying service station site before it was demolished and replaced with a new hardware store in 2001. 560 Crandon was demolished in 2605: the site is currently being cleaned up for an office budding. Policy 1.2.1 8y statutory deadline or sooner, enact and enforce land development code Implemented. See below. standards and incentives to achieve new development, renovated development and or redevelopment that meets high s'ignage, landscaping, circulalionlparking and other standards. All new development, renovated development and redevelopment consistent with FLL'M. Implemented. At the lime of adoption of the Master Plan, the LOC was based an County Zoning. However, VKB Single Family -Residential (SF - R( and remaining zoning districts were amended on 10/24/00 and 5/9/03, respectively, to make the LDC consistent with the MP. Sign regulations. Implemented. Sign regulations were based on County standards until they were amended to meet the needs of the VKB on 5/9100 and again on 5/20/02 Landscaping requirements. Implemented. Originally based on County code, Landscape Regulations were amended on 5/9/00 and again on 6/11/02 to meet the needs of the VKB. Parking requirements. Implemented. Originally based on County code, Parking Regulations were amended on 5/9/00 to meet the needs of the VKB. opal 2 Prelecland erdtance the rest denGal,. ;harslet, resort, and natural. resource - Objective 2.1 areas Sanitary Sewer Facilities: Extend public sanitary sewer to additional developed In by 2008 and ensure effective septic and drain field functioning. progress. Policy 2.1.1 extension. Cooperate with County to complete financial and engineering plan for sanitary sewer In progress. Redesigned along with replacement for H2O tines. Project completed and goal to be met by 2000. Wallace Roberts & Todd, LLC 57 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Complete plan by 1998. In progress. Begin implementation as soon as possible to complete implementation by 2008. In progress. Policy 2,1,2 Enact and enforce installation requirements to ensure effective functioning of septic and drain fields. Implemented. Based on DERM requirements. Objective 2.2 Storm Sewer Infrastructure: Upgrade drainage system so outfalls into Biscayne Bay (and adjacent canals) fully meet NPDES standards and Chapters 17-25 and 17- 302.500, F.A.C., by 1998. Upgrade private property on -site drainage standards to ensure retention of al feast the first one inch of stormwater, and no more runoff after development than before. Implemented: ongoing, ' Policy 2.2.1 Enforce food damage prevention regulations to ensure that new development occurs al appropriate elevations to minimize food impact. Implemented: ongoing. Policy 2.2,2 By statutory deadline or sooner, enact and enforce provisions regarding on -site drainage detention, runoff, erosion, minimum pervious open space, swats maintenance, and drainage level -of -service (LOS) standards. Implemented: ongoing. Ordinances: 30-230(f); 10-61 (10); 30-80(f).(8).h.2 Policy 2.2.3 Enact concurrency management system for development permits that meets 9J- 5.0055 for infrastructure, recreation, and traffic. Implemented. bjective 2.3 Natural Resources: Upgrade drainage system so oulfalls into Biscayne Bay (and adjacent canals) fully meet NPDES standards and Chapters 17-25 and 17-302.503. F.A.C. by 1998. Upgrade private property on -site drainage standards to ensure retention of al least the first one inch of Slomwater, and no more runoff after development than before. Implemented: ongoing. Policy 2.3.1 Activate stormwaler utility assessment based on Drainage Master Plan (DMP) by 1998 and update DMP as necessary in accordance with Objective 1,1 of the Infrastructure Element. Implemented: ongoing. Policy 2.3.2 By statutory deadline or sooner, enact and enforce provisions regarding on -site !drainage detention, runoff, erosion, minimum pervious open space. swate maintenance, and drainage level -of -service standards. Implemented: ongoing, Ordinances: 30-230(f); 10 - 61(10), 30-80(f).(6).f; 30 - 80(f).(6).h.2',16.64(c);3 -100; 30-181(9): 30-80(9).(6) Objective 2.4 Hurricane Evacuation: Eliminate or reduce land uses inconsistent with Interagency hazard mitigation report recommendations, and provide all relevant information to the Metro -Dade County (MAC) Office of Emergency Management (OEM). Implemented: ongoing. lip Policy 2.4.1 Regulate development according to the FLUM and consistent with Interagency Hazard Mitigation Team Report, FEMA 955 -DR -FL, 1992. Implemented: ongoing. Policy 2.4.2 Annually assess population densities and transmit significant changes to MDC OEM, Implemented: ongoing. NSFR reported monthly to Census Bureau. Objective 2.5 Drainage and Sewer System Land Needs: Ensure suitable land is available for drainage and sanitary sewer facilities needed to support planned infrastructure improvements. Implemented: ongoing. Policy 2.5.1 8y statutory deadline or sooner, enact and enforce land development code provisions for sewer and stsrmwater facilities. Implemented: ongoing. Ordinances: Chapter 29; 30 - 80(g).(4(; 30-163; Policy 2.5.2 Do not vacate road rights -of -way (ROW) without first determining that the ROW is not necessary to accommodate future storm andlor sanitary sewer facilities. Implemented. Objective 2.6 .Historic Preservation: Prepare a list of and strategy for preservation of potentially significant historic structures by 1999. Not implemented. Them is no local designation process, nor a list of historic properties because there are no structures on the Island older than 50 years and of significant historic merit. The structure associated with Nixon was eligible, but it was demolished in the summer of 2004. A collage on the Matheson property was restored in a manner consistent with how it was originally built to represent typical local tounst lodgings of the time. A plaque was erected to acknowledge its histoncat significance. However, at this pant in time. the cottage is not eligible for official local, slate, or national designation because of its age. I r Policy 2.6.1 Designate candidates for historic preservation and draft a strategy for preservation of some or all of these structures. Not implemented. Objective 2.7 Biscayne Bay Preservation: Assist MDC"s efforts to preserve and enhance Biscayne Bay Aquatic Preserve. In progress. Septic tanks are in the process of being replaced with sanitary sewers and new water pipes. The Village is in the grant -raising phase of the project. Policy 2.7.1 coordination Attempt In maintain and improve water quality of Biscayne Bay by implementing In DMP, replacing septic tanks with sanitary sewers, land development code provisions for an -site stomkwater detention and marina pump -out facilities, and with Biscayne Bay Shoreline Development Review Committee. progress. Septic lanky are in the process of being replaced with sanitary sewers and new water pipes. The Village is in the grant -raising phase of the project. Ordinances: 30- 100(I).(3).a,4; 30 - 100(1).(3).a.5 Wallace Roberts & Todd, LLC 58 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN b. Traffic Circulation (1) Purpose of the Traffic Circulation Plan. The purpose of the Traffic Circulation chapter is to: "...provide a transportation system that meets the circulation needs of Key Biscayne in a safe and efficient manner but does not adversely impact the quality of life of the residents." (2) Summary Assessment. The Traffic Circulation section addresses elements of Key Biscayne's vehicular, pedestrian and transit issues on both the local and regional levels. In several cases, the policies are initial steps toward problem solving; e.g. the completion of an exploratory plan, the inclusion of provisions in the LDC or the completion of a project's first phase. To date, the Village has implemented or is in progress with the majority of the policies. The Crandon Boulevard Master Plan was completed in February of 2004 and construction is underway; the most recent Ocean Lane Drive public workshop was conducted on October 17th 2005 and addressed the issues of parking, beach, access and public safety; and a bike, pedestrian and streetscape plan is in progress for Harbor Drive, Fernwood Road, and West Mashta Drive. However, the Traffic Circulation Element will need to be updated to address a developing issue identified during the 2020 visioning process: an increase in internally generated traffic congestion. According to anecdotal evidence, the number of cars per household on Key Biscayne is trending upward. (According the state Department of Motor Vehicles, the number of registered vehicles in January 2006 is 10,582. The Department is currently unable to provide historical data for the purposes of comparison.9 However, the figure provided may serve as the basis for a future study analyzing the patterns in internally -generated traffic congestion.) (3) Recommended Amendments to the Traffic Circulation Element. The following ordinances affecting the Traffic Circulation Element have been passed since the Comprehensive Plan was adopted. 9 According to the DMV, due to the prior configuration of its database, historic registered vehicle counts derived from addresses or zip codes may be inaccurate. It was possible for a vehicle to mistakenly be counted more than once: the address field was associated with the customer, not to the vehicle record; therefore, if a customer changed his or her address more than once in a calendar year, the vehicle record would have been double -counted. Wallace Roberts & Todd, LLC 59 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Ord. 2004-05 approved the creation of the Crandon Boulevard Master Plan Implementation Committee (created to oversee and ensure the completion of the CBMP throughout its three phases). The following amendments to the Traffic Circulation Element are being suggested as part of the Evaluation and Appraisal Report. (See Section 6 Conclusions and Recommendations) • Under Objective 1.1, add a policy scheduling a traffic study to assess the impact of internally generated traffic congestion. (See Section 6 Conclusions and Recommendations, Recommendation TC1) • Under Objective 1.1, add a policy scheduling a traffic study to assess the LOS of collector and local streets. (See Section 6 Conclusions and Recommendations, Recommendation TC2) • In Policy 1.1.1, change the designation for arterial roadways from LOS "E" to LOS "D." (See Section 6 Conclusions and Recommendations, Recommendation TC3) • Designate Fernwood Road as a transitional road between residential and commercial. At the rear lot line of specific commercial centers on Crandon Boulevard, require that access points be opened where appropriate to pedestrians, golf carts and, on a limited basis, to vehicular traffic. (See Section 6 Conclusions and Recommendations, Recommendation TC4) • Place and coordinate the update of electric signs at the intersection of Highway 95 and US Route 1 South that inform visitors if Bill Baggs Park is at capacity or accepting additional visitors. (See Section 6 Conclusions and Recommendations, Recommendation TC5) • To better encompass the spectrum of transportation facilities, the Traffic Circulation Element shall be renamed the Transportation Element. (See Section 6 Conclusions and Recommendations, Recommendation TC6) • To the new Transportation Element, the Village should add a policy to "[u]pdate the transportation maps every three years." (See Section 6 Conclusions and Recommendations, Recommendation TC7) Wallace Roberts & Todd, LLC 60 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • To the new Transportation Element, the Village should add a policy to "[c]oordinate the Future Land Use Map with the transportation system. (See Section 6 Conclusions and Recommendations, Recommendation TC8) • To the new Transportation Element, the Village should add a policy to "[e]stablish numerical indicators to measure achievement of mobility goals." (See Section 6 Conclusions and Recommendations, Recommendation TC9) To the new Transportation Element, the Village should add a policy to "[c]onduct a public transit feasibility study." (See Section 6 Conclusions and Recommendations, Recommendation TC10) (4) Evaluation of Goals, Objectives, and Policies of the Traffic Circulation Plan. See matrix on following page. (5) Traffic Circulation Plan Land Development Code Ordinances. Section 30-181: Location, Character and Size of Required Parking Spaces Section 30-100(f)(4): Driveway and Parking criteria. Regulates 1) points of access 2) driveway materials 3) setbacks and 4) width Section 30-100(f)(4).c: Setbacks. All driveways shall be set back at least five feet from any side property line. All circular driveways shall be set back at least two feet from any front and/or property side street property line. On corner lots, driveways shall be set back 15 feet from the extended right-of-way Intersection. Section 30-100(f)(4).d: Width. A maximum width of 24 feet is permitted for single family and 36 feet for two-family homes for a lot with 75 feet or less of frontage at the property line. For all other lots the width of a driveway or combination of driveways at the point of intersection with the right-of-way shall not exceed the lesser of 36 feet or 32 percent of the lot's frontage, including side street frontage on corner lots. Section 30-181(n) Location, Character, and Size of Required Parking Spaces: Curb cuts. All curb cuts shall conform to the design and construction standards required by the Public Works Supervisor. Wallace Roberts & Todd, LUX 61 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN - TRAFFIC CIRCULATION Goal 1 4 T o provide a transportation system that meals the circulation needs of Key Biscayne in a safe and efficient manner but does not adversely impact the quality of life of the residents. Objective 1.1 Moiorited Transportation System: Ma iifaIn designated LOS, but with enhanced pedestrian safety and amenities. Partially implemented/1n progress. The Village has maintained LOS except at main intersections; however, deficiencies will be corrected with the Crandon Boulevard Street Enhancements, which are currently under construction. Policy 1.i. 1 Regulate liming of development it maintain al least peak hour level of service standards for arterials (LOS "E"), collectors (LOS "6"), and local service streets (LOS "A"). Implemented: ongoing. Density limited by ordinance to current level. Policy 1.1, 2 By statutory deadline or sooner, enact and enforce LOC standards regarding roadway access and on -site traffic flow and parking. Implemented: ongoing. Originally based on County standards, parking regulations on 519100 to meet the needs of the VKB. Policy 1.1.3 Street improvements designed to deter speeding on collector streets. Implemented: ongoing. The Village has implemented a series of traffic calming devices on collector streets and reduced the speed limit to 20 mph on all roads except Crandon Boulevard, which is operated by the County. Ocean Lane Drive is in the design phase of receiving new sidewalks, striping and paving. Objective 1.2 Land Use Plan Implications: Limit commercial development and redevelopment to arterial road frontage plus Harbor Drive collector street frontage from Femwood Road to Crandon Boulevard. I implemented: ongoing. The Village has added a Commercial dishict to the Land Development Code: all commercial development and redevelopment is contained wdhin that zone. As denoted on the future land use map, the District is located along Crandon Boulevard. Policy 1.2.1 Use future land use and zoning maps to limit commercial and office development to arterial frontage and Harbor Drive collector street frontage from Femwood Road to Crandon Boulevard except for ocean resorts. Partially implemented. Cnly 2 properties do not front Crandon 21 and 51 Crandon Drive; they front Harbor Drive. Objective 1.3 Regional Pians: Work with MDC to limit traffic volume increases on the Rickenbacker Causeway. Implemented: ongoing. Policy 1.3.1 Work with MDC Planning Department and Metropolitan Planning Organization to limit intensity of development on Causeway and Crandon Boulevard in order to maintain an adequate traffic level of service. Implemented: ongoing. Adopted Virginia Key and Calusa Park agreements. Objective 1.4 y. Right -of -Way Protection: Implement LOC, FLUM and Future Traffic Circulation Plan to protect existing and future ROWs from building encroachment, and achieve a 10% net reduction of Crandon Blvd. (plus one block of Harbor Drivel curb cuts by 2004. Implemented. Curb cuts have been reduced in several locations as a result of the Crandon Boulevard Streetscape Project: the entry block , the intersection and Harbor Drive, near 560 Crandon Boulevard and near 220 Crandon Boulevard one or more curb cuts has been eliminated. The Projects Master Plan explicitly recommends the elimination or reduction of curb cuts. Policy 1.4.1 Use LDC to prohibit ROW encroachments through setback requirements. Implemented. Ordinances: 30-100(f),(4).c; 30-100(f).(4).d Policy 1.4.2 Use LOC standards and LOC review process to reduce number and width of existing curb cuis on Crandon and Harbor by 10%. Implemented. See above Objective 1.4. Ordinances: 30-181(n) Objective 1.5 Bikeways and Pedestrian Ways: Achieve the first phase of a pedestrian and bikeway system based on. a otreelscape and multi -modal circulation plan for Harbor Drive, Femwood Road. West Wood Dove and West Mashta Drive by 2004. Implemented. All projects were completed by June 2005. Policy 1.5.1 Complete bike, pedestrian and streetscape plan for Harbor Drive, Femwood Road and West Mashta Drive by 1999. Include these streets and West Wood Drive in a speed control planning and implementation plan. Implemented. Complete by 2005. Policy 1.5.2 Achieve first phase implementation of this plan on Harbor Drive by 2004. Implemented. Wallace Roberts & Todd, LLC 62 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN c. Housing (1) Purpose of the Housing Plan. The purpose of the Housing Plan is to: "...Assure the availability of a sound and diversified housing stock in Key Biscayne." (2) Summary Assessment. Objectives and Policies in the Housing Section address either the appearance and quality of the housing stock or the diversification of what is available. Since the time the Plan was written, the Key Biscayne real estate market has experienced a steady increase in demand while maintaining a finite supply of vacant and redevelopable land. Therefore, while the market has naturally addressed most issues regarding appearance and quality, the diversification and affordability of residential property has lessened. Policies addressing these latter issues have either not been implemented or, when implemented, have not successfully produced the intended results. The Village intends to continue working with other jurisdictions on the issue as well as define and promote affordable housing of a type and a price range consistent with Key Biscayne local market and general market conditions. (3) Recommended Amendments to the Housing Element No ordinances affecting the Housing Element have been passed since the Comprehensive Plan was adopted. The EAR recommends that the Master Plan be amended to reflect the following: • Add a policy that the Village shall "[m]onitor current and future housing needs and explore innovative solutions to increase the affordability and diversity of the stock while maintaining compliance with Coastal High Hazard Area and Floodplain regulations." (See Section 6 Conclusions and Recommendations, Recommendation H1) • The following objective should be amended to read: ■ Objective 1.4. The Local Planning Agency (LPA) shall define and seek opportunities to promote affordable housing of a type and at a price range consistent with Key Biscayne local market and general market conditions. Wallace Roberts & Todd, LLC 83 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN (See Section 6 Conclusions and Recommendations, Recommendation H2) • The following objective should be amended to read: • Objective 1.6 Development of Affordable Housing in Nearby Communities. Develop ongoing interlocal coordination with other jurisdictions and non -governmental agencies for the provision of affordable housing. (See Section 6 Conclusions and Recommendations, Recommendation H3) • Remove Objective 1.1 because it is no longer relevant to existing conditions and needs. There were and are no vacant properties along Crandon Boulevard. There were two sites originally developed as small, low -density hotels and replaced with more than 250 units. • Objective 1.1 New Construction: Cooperate with private sector to build at least 250 well designed and diversified units on vacant residentially designated areas along Crandon Boulevard by 2004. (See Section 6 Conclusions and Recommendations, Recommendation H4) • Add a policy that the Village shall "[e]xplore federal, state, and local housing subsidy programs as means to provide housing opportunities for low-income persons and families, where appropriate. (See Section 6 Conclusions and Recommendations, Recommendation H5) • Add a policy that the Village shall "[c]ollaborate with Miami -Dade County and the City of Miami to create a program for annual evaluation of affordable housing needs within incorporated and unincorporated areas. (See Section 6 Conclusions and Recommendations, Recommendation H6) • Add a policy that the Village shall "[p]articipate in South Florida Regional Planning Council's initiatives directed toward educating local governments of new techniques, especially programs applicable to the region and/or the county, for promoting affordable housing. (See Section 6 Conclusions and Recommendations, Recommendation H7) Wallace Roberts & Todd, LLC 64 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Add a policy that the Village shall "[e]valuate the feasibility of establishing an affordable housing fee trust fund in partnership with Miami -Dade County or the City of Miami (via interlocal agreements) to fund affordable housing programs and projects in Miami -Dade or the City of Miami. (See Section 6 Conclusions and Recommendations, Recommendation H8) • Add a policy that the Village shall [e]nsure that land use designations and zoning districts that foster diverse housing types to serve the needs of the local population, including single family, duplex, and multi -family units. (See Section 6 Conclusions and Recommendations, Recommendation H9) (4) Evaluation of Goals, Objectives and Policies of the Housing Plan. See matrix on following page. (5) Housing Plan Land Development Code Ordinances Section 30-100 (e): Setback Regulations (minimum) Wallace Roberts & Todd, LLC 65 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN HOUSING ,Objective 1.1 New Construction: Cooperate v/ith private sectorto build at least 250 well designed and diversrted units on vacant residentially designated areas along Crandon Boulevard by 2004. Obsolete. There were and are no vacant properties along Crandon Boulevard. There were two sites originally developed as small ,low - density hotels and replaced with more than 250 units. Policy 1.1.1 Group Homes: Accommodate as many small group homes and foster care facilities as possible in residential areas. Implemented. Existing mixed density east of Crandon Boulevard, Grand Bay SF -R and Ocean Club MF-R zoning districts added to LDC. Policy 1.1.2 Periodically review permitting and regulatory processes in the LDC to ensure prompt and professional development permitting process, Implemented. The Village originally used Fitemaker Pro manual permit system and had no permit time schedule. However, it converted to Permits Plus to upgrade processing and established a timeline for permit processing. OCjeetive 1.2 Group Homes: Accommodate as many small group homes and foster care facilities as possible in residential areas. Implemented: ongoing. The Village has amended zoning code to permit group homes in the Multi -Family District, but the private sector has yet to exercise this opportunity. Policy 1.2.1 By statutory deadline or sooner, permit group homes and foster cam facilities with consideration to hurricane evacuation constraints. Not implemented, Objective 1.3 Conservation Rehabilitation, Demolition, Substandard Housing Structural and Implemented: ongoing. Aesthetic Improvement of Housing: Maintain a structurally sound housing stock by rehabilitating or demolishing housing units thal may deteriorate to a substandard condition in the future. Measure achievement by existence of no substandard housing units. Policy 1.3.1 The Village Manager shall enforce County minimum housing standards code or appropriate modified code enacted by Council Implemented: ongoing. The County's codes are used. Policy 1.3.2 Use LDC setback/bulk standards and DMP to assure stable residential neighborhoods. Implemented. Originally based on County code, ordinances decreasing FAR and increasing sideyards for SF -R were adopted on 10124100. Ordinances: 30-100(e) Objective 1.4 Housing Coordination and Implementation: The Local Planning Agency (LPA) Not Implemented. shall coordinate and achieve housing policy implementation. Policy 1,4.1 Communicate with private and non-profit housing agencies to assure that Village policy information flows to housing providers. Not implemented. The Village has not communicated with any non-profit housing agencies. Policy 1.4.2 Cooperate with any developer using County or other subsidy mechanisms. rnptemented: ongoing. No developer has called to date, but if one did he Village would be willing to cooperate. Objective 1.5 Historically Significant Housing: Identify and preserve at least one historically significant residential structure. Not Implemented, There Is no local designation process, nor a list of historic properties because there are no structures on the island older 'than 50 years and of significant historical merit. The structure associated with Nixon was eligible, but it was demolished in the summer of 2004. A cottage on the Matheson property was restored in a manner consistent with how it was originally built to represent typical local tourist lodgings of the time. A plaque was erected to acknowledge its historical significance. However, at this point in time, the cottage is not eligible for official local, state, or national designation because of its age. Policy 1.5.1 Designate candidates for historic preservation based on age, architecture and function, and draft a preservation strategy. Not implemented. See above Objective 1.5. Objective 1.6 Development of Affordable Housing In Nearby Communities: Provide adequate ales for the distribution of very' low income. low income and moderate income families. In progress. The Village has not assisted other communities, nor has ids help been requested. Policy 1.6.1 Village manager or designee will inform Village Council of appropriate actions that ,encourage the provision of adequate sites for affordable housing in nearby communities with land values that can reasonably accommodate such housing. In progress. Objective 1.7 Structural and Aesthetic Improvement of Existing Housing: Achieve and maintain 100% standard housing and achieve private reinvestment to structurally and aesthetically upgrade at least 50 existing housing units. Implemented: ongoing. The number of renovated Macke) homes greatly exceeds 50. Policy 1.7.1 Vigorously enforce the existing cede to ensure no housing becomes substandard. Implemented: ongoing. Policy 1.7.2 By statutory deadline or sooner, enact or enforce CDC regulations for building height, setback and olher regulations that facilitate aesthetically pleasing upgrades to existing housing stock. Implemented. Originally based on County code, VKB ordinances are enforced at several points of review, required at formwork, stomwall and construction completion. Ordinances: 30-100(e) Wallace Roberts & Todd, LLC 66 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN d. Infrastructure (1) Purpose of the Infrastructure Plan. The purpose of the Infrastructure Element is to: "...Provide and maintain the public infrastructure in a manner that will ensure bay water quality, and public healthy, safety, and quality of life for Key Biscayne residents." (2) Summary Assessment. The Infrastructure Element of the Master Plan provides policies to address deficiencies in 1995 levels of service as well as anticipated future needs related to drainage; sewage; solid waste; water and sewer; and water conservation. The Village has, at minimum, begun implementation in all areas. However, unforeseen conflicts (e.g. hurricanes) have delayed completion dates for several objectives and policies beyond the scope of the timeline specified in the Master Plan. The Plan will need to be updated to accurately reflect current completion projections. (3) Recommended Amendments to the Infrastructure Element. No ordinances affecting the Infrastructure Element have been passed since the Comprehensive Plan was adopted. The following amendments to the Infrastructure Element are being suggested as part of the Evaluation and Appraisal Report. (See Section 6 Conclusions and Recommendations) • The language and dates referenced in the following policies should be updated: ■ Objective 1.1: Continue to upgrade drainage system so outfalls in Biscayne Bay (and adjacent canals) fully meet NPDES standards and Chapters 17-25 and 17-302.500, F.A.C. Continue to upgrade private property on -site drainage standards to ensure retention of at least the first one inch of stormwater, and no more runoff after development than before. • Policy 1.2.1 Complete financial and engineering feasibility plan to extend sanitary sewers to unsewered areas by 2008, and complete implementation by 2010. ▪ Objective 1.3: Future Needs; Solid Waste: Continue to achieve the most cost-effective solid waste collection system. Wallace Roberts & Todd, LLC 67 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN ■ Objective 1.5: Water Conservation: Continue working toward reducing the average daily per capita water consumption by 5%. (See Section 6 Conclusions and Recommendations, Recommendation 11) • Add a policy that the Village shall "[u]pdate the Master Plan within 18 months of the South Florida Water Management District updating its regional water supply plan, highlighting alternative water supply projects, and completing the required "Work Plan Amendment." (See Section 6 Conclusions and Recommendations, Recommendation 12) • Add a policy that the Village shall "[sleek and obtain a written statement from the Miami -Dade Water and Sewer Authority regarding the availability of water to serve all proposed development projects, including current and projected demand, remaining permitted water withdrawals, facility capacity, and scheduled capital improvement projects." (See Section 6 Conclusions and Recommendations, Recommendation 13) • Add a policy that the Village shall "[e]stablish a single -point -of - contact at the South Florida Water Management District and Miami -Dade Water and Sewer Authority to determine the extent to which the Village will be involved in the planning, financing, construction, and operation of water supply facilities that will serve the community." (See Section 6 Conclusions and Recommendations, Recommendation 14) • Add a policy that the Village shall "[v]erify with the Miami -Dade Water and Sewer Authority the availability of water before making changes to the Future Land Use Map." (See Section 6 Conclusions and Recommendations, Recommendation 15) (4) Evaluation of Goals, Objectives, and Policies of the Infrastructure Plan. See matrix on following page. (5) Infrastructure Plan Land Development Code Ordinances. Section 8-100:8-108: Water Shortage Regulations Section 30-230(a): Promote xeriscape by encouraging the use of drought -tolerant landscape materials, grouping of plant material by Wallace Roberts & Todd, LLC 68 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN water requirement and the use of irrigation systems that conserve the use of potable water supplies. Section 30-232: Required Landscape Plans Section 30-234: Required Irrigation Plans Wallace Roberts & Todd, LLC 69 Objective 1.1. VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN INFRASTRUCTURE oa o pray .e an • maintain the public infrastructure in a manner that will insure bay water quality, and public health, safety, and quality of life for Key Current Deficiencies and Future Needs; Drainage: Upgrade drainage system so oulfalls into Biscayne Bay (and adjacent canals) fully meet NPDES standards and Chapters 17-25 and 17302.500, F.A.C., by 1998. Upgrade private property on -site drainage standards to ensure retention of at least the first one inch of stormwater, and no more runoff after development than before. Implemented: ongoing. Policy 1.1.1 Activate the storm water utility assessment as a basis for banding for the first phase Implemented: ongoing. of drainage plan implementation by 1998. Update DMP as needed to ensure efficacy and upgrade of storm sewer system as outlined in Objective 1.1 above. Policy 1.1.2 Mitigate direct stormwateroutfalls as technically and economically feasible into Biscayne Bay and canals to meet standards set forth. in Objective 1.1 above. Implemented: ongoing. Policy 1.1.3 By statutory deadline or sooner, enact and enforce provisions regarding on -site drainage detention, runoff, erosion, minimum pervious open space, Swale maintenance, and drainage level -of -service standards in order to meet requirements as outlined by Objective 1.1 above. Implemented: ongoing, Originally based on County code, ordinances were amended to meet needs of the VKB; specifically, a 30 percent open space requirement was implemented for SF -R on 10124100 and general retention of runoff requirements were' implemented on 519100. 'Ordinances: 30-230(f); 10- 61(10); 30-80(1),(6) f; 30- 80(f).(6(.h.2; 16-644(c);30-100; 30-181(g); 30-80(9).(6) Objective 1.2 Current Deficiencies and Future Needs; Sewage: Extend public sewer sego to additional developed areas by 2008 and ensure effective septic and drain field functioning. In progress. Redesign of sanitary sewer project to include replacement of existing asbestos water lines. Policy 1.2.1 Complete financial and engineering feasibility plan to extend sanitary sewers to unsewered areas by 1998, and complete implementation by 2008. In progress. Policy 1.2.2 Cooperate with Stale of Florida Health and Rehabilitative Services (FHRS) and MDC Department of Environmental Resources Management (DERM) to ensure effective functioning of septic tanks and drain fields. Implemented. Objective 1.3 Future Needs; Solid Waste: Achieve the most cost-effective solid waste collection system by 1999. Implemented: ongoing. Policy 1.3.1 Assess cost-effectiveness of replacing County collection system with one or more private systems by 1996. Implemented. Policy 1.3.2 Initiate recommended changes in the solid waste collection and recycling system by 1999,. Implemented. 'Objective 1:4 Level of Service: Provide adequate capacities to meet the LOS standards: see polities for measurable standards. Implemented. Policy 1.4.1 Sewered Areas: County -wide "maximum day flow" of preceding year shall not exceed 98% of County treatment system's rated capacity, The sewage generation standard shall be 140 average gallons per capita per day. Implemented: ongoing. Policy 1.4.2 Unsewered Areas: The LOS shall be receipt of a DERM septic tank pennit. Implemented: ongoing. Policy 1.4.3 Potable Wafer. County -wide "maximum day flow" of preceding year shall not exceed 98% of County treatment system's rated capacity. Minimum pressure of 20 Ibs.lsq, in. at property line and consumption standard of 280 avg. gallons/capita/day. Implemented: ongoing. Policy 1.4.4 Drainage: Nonresidential development and redevelopment accommodate runoff to meet Federal, slate and local requirements. Stormwater is treated in according to Chapter 17-25 and Chapter 17-302.500, F.A.C., with one inch of runoff retained on site. Implemented: ongoing. Policy 1.4.5 Solid Waste: County solid waste disposal system maintains a minimum of We years capacity using a generation rate of 5.2 pounds per person per day. In progress: ongoing. Objective 1.5 Water Conservation: Reduce the average daily per capita water icionsumpfion by 5% by 2004 (dependent on near -term ability to measure Village -wide consumption). In progress. Policy 1.5.1 By statutory deadline or sooner, enact and enforce LOC regulations including water conservation -based irrigation; water conservation -based plant species, lawn watering restrictions, mandatory use of ultra -low volume water saving devices for substantial rehabilitation and new construction, and other water conservation measures as feasible. Implemented: ongoing. Ordinances: 8-100:8-108 30 230(a); 30-232; 30-234; Policy 1.5.2 Promote education programs that discourage waste and conserve potable water. Implemented: ongoing. Policy 1.5.3 Cooperate with MDC Water and Sewer Authority (WASA) to devise a water tracking consumption separate from customer billings sr other sources. Implemented: ongoing. Policy 1.5.4 Cooperate with WASA efforts to ensure the potable water distribution system shall Implemented: ongoing. reduce water loss to less than 16% of the water entering the system. Wallace Roberts & Todd, LLC 70 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN e. Conservation and Coastal Management (1) Purpose of Conservation and Coastal Management Plan. The purpose of the Conservation and Coastal Management Element is to: "...Preserve and enhance the significant natural features in Key Biscayne; to conserve and manage the environmental resources and man-made uses in the coastal area of the Village; and to minimize human and property loss due to hurricanes." (2) Summary Assessment. The scope of the Conservation and Coastal Management section is extensive. The Village has implemented or is in the process of implementing policies and objectives in all sub -categories, with the exception of historic preservation. No historic preservation policy to protect Mackie homes or any other structures within Village limits has been implemented because there are currently no structures that meet the state or national age and significance requirements for national historic designation. (3) Recommended Amendments to the Conservation and Coastal Management Element. The following ordinance affecting the Conservation and Coastal Management Element has been passed since the Comprehensive Plan was adopted. Ord. 2005-5 amended Section 30-102 Governmental Use District of Chapter 30 of the Land Development Code by adding a schedule of permitted uses and regulations for public beaches. The following amendments to the Conservation and Coastal Management Element are being suggested as part of the Evaluation and Appraisal Report. (See Section 6 Conclusions and Recommendations) • An addition to should be made to state that the Village will continue to explore new ways to integrate green technologies into public facilities. (See Section 6 Conclusions and Recommendations, Recommendation CCM1) • Language and dates referenced in the following objective should be updated: Wallace Roberts & Todd, LLC 71 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN ■ Policy 2.2.3: Continue to evaluate the need for and efficacy of alternate financing methods for beach renourishment and dune development. • Objective 2.4 Historic Preservation: Prepare a list of potentially significant historic structures and a preservation strategy by 2010. ■ Objective 3.3: Post Disaster Redevelopment: Adopt a post -disaster redevelopment plan by 2010. • Policy 3.3.1: Prepare a post -disaster redevelopment plan based on the Hurricane Andrew experience and in consultation with the South Florida Regional Planning Council (SFRPC) and MDC OEM by 2010. (See Section 6 Conclusions and Recommendations, Recommendation CCM2) • Update Policy 3.3.1 to read: ■ Policy 3.3.1 Update the disaster response plan based on the Hurricane Andrew experience and in consultation with the South Florida Regional Planning Council (SFRPC) and MDC OEM by 1996. The Village is in the process of coming up with a more comprehensive plan that covers pre -storm, evacuation, and post storm guidelines. (See Section 6 Conclusions and Recommendations, Recommendation CCM3) • In coordination with recommendation 12, add a policy to the Conservation and Coastal Management Element that the Village will "assess projected water needs and sources for at least a 10 - year planning period, considering the South Florida Water Supply Plan." (See Section 6 Conclusions and Recommendations, Recommendation CCM4) (4) Evaluation of Goals, Objectives, and Policies of the Conservation and Coastal Management Plan. See matrix on pages 46-49. (5) Conservation and Coastal Management Plan Land Development Code Ordinances. Wallace Roberts & Todd, LW 72 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Section 10-23(1): Restrict or prohibit uses which are dangerous to health, safety and property due to water or erosion hazards, or which result in damaging increases in erosion or in Flood heights or velocities Section 10-42(f): Description of the type, extent and depth of proposed fill and the elevation in relation to Mean Sea Level of the top surface of the fill; Section 10-42(h): Plot plan, drawn to scale, illustrating the locations of all proposed construction, fill, excavating, and other aspects of the Development; Section 10-44(d)(5): The necessity of the facility to a waterfront location, in the case of a functionally dependent facility. Section 10-61(10): Adequate drainage paths shall be provided around Structures to guide stormwater runoff away from them. Section 10-63: Standards for Coastal High Hazard Areas (V -zones): Located within the Areas of Special Flood Hazard are areas designated as Coastal High Hazard Areas, which are denoted with a "V" prefix on the Flood Insurance Rate Map. These areas, called "velocity zones," have special Flood hazards associated with wave action; therefore, the following provisions shall apply...: Section 10-63(7): Protection of Sand Dunes and Mangrove Stands. There shall be no alteration of Sand Dunes or Mangrove Stands which would increase potential Flood damage. Section 30-80(f)(6)f: Details of the proposed drainage system, including drainfield cross sections and lengths, catch basin types and sizes, designated retention/detention area cross sections, and the like. Section 30-80(f)(9)e: Demonstration that the proposed Development will not adversely affect any endangered or threatened plant or animal species, and will to the greatest extent possible, protect natural areas, native species, potable water well -fields, and dune systems, and will provide effective erosion control, and will protect against hazardous waste. Section 30-100: Island Residential (waterfront) District Section 30-100(b): Development Regulations Section 30-100(e): Setback Regulations (minimum) Section 30-100(f)(11): Pavers and walkways in Side and Rear Yards. Pavers or other walkway material may be placed within the Side or Rear Yard so long as they do not materially affect the drainage characteristics of the area. The maximum width of the Wallace Roberts & Todd, LLC 73 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN walkway is five feet but in no instance shall the Setback be less than four feet. Section 30-100:30-112: Schedule of District Use and Setback Regulations Section 30-102(e): Permitted Recreational Activities. Subject to the approval of a Beach Management Plan pursuant to subsection (f) and the supplementary regulations in subsection (g) the activities as described below shall be considered Main Permitted Uses on lands within the GU District which are seaward of the Erosion Control Line (as identified in Section 1.03 of the Village Charter) where such activities occur as ancillary and supportive of principal uses conducted on the upland contiguous privately owned property. Section 30-102(g)6: None of the permitted activities including the storage of any equipment shall be maintained or conducted within five feet of the dune as defined pursuant to Section 161.54, Florida Statutes, or within 15 feet of the waterline, unless overnight storage on the public beach is approved pursuant to a Beach Management Plan. Section 30-103: Hotel Resort District Section 30-107(d)(8): Construction or subsequent operation of any new or expanded marina shall not destroy or degrade hammocks, pinelands, salt marshes, mangrove protection areas, seagrass, hard bottom communities, or habitats used by endangered or threatened species, unless approved by the appropriate regulatory agencies. Section 30-160: Purpose of Concurrency Management The purpose of this article is to ensure that the infrastructure necessary to serve new Development is Available concurrently with the impacts of that new Development. Impact is measured against the adopted minimum acceptable levels of service with respect to: (a) roads, (b) sanitary sewer, (c) solid waste, (d) drainage (e) potable water and (f) parks and open space. Section 30-230(f): Contribute to the processes of air movement, air purification, oxygenation regeneration, ground water recharge, stormwater runoff retention, while aiding in the abatement of noise, glare, heat, air pollution and dust generated by impervious areas. Section 30-235(f): Removal of trees on public lands. No trees shall be removed from any public land including, but not limited to Rights -of -Way and swale areas, without the approval of the Building, Zoning and Planning Director. Wallace Roberts & Todd, LLC 74 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN oat 1 CONSERVATION AND COASTAL MANAGEMENT (Conservation and Coastal Management goats. objectives and policies are cornbread because they are complimentary.) To preserve and enhance the sfgnlncant natural features In Key Biscayne. Objective 1.1 Air Quality: Improve air quality to achieve or maintain applicable standards as established by the US Environmental Protection Agency (EPA). Implemented: ongoing. Through intergovernmental coordination, the Village supports Miami -Dade County's efforts to improve air quality Policy 1.1.1 Maintain compliance with traffic LOS standard thereby avoiding congestion that would adversely impact air quality. Implemented: ongoing. Crandon Boulevard improvements and plans for Harbor Drive al the Village entrance have addressed congestion and air quality issues, Policy 1.1.2 Control emissions from all hazardous waste facilities to comply with Lowest Achievable Emission Rates, including vapor control systems to control hydrocarbon emissions at gas stations. Implemented: ongoing. Through intergovernmental coordination, the Village supports Miami -Dade County's efforts to improve air quality 'Objective 1.2 Water Pollution: Upgrade drainage system so outfalls Into Biscayne Bay (and adjacent canals) fully meet NPDES standards and Chapters 17-25 and 17-302.500. F.A.C., by 1998. Upgrade private property on -site drainage standards to ensure retention of at least the first one inch of stormwater. and no more runoff after development than before. Implemented: ongoing. Policy 1.2.1 Based on capital cost implications of DMP, activate the stonnwater utility assessment as a basis for bonding by 1998. Update DMP to upgrade storm sewer system to meet standards of Objective 1.1 of the Infrastructure Element, Implemented. Policy 1.2.2 By statutory deadline or sooner, enact and enforce LDC provisions regarding detention, runoff, erosion control, pervious open space minimums, swains, drainage LOS, beach dune protection and other land protection measures. Implemented: ongoing. Ordinances: 10 -23(1);10 - 61(10); 10.83(7); 30 - 80(f).(6).f; 30-80(t).(9).e; 30- 100(b); 30-102(e); 30- 100(f).(11);: 30-102(g).6; 30- 160; 30-230(f); 30.235 (ft Policy 1.2.3 Refer any development permit applications for storage of hazardous waste to MDC. Implemented: ongoing. Objective 1,3 Vegetative and Soil Resources: Achieve zero net toss of mangroves. Implemented: ongoing. There is no official Village map of mangroves. However, housing projects are evaluated on a case -by -case basis including a review of landscape. Should a prgect significantly infnnge on environmental features, the Village would deny approval where appropriate. Policy 1.3.1 By statutory deadline or sooner, enact and enforce estuarine waterfront protection provisions in the LDC in accordance with state of Florida Department of Environmental Protection (FDEP) and waterfront policies of DERM. Implemented: ongoing, Ordinances: 10-44(d).(S);10- 63(7);30-107(d).(8) Policy 1.3.2 Contact DERM it any adverse impact is observed relative to the limited sea grass beds in adjacent Bay waters. Implemented: ongoing. Objective 1.4 lit Sea Turtle Preservation: Strive to achieve zero human -induced loss of manatees andror sea turtle eggs. I Implemented: ongoing. e Policy 1.4.1 Village police will report speeding violations in manatee protection areas to County and State marine police, and publicize the MDC manatee telephone hotline to the public. Implemented: ongoing. Policy 1.4.2 By statutory deadline or sooner, enact and enforce land development provisions to minimize light on beach areas where sea turtles nest. Implemented: ongoing. Objective 1.5 It Floodplatns: Achieve construction of all new building fast flows at or above FEMA ' specified food regulations and also, for non-residential uses only, in accordance with FEMA approved waterproof construction specifications. Implemented: ongoing, The Village has a base flood elevation ordinance that is consistent with FEMA's requirements. Chapter 10 Policy 1.5,1 Village Manager shall design and promulgate specific management techniques to ensure effective enforcement of FEMA regulations. Flood damage prevention regulations shall be enforced by the Village. Implemented: ongoing, Objective 1.6 least to Emergency Water Conservation: Reduce per capita water consumption by at 10% in the event of a water supply emergency (pending upon near term ability measure Village -wide consumption). implemented: ongoing. Policy 1.6.1 Enact and enforce and emergency water conservation based on South Florida Water Management District (SFWMD) model ordinance and requirements. ll Implemented: ongoing. Objective 1.7 Conservation of Wildlife and Habitat: Achieve zero degradation of fisheries, Implemented: wildlife, wildlife habitat, marine habitat and environmentally sensitive land. ongoing. Wallace Roberts & Todd, LLC 75 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Policy 1.7.1 Cooperate with US Army Corps of Engineers (ACE) for beach renourishmenf as necessary to minimize damage to offshore grass flats, terrestrial and marine animal habitats and dune vegetation. Implemented: ongoing. Related ordinances were passed as a result of the Long Range Beach Renoudshment Plan (1997). Ordinance 2002-6 amended Sec. 30-100(f)(3) Docks and Mooring Piles. It regulated docking facilities within single family districts so as to prevent projects detrimental to the equitable, safe, and adequate navigation of all waterways in the Village. Policy 1.7.2 Limit permits (within Village jurisdiction) far beach restoration or renourishment borrow areas to those that do not negatively affect offshore reefs or grass fats. Implemented: ongoing. Addressed in Long Range Beach Renoudshment Plan (1997). Policy 1.7.3 By statutory deadline or sooner, enact and enforce LDC provisions requiring minimum building setbacks from the ocean. Prevent encroachment on beach front according to the Dune Restoration Area of the FLUM and the Coastal Construction Control Line. [Implemented: ongoing. Ordinances: Section 30- 100:30-112 Policy 1.7.4 Prohibit dredging or filling that would result In the destruction of grassialgae fats, hard bottom or benthic communities within Village limits. Implemented. This applies only In canals or in natural harbors (e.g. Hurricane Harbor; within the Yacht Club). The Village limits end at shoreline on Bayside. Measured at high tide, the beach along the Atlantic seaward is property of the State. Bayside water Is County property up to the southern portion of the island, where it is national parkland. Polley 1.7.5 Prohibit deposit of solid waste or industrial waste that create a health or environmental hazard. In progress. Policy 1.7.8 Maintain standing as a bird sanctuary, and prohibit destruction of any bird except by those persons with a valid permit for scientific purposes issued by the US Fish and Wildlife Service. Implemented. Cape Florida State Park/Bill Boggs is officially recognized as a bird sanctuary. Policy 1.7.7 Require all new shoreline development affecting marine habitats to be reviewed by DERM. Implemented: ongoing. The Village has received preliminary approval by DERM. Policy 1.7.8 Give preference to salt tolerant landscaping over traditional materials in the enactment of the landscape requirements of the LDC. In progress. The Village adopted County regulations to address landscaping, but has amended them to meet its needs. An amendment passed on 519100 required 30 percent native plant materials to be used Policy 1.7.9 Prohibit and require eradication of invasive species on all sites of new and redevelopment projects. Implemented. The Village used County regulations to address invasive species,but has amended its ordinances to meet local needs. On 519100 the Village adopted and has subsequently enforced six regulations to respond to this issue. Policy 1.7.10 Coordinate with County and FDEP in monitoring coastal waters and sediments. Implemented: ongoing. The Village has created a volunteer beach clean-up program that coincides with a national annual coastal clean-up effort. Policy 1.7.11 Cooperate and comply with Federal, stale and county programs and mandates regarding dockside pump out facilities. Implemented: ongoing. Policy 1.7.12 Promote beautification with an annual clean-up drive for the beaches and shorelines, Implemented: ongoing. The Village has created a volunteer beach clean-up program that coincides with a national annual coastal clean-up effort. Policy 1.7.13 Enact and enforce an emergency water conservation plan, through a water shortage ordinance consistent with SFWMD. In progress. Policy 1.7.14 Officially designate DERM mangrove areas within the Village (see Figure V-1, Data and Analysis) as environmentally sensitive lands which shall be protected from development unless their ecological value is replaced via mitigation. oat 2 To conserve and manage the environmental resources and man-made oe/a n the coastal area of Key Biscayne. Objective 2.1 Water -Dependent and Water•Oriented Uses: Presume existing and planned sues for water -dependent and water -oriented ocean hotel resort uses, and assure that marina expansion or development meets appropriate location standards. In progress. Implemented: ongoing. The zoning code has a designation for private clubs with ocean or bay frontage. r�— I' Policy 2.1.1 8y statutory deadline or sooner, enact and enforce zoning districts based on Multi- family Residential, Ocean Resort Hotel, Waterfront Recreation and Open Space Land Use Plan categories, and consistent with density limits in the PLUM. Implemented: ongoing. Using the County as its base model for Zoning Districts, the Village added two new categorizations on 519100:, PUD and Hotel Resort (HR), both of which offer incentives. The Public Recreation and Open Space District is also available should the Village own or have a tong term lease (5 years or longer) on a parcel and desire to use the land for public recreation or open space purposes. These districts permitted Beach Park public access. Policy 2.1.2 New wafer -dependent uses shall meet specified criteria incorporated in LDC by statutory deadline or sooner. Implemented. After using County code as its model, the Village recently adopted a resolution for beachfront activities in May of 2005. Wallace Roberts & Todd, LLC 76 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Objective 2.2 Beaches and Dunes: Achieve no new major development or redevelopment seaward of the Coastal Construction Control Line and restore a naturally vegetated dune along the entire Atlantic Ocean frontage of the Village. Implemented: ongoing. Policy 2.2.1 By statutory deadline or sooner, enact and enforce minimum oceanfront setbacks, including protection of the proposed dune system, as part of the LDC. Implemented: ongoing, Ordinances: 30-100; 30-103 Policy 22.2 By statutory deadline or sooner, enact and enforce dune development and vegetation requirements as part of the LDC in conjunction with any new beachfront development and redevelopment. Implemented: ongoing- Ordinances: 10-63(7); 30 - 80(f).(9).e ; 30-102(gj.6; 30 - 107(d).(8) Policy 2.2.3 Evaluate the need for and efficacy of alternate financing methods for beach renourishment and dune development by 1996. Implemented: ongoing. Between 1995 and 2002, the Miami -Dade County Department of Environmental Resource Management included Key Biscayne as one of three areas targeted for beach restoration projects. According to the M -D EAR, Key Biscayne had 63.6 acres of beach restored. iiikObjective 2.3 Beach Public Access: Achieve one municipal beach access point open to the general public by 2004. Implemented. Policy 2,3.1 Enforce an existing development agreement with a private property owner to provide beach access open to the general public. Implemented. The Village has an agreement on an easement with the Grand Bay Resod. Objective 2.4 i* Historic Preservation: Prepare a list of potentially significant historic structures and a preservation strategy by 1999. Not implemented. There is no local designation process, nor a list at historic properties because there are no structures on the Island older than 50 years and of significant historical merit. The structure associated with Pkxon was eligible, but it was demotished in the summer of 2004. A cottage on the Matheson property was restored in a manner consistent with how it was originally built to represent typical local tourist lodgings of the time. A plaque was erected to acknowledge its historical significance. However, at this point in time, the cottage is not eligible for official local, ,stale, or national designation because of its age. Policy 2.4.1 Designate candidates for historic preservation based on age, architecture and function, and draft s preservation strategy. Net implemented. There are no historic structures older than 50 years and therefore none that meet the requirements of the National Register. Objective 2.5 Biscayne Bay Preservation: Assist the County, FOEP and National Park Service (NPS) to preserve and enhance Biscayne Bay Aquatic Preserve I In progress. Septic tanks are in the, process of being replaced with sanitary sewers and new water pipes. The Village is in the grant -raising phase of the project, i Policy 2.5,1 Contribute to the improvement of Biscayne Bay through implementation of DMP,. replacing septic tanks with sanitary sewers tied into the County system and/or upgrading of septic tank and drainfield standards, mandating on -site stommwater detention and marina siting standards according to Infrastructure Element and this Element. In progress, Sanilary sewer project will be completed by 2006. Policy 2.5.2 Contribute to the improvement of Biscayne Bay water quality through cooperation and consultation with the Biscayne Bay Shoreline Development Review committee, FDEP and the NPS. Not implemented. Objective 3.1 Coastal High -Hazard Area Land Use and Infrastructure: Limit Village funds on infrastructure within the Village (all of which is in the coastal high -hazard area) that contributes to significantly more intense development than authorized by this plan. Implemented: ongoing. Infrastructure is based on the maximum density of devetopment permitted by the zoning code. Policy 3.1.1 Limit funding of public infrastructure expansion if the effect is a direct subsidy to a specific private development in the Village. Implemented: ongoing. The Village does not subsidize private development; 0 pays for its own infrastructure needs. Policy 3.1.2 Objective 3.1 and Policy 3.1.1 should not preclude plans to extend sewer lines, improve drainage facilities or reconfiguration of streets to provide adequate infrastructure to serve Future Land Use Plan development or prior vested development rights. Implemented. Objective 3.2 )i Hurricane Evacuation: Maintain the current estimated 13 hourhurdcane evacuation clearance time based on pre -Hurricane Andrew planning and post- Hunicane Andrew experience. Implemented: ongoing. Policy 3.2.1 Maintain traffic LOS, based on PLUM, to achieve a reasonable hurricane evacuation time. implemented: ongoing. Policy 3.2.2 Prepare a hurricane emergency plan by 1995, based on the Hurricane Andrew Implemented. experience and fn concert with 1991 County Emergency Operations Plan and 1991 US COE hurricane evacuation study. In June 2001,, the Hurricane Information Manual was adopted in order to assist Village residents to plan and prepare for a hurricane and its aftermath. Objective 3.3 1996 Post -Disaster Redevelopment: Adopt a post -disaster redevelopment plan by In progress. ' Wallace Roberts & Todd, LLC 77 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Policy 3.3.1 Prepare a post -disaster redevelopment plan based on the Hurricane Andrew experience and in consultation with the South Florida Regonat Planning Council (SFRPC) and MDC OEM by 1996. In progress. Policy 3.3.2 The adopted plan wilt specify that during post -disaster redevelopment, the Building Department will distinguish between actions needed to promote public health and safety with immediate clean-up and long term repair activities and redevelopment areas. In progress. Policy 3.3.3 During recovery periods, use post -disaster redevelopment plan to reduce or eliminate future exposure of life and property to hurricanes, incorporate recommendation of interagency hazard mitigation reports and recommend any amendments to MP. In progress. Policy 3.3.4 Unsafe conditions and inappropriate uses identified in recovery phase will be eliminated as opportunities arise. Implemented. Objective 3.4 Level of Service and Public Facility Tinting: Achieve LOS standards by concurency and a capital improvement schedule. implemented: ongoing. During the site plan review process, the Village reviews LOS and concurrency to ensure the project is consistent with them. Policy 3.4.1 Implement concunency management. system with phased capital improvement schedule to achieve and maintain LOS standards concurrent with the impact of development. Implemented: ongoing. Objective 3.5 Hurricane Damage Avoidance: Minimize damage horn any hurricane storm surge. See Policies for measurability. Implemented: ongoing. Policy 3.5.1 By statutory deadline or sooner, enact and enforce LDC provisions requiring minimum setbacks from the ocean and compliance with the CCCL regulations. Implemented: ongoing. Ordinances: 30-100(e) Policy 3.5.2 Enforcement of new residential construction at or above flood elevation specified by. FEMA, and new non-residential construction at or above flood elevation specified by FEMA or in accordance with FEMA approved waterproof construction specifications. Implemented: ongoing. Policy 3.5.3 By statutory deadline or sooner, enact and enforce LDC provisions limiting the amount of fill added to a property in conjunction with development or redevelopment to minimize stormwater runoff. Implemented: ongoing. Ordinances: 30-230(1); 10 - 61(10);1042(0;10.42(h( Policy 3.5.4 ,hazard Monitor changes to and recommend County Emergency Operations Plan (EOP) mitigation reports as basis for amending MP and LDC as appropriate. Not Implemented. Zoning in the LDC reflects the MP. Policy 3.5.5 Reduce permitted population densities according to FLUM to coordinate with 1991 MDC EDP (local) and lower Southeast Florida Hurricane Evacuation Plan (regonal). Not Implemented. The Village is maintaining levels, but not reducing them. Policy 3.5.6 Limit funding of public infrastructure expansion if the effect is a direct subsidy to a specific private development in the Village. implemented: ongoing. Objective 3.6 Commercial Redevelopment: Revitalize. by 2004 at least one Crandon Boulevard property that has a bligntmg impact on the Village and is likely to sustain significant hurricane damage. Implemented. The CVS shopping center was previously a vacant grocery store before being renovated in 2003. The parking lot, landscaping. and facades were all redone. The building at 800 Crandon Boulevard was a decaying service station site before it was demolished and replaced with a new hardware store in 2001. 560 Crandon was demolished in 2005; the site is currently being cleaned up for an office building. Policy 3.6.1 By statutory deadline or sooner, enact and enforce LDC standards to conform with Implemented: flood damage prevention regulations outlined by Conservation and Coastal Management Policy 3.5.2. ongoing. Ordinances: 10-63 Wallace Roberts & Todd, LLC 78 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN f. Recreation and Open Space (1) Purpose of Recreation and Open Space Plan. The purpose of the Recreation and Open Space Plan is to: "...Provide a desirable level of public recreation and open space facilities together with supplemental private recreation and open space facilities." (2) Summary Assessment. Prior to and at the time of incorporation the Village was not in compliance with the Miami -Dade County LOS standards for public recreation and open space facilities. This deficiency was an important catalyst in the move to incorporate. Since incorporation, the Ocean Club and Grand Bay (approved for development prior to incorporation) heightened the recreation and open space deficiency. Since the Master Plan was adopted, the Village has attained additional parks and recreation acreage. However, with the increase in population, it has not been enough to raise the level of service to meet its standard of 2.5 acres per 1000 people. The Village is currently actively exploring its options and monitoring near- and medium -term changes to its present state (e.g. its agreement with Miami -Dade County for use of facilities Calusa Park expires in 2008); Upon adopting a new program for acquiring parks and recreation space, the Village will need to incorporate appropriate objectives and policies into the Master Plan. (3) Recommended Amendments to the Recreation and Open Space Element. No ordinances affecting the Recreation and Open Space Element have been passed since the Comprehensive Plan was adopted. The following amendments to the Recreation and Open Space Element are being suggested as part of the Evaluation and Appraisal Report. (See Section 6 Conclusions and Recommendations) • The following objective should be amended to read: • Objective 1.5 Public -Private Coordination: Explore and implement a fully coordinated system of recreation resources. (See Section 6 Conclusions and Recommendations, Recommendation ROS1) Wallace Roberts & Todd, LLC 79 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • The following policy should be amended to read: ■ Policy 1.3.5 Explore means of revenue raising to support public trust acquisition of recreation lands and open space and preservation of historic landmarks by 2010. (See Section 6 Conclusions and Recommendations, Recommendation ROS2) • Add a policy that the Village shall "[p]repare a strategy for buying land in the Village to be dedicated as recreational space." (See Section 6 Conclusions and Recommendations, Recommendation ROS3) • Add a policy that the Village shall "[n]egotiate use agreements with Miami -Dade County and the City of Miami for Village residents to have access to parkland outside Key Biscayne." (See Section 6 Conclusions and Recommendations, Recommendation ROS4) • Add a policy that the Village shall "[r]eview and revise current regulations to require that any future development proposed in the Village that contains apartments or hotel condominiums to provide public open space on- or off -site in the amount necessary to serve the demand created by the projected population increase." (See Section 6 Conclusions and Recommendations, Recommendation ROS5) • Add a policy that the Village shall "[e]xplore instituting an impact fee for new single-family detached and residential duplex construction." (See Section 6 Conclusions and Recommendations, Recommendation ROS6) (4) Evaluation of Goals, Objectives, and Policies of the Recreation and Open Space Element. See matrix on following page. (5) Recreation and Open Space Plan Land Development Code Ordinances. Section 30-100(b): Development Regulations: Minimum Pervious Area Section 30-100(e): Development Regulations: Setback Regulations Section 30-108: PROS Public Recreation and Open Space District Wallace Roberts & Todd, LLC 80 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN RECREATION AND OPEN SPACE Goal 1 Provide a desirable level of public recreation and open space facilities together with supplemental private recreation and open space facilities, Objective 1.1 Waterfront Access: Achieve one municipal ocean beach access point by 2004. Implemented. Policy 1.1.1 Enforce an existing development agreement with a private property owner to provide beach access open to the general public as a condition for development approval. Implemented: ongoing. The Village offers FAR incentives for altering beach access easements. Objective 1.2 School Playfield Access: Assure resident access to the elementary school ptayfield by 1995. Implemented. Policy 1.2.1 Seek joint use agreement with School Board to assure resident access to the school's playfieids. Implemented. Objective 1.3 Public Recreation Facilities: Achieve park and recreation lands (with facilities) of at least 2.5 acres per 1,000 people permanent population. In progress. Policy 1.3.1 Reserve for recreation use all Village -owned land designated on the FLUM and seek additional acreage to meet standard of 2.5 acres per 1,000 people permanent population (concurrency/LOS standard) through purchase, long-term lease and/or donation. In progress. Although the Village still does not meet the standard of 2.5 acres per 1,000 persons, it has added parks and recreation space toils roster (Village Green, Village Lake and Beachfront Parks, St. Agnes fields) and has some prospects (Key Biscayne Presbyterian Church, Village Civic Center Park) Policy 1.3.2 By statutory deadline, conduct a feasibility study of obtaining additional sites needed to achieve and maintain LOS standard. Implemented. Policy 1.3.3 Continue to pursue acquisition (purchase or lease) of park land to meet LOS standard outlined in Capital Improvement Schedule, In progress. As mentioned above, the Village is pursuing opportunities with the Key Biscayne Presbyterian Church and an undeveloped parcel adjacent to the civic center. Policy 1.3.4 As acquisition of park tracts is assured, finalize detailed planning for facilities such as ball fields, playgrounds and community center and initiate a phased implementation plan. In progress. The Village has hired SWA consultants to assemble a potential capital improvements list, including parks and recreation projects. The committee comprised of resident volunteers is in the process of prioritizing the projects based and estimating costs. Policy 1.3.5 Explore a recreation impact fee to help finance acquisitions and improvements by 1994. Not implemented. Objective 1.4 1111 Open Space: Achieve some passive public open space in the central part of Village, some semi-public open space on the waterfront plus private open space in conjunction with any new private development. Implemented. The Village has built the Village Green and Beach Park. If development generates a demand on open space and public recreation facilities, it is required to submit open space as part of ils plan. Policy 1.4.1 By statutory deadline or sooner, enact and enforce as part of LDC minimum front, side and rear residential setbacks and a no less than 30% pervious open space minimum of total site area for the average single family residential site. Partially implemented. After using County code as the standard, the Village passed setback and open space ordinances for SF -Ron 10/24100. However, it has not passed setback and open space requirements for other districts, Ordinances: 30-100(b): 30 - 100(e) Policy 1.4.2 By statutory deadline or sooner, enact and enforce LDC zoning to implement Waterfront Recreation and Open Space category to preserve open space uses such as the beach club and yacht club. Pervious space requirement will be no less that 15% of entire site. Implemented: ongoing. After using County code as the standard, the Village added a new district to its LDC on 519100: Public Recreation and Open Space. Ordinances: 30.108 Policy 1.4.3 Evaluate the desirability of developing a village center in tandem with central area public open space. Implemented. Key Biscayne is working toward creating a Village center. The buildings have been completed, but the amenities are still under construction. Mir = Public -Private Coordination: Achieve a fully coordinated system of recreation resources by 2004. In progress. Policy 1.5.1 Complete an inventory of private and semi-public recreational facilities to finalize the Implemented. plan described in Policy 1.3.3. Wallace Roberts & Todd, LLC 81 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN g. Intergovernmental Coordination (1) Purpose of Intergovernmental Coordination Plan. The purpose of the Intergovernmental Coordination Plan is to: "Maintain or establish processes to assure coordination with other governmental entities where necessary to implement the Master Plan." (2) Summary_ Assessment. The Village has active relationships with Miami -Dade County and the School Board to implement policies and objectives related to education, parks and recreation, water and sewer provision, and water quality. In certain cases, the Village has yet to meet its LOS standards. However, as with the provision of sanitary sewer service, the Village is jointly involved with the Miami -Dade Water and Sewer Authority in the planning stage of the project; with the provision of adequate parks and recreation space, the Village continues to keep open dialogue with appropriate County agencies while simultaneously seeking alternative means to provide adequate services to its residents. (3) Recommended Amendments to the Intergovernmental Coordination Element. No ordinances affecting the Intergovernmental Coordination Element have been passed since the Comprehensive Plan was adopted. The following amendments to the Intergovernmental Coordination Element are being suggested as part of the Evaluation and Appraisal Report. (See Section 6 Conclusions and Recommendations) • The following policy should be amended to read: • Policy 1.2.1 As is relevant, consider and attempt to consummate the following interlocal agreements on an ongoing basis. (See Section 6 Conclusions and Recommendations, Recommendation IC1) • The following policy should be amended to remove references to annexation because it is no longer relevant to existing conditions and needs. The Village has not attempted to annex any land, nor does it foresee doing so. It should be amended to: Wallace Roberts & Todd, LLC 82 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Policy 1.1.3 Use informal mediation process of SFRPC conflicts with other governmental entities. (See Section 6 Conclusions and Recommendations, Recommendation IC2) • The following policy should be amended to read: • Policy 1.5.2 Explore means of revenue raising to support public trust acquisition of recreation lands and open space and preservation of historic landmarks by 2010. (See Section 6 Conclusions and Recommendations, Recommendation IC3) • Add a policy that the Village shall "[c]ollaborate with Miami -Dade County and the City of Miami to create a program for annual evaluation of affordable housing needs within incorporated and unincorporated areas. (See Section 6 Conclusions and Recommendations, Recommendation IC4) • Add a policy that the Village shall "[p]articipate in South Florida Regional Planning Council's initiatives directed toward educating local governments of new techniques, especially programs applicable to the region and/or the county, for promoting affordable housing. (See Section 6 Conclusions and Recommendations, Recommendation IC5) • Add a policy that the Village shall "[e]valuate the feasibility of establishing an affordable housing fee trust fund in partnership with Miami -Dade County or the City of Miami (via interlocal agreements) to fund affordable housing programs and projects in Miami -Dade or the City of Miami. (See Section 6 Conclusions and Recommendations, Recommendation IC6) • Add a policy that the Village shall [e]nsure that land use designations and zoning districts that foster diverse housing types to serve the needs of the local population, including single family, duplex, and multi -family units. (See Section 6 Conclusions and Recommendations, Recommendation IC7) (4) Evaluation of Goals, Objectives, and Policies of the Intergovernmental Coordination Plan. See matrix on following page. Wallace Roberts & Todd, LLC 83 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN (5) Intergovernmental Coordination Plan Land Development Code Ordinances. There are no ordinances directly related to Intergovernmental Coordination policies. Wallace Roberts & Todd, LLC 84 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN INTERGOVERNMENTAL COORDINATION oat I To maintain or establish processes to assure coordination with abet'. governmental entitles where names- , ,to implement this plan. Objective 1.1 Coordination with the County Plan and School Board: Achieve consistency between Village Plan, MDC Comprehensive Plan and City of Miami Comprehensive Plan (and amendments); achieve coordination with Dade County School Board Mans, .411.116, r In progress. Policy 1.1.1 Monitor the MDC Comprehensive Plan process as County Plan is updated and revised in conjunction with its Evaluation and Appraisal Review (EAR). Implemented: ongoing. Where the County makes decisions that affect the Village, such as on Virginia Key, in Crandon Park or at the Seaquarium, the Village monitors its actions. Policy 1.1.2 Maintain active dialogue wish School Board staff concerning any Village elementary school plans. implemented: ongoing. Policy 1.1.3 Use informal mediation process of SFRPC to resolve annexation and other conflicts with other governmental entities. Obsolete. The Village has not attempted to annex any land nor does it foresee doing so. 'Policy 1.1.4 Review and compare proposed development in City of Miami and MDC with proposed development of Village Comprehensive Plan; and, where appropriate, respond at public hearings, through memoranda, or through the SFRPC mediation process. Implemented: ongoing. Objective 1.2 Master Plan Impact and Implementation Coordination: Coordinate developmental impact of MP wish other juesdictions. Implemented: ongoing. Where otherjunsdictions make decisions that ' affect the Village, such as on Virginia Key. in Crandon Park or at the Seaquarium, the Village monitors their actions. Policy 1.2.1 Consider and attempt to consummate the following interlocal agreements by 1999. Extension of Sewers: Coordinate and cooperate with appropriate County agencies. In progress, Solid Waste Disposal: Coordinate and cooperate with County Solid Waste Management Department.. implemented; ongoing. Lease ofCafusa Park: Village maintains park to benefit all County residents and meet Village recreation LOS. Partially implemented. Lease of Virginia Key Site(s) for Recreation: Village commits to develop and maintain sites to meet Village recreation LOS. Implemented. The Village is a member of the Virginia Key Master Plan Committee, which is guiding the development of Virginia Key. Expansion of Caruso Park into Crandon Park: Accommodate play fields to meet Village recreation LOS (requires that Village peliiicn MOO to modify its current plan for Crandon Park). Not Implemented. Although the Village still does not meet the standard of 2.5 acres per 1,000 persons, it has added parks and recreation space to its roster (Village Green, Village Lake and Beachfront Parks, St. Agnes fields) and has some prospects (Key Biscayne Presbyter Bill Beggs State Park: Agreement with FDEP to provide play fields to meet Village recreation LOS (requires that Village petition slate government agency to modify its current plan for Bill Beggs State Park). Not implemented. The agreement was rejected by the legislature. Key Biscayne Elementary School: Make playground available for Village use. Implemented. The Village maintains the property in exchange for its use during certain hours. Crandon Boulevard: imreovedstreetscape Implemented. ongoing. The Crandon Boulevard Master Plan is in Phase II of construction. Policy 1.2.2 Maintain dialogue with Metro -Dade Planning Dept. and other County agencies relative to limiting land use intensity. Implemented: ongoing. Where the County makes decisions that affect the Village, such as on Virginia Key, in Crandon Park or at the Seaquarium, the Village monitors their actions. Policy 1.2.3 Assisi in providing information regarding services such as waste, water, sewers, transit and hurricane response to residents. in progress. Policy 1.2.4 improve Biscayne Bay water quality by the following: In progress. Implementation of Master Drainage Plan. In progress. Replacement of septic tanks with sanitary sewers tied into County system. In progress. "Mandating on -site stormwater detention. Implemented. Ordinances specify the retention of runoff on -site. Marina siting standards. Implemented. Policy 1.2.5 Improve Biscayne Bay water quality by coordination with BBSDRC, FDEP and Implemented: Kr, ongoing. ObJ he 1.3 Level of Service Standards Coordination: Ensure coordination with Metro -Dade Implemented: County in establishing LOS standards for sewage and potable water. ongoing. Policy 1.3.1 standards Monitor changes to LOS standards of Metro -Dade County and adjust own LOS In accordingly. progress. Wallace Roberts & Todd, LLC 85 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN h. Capital Improvements (1) Purpose of Capital Improvements Plan. The purpose of the Intergovernmental Coordination Plan is to: "...To undertake capital improvements necessary to provide adequate infrastructure and a high quality of life, within sound fiscal practices." (2) Summary Assessment. The Village has been diligent about implementing objectives and policies in the capital improvements section, annually updating its capital improvements budget, monitoring levels of service, and adhering to Coastal High Hazard Area limitations. The Village is examining the feasibility and implications of adjusting the parameters of the debt cap requirements. The Capital Improvements Plan/Capital Outlay Allocations Analysis: FY 2006-2007 follows. Wallace Roberts & Todd, LLC 86 VILLAGE OF KEY BISCAYNE EV ALUATION AND APPRAIS AL REPORT (E AR) OF THE CAPITAL OUTLAY ALLOCATIONS ANALYSIS - FY 2006-2007 B D E ITEM DESCRIPTION PROJECTED FISCAL 2007 RESERVED TOTALS AT 9/30/06 ALLOCATION IN GEN FUND 1 Fire Equipment 38,647 10;000 0 48,647 2 Fire Vehicle Replacement 39,605 45;000 50,000 134,605 3 Beach Renourishment 374,924 250,000 0 624,924 4 Tree Replacement Program 25,000 0 0 25,000 5 School Parking 0 0 0 6 Calusa Park 0 0 0 5 Future Land Acquisition/Playing Fields 0 0 456 .403 456.403 6 Art in Public Places 85,301 0 0 85,301 4 M aintenance Reserve- Community Center 37,305 212,695 0 250,000 5 Maintenance Reserve- Police/Admin Building 50,000 175,000 25,000 250,000 6 Maintenance Reserve- Fire Station 50,000 175,000 25,000 250,000 7 Community Center Equipment Replacements 41,633 158,367 50,000 250,000 8 Evaluation & Appraisal Report 0 0 0 9 Harbor Drive Drainage 0 0 0 8 Grapetree Drive Uplighting 10,000 90,000 0 100,000 Wallace Robe rts & Todd, LLC 87 VILLAGE OF KEY BISCAYNE EVALUATION AND APPR AISAL REPORT (E AR) OF THE KEY BISCAYNE MASTER PL AN 9 Ocean Lane Drive Improvements 0 0 0 0 '17 Playground Equipment 0 0 0 9 Union Labor Contract 250,000 50,000 0 300,000 10 Emergency Hurricane Reserves 0 1,510,507 2,489 .493 4,000,000 11 Additional Working Capital Reserves 0 400,000 600,000 1,000,000 12 Drainage- Glenridge/WoodcresttButtonwood 0 300.000 0 300,000 13 Contingencies 331,410 0 0 331,410 13 Master Plan Initiatives 1,110,778 500.000 1,610,778 14 Galen Drive Lighting '150.000 14 Inspector Fees 275,000 275.000 15 Capital Lease 404,471 404.471 16 Prepaid items 204,248 204,248 17 Compensated Absences 334,644 334,644 18 Law Enforcement Seizures 326,827 326,827 19 Special Disaster Relief Reserve 13,192 13,192 15 Sunrise Drive Lighting 150,000 TOTAL 1,333,825 4,787,347 5,754,278 11,575,450 Wallac e Roberts & Todd, LLC $8 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN (3) Recommended Amendments to the C pital Improvements Element. No ordinances affecting the Capital Improvements Element have been passed since the Comprehensive Plan was adopted. The following amendments to the Capital Improvements Element are being suggested as part of the Evaluation and Appraisal Report. (See Section 6 Conclusions and Recommendations) In compliance with Chapter 163, F.S. (5)(d), provisions should be included for granting concurrency exceptions. (See Section 6 Conclusions and Recommendations, Recommendation CH) • The date referenced in the following policy should be updated: • Policy 1.5.2: Explore a recreational impact fee for all new development to help fund acquisitions and improvements by 1994. (See Section 6 Conclusions and Recommendations, Recommendation C12) • Add a policy that the Village shall "[i]mplement a tracking system that measures increases in population resulting from development and redevelopment and provide results to Miami -Dade County the Water and Sewer Authority on a regular basis." (See Section 6 Conclusions and Recommendations, Recommendation Cl3) • Add a policy that the Village shall "[e]stablish criteria for updating and prioritizing projects within the CIP tied to concurrency requirements." (See Section 6 Conclusions and Recommendations, Recommendation C14) • Add a policy that the Village shall "Shift from an annual to five-year CIP." (See Section 6 Conclusions and Recommendations, Recommendation 015) (4) Evaluation of Goals, Objectives and Policies of the Capital Improvements. See matrix on following pages. (5) Capital Improvements Plan Land Development Code Ordinances. Section 30-160: 30-166: Concurrency Management Wallace Roberts & Todd, LLC 89 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Section 30-163: Level of service standards: For the purpose of concurrency determinations, the Village has adopted a master plan that provides the Level of Service Standards (LOS) for public facilities and services: roads, sanitary sewer, solid waste, drainage, potable water, and parks and recreation. All developments that are subject to a finding of must be consistent with these standards. Wallace Roberts & Todd, LLC 90 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN C•'IT•LIM' eVEMENT5 ..11' T•un ert.kec..tl.Itm.rovementsneasaryi..r.vld: •de.uat: infrastructur:.a.. hhh •uality .Fill-, within s.un. fiscal pr.ctic=s. Objective 1.1 The Annual Capital Improvement Program Process: Use this Element to monitor public facility needs as a basis for annual capital budget and 5 -year program preparation. Implemented: ongoing. The Village does this as part of[he budget process. Policy 1,1.1 Staff and engineering studies to form basis for preparation of a 5 -year capita '' improvement program, with one year capital budget, in order to further MP elements. Implemented. The Village does a one year Capital Improvement Budget and a fiscal budget every five years. Policy 1.1.2 Capital improvement program to include drainage facility program based on 1993 DMP. Implemented. Policy 1.1.3 Public safety, quality of life, LOS, redevelopment and Biscayne Bay enhancement projects will be used as criteria for setting priorities that include financial feasibility or budget impact assessments. Partially Implemented. The Village does not enhance Biscayne Bay because it is the County's responsibility. Policy 1.1.4 Maximize use of designated funds (such as drainage utility and sewer assessments) in order to free general funds for other Village projects such as park land acquisition and streetscape work. Implemented: ongoing. The Village does this as part of its Capital Improvement Budget. Policy 1.1.5 Pursue a prudent policy in terms of borrowing for capital improvements or other purposes. Implemented: ongoing. Objective 1.2 Level of Service and Land Use Decisions: Use FLUP, financial analyses in this Element and LOS standards to review development applications and to prepare annual schedule of capital improvements. Implemented. All development is consistent with adopted LOS standards. Policy 1.2',1 Maintain the following peak hour LOS standards. Sheets: Regulate the timing of development to maintain peak hour LOS standards (Arfenaf: LOS "E", Col/odors: LOS fi , Local Service Streets: LOS ''A'). LOS along Crandon awkward could potentially fall slightly below E" near north Village limits. Implemented: ongoing. Sanitary Sewers in Sewered Areas: Not to exceed 98% of County treatment system's rated capacity. Average sewage generation standard of 140 gallons per capita per day. Implemented: ongoing. Sanitary Sewers in Unsewered Amos: Permit septic tanks only in compliance with county and state standards. In progress. The Village is in the planning stage of the process of converting all non-sewered areas to sewer. Potable Water: Not to exceed 98% of County treatment and storage system's rated capacity, with of least 20 lbs. per sq. inch at properly fine and average 280 gallons per capita per day. Implemented: ongoing. Drainage: Nonresidential development and redevelopment accommodate runoff to meet Federal, state and local requirements. Implemented: ongoing. Solid Waste: County system maintains a minimum of 5 years capacity; Village use generation rate of 5.2 lbs. per person per day. Implemented: ongoing, Recreation: Maintain a LOS standard of at least 2.5 acres of park land per 1,000 persons permanent populaf ion, In progress. Prior to and since incorporation, the Village has been below a LOS standard of 2.5 acres of parks and recreation space per 1000 persons. However, the Village is in an ongoing pursuit to achieve this goal. Objective 1.3 Infrastructure in Coastal High Hazard Area: Do not fund infrastructure that would have the effect of subsidizing significantly more intense development than outlined by this Plan. Implemented: ongoing. The Village does not subsidize private development: it pays for its own infrastructure needs. Wallace Roberts & Todd, LLC 91 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Policy 1.3.1 Capital improvement program schedule shall not include projects that would achieve significantly more intensive development than authorized by this plan by directly causing developer applications for Land Use Plan or zoning map amendments . Implemented: ongoing. Objective 1.4 Concurrency: Assure provision of public facilities concurrent with development impacts through a concurrency management system in the 1994 LOC. to progress. Policy 1.4.1 By statutory deadline or sooner, enact and enforce a concurrency management system that meets 9J-5.0055 as part of LDC. Implemented: ongoing, Ordinances: 30-160:30-155 1. Measure conformance with LOS standards for water, solid waste and drainage, recreation, and traffic. Implemented: ongoing. 2. Concurrency Monitoring System Implemented: ongoing. The Land Development Code requires a review of concurrency during every building permit application review. 3. Capacity Reservation Imp€emented: ongoing. 4. Administration Implemented: ongoing. 5. Project Impact or Demand Measurement Implemented: ongoing. Objective 1.5 Funding Capital Improvements: The LDC concurrency management system shall reflect both the existing approved Development of Regional Impact (ORB orders. Implemented. Policy 1.5.1 The concurrency management system formulas shall include the public facility demands to be created by the two DRi projects as "committed° and capital improvement schedule shall include the project implications of this demand to assure concurrency. Implemented. Ord,nances: 30.163 Policy 1.5.2 Explore a recreational impact fee for all new development to help fund acquisitions and improvements by 1994. Not implemented, Policy 1.5.3 The Village shall not give approval to new projects that create need for expanded capital improvement unless the project pays a proportional share of the Costs of these improvements following legally prescribed criteria for such fees. Implemented. Wallace Roberts & Todd, LLC 92 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 4. Major Local Issues In 1998, the State of Florida modified statutory requirements for the EAR, permitting local governments to identify key local issues and use them as the basis upon which to measure the performance of the Master Plan. A subcommittee of the Village's 2020 Vision/EAR Committee —the EAR Advisory Subcommittee —was delegated the task of identifying key local issues to be addressed in the EAR. To this end, the subcommittee held a series of meetings in May and June 2005, involving lively, exhaustive dialogue among the members —many of whom were similarly involved in the pre -incorporation work and the work preceding the Village's 1995 Master Plan —as well as close coordination with the initial round of visioning activities that led to the formulation of the Vision Statement. The resulting set of major issues, described in the following pages, was unanimously approved by the EAR Subcommittee and then by the 2020 Vision/EAR Committee at its June 15, 2005 meeting. The list was subsequently ratified by the Village Council via Resolution No. 2005-28 on July 5, 2005. The list of issues was also shared with adjacent local governments and State and regional agencies. The twelve major issues are below: Issue a: Definition, Preservation and Enhancement of Key Biscayne's Unique Village Character and Quality of Life Issue b: The Need for Additional Local Parks, Recreation Space and Open Space Issue c: Calusa Park, Crandon Park, Bill Baggs Cape Florida State Park and Virginia Key - Interlocal Cooperation Relative to Village Issues Issue d: Implications of Redevelopment Issue e: Traffic Volume, Operations and Safety Issue f: Sustainability of Local Retail and Services Issue g: Vulnerability to Damage from Tropical Storms and Hurricanes Issue h: Need to Improve or Replace Infrastructure Wallace Roberts & Todd, LLC 93 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Issue is Implications of Debt Cap Issue j: Conservation, Coastal Management and Environmental Protection Issue k: Land Development in the Context of Master Plan Goals, Objectives, and Policies Issue I: Historic, Cultural and Educational Resources and Needs Wallace Roberts & Todd, LLC 94 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN a. Definition, Preservation and Enhancement of Key Biscayne's Unique Village Character and Quality of Life What are the defining qualities and conditions that give the Village of Key Biscayne its unique identity and sense of place? What pressures and conditions exist that may threaten the preservation and enhancement of those defining qualities? In the face of redevelopment pressures, escalating land and housing costs, and ongoing demographic shifts, there is growing concern among the community about whether the Village will be able to retain its small town character, casual charm and ambiance, and diverse population. (1) Assessment of success in implementing Master Plan objectives related to issue. Goal 1 of the 1995 Master Plan Future Land Use Element attempted to summarize the community's view of the residential character and quality it sought to preserve based on feedback it received from a survey questionnaire mailed to 5,000 local addresses. Complete results were included in the 1995 Master Plan; excerpts are below. • 84 percent of those who responded wanted residential development to be at the lowest density possible, consistent with the protection of reasonable property rights; • 84 percent also said they favored either no more retail development or only "a very limited amount"; • 85 percent of the respondents felt the same way about additional office development; • 58 percent of the respondents wanted public beach access although most wanted it limited to Village residents. The majority of those stating an opinion wanted a bay -front park; • 61 percent opposed developments which place apartments above retail uses; • 74 percent favored some kind of architectural review process. The Village has closely followed and complied with the interrelated goals, objectives and policies that complement the Master Plan's Wallace Roberts & Todd, LLC 95 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN definition of the desired community character. Among other things, the Village (1) adopted land development regulations consistent with the Master Plan, (2) retained professional and trained staff and implemented procedures to enforce the adopted codes and provide guidance to those seeking development approvals, (3) acquired and improved the Village Green and other parks, (4) negotiated set -asides for additional parks and open space, (5) developed the Civic Center complex, including the Community Center, (6) promoted communication through an interactive website, community television and other means, (7) solicited community involvement through advisory committees and otherwise, (8) performed numerous streetscape and landscape improvements, and other beautification measures, and (9) has undertaken the 2020 Vision initiative. Experience, reflection, and more active community involvement have enabled citizens to produce a finer grained vision statement --that more accurately reflective of the true Key Biscayne character and quality of life valued by residents. (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated. The Crandon Boulevard Master Plan Citizen's Advisory Committee held a series of visioning exercises to inform the street's design concept. Results show that sentiment for the Village's character has remained largely unchanged over the past decade: residents want to preserve the human scale of the Village, the shady, often native vegetation; the juxtaposition of elegance and relaxation; and the breezy, ocean -side appearance. In some respects, however, the Village's goals have evolved. For example, public sentiment about retail needs and traffic circulation appear to have changed, as reflected in the EAR public participation and 2020 Vision SWOT exercises. This is demonstrated through a commitment to traffic interconnection (between Fernwood Road and the commercial centers along Crandon Boulevard, and between the commercial centers) that was not evident in 1995. (3) Recommended Amendments to the Master Plan. • Add a policy that the Village shall [p]rovide land use designations and zoning districts that foster diverse housing types to serve the needs of the local population, including Wallace Roberts & Todd, LLC 96 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN single family, duplex, and multi -family units. (See Section 6 Conclusions and Recommendations, Recommendation H9) • Language and dates referenced in the following objective should be updated: • Objective 2.4 Historic Preservation: Prepare a list of potentially significant historic structures and a preservation strategy by 2010. (See Section 6 Conclusions and Recommendations, Recommendation CCM2) • Add a policy that the Village shall "[p]repare a strategy for buying land in the Village to be dedicated as recreational space." (See Section 6 Conclusions and Recommendations, Recommendation ROS3) b. The Need for Additional Local Parks, Recreation Space and Open Space In spite of recent major initiatives to create new parks and recreational facilities, the Village continues to have an unmet need within the Village limits for recreational and open space amenities for the existing residents —particularly the growing population base of families with children. Deficiencies include passive parks, multi -purpose playing fields, ball fields, neighborhood -scale parks, mini -parks, and other recreational facilities. In addition, the Village, though located on an island, has limited public access to Biscayne Bay and the Atlantic Ocean. Given the near -built -out condition of the community and escalating property values, the Village faces a number of challenges in providing additional park sites, playing fields and other recreational opportunities. (1) Assessment of success in implementing Master Plan objectives related to issue: The Village's Level of Service standard for parks and recreation space —as measured by total acreage —continues to go unmet. Wallace Roberts & Todd, LLC 97 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Table 8: Key Biscayne Parks and Recreation Level of Service Total Acreage Parks & Recreation Space Population Level of Service Standard (acres/1000 people) Actual Level of Service (acres/1000 people) Shortfall (acres) 1995 14.5 8,841 2.5 1.64 7.6 2000 2-4,8 26.99 11,190 2.5 4,9-6 2.41 6.2 .91 Calculation of Level of Service in 1995 When the Master Plan was adopted in 1995, three facilities in Key Biscayne contributed to the calculation of the level of services . the Crandon Boulevard Tree Farm, the Key Biscayne Community School (now known as the Key Biscayne K-8 Center); and Calusa Park. According to the Master Plan, these three facilities together totaled 14.5 usable acres, corresponding, in 1995, to a parks and recreation level of service of 1.64 acres per 1,000 permanent residents. • The first, the 9.2 -acre Crandon Boulevard "Tree Farm," was purchased in the early 1990s by the Village to serve as the "Village Green," a passive recreation facility with a playground and a path encircling multi -purpose fields. By developing this facility, the Village partially met Objective 1.4 of the Recreation and Open Space Element, which seeks to "achieve open space." • The second, Key Biscayne Community School, provided the Village with 2.3 acres of recreational space. Shortly following the adoption of the Master Plan, and consistent with Objective 1.2 of the Recreation and Open Space Element, the Village signed a formal joint use agreement with Miami -Dade County Public Schools regarding use of Key Biscayne K-8 Center's fields. The Village's Parks and Recreation Department maintains all of the school's grounds in exchange for unrestricted, public access to the fields at the conclusion of the school day. 1° The Village is not able to include towards its acreage count Miami -Dade County's Crandon Park to the north, the State of Florida's Bill Beggs Cape Florida Park to the south and the privately owned, limited access 2.4 -acre Key Biscayne Beach Club and 4.5 -acre Key Biscayne Yacht Clubs (both are within Village limits) because the facilities are neither under its jurisdiction, part of an interlocal agreement nor, in the cases of the private clubs, openly accessible to the general public. Wallace Roberts & Todd, LLC 98 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • The third facility, Calusa Park, is inside the Village's northern boundary yet part of Miami -Dade County's Crandon Park. Among its 7.5 total acres, it provided 3.0 acres of usable playfields and recreational facilities and 4.5 acres of mangroves and other vegetation. The Village does not own the Park, but has an interlocal agreement for its nonexclusive use with Miami -Dade County". At the time the Master Plan was adopted, the Village anticipated expanding Calusa Park at its own expense in order to provide additional acres of parkland and space suitable for active recreation uses. However, an agreement with the County was not reached; the County was in the process of developing its own Crandon Park Master Plan to determine future uses of park assets. Parks, Recreation and Open Space Changes between 2000-2005 The composition of the Village's parks, open and recreation space has changed over the past decade. In accordance with recommendations in the Master Plan,12 the Village has ■ Built a new community center on the northwest sector of the Civic Center site; ■ Added the 2.8 -acre Key Biscayne Lake Park located at the corner of East Enid Drive and Crandon Boulevard; ■ Renovated and upgraded beach access at the 2.0 acre Beach Park (The improvements are designed to 11 Through its interlocal agreement with Miami -Dade County, the Village of Key Biscayne Parks and Recreation Department is responsible for administering the management of both Calusa and parts of Crandon Park, including weekly inspections for maintenance and safety concerns. 12 The Master Plan also recommended the acquisition of the residential and commercial blocks between West McIntyre Street, West Enid Drive, Glenridge Road, and Crandon Boulevard (totaling 6.7 acres) for open space and recreation facilities and the development of the Enid/Crandon/Seaview Drive parcel (10.2 acres) into a recreation facility. The Village did not acquire these blocks as originally described. Instead, since 1995, property has been acquired between Fernwood and West McIntyre Street south of the Village Green for the construction of the Community Center; on the south side of West McIntyre Street between Fernwood Road and Crandon Boulevard for the development of the Fire Station and Village Hall; and between West McIntyre Street and Crandon Boulevard south of the Sun Trust Bank site for the development of a passive park. This last parcel, however, remains vacant. The Civic Center Master Plan contemplated a theater or cultural center on this parcel, based on feedback from residents. A final decision on the use of this parcel has not yet been made; however, at 0.33 acres in area, the parcel is not large enough to accommodate playfields or other active recreation facilities. Wallace Roberts & Todd, LLC 99 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN concentrate most of the activity along the beach in order to maximize residents' access to the ocean)13 and • Completed a beach renourishment project that added approximately 11 acres of sand to the shoreline bordering the Village's eastern limit. The pre-renourishment beach was 18.48 acres. The post-renourishment beach was approximately 29.53 acres upon project completion in 2001. Floor Area Ratio incentives for providing beach access easements have been added to the Zoning Code. In addition to recommendations in the Master Plan, the Village: ■ Entered into a joint use agreement with St. Agnes Catholic Church in 2004 that formalized Village use of the Church's 2.1 -acre playing field. In exchange for use of the Church's fields, the Village Parks and Recreation Department contributed $400,000 in improvements, including lights for the field and refurbished drainage, sod and irrigation systems. In addition, the Village annually pays St. Agnes $36,000 in lease fees. • Acquired 0.4 acres of pedestrian friendly pocket parks and mini -plazas (reclaimed from pavement) as part of the Crandon Boulevard Master Plan. ■ Added bike lands on Crandon Boulevard and Harbor Drive ■ Built the Monaco Reflecting Pools, an art in public places project comprised of two reflecting pools surrounded by lighting and a landscaped area. The passive space, which is amid a highly urbanized environment, provides Village residents an opportunity for contemplation and appreciation of the artwork. • Decided to convert 530 Crandon Boulevard to recreation space upon the completion of the Crandon Boulevard Phase II Streetscape Program and installation of sewers when the property will not longer be used for construction staging. The Village lost approximately 0.28 acres of playing fields at the renamed Key Biscayne K-8 Center (formerly known as the Key Biscayne Community School) in 2004 to the construction of a new 13 The land for Lake Park and Beach Park was deeded to the Village by the Ocean Club in 2001 and 2002, respectively. Wallace Roberts & Todd, LLC 100 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Middle School facility at the southwest corner of the campus. The building was completed in June 2005. Calculation of Level of Service in 2005 The following contribute to the 2005 Parks, Recreation and Open Space Level of Service. Table 9: Parks and Recreation Facilities Counted in 2005 Level of Service Calculations' Parks and Recreation Space Acreage Calusa Park12 3.00 Village Green 9.50 Key Biscayne K-8 Center3 2.02 East Enid Lake Park 2.78 Beach Park 2.00 Pocket Parks4 0.39 St. Agnes Field 2.13 Community Center 1.95 Bike lanes on Crandon Boulevard and Harbor Drive 1.36 Monaco Reflecting Pools 0.19 Library Park 1.17 530 Crandon Boulevard +lus sur+lus ROW 0.52 TOTAL: 2-1 26.99 1 Calusa Park is with the Village limits and is used by Key Biscayne residents, but belongs to Miami -Dade County 2 The 3.0 acres includes open space and recreational facilities, but excludes protected mangrove areas. 3 The acreage count for the Key Biscayne K-8 Center has changed over the past decade due to renovations and expansions to the original K-5 facility between 1995-1997 and the construction of a new Middle School building to serve grades 6-8 in 2004-2005. 4 The pocket parks are part of the Crandon Boulevard Streetscape Master Plan. Today, the level of service is estimated at 1.96 2.41 acres per 1,000 residents, based on the estimated 2003 population of 11,160 persons. To meet its objective of 2.5 acres per 1,000 residents, the current parks and recreation space needed is a total of 27.9 acres (using current population levels). Moreover, to meet the needs of the projected build -out population of 11,425, the Village would need to secure approximately 28.6 total acres of parks, recreation and open space by 2015. Wallace Roberts & Todd, LLC 101 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated. Since the completion of the Master Plan, the amount of potential land available for conversion to parks and recreation space has decreased. Vacant or redevelopable lots once for sale and possibly suitable for public pocket parks and bay access points have since been purchased and privately developed. Factoring in values of the land and existing structures, these parcels would be extremely costly to acquire and convert to public use today. In conjunction with its visioning process, the Village of Key Biscayne is evaluating an extensive list of capital improvement projects, including several projects relevant to the protection and enhancement of the Village's parks and recreation space. In January 2006, a subset of members of the 2020 Vision/EAR Committee's EAR Subcommittee was asked to prioritize and estimate the cost of each project. Upon consideration of input from the community, members of the EAR Subcommittee, and the full citizen's advisory committee, the following projects were labeled as high priority: ■ Civic Center Park (use of this now vacant parcel at 560 Crandon Boulevard is to be determined at a later date, in the context of all the Vision Plan projects). • Bay Access (20 foot wide Matheson Drive View Corridor to Bay) • Community Parks/Playing Fields (Option 1: Key Biscayne Presbyterian Church (through a joint use agreement) — enhancements include a Bayfront Park, Playing Field, Canal Bay Access Park, Mangrove Interpretive Park, floating fishing pier over water; Option 2: Bayfront Park on Harbor Drive —enhancements include a sandy beach, small shade structure, sitting areas, pier, trees and grass) • Calusa Park (mangrove nature trail with bay access and new baseball and soccer fields —in addition to existing tennis, courts, bathrooms and a parking lot) ■ Neighborhood Parks (overlook in right-of-way on Crandon Boulevard at Pines Canal; short interior street ROW demolition, trees, grass, benches, pedestrian -scale lights) ■ Nature Trails (Presbyterian Church bay area to St. Agnes Church; at rear or 7-11 Shopping Center through Calusa Wallace Roberts & Todd, LLC 102 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Park to Crandon Park Tennis; and St. Agnes Playing Field to 7-11 Shopping Center) (3) Recommended Amendments to the Master Plan. • The following objective should be amended to read: O bjective 1.5 Public -Private Coordination: Explore and implement a fully coordinated system of recreation resources. (See Section 6 Conclusions and Recommendations, Recommendation ROS1) • The following policy should be amended to read: ■ Policy 1.3.5 Explore means of revenue raising to support public trust acquisition of recreation lands and open space and preservation of historic landmarks by 2010. (See Section 6 Conclusions and Recommendations, Recommendation ROS2/1C3) • Add a policy that the Village shall "[p]repare a strategy for buying land in the Village to be dedicated as recreational space." (See Section 6 Conclusions and Recommendations, Recommendation ROS3) Add a policy that the Village shall "[n]egotiate use agreements with Miami -Dade County and the City of Miami for Village residents to have access to parkland outside Key Biscayne." (See Section 6 Conclusions and Recommendations, Recommendation ROS4) • Add a policy that the Village shall "Neview and revise current regulations to require that any future development proposed in the Village that contains apartments or hotel condominiums to provide public open space on- or off -site in the amount necessary to serve the demand created by the projected population increase." (See Section 6 Conclusions and Recommendations, Recommendation ROS5) • Add a policy that the Village shall "[e]xplore instituting an impact fee for new single-family detached and residential duplex construction." (See Section 6 Conclusions and Recommendations, Recommendation ROS6) Wallace Roberts & Todd, LLC 103 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • The date referenced in the following policy should be updated: ■ Policy 1.5.2: Explore a recreational impact fee for all new development to help fund acquisitions and improvements by 1994. (See Section 6 Conclusions and Recommendations, Recommendation C12) c. Calusa Park, Crandon Park, Bill Baggs Cape Florida State Park and Virginia Key - Interlocal Cooperation Relative to Village Issues Despite a recent extension of the interlocal agreement for use of Crandon Park as a whole, Calusa Park —a portion of Crandon Park but also an "appurtenance" to the Village —remains an underutilized resource. Considering that Virginia Key, Crandon Park and Bill Baggs Cape Florida State Park abut the Village and affect local conditions, interlocal cooperation with the City of Miami, Miami -Dade County, State of Florida Department of Environmental Protection and other agencies will be critical to forestall problems and find solutions to local and regional problems related to park access, usage, and visitation issues. As one of three governments involved in creating the Virginia Key Master Plan, the Village must continue to work with Miami -Dade County and the City of Miami to ensure that the Master Plan includes facilities necessary to meet the needs of Key Biscayne residents. (1) Assessment of success in implementing Master Plan objectives related to issue. The Key Biscayne Master Plan devotes an entire chapter to intergovernmental coordination to strengthen its relationships with other jurisdictions and protect its interests amidst regional change. Where the State, the County, and the City of Miami make decisions that affect Key Biscayne, the Village Council monitors their actions and maintains ongoing communication with them. ■ The Village Council has participated in ongoing dialogue with the State, the County, and the City of Miami to address traffic, safety, and redevelopment concerns generated by Virginia Key, the Causeway, and Crandon and Bill Baggs Cape Florida Parks. ■ The Village is a member of the Virginia Key Master Plan Committee. According to the City of Miami Planning Wallace Roberts & Todd, LLC 104 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Department, the Virginia Key Master Plan's intent is to develop meaningful waterfront and public open space areas; to offer policies for the use, development and management of land; and to protect and enhance natural resources while providing the necessary infrastructure and traffic flow to serve future development. ■ The 3 -acres of open space usable for recreation at Calusa Park, outside north edge of Key Biscayne's municipal limits, are located within the boundaries of Miami -Dade County's much larger Crandon Park. This publicly accessible part of Calusa Park's 9 acres is largely a clearing surrounded by mangroves on three sides and consisting of tennis courts, a playground, open space, a pavilion with public restrooms and a parking lot. The Village has attempted to reach agreements with Miami Dade County for improvements to Calusa that would add a soccer/baseball playing field, without result to date. However, the Village plans to upgrade the pavilion/restroom facility and modify the tennis courts into multipurpose sports courts, to meet both Crandon Park Master Plan and Village needs, has been approved. • The Village negotiated an extension to the Crandon Park agreement providing for use of lighted playing fields on a scheduled basis, • The Village attempted to negotiate with the State of Florida a possible solution to its open space and playing fields deficiencies by dedicating a portion of the area adjacent to the north entrance of Bill Baggs Cape Florida Park to local recreational needs, subject to appropriate controls and defined uses. However, an agreement, which would have added a nature trail with bay access and soccer and other playing fields, was not met. (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated. See preceding section, C(1). (3) Recommended Amendments to the Master Plan. • The following policy should be amended to read: • Policy 1.2.1 As is relevant, consider and attempt to consummate the following interlocal agreements on an ongoing basis. Wallace Roberts & Todd, LLC 105 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN (See Section 6 Conclusions and Recommendations, Recommendation IC1) • The following policy should be amended to read: ■ Policy 1.5.2 Explore means of revenue raising to support public trust acquisition of recreation lands and open space and preservation of historic landmarks by 2010. (See Section 6 Conclusions and Recommendations, Recommendations ROS21lC3) • Add a policy that the Village shall "[n]egotiate use agreements with Miami -Dade County and the City of Miami for Village residents to have access to parkland outside Key Biscayne." (See Section 6 Conclusions and Recommendations, Recommendation ROS4) d. Traffic Volume, Operations and Safety The Village has made great strides in improving traffic safety through the use of traffic calming devices in certain areas of the Village. However, in other areas of the Village, excessive traffic speed and cut -through traffic remain a problem, particularly in places lacking sidewalks and crosswalks for pedestrian safety. Changing demographics, growth, and commerce have resulted in local traffic congestion. In addition, expected increases in visitation to the regional attractions located on or near Key Biscayne —particularly during holiday weekends and for special events —raise concerns about ever- increasing traffic congestion on Crandon Boulevard, the Village's main conduit for ingress and egress, as well as about traffic speed, cut - through traffic, and public safety on residential streets. (1) Assessment of success in implementing Master Plan objectives related to issue. As recognized in the Crandon Boulevard Master Plan, the level of congestion has great potential to increase. First, while new development will be limited, older single-family homes within residential areas are being redeveloped into larger homes for larger families with more cars. Second, given that the current build out of some commercial developments is below the allowable 0.50 Floor Area Ratio, an increase in the commercial square footage is possible. Third, the Ocean Club condominium development currently has a very low average occupancy rate, but is likely to Wallace Roberts & Todd, LLC 106 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN see a significant increase. Lastly, because Crandon Boulevard is the sole access to Bill Baggs Cape Florida Park and the only thoroughfare traversing Key Biscayne, the road already experiences heavy through -traffic. Crandon Boulevard, the Village's only principal urban arterial roadway 14 and the only road within Village limits that remains under Miami -Dade County jurisdiction, is the first street to undergo major improvements since the adoption of the Master Plan. The study that resulted in the 2004 Crandon Boulevard Master Plan was approved and funded by the Village of Key Biscayne and Miami -Dade County in an interlocal agreement dated February, 8, 2002. The study sought to address the following goals: improved public safety, easing of traffic congestion, traffic calming, pedestrianization, improved mass transit, and improved streetscape and landscape elements. Based upon the recommendations provided by the Village Council, the Crandon Boulevard Master Plan Committee, an 18 -member citizen advisory committee appointed by the Village Council, worked with consultants and members of the public to achieve these goals. The Committee made its recommendations to the Council, who approved the Master Plan in 2004. The Miami -Dade County Commission followed with its approval. In February 2005, the Village began the first phase of construction at the intersection of Crandon Boulevard, West McIntyre Street, and Galen Drive in front of the Civic Center. Phase II of the project began in July 2005 along Harbor Drive from Fernwood Road to the intersection with Crandon Boulevard. Harbor Drive is one of the Village's two collector streets. Phase II also includes improvements from the entry block of Crandon Boulevard to West McIntyre Street to the southern end of Crandon Boulevard at the entrance to Bill Baggs Cape Florida State Park. Public safety and street improvements in Phase II include: ■ Redesigned intersections where Crandon Boulevard meets cross streets and condominium entranceways. Features include tightened corner radii and contrasting pavers in pedestrian crosswalks and infields; ■ A new eight foot wide sidewalk on each side of Crandon Boulevard; 14 This designation was granted by the Federal Highway Administration and the Florida Department of Transportation. Wallace Roberts & Todd, LLC 107 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Curb and gutters on the commercial frontage along Crandon Boulevard and Harbor Drive; • Improvements on Crandon Boulevard and Harbor Drive that will increase the flow of traffic; • A large traffic circle on Harbor Drive and Fernwood Road that will increase the flow of traffic; • New traffic lights that will maintain the flow of traffic on Crandon Boulevard; • Marked bicycle path on each side of Crandon Boulevard; • Shade trees along the swale and additional palm trees in the median on Crandon Boulevard; and • New bus shelters and benches along the east side of Crandon Boulevard and bus stops with benches along the west side for the entire length of the Boulevard within the Village limits. Phase I intersection improvements at the Crandon Boulevard intersection with West McIntyre Street and Galen Drive, as well as between Crandon Boulevard and Village Green Way along West McIntyre Street, were paid for by funds appropriated from "the Civic Center Project" budget. Phase II is funded primarily by the proceeds of a half -penny transit tax approved by Miami -Dade County voters in 2002, that was awarded to qualifying municipalities on a yearly basis; the Village leveraged its share of these funds to raise approximately $2.3 million of the $4.0 million estimated costs. The surtax funds are supplemented by contributions from developers currently redeveloping or planning to redevelop commercial properties in the Village of Key Biscayne. The State of Florida contributed $1 million in additional funding in acknowledgement that Bill Baggs Cape Florida State Park, one of the most highly visited parks in the state, generates a lot of traffic on Crandon Boulevard, the Park's only access. Specific funding for the implementation of Phase III had not been identified at the time of adoption of the Crandon Boulevard Master Plan. However, County and State sources are expected to be available. Four local roads serve important functions in Key Biscayne's circulation network, in addition to Harbor Drive and West Mashta drive, which are designated collector roads by FDOT standards. Fernwood Road, one of three north/south roads in the municipality, separates the commercial district from the residential area. As such, it will need to be explored for improvements. West Wood Wallace Roberts & Todd, LLC 108 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Drive, West McIntyre Street and West Heather Drive all collect traffic from tangential Village streets and direct it to Harbor Drive and Crandon Boulevard. To date, the Village has made minor improvements to some east/west roads east of Crandon Boulevard (East Enid Drive, Seaview Drive and Grapetree Drive), but none was part of a comprehensive strategic plan to improve the network. A coordinated scope for improvements is necessary. Multimodal Transportation In 1999, the Village of Key Biscayne Chamber of Commerce undertook a study to explore the feasibility of a free trolley service in Key Biscayne geared toward seniors. Survey results indicated that the majority of respondents supported a trolley service, but believed it should be paid for by private enterprise rather than the Village. Based on this feedback, the Village proceeded to contact the Miami -Dade Transit Authority (MDTA) to initiate the process of creating an interlocal agreement and applying for a circular route certification of transportation. Prior to formalizing any agreements, the Chamber of Commerce sought to procure a trolley for a trial testing period; trolley vendor quotes were prohibitively expensive and the project was deemed to be unfeasible due to the high costs involved for comparatively low projected ridership. In February 2004, the trolley concept was revisited by the Crandon Boulevard Master Plan Committee. MDTA, a consultant to the Crandon Boulevard Master Plan Committee, suggested broadening target ridership from seniors to a mix of ages. Upon reviewing the recommendation, the Committee determined that "a trolley service owned and operated by the Village of Key Biscayne would entail extensive costs for equipment, personnel, and maintenance, and not have sufficient riders to make it economically feasible at this time. A more detailed study in the future could be performed to determine if a different trolley/shuttle passenger mix, such as children attending island public and private schools, seniors, and MDTA bus riders, could be feasibly accommodated. The Miami -Dade County Metropolitan Planning Organization Municipal Program has planning fund available for such studies, and interested municipalities can compete for these planning funds." (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated. Wallace Roberts & Todd, LLC 109 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN According to the February 2004 Traffic and Parking Impacts of Commercial Development study commissioned by the Crandon Boulevard Zoning and Redevelopment Committee, during the past 10 years, intra-Village traffic grew by 15 percent while traffic along Crandon Boulevard north of Harbor Drive (beyond northern Village limits) had only a 5 percent increase. The growth of the intra- village traffic is the direct result of new construction and redevelopment including the Ritz -Carlton Hotel (formerly the Grand Bay Resort), the Grand Bay Residences (condominiums and single family homes), the Ocean Club, and a proportional increase in drivers per household. Many of the larger commercial properties that front on Crandon Boulevard are bounded along their rear property line by Fernwood Road. The Village has been considering the possibility of allowing driveway connections from Fernwood for these properties. Such connections are expected to produce a redistribution of traffic from Crandon Boulevard to Fernwood Road of 5 to 10 percent and a more limited redistribution along the intersecting side streets. Since adoption of the Master Plan, the Village has started funding a senior transport service. Administered by the parks and recreation department, the service transports seniors to any location on the Key, including Crandon and Bill Baggs Cape Florida State Parks. (3) Recommended Amendments to the Master Plan. • A policy should be written under Objective 1.1 scheduling a traffic study to assess the impact of internally generated traffic congestion. (See Section 6 Conclusions and Recommendations, Recommendation TC1) • A policy should be written under Objective 1.1 scheduling a traffic study to assess the LOS of collector and local streets. (See Section 6 Conclusions and Recommendations, Recommendation TC2) • In Policy 1.1.1, change the designation for arterial roadways from LOS "E" to LOS "D." (See Section 6 Conclusions and Recommendations, Recommendation TC3) • Designate Fernwood Road as a transitional road between residential and commercial. At the rear lot line of specific Wallace Roberts & Todd, LLC 110 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN commercial centers on Crandon Boulevard, require that access points be opened where appropriate to pedestrians, golf carts and, on a limited basis, to vehicular traffic. (See Section 6 Conclusions and Recommendations, Recommendation TC4) • Place and coordinate the update of electric signs at the intersection of Highway 95 and US Route 1 South that inform visitors if Bill Baggs Park is at capacity or accepting additional visitors. (See Section 6 Conclusions and Recommendations, Recommendation TC5) • To better encompass the spectrum of transportation facilities, the Traffic Circulation Element shall be renamed the Transportation Element. (See Section 6 Conclusions and Recommendations, Recommendation TC6) • To the new Transportation Element, the Village should add a policy to "[u]pdate the transportation maps every three years." (See Section 6 Conclusions and Recommendations, Recommendation TC7) • To the new Transportation Element, the Village should add a policy to "[c]oordinate the Future Land Use Map with the transportation system. (See Section 6 Conclusions and Recommendations, Recommendation TC8) • To the new Transportation Element, the Village should add a policy to "[e]stablish numerical indicators to measure achievement of mobility goals." (See Section 6 Conclusions and Recommendations, Recommendation TC9) • To the new Transportation Element, the Village should add a policy to "[c]onduct a public transit feasibility study." (See Section 6 Conclusions and Recommendations, Recommendation TC10) e. Implications of Redevelopment Due to ever -escalating property values and the unavailability of vacant land, pressures for redevelopment continue to grow. Redevelopment issues remain a major concern of the Village. The replacement of homes built in the 1950s and 1960s with new homes has resulted in increases in population and vehicular traffic, as well as in visual Wallace Roberts & Todd, LLC 111 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN impacts related to the scale and massing of new buildings. In addition, existing, older rental apartment buildings will either be substantially renovated or demolished and replaced with new condominium buildings. The conversion of apartment buildings affects the availability of housing at price points that might attract seniors, young adults and others that would enhance the diversity of the community. Similarly, concerns exist about the impacts that proposed hotel and condo -hotel redevelopment at the existing Sonesta Resort and potential future redevelopment of the small-scale Silver Sands Motel sites might have on density, building mass, traffic, and local businesses. (1) Assessment of success in implementing Master Plan objectives related to issue. When the Master Plan was adopted in 1995, the trend of sound, existing, modestly -scaled houses being demolished in order to build excessively proportioned houses with modern amenities was emerging in Key Biscayne. Redevelopment's three pronged effect on the island —the alteration of the affordability and diversity of housing stock, appearance, and levels of traffic —has been addressed over the last decade in varying degrees. Affordability and Diversity Appreciating property values and redevelopment continues to reduce the affordability and diversity of housing in Key Biscayne. In recent years several rental properties have been converted to condominiums, thereby diminishing the availability of rental units. As the older housing stock is converted into much larger, more expensive structures, the ability to purchase property on Key Biscayne is increasingly elusive as well. In the Village, these trends most directly affect the elderly and young families with intentions to move within the island to different units, but not necessarily the means to be able to afford the taxes associated with doing so. Through a variety of mechanisms, the Village has made and is in the process of making efforts to curb this trend. For example, it ■ Converted the zoning designation of several properties on Fernwood Road to be Two -Family in order to diversify the housing stock. Several of these properties are rentals. ■ Permits group housing in all multi -family districts. Wallace Roberts & Todd, LLC 112 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Monitors the production of housing the larger metro area to ensure regional needs are met. ■ Through the 2020 Vision process, continues to discuss the needs of its elderly population and will continue to explore the feasibility of providing incentives for the provision of assisted living facilities in the Key. • Explores innovative solutions to increase the affordability and diversity of the stock while maintaining compliance with Coastal High Hazard Area regulations. However, the Village's ability to provide affordable housing is constrained by several factors: ■ As a Coastal High Hazard Area within floodplain designation AE, the Village is not permitted to approve any development applications that would serve to increase density beyond what exists or is allowed by current zoning and/or vested rights • The Village is almost entirely built out. Purchasing property from the very limited supply of vacant land would be costly and burden the debt cap. This is in conflict with Policy 1.3.1 of the Capital Improvements Element of the Master Plan, which states that the "capital improvement program schedule shall not include projects that would achieve significantly more intensive development than authorized by this plan by directly causing developer applications for Land Use Plan or zoning map amendments." Policy 1.5.3 of the same element follows "the Village shall not give approval to new projects that create need for expanded capital improvement unless the project pays a proportional share of the costs of these improvements following legally prescribed criteria for such fees." • Because the Village is bordered by Biscayne Bay to the west, county -owned Calusa and Crandon Parks to the north, the Atlantic Ocean to the East, and Bill Baggs Cape Florida State Park to the south, annexation is not an option. The University of Florida's Shimberg Center for Affordable Housing, under contract with the State of Florida Department of Community Affairs, prepares an Affordable Housing Needs Assessment (AHNA) for each municipality in the State in order to assist in the Wallace Roberts & Todd, LLC 113 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN development and evaluation of comprehensive plan housing elements. The AHNA provides information about household size, income (as measured against the median), ownership status, and other indicators. While the ANNA is a suitable source of information on affordable housing in many municipalities in Florida, it is not for a small community with finite land resources such as Key Biscayne. It is critical to note the AHNA's caveats. According to the Shimberg Center's September 2005 Affordable Housing Needs Assessment: Population and Household Projection Methodology report, the most important base data for preparing estimates and projections of housing demand is population data. However population information is difficult to project for small jurisdictions such as Key Biscayne. Therefore, the accuracy of housing affordability forecasts in this case is compromised for the following reasons: ■ Population projections are based on previous trends in a jurisdiction and do not take into account potentially trend - reversing characteristics such as limited land availability. • Population estimates and projections for small areas are particularly vulnerable to being skewed by variables such as in- and out- migration of population, land availability, zoning, infrastructure availability, and other factors that have a large impact at the local level. • In a smaller city like Key Biscayne, the impact of growth is magnified under certain projection techniques. • Several avenues are closed off to a method that must project an age distribution at the jurisdiction (or other small area) level. Cohort -component and econometric techniques require detail generally lacking at this geographic level. ■ In general, the complexity of a calculation and its margin of error is increased by adding levels of detail (total population vs. age, sex, and income detail), decreasing the size of the place (nation vs. county vs. census tract), and increasing the time since the last base point (estimate for 5 years since the last census vs. 20 year projection vs. 50 year projection). Estimating and projecting a population's composition is especially problematic for small geographic areas such as Key Biscayne because it Wallace Roberts & Todd, !LC 114 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN requires the consideration of all three factors: detail, size, and horizon. According to the AHNA, the Village will have the following (Tables 11 and 12) demand for affordable housing over the next twenty years. To reiterate, due to the caveats stated above, the Village deems these figures to be exaggerated. Table 11: Affordable Housing Demand in Key Biscayne Year 2005 Year 2010 Year 2015 Year 2020 Year 2025 Total Number of Households 4439 4694 5038 5377 5560 Renter Households/% of Total 1243/28% 1280/27% 1354/27% 1416/26% 1468/26% Owner Households/% of Total 3196/72% 3414/73% 3684/73% 3961/74% 4182/75% Very Low Income renter Households/% of Total Rentals 445/36% 467/36% 500/37% 528/37% 552/38% Low Income Owner Households/% of Total Rentals 255/21 % 260/20% 277/20% 287/20% 294/20% Moderate Income Renter Households/% of Total Rentals 238/19% 244/19% 254/19% 265/19% 276/19% Total Low and Moderate Income Renter Households/% of Total Rentals 938/75% 971/76% 1031/76% 1080/76% 1122/76% Very Low Income Owner Households/% of Total 527/16% 570/17% 634/17% 708/18% 784/19% Low Income Owner Households/% of Total Owned 426/13% 463/14% 514/14%© 569/14% 609/15% Moderate Income Owner Households/% of Total Owned 558/17% 594/17% 652/18% 701/18% 738/18% Total Low and Moderate Income Owner Households/% of Total Owned 1511/47% 162748% 1800/49% i 1978/50% 2131/51% ource: ordable Housing Needs Assessment, Shimberg Center for Affordable Housing 2005 In order to accommodate local housing needs based on the Shimberg Assessment's household size, tenure and income projections, Key Biscayne would need to have the following quantities and distributions of units between 2005 and 2025. Wallace Roberts & Todd, LLC 115 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Table 12: Projected Demand of Renter- and Owner -Occupied Units by Income based on AHNA Data 2005 12010 2015 2020 2025 Very Low Income Units Rental 445 467 500 528 552 Owner 527 570 634 708 784 Total Very Low Income Units 972 1,037 1,134 1,236 1,336 Low Income Units Rental 255 260 277 287 294 Owner 426 463 514 569 609 Total Low Income Units 451 723 791 856 903 Moderate Income Units Rental 238 244 254 265 276 Owner 1558 594 652 701 738 Total Moderate Income Units 796 838 906 966 1,014 Middle/Upper Income Units Rental 305 309 323 336 346 Owner 1,685 1,787 1,884 1,983 2,051 Total MiddlelUpper Income Units 1990 _ 2,096 12,207 2,319 2,397 ource: Affordable Housing Needs Assessment, Shimberg Center for Affordable Housing, 2005 Highlighting one of the AHNA's caveats critical to Key Biscayne, estimates are based on historic and current population figures and growth trends that do not necessarily reflect actual local conditions. The AHNA data projects, upon continuous increase, a Village population of 14,068 in 2025. However, the Village of Key Biscayne is currently very close to build -out and more likely to follow the growth trend predicted for the Village by Miami -Dade County, which forecasts a leveling of population in 2010 at approximately 11,425 residents. The Shimberg Center estimates this population sometime between 2005 and 2010; therefore, the Village's demand for housing units between 2015 and 2025 will probably be closer to the estimated demand between 2005 and 2010. The condition of the existing housing is a complementary facet of providing adequate affordable housing. The Shimberg Center for Affordable Housing defines substandard units as those that have one or more of the following characteristics: no heating fuel; incomplete kitchen and/or plumbing, and/or overcrowded units. In addition, substandard units may have code violations and/or structural issues. The data reflect Key Biscayne's superior quality of residential units. See Table 13 Wallace Roberts & Todd, LLC 116 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Table 13: Substandard Housing, 2000 Overcrowded Units (Occupied Units) No Heating Fuel Used (Occupied Units) Lacking Complete Kitchen Facilities (All Units) Lacking Complete Plumbing Facilities Number Percentage Number % Number % Number % 282 6.6 194 4.6 7 0.1 27 0,4 Source: Affordable Housing Needs Assessment, Shimberg Center for Affordable Housing, 2005 Appearance To maintain the appearance of the Village's residential areas and limit structures disproportionate to their lot sizes from being built, the Land Development Code regulates the maximum lot coverage, the maximum floor area ratio, setbacks, and the maximum number of stories in residential zones. The Village's landscape ordinances reinforce the regulation of the exterior appearance of structures: "Landscape design shall enhance architectural features, relate structural design to the site, visually screen dissimilar uses and unsightly views, reduce noise impacts from roadways and incompatible uses, strengthen vistas and reinforce neighborhood site design and architecture." (Article IX. Sec. 30-233.(1)). Compliance with these regulations is tracked during the site plan review process. No historic preservation policy to protect older residential stock such as Mackle homes or any other structures on the island has been implemented; however, there are currently no structures that meet the state or national age and significance requirements for state or national historic designation. Traffic Evidence reported in the February 2004 Traffic and Parking Impacts of Commercial Development study indicates that traffic congestion has increased over the past decade. While the Village has continuously met level of service standards for most roads on the island, a few locations —specifically, select intersections along Crandon Boulevard with Harbor Drive, West Wood Drive, and the Key Colony Condominium entrance —have worsened. The Crandon Boulevard Master Plan Implementation Project, which is currently under construction, will correct these Wallace Roberts & Todd, LLC 117 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN deficiencies. The Master Plan recommends a reduction in curb cuts and a roundabout at the intersection of Fernwood Road and Harbor Drive (the primary collector street for much of the local and commuter traffic from the main single family residential neighborhood on the west side of the Village) to alleviate traffic generated by the three day schools in the area. Additionally, congested and unsafe turn lanes have been redesigned to better accommodate demands generated by surrounding uses and signal timing has been adjusted. (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated. The Master Plan was written prior to the complete construction of the Grand Bay Resort and Residences and the Ocean Club, the two very influential Developments of Regional Impact on Key Biscayne. The Plan recognized that the residential intensity for the two DRI tracts would be critically important in determining the "build out" population of the Village and therefore, it would need to be reassessed upon completion of construction to verify its accuracy. According to the February 2004 Crandon Boulevard Master Plan, while the Village of Key Biscayne is nearly fully developed, the potential exists for redevelopment -induced increases in future traffic volumes on Crandon Boulevard. First, there is a vacant commercial parcel across from Key Colony. Second, an increase in commercial square footage is possible for some of the existing commercial developments given that their current build -out is below the allowable 0.50 Floor Area Ratio. Third, older single- family homes within residential areas are being redeveloped into larger homes for larger families with more cars. Last, the Ocean Club condominium development, which currently has a very low average yearly occupancy rate of approximately 30 percent, could see an increase in occupancy over the next decade (like the Key Colony development experienced in the 1990s). As demand increases in an area of finite supply, both commercial and residential rental rates and property values are increasing. Key Biscayne has become unaffordable for current segments of the population. Seniors who have lived in the Village for decades, maintained the same tax rate on their property, and would like to downsize, often can't afford to purchase a new property for which they would have to pay today's tax rate. Many smaller, "daily Wallace Roberts & Todd, LLC 118 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN needs" businesses, whose typical revenue could not support the rents commanded by local commercial properties, have also been priced out of the market. (3) Recommended Amendments to the Master Plan. • A policy should be written under Objective 1.1 scheduling a traffic study to assess the impact of internally generated traffic congestion. (See Section 6 Conclusions and Recommendations, Recommendation TC1) • A policy should be written under Objective 1.1 scheduling a traffic study to assess the LOS of collector and local streets. (See Section 6 Conclusions and Recommendations, Recommendation TC2) • Designate Fernwood Road as a transitional road between residential and commercial. At the rear lot line of specific commercial centers on Crandon Boulevard, require that access points be opened where appropriate to pedestrians, golf carts and, on a limited basis, to vehicular traffic. (See Section 6 Conclusions and Recommendations, Recommendation TC4) • Add a policy that the Village shall "[m]onitor current and future housing needs and explore innovative solutions to increase the affordability and diversity of the stock while maintaining compliance with Coastal High Hazard Area and Floodplain regulations." (See Section 6 Conclusions and Recommendations, Recommendation H1) • The following objective should be amended to read: • Objective 1.4. The Local Planning Agency (LPA) shall define and seek opportunities to promote affordable housing of a type and at a price range consistent with Key Biscayne local market and general market conditions. (See Section 6 Conclusions and Recommendations, Recommendation H2) • The following objective should be amended to read: • Objective 1.6 Development of Affordable Housing in Nearby Communities. Develop ongoing interlocal Wallace Roberts & Todd, LLC 119 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN coordination with other jurisdictions and non -governmental agencies for the provision of affordable housing. (See Section 6 Conclusions and Recommendations, Recommendation H3) • Remove Objective 1.1 because it is no longer relevant to existing conditions and needs. There were and are no vacant properties along Crandon Boulevard. There were two sites originally developed as small, low -density hotels and replaced with more than 250 units. ■ Objective 1.1 New Construction: Cooperate with private sector to build at least 250 well designed and diversified units on vacant residentially designated areas along Crandon Boulevard by 2004. (See Section 6 Conclusions and Recommendations, Recommendation H4) • Add a policy that the Village shall "[e]xplore federal, state, and local housing subsidy programs as means to provide housing opportunities for low-income persons and families, where appropriate. (See Section 6 Conclusions and Recommendations, Recommendation H5) • Add a policy that the Village shall "[c]ollaborate with Miami - Dade County and the City of Miami to create a program for annual evaluation of affordable housing needs within incorporated and unincorporated areas. (See Section 6 Conclusions and Recommendations, Recommendation H6) • Add a policy that the Village shall "[p]articipate in South Florida Regional Planning Council's initiatives directed toward educating local governments of new techniques, especially programs applicable to the region and/or the county, for promoting affordable housing. (See Section 6 Conclusions and Recommendations, Recommendation H7) • Add a policy that the Village shall "[e]valuate the feasibility of establishing an affordable housing fee trust fund in partnership with Miami -Dade County or the City of Miami (via interlocal agreements) to fund affordable housing programs and projects in Miami -Dade or the City of Miami. (See Section 6 Conclusions and Recommendations, Recommendation H8) Wallace Roberts & Todd, !!C 120 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Add a policy that the Village shall [e]nsure that land use designations and zoning districts that foster diverse housing types to serve the needs of the local population, including single family, duplex, and multi -family units. (See Section 6 Conclusions and Recommendations, Recommendation H9) f. Sustainability of Local Retail and Set -vices For the community to remain sustainable in the long-term, it must be able to provide basic services that satisfy basic community needs. Increasing property values and rent levels threaten the economic viability of small merchants, services, and retailers who provide important local services. (1) Assessment of success in implementing Master Plan objectives related to issue. There are two primary components to consider in an assessment of the provision of daily, basic goods and services: the quantity of retail and the type of retail. Research conducted for the 1995 Master Plan and, a decade later, for the Analysis of Retail and Service Space (September 2005) and the Traffic and Parking Impacts of Commercial Development (February 2004) studies indicates a consistency in the quantity: Key Biscayne has more square feet of retail building area than its residents alone are able to support and, despite parking shortages, shopping centers, office space and retail space have high levels of occupancy. Traffic Circulation Objective 1.2 in Part II of the Master Plan seeks to "limit commercial development and redevelopment to arterial road frontage plus Harbor Drive collector street frontage from Fernwood Road to Crandon Boulevard." The Village has implemented this objective by adding a Commercial district to the Land Development Code. All commercial development and redevelopment is contained within that zone. As denoted on the Future Land Use map, the district is primarily located along Crandon Boulevard. The Master Plan addresses the issue of quality very minimally. Part I indicates a need for additional filling stations and food and drug store space, but develops the topic no further. Part II does provide policies or objectives to encourage and stimulate the provision of basic retail services. Wallace Roberts & Todd, LLC 121 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN In May 2004, the Village Council created the Crandon Boulevard Zoning and Development Committee in order to address use, design, and development regulations for commercial properties located in the entry block. The Committee's work resulted in changes to the Land Development Code. Ordinance 2005-19, passed in November 2005, amended Section 30-101 "Commercial Districts" of Chapter 30 "Zoning". The Ordinance supports the inclusion of businesses geared toward the service of local needs. Additionally, it altered permitted uses, setbacks, maximum number of stories, floor area ratios, lot coverage, minimum lot area, and setback requirements in C-1 Commercial Areas. In order to deemphasize the visual prominence of parking, the ordinance added floor area ratio bonuses for the use of subterranean or set- back parking garages. Floor area ratio bonuses were also offered for the use of preferred design elements, site locations, uses, parking configurations, and landscaping. (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated. There continues to be a notable lack of small merchants and retailers providing local services. Rent levels price out of the market all but the most financially profitable businesses —such as banks, financial services, and real estate agents. Over the past decade the problem has been exacerbated by an increase in rent disproportionately higher than the natural increase in the rate of inflation. (3) Recommended Amendments to the Master Plan. The following policy should be amended to read: • Policy 1.2.1: As is relevant, consider and attempt to consummate the following interlocal agreements on an ongoing basis. (See Section 6 Conclusions and Recommendations, Recommendation IC1) g. Vulnerability to Damage from Tropical Storms and Hurricanes The Village, located on a low-lying barrier island in an AE flood hazard zone, is vulnerable to wind damage and storm surge damage from tropical weather systems. A protective shoreline dune system partially addresses this vulnerability along the Atlantic Ocean Coast since gaps in the dune system exist to provide beach access. Residential lots Wallace Roberts & Todd, LLC 122 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN with seawalls facing Biscayne Bay can be breached by storm -induced waves traveling across the shallow bay waters. The health, safety and welfare of residents is a major concern. Many, particularly the elderly, are reluctant or unable to evacuate the Village during tropical storm and hurricane events. (1) Assessment of success in implementing Master Plan objectives related to issue. Property Goal 3 of the Conservation and Coastal Management Element of the Master Plan is devoted to minimizing human and property loss due to hurricanes. Through the Land Development Code and Master Plan, the Village ■ Restricts the intensity of development through its Land Development Code, thereby preventing densities inappropriate for a Coastal High Hazard Area (Conservation and Coastal Management Objective 3.1). ■ Adopted traffic LOS standards that, based on Future Land Use Management (FLUM) policies, achieve a reasonable hurricane evacuation time. • Devised a concurrency management system with a phased capital improvement in order to achieve and maintain LOS standards concurrent with impact of development (Conservation and Coastal Management Objective 3.4). • Enacted and enforces Land Development Code provisions requiring minimum setbacks from the ocean, requires new construction at or above flood elevations specified by FEMA, restricts the amount of fill according to Land Development Code provisions, and limits funding of public infrastructure expansion 15 (Objective 3.5). • Has maintained permitted population densities to coordinate with local and regional hurricane evacuation plans according the zoning in the Master Plan. ■ Adopted regulations based on FEMA requirements to ensure adequate drainage paths around structures to guide storm water runoff; zone -appropriate first floor 15 Funding is limited if the effect of the expansion is a direct subsidy to a specific private development in the Village. Wallace Roberts & Todd, LLC 123 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN elevations for all new residential and non-residential buildings; the siting of all buildings in compliance with Florida Coastal Zone Protection Act of 1985; and the prohibition of structural fill. In coordination with the implementation of the Master Plan's policies and objectives, the Village has made substantial efforts to comply with and exceed national and state requirements. Since 1998, the Village has participated in the Community Rating System (CRS), a part of the National Flood Insurance Program. It has achieved a CRS classification of "6," placing it among the top ten communities in the state of Florida and reducing its flood insurance premiums for residents by 20 percent. The Village's Floodplain Management Plan, which was prepared with the aid of a State Emergency Management Preparedness and Assistance grant and adopted by the Village Council in April 1998, was showcased as a national model by FEMA in 2003. Its storm drainage capacity system has demonstrated a capacity to cope with torrential rain storms of greater than 60 year intervals in recurring frequency. People Policy 1.2.3 of the Intergovernmental Coordination Element of the Master Plan states that the Village shall assist in providing information regarding services such as waste, water, sewers, transit and hurricane response to residents. In June 2001, a Hurricane Information Manual was adopted in order to assist Village residents in planning and preparation for a hurricane and its aftermath (Conservation and Coastal Management Policy 3.2.2). Based on experiences from Hurricane Andrew in 1992, the 1991 County Emergency Operations Plan and the 1991 US Corps of Engineers Hurricane Evacuation Study, it addresses what to do before and after the storm, including general, outdoor and indoor safety tips. The information was compiled through consultation with the Miami -Dade County Department of Code Compliance, the Miami -Dade County Office of Emergency Management, the Broward County Office of Emergency Management, the Monroe County Office of Emergency Management, and the American Red Cross and has been distributed to the public through several news outlets Wallace Roberts 8c Todd, LLC 124 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN In early 2006 a committee will convene to address the vulnerability of residents during and after severe storms. Comprised of residents and the fire chief, it will explore how to best identify ■ residents requiring special assistance, including contact information, relevant medical history and needs, next -of -kin andfor care -givers; • those available to aid residents in need; • the role the Village will play in ensuring required medication is available for the duration of the disaster and recovery period; ■ evacuation procedures; • a transportation plan with an emphasis on those who are not independently mobile; ▪ evacuation sites with adequate services and supplies; • off -island housing, as necessary, during storm recovery periods; • generators and other alternative sources of power; the role the community center and schools may play as shelters for those who are unable to evacuate; • a means by which to store necessary supplies during a period when services on the Key are absent. The committee will look into establishing a data center to centrally store information and an entity to maintain it and creating a schedule that prioritizes the severity residents' needs. (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated. See previous section. (3) Recommended Amendments to the Master Plan. • Language and dates referenced in the following objective should be updated: ■ Policy 2.2.3: Continue to evaluate the need for and efficacy of alternate financing methods for beach renourishment and dune development. Wallace Roberts & Todd, LLC 125 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Objective 3.3: Post Disaster Redevelopment: Adopt a post -disaster redevelopment plan by 2010. • Policy 3.3.1: Prepare a post -disaster redevelopment plan based on the Hurricane Andrew experience and in consultation with the South Florida Regional Planning Council (SFRPC) and MDC OEM by 2010. (See Section 6 Conclusions and Recommendations, Recommendation CCM2) h. Need to improve or Replace Infrastructure Sewer System A portion of the Village remains on individual septic systems. The Master Plan indicates that limited periodic percolation of sewage effluent occurs with ground saturation during periods of heavy rains, and requires that sanitary sewers must be installed by 2008 to replace the individual septic tanks. How will the Village achieve this objective? Overhead Utilities Although the present network of overhead utilities is not considered functionally deficient, placing all utilities underground will aid in storm recovery, as well as improve the aesthetics of the Village. Roadway Network Parts of the Village road network suffer from a proliferation of potholes and require improved road maintenance. Village -wide Streetscape and Landscape Improvements The Village has begun implementing the recently completed master plan for the improvement of Crandon Boulevard. The need for a similar initiative to consistently enhance all local roads and civic spaces has also been identified, to achieve the desired Village character and appearance. (1) Assessment of success in implementing Master Plan objectives related to issue. Water and Sewer Systems The 1995 Master Plan presented four alternatives the Village's existing mix of sewered and non -serviced areas (houses currently on septic): Wallace Roberts & Todd, LLC 126 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Install sanitary sewers throughout the entire Village, prioritizing service residential streets adjacent to Biscayne Bay (such as southern Harbor Drive) ahead of others. • Initiate a petition among the property owners demanding service from the County.' ■ Set up, in compliance with State statute, a special taxing district and sewer collection system with sewage channeled through WASD trunk lines. ■ Use the Village's general fund to pay for the entire project. The Master Plan endorsed the first option and the Village is currently pursuing the installation of a sewer system throughout the entire Village. Key Biscayne is cooperating with the County to produce financial and engineering plans for an extension of the sewer and water systems. As of October 2005, the planning portion of the project was 33 percent complete; the Public Works Department foresees construction to commence in by spring of 2006. The Sewer Project has been divided into two phases, each of which contains two unserviced areas. The duration of each phase is estimated to last between eight and twelve months. According to the Miami -Dade Water and Sewer Authority (MDWASA), once the main water line and connections are in place, it will provide the residents with a prudent time frame in which to connect to the lines. Residents will be responsible for expenses incurred from treating and removing their septic tank and making the connection. The Village of Key Biscayne Public Works Department is still waiting to find out from the MDWASA the amount residents will be charged for these procedures. 16 At the time the Master Plan was written, the Metro -Date Water and Sewer Department (WASD) was responsible for the collection and treatment of the sewage from the lines of the Village. Wallace Roberts & Todd, LLC 127 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Table 14: Sanitary Sewer and Water Conversion Project Progress Zone Percent Complete Detailed Status Zone 1 Sanitary Sewer Water Zone 4 75 The new survey has been brought into all of the drawings and flows to the pump station are currently being verified and that no upgrades to the pump station are required. A site visit was conducted in September 2005 to verify structure types and businesses and to look at project conditions (tree sizes, driveway types, etc.) Pipe material types must be verified for those portions where the consultant does not have sufficient data, which will require input from the Village. A site visit was conducted in September to confirm that the new water lines should be put in the pavement, as opposed to in the swale where construction would impact decorative driveways and landscaping. Sanitary Sewer Water Zone 2/3 75 As of September 2005, the new survey was brought into all of the drawings; the flows to the pump station were being verified, as was the sufficiency of the pump stations as they are now and without upgrades. As of September 2005, the pipe material types needed to be verified for those portions where the consultant did not have sufficient data, which will require input from the Village. A site visit was conducted in September of 2005 to confirm that the new water lines should be put in the pavement, as opposed to in the swale where construction would impact decorate driveways and landscaping. Sanitary Sewer Water 25 As of September of 2005, the new survey had been brought into all of the drawings and flows to the pump station were in the process of being verified. A site visit was conducted in September to verify structure types and businesses and to look at project conditions (tree sizes, driveway types, etc). As of September of 2005, the pipe material types had to be verified for those portions where the consultant did not have sufficient data, which will require input from the Village. A site visit was conducted in September during which the consultant was determining whether the new water lines should be put in the pavement or in the swale, where construction would impact decorative driveways and landscaping. Wallace Roberts & Todd, LLC 128 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN In light of recently publicized challenges faced by MDWASA, the Village will work with the Authority to respond to and amend the project's timeline so the County may achieve its goal of delivering adequate water and sanitary sewer service to its residents. However, as of February 2006, the Village anticipates that the project will go out to bid in April or May of 2006 as permitting reaches completion. Overhead Utilities As part of its objective to maintain existing development and achieve new development and redevelopment which is consistent with community character (Future Land Use Objective 1.1), the Village made a policy to enact Land Development Code provisions governing subdivisions. The subdivision code was to require that certain utilities be installed underground. In July 2005, the Village requested a cost estimate from Florida Power and Light to bury all power lines west of Crandon Boulevard and along Galen Drive on the east side. The Village Manager inquired about any state or federal subsidies currently being offered to government entities considering similar projects and the Director of Public Works expressed his support for dividing the project into distinct zones. In January 2006, FPL provided the Village with an estimate of $11 million to complete the project. Communication is ongoing. FLP projects that it will pay for 25 percent of the project; costs incurred may be passed on to customers via surcharges. Roadway Network The Village's major arterial, Crandon Boulevard, is being improved according to the Crandon Boulevard Master Plan. Details are in Section 4.D(1) Traffic Volume, Operations and Safety. The Village is also in the process of seeking public input regarding parking, beach access, and safety improvements on Ocean Lane Drive; most recently, it held a public workshop on October 17th, 2005. Streetscape and Landscape Improvements Major streetscape and landscape improvements are being made to Crandon Boulevard, West McIntyre Street, and Harbor Drive as a result of the Crandon Boulevard Master Plan. The Departments of Public Works and Building, Zoning and Planning as well as the Manager's Office and consultants are working on a comprehensive plan to address landscaping in public areas. Improvements include Wallace Roberts & Todd, LLC 129 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN a redesign of the Village entrance, pocket parks/mini plazas, street furniture, locations of public art, signalization, street lighting, traffic, street name signage, and utilities. (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated. A survey to all residents administered by the Key Biscayne Village Council during the Master Planning process yielded results regarding prioritization of infrastructure improvements compared to preferences expressed recently indicates opinion has not shifted much over the past decade. 17 In the original survey, three quarters of participants rated "extending sanitary sewers to all areas of the Village" as desirable or higher; 94.8 percent rated "improving storm drainage throughout the Village" as desirable or higher (with a notably high percentage, 32.23 percent, indicating that it is a "first priority"); and installing street lights, installing special pavements, and installing curbs, rated in descending order of importance from there (57.5 percent; 46.0 percent, and 40.7 percent respectively). (3) Recommended Amendments to the Master Plan. • Place and coordinate the update of electric signs at the intersection of Highway 95 and US Route 1 South that inform visitors if Bill Beggs Park is at capacity or accepting additional visitors. (See Section 6 Conclusions and Recommendations, Recommendation TC5) • The language and dates referenced in the following policies should be updated: ■ Policy 1.2.1 Complete financial and engineering feasibility plan to extend sanitary sewers to unsewered areas by 2008, and complete implementation by 2010. (See Section 6 Conclusions and Recommendations, Recommendation 11) • Add a policy that the Village shall "ju}pdate the Master Plan within 18 months of the South Florida Water Management District updating its regional water supply plan, highlighting alternative water supply projects, and completing the required " The survey was sent to all Villages households and returned by approximately 20 percent. Wallace Roberts & Todd, LLC 130 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN "Work Plan Amendment." (See Section 6 Conclusions and Recommendations, Recommendation 12) • Add a policy that the Village shall "[sleek and obtain a written statement from the Miami -Dade Water and Sewer Authority regarding the availability of water to serve all proposed development projects, including current and projected demand, remaining permitted water withdrawals, facility capacity, and scheduled capital improvement projects." (See Section 6 Conclusions and Recommendations, Recommendation 13) • Add a policy that the Village shall "[e]stablish a single -point -of - contact at the South Florida Water Management District and Miami -Dade Water and Sewer Authority to determine the extent to which the Village will be involved in the planning, financing, construction, and operation of water supply facilities that will serve the community." (See Section 6 Conclusions and Recommendations, Recommendation 14) i. Implications of Debt Cap Although the Village has a strong and growing tax base, its debt capacity is finite and may hinder the Village's ability to implement capital initiatives, including park development, sewer extensions and placement of utilities underground, in a timely manner. Should the Village consider amending the debt cap as currently defined in the Village Charter? (1) Assessment of success in implementing Master Plan objectives related to issue. The Village of Key Biscayne is subject to a debt cap ordinance and also a provision to allow possible referendum on new debt issuance where any capital project is involved. The debt cap provision at present limits debt to one percent of current assessed value as provided by the county property appraiser. The debt cap schedule provided shows the current year and projections for future periods as assessed valuation changes and debt is anticipated to be incurred. The referendum requires a 30 day period between the first reading and second readings of any ordinance that would permit issuance of debt that relates to any capital project. Wallace Roberts & Todd, LLC 131 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN J• (2) Description of changed circumstances (►f any) related to issue since Master Plan was prepared/updated. See the preceding section, i(1). (3) Recommended Amendments to the Master Plan. • The language and dates referenced in the following policies should be updated: • Objective 1.1: Continue to upgrade drainage system so outfalls in Biscayne Bay (and adjacent canals) fully meet NPDES standards and Chapters 17-25 and 17-302.500, F.A.C. Continue to upgrade private property on -site drainage standards to ensure retention of at least the first one inch of stormwater, and no more runoff after development than before. ■ Policy 1.2.1 Complete financial and engineering feasibility plan to extend sanitary sewers to unsewered areas by 2008, and complete implementation by 2010. • Objective 1.3: Future Needs; Solid Waste: Continue to achieve the most cost-effective solid waste collection system. ■ Objective 1.5: Water Conservation: Continue working toward reducing the average daily per capita water consumption by 5%. (See Section 6 Conclusions and Recommendations, Recommendation I1) • In compliance with Chapter 163, F.S. (5)(d), provisions should be included for granting concurrency exceptions. (See Section 6 Conclusions and Recommendations, Recommendation Cli) Conservation, Coastal Management and Environmental Protection The residents of Key Biscayne place a high priority on protecting, enhancing, and, in some cases, restoring important natural resources that are not only intrinsic to the community's barrier island identity, but also contribute to the quality of life of both residents and visitors. (1) Assessment of success in implementing Master Plan objectives related to issue. Wallace Roberts & Todd, LLC 132 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN The first goal of the Master Plan's Conservation and Coastal Management Element is "to preserve and enhance the significant natural features" including ■ Vegetative and soil resources (Conservation and Coastal Management Objective1.3): Achieve zero net loss of mangroves); ■ Sea turtles, manatees (Conservation and Coastal Management Objective 1.4: Strive to achieve zero human - induced loss of manatees and/or sea turtle eggs; and • Wildlife and habitat (Conservation and Coastal Management 1.7: Achieve zero degradation of fisheries, wildlife, wildlife habitat, marine habitat and environmentally sensitive land. According to the 2003 Miami Dade County EAR, the Key Biscayne Special Management Zone artificial reef site off the Atlantic coast is the only designated environmental protection area related to beaches and artificial reefs near the Village. The Special Management Zone was designated in 1991 and contains 2,203.5 acres. Over the last decade, the Village of Key Biscayne has: ■ Enacted and enforced estuarine waterfront protection provisions in the LDC in accordance with state DEP and waterfront policies of Department and Environmental Resource Management (DERM). The Biscayne Bay Shoreline Development Review Committee was established as an interlocal entity to review all development permits (except single family and duplex houses) for tracts fronting the Bay; ■ Communicated with DERM on occasions where any adverse impacts are observed relative to the sea grass beds in adjacent Bay waters; • Reported speeding violations in manatee protection areas to County and State marine police. The entire western shore of Key Biscayne is designated as a Manatee Protection Area, which means that boat speeds above seven miles an hour and water skiing are prohibited; ■ Enacted and enforced LDC provisions in order to minimize night-time artificial light on beach areas where sea turtles nest; Wallace Roberts & Todd, LLC 133 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN • Enacted and enforced LDC provisions regarding detention, runoff, minimum pervious open spaces, and drainage level - of -service standards; • Researched and implemented beach renourishment projects. In 1997, Coastal Systems International, as a consultant to the Village, produced the "Long Range Beach Nourishment Plan for The Village of Key Biscayne, Dade County" in cooperation with a Council -appointed citizen's Beach Task Force. Its purpose was to present a long-range beach nourishment plan to address the eroded shoreline along the Village. The 2000-2001 project, overseen by the US Army Corps of Engineers, placed a reported 420,000 cubic yards of sand. The nourishment was designed to mitigate the long-term sand into the deeply dredged Government Cut channel north of Key Biscayne that formerly reached the island via longshore drift. The design of the beach fill template was developed based on the historical erosion rate, critical areas of erosion, location of nearshore seagrasses, and projected nourishment interval. Members of the Village's Beach Task force conducted research to identify appropriate sand characteristics required ensure compatibility of the new sand imported from offshore borrow areas with existing beach materials. As of 2006, the Village's Public Works Department and consultants are in the process of researching the next phase of beach renourishment. (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated. Refer to previous section, 1(1). (3) Recommended Amendments to the Master Plan. • Language and dates referenced in the following objective should be updated: • Policy 2.2.3: Continue to evaluate the need for and efficacy of alternate financing methods for beach renourishment and dune development. (See Section 6 Conclusions and Recommendations, Recommendation CCM2) Wallace Roberts & Todd, LLC 134 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN k. Land Development in the Context of Master Plan Goals, Objectives, and Policies The Village Master Plan includes future land use descriptions which include maximum lot coverage and building heights, landscaping requirements, and sign regulations. Does the Master Plan, with its present level of detail, articulate standards for development and landscaping that are consistent with and that enhance the desired ambiance and character of the Village? (1) Assessment of success in implementing Master Plan objectives related to issue. Goal 1 of the Future Land Use Element of the Master Plan states: "Achieve desired community character: Key Biscayne should be a residential community. Development policies should protect residential character. Future residential development should be at the lowest densities consistent with protection of reasonable property rights. Hotels should be permitted in order to provide ocean access opportunities and respect an established land use pattern; however, they should be modest in size so as to not overpower the community's residential character. Other commercial development should be sized to meet the needs of residents and hotel guests. Office development should be limited to the minimum amount practical in light of existing development patterns." The Village has codified this goal in the Land Development Code. • Section 30-80 outlines site plan review procedures: a) Purpose. Site Plan review is designed to achieve the following objectives: (1) To insure that infrastructure (water, sewer, and roads) is in place at the time the project is completed, as mandated by Florida's Growth Management law; (2) To encourage logic, imagination, and variety in the design process; (3) To insure that projects are compatible, both aesthetically and functionally, with the surrounding area; Wallace Roberts & Todd, LLC 135 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN (4) To promote excellence in urban design; and (5) To encourage buildings that are consistent with the high quality environment associated with the Village. ■ Section 30-233 outlines landscape plan review criteria: (1) "Landscape design shall enhance architectural features, relate structural design to the site, visually screen dissimilar uses and unsightly views, reduce noise impacts from roadways and incompatible uses, strengthen vistas and reinforce neighborhood site design and architecture...(5) Street trees shall be used to shade roadways and provide visual order. All street tree planting shall conform to the Village's street tree planting system." Section 30-190 outlines sign criteria: "Regulations are intended to preserve the unique aesthetic character of the Village and ensure that signs are compatible with their surroundings. It is further intended to protect property values, create a better business climate, enhance the physical appearance of the community, preserve the natural beauty of the Village and improve vehicular and pedestrian safety and reduce visual pollution." Regulations have not prevented a major shift in scale of residential development. Recommendations from the Crandon Boulevard Commercial Development and Zoning Standards, which include quantifiable design bonuses to encourage buildings that contain architectural interest and reduce visual impact and zoning controls to ensure larger developments on assembled lots are designed within a Village setting, have recently been adopted and will soon be applied. (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated. See previous section. (3) Recommended Amendments to the Master Plan. When the property tax issue is resolved by the State Legislature, and therefore the Village Council is able identify funding for items Wallace Roberts & Todd, LLC 136 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN in the Capital Improvement Plan and approve projects generated during the 2020 Vision process, 2020 Vision Plan projects will be added to the Comprehensive Plan as amendments. I. Historic, Cultural and Educational Resources and Needs The Village of Key Biscayne has a number of historic and cultural resources and institutions that document the community's history and contribute to its identity by providing important social, educational, and community -building functions. For instance, the historic Silver Sands hotel, located at 301 Ocean Drive and built in the late 1950s, is typical of motel developments in Florida built during that era. It is the sole remaining structure of its type in Key Biscayne and one of the few remaining in southern Florida. It may be worthy of exploration for historic designation in the near future, possibly standing on its own as a historic local, state, or national landmark. In the past, these resources have been overlooked or undervalued. There is, however, a growing awareness of the need to address issues related to enhancement, utilization, expansion, and/or preservation of these resources and institutions for the benefit of the community as a whole. (1) Assessment of success in implementing Master Plan objectives related to issue. Historic Structures Objective 2.6 of the Future Land Use Element, Objective 1.5 of the Housing Element, and Objective 2.4 of the Conservation and Coastal Management Element of the Master Plan all specify that no later than 1999, Key Biscayne was to prepare a list of potentially significant historic structures and a strategy for their preservation. The Village has not done so because, currently, there are no structures eligible for national or state historic designation due to age and significance requirements. However, the historic Mackie homes, which at one time occupied nearly all of the dry lots west of Crandon Boulevard, were built during the 1950s and 1960s and have reached or are approaching the 50 -year age requirement for official historic designation. Particularly as many of them have been demolished or substantially remodeled, preserving one or more in that original state would convey the island's history and culture. Wallace Roberts & Todd, LLC 137 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Historic Roads Crandon Boulevard was designated an Historic Highway by the State of Florida and by Miami -Dade County in the late 1980s. This was the product of a 1987 citizen protest rejecting the County's attempts to install a pedestrian underpass and preemptively abrogate any future efforts to widen the road. During the Crandon Boulevard master Planning process, the historic designation was amended in order to permit improvements to be made. (2) Description of changed circumstances (if any) related to issue since Master Plan was prepared/updated. In conjunction with its visioning process, Key Biscayne is evaluating an extensive list of capital improvement projects. In January 2006, a committee was formed to rank the priority and estimate the cost of each project. Upon consideration of input from the community and the 2020 Vision/EAR Committee, the following projects were labeled as high priority and relevant to the protection and enhancement of the Village's history, culture, and educational stature. • Civic Center Park ■ Beach Improvements via renourishment ■ Nature Trails connecting Presbyterian Church bay area to St. Agnes Church • High School on Virginia Key A library expansion/renovation was placed in a secondary tier of importance. An artwork in public places program, theater, museum, lifelong learning program, and beach walk were placed in a tertiary tier, indicating that Village residents perceive most resource intensive cultural projects to be long-term rather than immediate goals. (3) Recommended Amendments to the Master Plan. • Language and dates referenced in the following objective should be updated: ■ Objective 2.4 Historic Preservation: Prepare a list of potentially significant historic structures and a preservation strategy by 2010. Wallace Roberts & Todd, LLC 138 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN (See Section 6 Conclusions and Recommendations, Recommendation CCM2) Wallace Roberts & Todd, LLC 139 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 5. Consistency with Florida Growth Management Laws F.S. 163.3191 (2)(f), requires that the Evaluation and Appraisal Report assess relevant changes in growth management laws since the date of the Master Plan's adoption for consistency with the Key Biscayne's Master Plan. The assessment was based upon the only version, to date, of the Village's Master Plan (1995). a. State Comprehensive Plan, Chapter 187, F.S. F.S. 163.3191 requires that the EAR evaluate relevant changes in growth management laws, including the State of Florida Comprehensive Plan, since the date that the Village's Comprehensive Plan was adopted. The following section indicates the manner in which Key Biscayne is complying with the adopted State of Florida Comprehensive Plan (Chapter 187, Florida Statues). (1) Manner of Compliance with State Comprehensive Plan Elements Children (a) Goal. —Florida shall provide programs sufficient to protect the health, safety , and welfare of all of its children. Response — Addressed through the Master Plan's ongoing intergovernmental coordination efforts involving public school and parks and recreation planning. Families (a) Goal. -- Florida shall strengthen the family and promote its economic independence. Response — Addressed through ongoing intergovernmental coordination efforts, the Master Plan's Land Use Element, and the Vision Plan. The Elderly (a) Goal. — Florida shall improve the quality of life for its elderly citizens by promoting improved provision of services, with an emphasis on independence and self-sufficiency. Response — All Multi -Family Districts in the LDC permit adult living facilities. The Parks and Recreation Wallace Roberts & Todd, LLC 140 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Department coordinates senior -oriented programs at the Key Biscayne Community Center and the Village coordinates a free senior transportation program. In 2006, a committee comprised of residents and led by the fire chief will convene to coordinate a program to assist the elderly during and after severe storms. Housing (a) Goal. — The public and private sectors shall increase the affordability and availability of housing for low-income and moderate -income persons, including citizens and rural areas, while at the same time encouraging self-sufficiency of the individual and assuring environmental and structural quality and cost-effective operations. Response — This is addressed in the Master Plan's Housing Element, but several additional policies are being recommended in the EAR. Health (a)1. Goal. —Healthy residents who protect their own health and the health of others and who actively participate in recovering their own health when they become ill. (b)1. Goal. —An environment which supports a healthy population and which does not cause illness. (c)1. Goal. —Health care services which are of high quality, reasonably accessible, and adequate to meet the needs of the public. (d)1. Goal. —Health costs which are contained to a level appropriate to the financial resources of the state and its residents. Response — Addressed, in part, in the Master Plan's Conservation and Coastal Management and Recreation and Open Space Elements. The Key Biscayne Community Center encourages healthy living by making its facilities and programs available to residents of the Village. Wallace Roberts & Todd, LLC 141 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Public Safety (a) Goal. — Florida shall protect the public by preventing, discouraging, and punishing criminal behavior, lowering the highway death rate, and protecting lives and property from natural and manmade disasters. Response — Addressed, in part, in the Master Plan's Capital Improvements (Objective 1.1) Element. Emergency Management is addressed in the Conservation and Coastal Management Element. Water Resources (a) Goal. — Florida shall assure the availability of an adequate supply of water for all competing uses deemed reasonable and beneficial and shall maintain the functions of natural systems and the overall present level of surface and ground water quality. Florida shall improve and restore the quality of waters not presently meeting water quality standards. Response As noted in the EAR, the Village shall coordinate, as appropriate with Miami -Dade County to implement the Water Supply Facilities Workplan. Water Resources are addressed in the Master Plan's Infrastructure (Objectives 1.4; 1.5), Conservation and Coastal Management (Objectives 1.2, 1.6), Intergovernmental Coordination, and Capital Improvements (Objective 1.2) Elements. The EAR is recommending additional policies that will aid the Village in helping the State to achieve this goal. See Section 6. Conclusions and Recommendations. Coastal and Marine Resources (a) Goal. — Florida shall ensure that development and marine resource use and beach access improvements in coastal areas do not endanger public safety or important natural resources. Florida shall, through the acquisition and access improvements, make available to the state's population additional beaches and marine environment, consistent with sound environmental planning. Response — Addressed in the Master Plan's Conservation and Coastal Management Element Wallace Roberts & Todd, LLC 142 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Natural Systems and Recreational Lands (a) Goal. — Florida shall protect and acquire unique natural habitats and ecological systems, such as wetlands, tropical hardwood hammocks, palm hammocks, and virgin longleaf pine forest, and restore degraded natural systems to a function condition. Response — Addressed in the Master Plan's Conservation and Coastal Management and Recreation and Open Space Elements. Air Quality (a) Goal. —Florida shall comply with all national air quality standards by 1987, and by 1992 meet standards which are more stringent than 1985 state standards. Response — Addressed in the Master Plan's Conservation and Coastal Management Element (Objective 1.1). Energy (a) Goal. —Florida shall reduce its energy requirements through enhanced conservation and efficiency measures in end -use sectors, while at the same time promoting an increased use of renewable energy resources. Response — Addressed through ongoing intergovernmental coordination efforts. The Village will continue to explore innovate ways to integrate green technologies in public facilities. Hazardous and Non -hazardous Materials and Waste (a) Goal. —All solid waste, including hazardous waste, wastewater, and all hazardous materials, shall be properly managed, and the use of landfills shall eventually be eliminated. Response — Addressed in the Master Plan's Conservation and Coastal Management Element (Objective 1.2). Mining (a) Goal. —Florida shall protect its air, land, and water resources from the adverse effects of resource extraction Wallace Roberts & Todd, LLC 143 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN and ensure that the disturbed areas are reclaimed or restored to beneficial use and soon as reasonably possible. Response — There is no mining in the Village. Property Rights (a) Goal. — Florida shall protect private property rights and recognize the existence of legitimate and often competing public and private interests in land use regulations and other government action. Response — Addressed in the Master Plan's Future Land Use Element. Land Use (a) Goal. — In recognition of the importance of preserving the natural resources and enhancing the quality of life of the state, development shall be directed to those areas which have in place, or have agreements to provide, the land and water resources, fiscal abilities, and service capacity to accommodate growth in an environmentally acceptable manner. Response — Addressed in the Master Plan's Future Land Use, Infrastructure, Conservation and Coastal Management, and Capital Improvements Elements. The EAR is recommending additional policies that will aid the Village in helping the State to achieve this goal. See Section 6. Conclusions and Recommendations. Urban and Downtown Revitalization (a) Goal. — In recognition of the importance of Florida's vital urban centers and of the need to develop and redevelop downtowns to the state's ability to use existing infrastructure and to accommodate growth in an orderly, efficient, and environmentally acceptable manner, Florida shall encourage the centralization of commercial, government, retail, residential, and cultural activities within downtown areas. Response — The commercial area of Key Biscayne is well -established and confined. Numerous studies have been undertaken with the goal of enhancing and strengthening the downtown core. Wallace Roberts & Todd, LLC 144 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Public Facilities (a) Goal. — Florida shall protect the substantial investments in public facilities that already exist and shall plan for and finance new facilities to serve residents in a timely, orderly, and efficient manner. Response — Addressed in the Master Plan's Capital improvements Element (Objective 1.1, 1.5). The EAR is recommending additional policies that will aid the Village in helping the State to achieve this goal. See Section 6. Conclusions and Recommendations. Cultural and Historical Resources (a) Goal. — By 1995, Florida shall increase access to its historical and cultural resources and programs and encourage the development of cultural programs of national excellence. Response — Addressed in the Master Plan's Future Land Use, Housing, and Conservation and Coastal Management Elements Transportation (a) Goal. — Florida shall direct future transportation improvements to aid in the management of growth and shall have a state transportation system that integrates highway, air, mass transit, and other transportation modes. Response — Addressed in the Master Plan's Traffic Circulation Element. The EAR is recommending additional policies that will aid the Village in helping the State to achieve this goal. See Section 6. Conclusions and Recommendations. Governmental Efficiency (a) Goal. — Florida governments shall economically and efficiently provide the amount and quality of services required by the public. Response — Addressed in the Master Plan's Capital Improvements Element (Objective 1.1, 1.5) Wallace Roberts & Todd, LLC 145 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN The Economy (a) Goal. — Florida shall promote an economic climate which provides economic stability, maximizes job opportunities, and increase per capita income for its residents. Response — The per capita income of Key Biscayne, $54,213, exceeds the per capita income of Miami -Dade County by $35,796. Agriculture (a) Goal. —Florida shall maintain and strive to expand its food, agriculture, ornamental horticulture, aquaculture, forestry, and related industries in order to be a healthy and competitive force in the national and international marketplace. Response — There is no agriculture in the Village. Tourism (a) Goal. — Florida will attract at least 55 million tourists annually by 1995 and shall support efforts by all areas of the state wishing to develop or expand tourist -related economies. Response — The Village is located between two major local and regional attractions: Bill Baggs Cape Florida State Park, located to the south, had 565,976 visitors between 2002-2003 and 567,657 visitors between 2003 - and 2004; Miami -Dade County -owned Crandon Park to the north had 833,114 visitors in 2003 and 755,297 visitors in 2004. Employment (a) Goal. — Florida shall promote economic opportunities for its unemployed and economically disadvantaged residents. Response — Key Biscayne is not an employment center, but rather mostly a bedroom community. Plan Implementation (a) Goal. — Systematic planning capabilities shall be integrated into all levels of government in Florida with particular emphasis on improving intergovernmental coordination and maximizing citizen involvement. Wallace Roberts & Todd, LLC 146 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Response — Addressed in Master Plan's Intergovernmental Coordination Element. (2) Recommended Amendments to Achieve Compliance with the State Comprehensive Plan Elements While the Master Plan addresses several of the applicable goals of the State Comprehensive Plan, several additional policies are being recommended that would augment the Village's ability to further the State's goals. These suggested policies pertain to Housing Goal (a); Water Resources Goal (a); Land Use Goal (a); Public Facilities Goal (a); and Transportation Goal (a) and are listed in section 6 of this document, Conclusions and Recommendations. Wallace Roberts & Todd, LLC 147 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN b. Local Government Comprehensive Planning and Land Development Regulation Act, Chapter 163 (Part I!), F.S. In July 2005 the State of Florida adopted additional amendments to Chapter 163 and its growth management requirements. A table indicating the manner in which the Village of Key Biscayne is addressing the requirements of Chapter 163, Florida Statues, is below. (1) Manner of Compliance with Local Government Comprehensive Planning and Land Development Regulation Act, Chapter 163 (Part 1!), F.S. See table on followings pages. Wallace Roberts & Todd, LLC 148 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 1998: 78 79 80 81 82 83 84 85 86 N/A Changes to Chapter 163, F.S. 1998-2005 Addressed (where/how) [Ch. 98-75, s. 14; Ch. 146, ss. 2-5; Ch. 98-176, ss. 2-6 and 12-15; Ch. 98-258, ss. 4-5, Laws of Florida] Exempted brownfield area amendments from the twice -a- 163.3187(1)(g) year limitation. 163, F.S. Citations Required that the capital improvements element set forth 163.3177(3)(a)4. standards for the management of debt. Required inclusion of at least two planning periods — at least 5 years and at least 10 years. Allowed multiple individual plan amendments to be considered together as one amendment cycle. Defined "optional sector plan" and created Section 163.3245 allowing local governments to address DRl issues within certain identified geographic areas. Established the requirements for a public school facilities element. 163.3177(5)(a) Capital Improvements Element, Procedural Procedural Amendment Needed By Element Established the minimum requirements for imposing school concurrency. Required DCA adopt minimum criteria for the compliance determination of a public school facilities element imposing school concurrency. Required that evaluation and appraisal reports address coordination of the comp plan with existing public schools and the school district's 5 -year work program. 163.3184(3)(d) 163.3164(31) and 163.3245 Procedural Procedural 163.3177(12) 163.3180(12) [Now: Section (13)] 163.3180(13) [Now: Section14)] X X Intergovernmental Coordination Element, Procedural 163.3191(2)(i) [Now: 163.3191(2)(k)] Wallace Roberts & Todd, LLC 149 Evaluation and Appraisal Report and Intergovernmental VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 163, F.S. Citations N/A Addressed (where/how) Amendment Needed By Element Coordination Element 87 88 89 Amended the definition of "in compliance" to include consistency with Sections 163.3180 and 163.3245. Required DCA to maintain a file with all documents received or generated by DCA relating to plan amendments and identify; limited DCA's review of proposed plan amendments to written comments, and required DCA to identify and list all written communications received within 30 days after transmittal of a proposed plan amendment. Allowed a local government to amend its plan for a period of up to one year after the initial determination of sufficiency of an adopted EAR even if the EAR is insufficient. 90 Substantially reworded Section 163.3191, F.S., related to _ evaluation and appraisal reports. 163.3184(1)(b) 163.3184(2), (4), and (6) 163.3187(6)(b) X Intergovernmental Coordination Element, Procedural Procedural 163.3191 91 Changed the population requirements for municipalities and counties which are required to submit otherwise optional elements. 1999: [Ch. 99-251, ss. 65-6, and 90; Ch. 99-378, ss. 1, 3-5, and 8-9, Laws of Florida] 92 Required that ports and local governments in the coastal 163.3178(7) area, which has spoil disposal responsibilities, identify dredge disposal sites in the comp plan. 9 Exempted from the twice -per -year limitation certain port related amendments for port transportation facilities and projects eligible for funding by the Florida Seaport 163.3177(6)(i) 163.3187(1)(h) Evaluation and Appraisal Report X X X Wallace Roberts & Todd, LLC 150 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 163, F.S. Citations N/A 94 95 Transportation and Economic Development Council. Required rural counties to base their future land use plans and the amount of land designated industrial on data regarding the need for job creation, capital investment, and economic development and the need to strengthen and diversity local economies. Added the Growth Policy Act to Ch. 163, Part II to promote urban infill and redevelopment. 163.3177(6)(a) 163.2511,163.25,14,163 .2517,163.2520,163.252 3, and 163.2526 X X Addressed (where/how) Amendment Needed By Element 96 97 98 99 100 101 102 Required that all comp plans comply with the school siting requirements by October 1, 1999. Made transportation facilities subject to concurrency. Required use of professionally accepted techniques for measuring level of service for cars, trucks, transit, bikes and pedestrians. Excludes public transit facilities from concurrency requirements. Allowed multiuse DRIs to satisfy the transportation concurrency requirements when authorized by a local comprehensive plan under limited circumstances. Allowed multimodal transportation districts in areas where priorities for the pedestrian environment are assigned by the plan. Exempted amendments for urban infill and redevelopment areas, public school concurrency from 163.3177(6)(a) 163.3180(1)(a) 163.3180(1)(b) Intergovernmental Coordination Element Transportation Circulation and Capital Improvements Elements Transportation Circulation and Capital Improvements Elements 163.3180(4)(b) 163.3180(12) Capital Improvements Element Procedural 163.3180(15) Procedural 163.31879(1)(h) and (i) [Now: (i) and (j)] X Wallace Roberts & Todd, LLC 151 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 103 2000: 104 105 106 107 108 Changes to Chapter 163, F.S. 1998-2005 the twice -per -year limitation. Defined brownfield designation and added the assurance that a developer may proceed with development upon receipt of a brownfield designation. [Also see Section 163.3221(1) for "brownfield" definition.] [Ch. 2000-158, ss. 15-17, Ch. 2000-284, s. 1, Ch. 2000-317, Repealed Section 163.3184(11)(c), F.S., that required funds from sanction for non -compliant plans go into the Growth Management Trust Fund. Repealed Section 163.3187(7), F.S. that required consideration of an increase in the annual total acreage threshold for small scale plan amendments and a report by DCA. Repealed Sections 1633191(13) and (15), F.S. Allowed small scale amendments in areas of critical state concern to be exempt from the twice -per -year limitation only if they are for affordable housing. Added exemption of sales from local option surtax imposed under Section 212.054, F.S., as examples of incentives for new development within urban infill and redevelopment areas. 2001: [Ch. 2001-279, s. 64, Laws of Florida] 109 Created the rural land stewardship area program. 2002: [Ch. 2002-296, ss. 1 - 11, Laws of Florida] Required that all agencies that review comprehensive plan 110 163, F.S. Citations 163.3220(2) s. 18, Laws of Florida] 163.3184(11)(c) [Now: Repealed] 163.3187(7) [Now: Repealed] 163.3191(13) and (15) [Now: Repealed] 163.3187(1)(c)1.e 163.2517(3)(j)2. 163.3177(11)(d) 163.3174 N/A X X X X X X X Wallace Roberts & Todd, LLC 152 Addressed (where/how) Amendment Needed By Element Intergovernmental 111 112 113 114 115 116 117 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 amendments and rezoning include a nonvoting representative of the district school board. Required coordination of local comprehensive plan with the regional water supply plan. Plan amendments for school -siting maps are exempt from s. 163.3187(1)'s limitation on frequency. Required that by adoption of the EAR, the sanitary sewer, solid waste, drainage, potable water and natural groundwater aquifer recharge element consider the regional water supply plan and include a 10 -year work plan to build the identified water supply facilities. Required consideration of the regional water supply plan in the preparation of the conservation element. Required that the intergovernmental coordination element (ICE) include relationships, principles and guidelines to be used in coordinating comp plan with regional water supply plans. Required the local governments adopting a public educational facilities element execute an inter -local agreement with the district school board, the county, and non -exempting municipalities. Required that counties larger than 100,000 population and their municipalities submit a inter -local service delivery agreements (existing and proposed, deficits or duplication in the provisions of service) report to DCA by January 1, 2004. Each local government is required to update its ICE based on the findings of the report. DCA will meet with Wallace Roberts & Todd, LLC 163, F.S. Citations 163.3177(4)(a) 163.3177(6)(a) 163.3177(6)(c) 163.3177(6)(d) 163.3177(6)(h) 163.3177(6)(h)4. 163.3177(6)(1)6., 7., & 8. N/A X X 153 Addressed (where/how) Coordination Element Intergovernmental Coordination Intergovernmental Coordination Element Intergovernmental Coordination Element Intergovernmental Coordination Element Intergovernmental Coordination Element Amendment Needed By Element VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 163, F.S. Citations N/A 118- 119 120 121 122 123 124 125 affected parties to discuss and id strategies to remedy any deficiencies or duplications. Required local governments and special districts to provide recommendations for statutory changes for annexation to the Legislature by February 1, 2003. Added a new Section 16331776 that allows a county, to adopt an optional public educational facilities element in cooperation with the applicable school board. Added a new Section 163.31777 that requires local governments and school boards to enter into an inter -local agreement that addresses school siting, enrollment forecasting, school capacity, infrastructure and safety needs of schools, schools as emergency shelters, and sharing of facilities. 163.3177(6)(h)9. 163.31776 163.31777 X X Addressed (where/how) Intergovernmental Coordination Element Amendment Needed By Element Added a provision that the concurrency requirement for transportation facilities may be waived by plan amendment for urban infill and redevelopment areas. Expanded the definition of "affected persons" to include property owners who own land abutting a change to a future land use map. Expanded the definition of "in compliance" to include consistency with Section 163.31776 (public educational facilities element). Streamlined the timing of comprehensive plan amendment review. Required that local governments provide a sign -in form at the transmittal hearing and at the adoption hearing for 163.3180(4)(c) 163.3184(1)(a) 163.3184(1)(b) 163.3184(3), (4), (6), (7), and (8) 163.3184(15)(c) X Wallace Roberts & Todd, LLC 154 Procedural Procedural Intergovernmental Coordination Element Procedural Procedural VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, KS. 1998-2005 163, F.S. Citations persons to provide their names and addresses. Exempted amendments related to providing transportation improvements to enhance life safety on "controlled access major arterial highways" from the limitation on the frequency of plan amendments contained in s.163.3187(1). Required EARs to include (1) consideration of the appropriate regional water supply plan, and (2) an evaluation of whether past reductions in land use densities in coastal high hazard areas have impaired property rights of current residents where redevelopment occurs. Allowed local governments to establish a special master process to assist the local governments with challenges to local development orders for consistency with the comprehensive plan. Created the Local Government Comprehensive Planning Certification Program to allow less state and regional oversight of comprehensive plan process if the local government meets certain criteria. Added a provision to Section 380.06(24), Statutory 163.3187(1) Exemptions, that exempts from the requirements for developments of regional impact, any water port or marina development if the relevant local government has adopted a "boating facility siting plan or policy" (which includes certain specified criteria) as part of the coastal management element or future land use element of its comprehensive plan. The adoption of the boating facility siting plan or policy is exempt from the limitation on the frequency of N/A * Addressed (where/how) Amendment Needed By Element 126 127 128 129 130 163.3187(1)(k) 163-3191(2)(1) 163.3215 163.3246 X X X Wallace Roberts & Todd, LLC 155 Future Land Use and Intergovernmental Coordination Elements Procedural Conservation and Coastal Management VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 plan amendments contained in s.163.3187(1). 131 Prohibited a local government, under certain conditions, from denying an application for development approval for a requested land use for certain proposed solid waste management facilities. 2003: [Ch. 03-1, ss. 14-15; ch. 03-162, s. 1; ch. 03-261, s. 158; 132 Creates the Agricultural Lands and Practices Act. 163, F.S. Citations N/A Addressed (where/how) Amendment Needed By Element 163.3194(6) h. 03-286, s. 61, Laws of Florida. (2): Provides legislative findings and purpose with respect to agricultural activities and duplicative regulation. (3): Defines the terms "farm," "farm operation," and "farm product" for purposes of the act. (4): Prohibits a county from adopting any ordinance, resolution, regulation, rule, or policy to prohibit or otherwise limit a bona fide farm operation on land that is classified as agricultural land. (4)(a): Provides that the act does not limit the powers of a county under certain circumstances. (4)(b): Clarifies that a farm operation may not expand its operations under certain circumstances. (4)(c): Provides that the act does not limit the powers of certain counties. 163.3162 Procedural Wallace Roberts & Todd, LLC 156 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 163, F.S. Citations N/A Addressed (where/how) 133 134 135 (4)(d): Provides that certain county ordinances are not deemed to be a duplication of regulation. Changes "State Comptroller" references to "Chief Financial Officer." Provides for certain airports to abandon DRI orders. Amended to conform to the repeal of s. 235.185 and the enactment of similar material in s. 1013.35. 136 Amended to conform to the repeal of ch. 235 and the enactment of similar material in ch. 1013. 163.3167(6) 163.3177(6)(k) 163.31776(1)(b)(2)-(3) 163.37111(1)(c), (2)(e) - (f), (3)(c), (4), (6)(b) X X X X x 2004: [Ch. 04-5, s. 11; ch. 04-37, s. 1; ch. 04-230, ss. 1-4; ch. 04-372, ss. 2-5; ch. 04-381, ss. 1-2; ch. 04-384, s. 2, Laws of Florida ] 137 (10): Amended to conform to the repeal of the Florida High -Speed Rail Transportation Act, and the creation of the Florida High -Speed Rail Authority Act. 138 (13): Created to require local governments to identify adequate water supply sources to meet future demand. (14): Created to limit the effect of judicial determinations issued subsequent to certain development orders pursuant to adopted land development regulations. (1): Provides legislative findings on the compatibility of development with military installations. (2): Provides for the exchange of information relating to proposed land use decisions between counties and local 163.3167 Creates 163.3175. X Wallace Roberts & Todd, LLC 157 Intergovernmental Coordination Element Procedural Amendment Needed By Element VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 139 Changes to Chapter 163, F.S. 1998-2005 governments and military installations. (3): Provides for responsive comments by the commanding officer or his/her designee. (4): Provides for the county or affected local government to take such comments into consideration. (5): Requires the representative of the military installation to be an ex -officio, nonvoting member of the county's or local government's land planning or zoning board. (6): Encourages the commanding officer to provide information on community_planning assistance grants. (6)(a): • Changed to require local governments to amend the future land use element by June 30, 2006 to include criteria to achieve compatibility with military installations. • Changed to specifically encourage rural land stewardship area designation as an overlay on the future land use map. (6)(c): Extended the deadline adoption of the water supply facilities work plan amendment until December 1, 2006; provided for updating the work plan every five years; and exempts such amendment from the limitation on frequency of adoption of amendments. (10)(1): Provides for the coordination by the state land 163, F.S. Citations 163.3177 N/A X Wallace Roberts & Todd, LLC 158 Addressed (where/how) Intergovernmental Coordination Element Amendment Needed By Element VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 planning agency and the Department of Defense on compatibility issues for military installations. (11)(d)1.: Requires DCA, in cooperation with other specified state agencies, to provide assistance to local governments in implementing provisions relating to rural land stewardship areas. (11)(d)2.: Provides for multicounty rural land stewardship areas. (11)(d)3 .-4: Revises requirements, including the acreage threshold for designating a rural land stewardship area. (11)(d)6 j.:. Provides that transferable rural land use credits may be assigned at different ratios according to the natural resource or other beneficial use characteristics of the land. (11)(e): Provides legislative findings regarding mixed -use, high -density urban infill and redevelopment projects; requires DCA to provide technical assistance to local governments. (11)(f): Provides legislative findings regarding a program for the transfer of development rights and urban infill and redevelopment; requires DCA to provide technical Wallace Roberts & Todd, LLC 163, F.S. Citations N/A X X X 159 Addressed (where/how) Amendment Needed By Element VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 163, F.S. Citations N/A 140 141 assistance to local governments. (1): Provides legislative findings with respect to the shortage of affordable rentals in the state. (2): Provides definitions. (3): Authorizes local governments to permit accessory dwelling units in areas zoned for single family residential use based upon certain findings. (4) An application for a building permit to construct an accessory dwelling unit must include an affidavit from the applicant which attests that the unit will be rented at an affordable rate to a very -low-income, low-income, or moderate -income person or persons. (5): Provides for certain accessory dwelling units to apply towards satisfying the affordable housing component of the housing element in a local government's comprehensive plan. (6): Requires the DCA to report to the Legislature. Amends the definition of "in compliance" to add language referring to the Wekiva Parkway and Protection Act. Creates 163.31771 163.3184(1)(b) X X Addressed (where/how) Procedural Housing Element Procedural Housing Element Amendment Needed By Element 142 (1)(m): Created to provide that amendments to address criteria or compatibility of land uses adjacent to or in close 163.3187 X Wallace Roberts & Todd, !!C 160 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 143 Changes to Chapter 163, F.S. 1998-2005 proximity to military installations do not count toward the limitation on frequency of amending comprehensive plans. (I)(n): Created to provide that amendments to establish or implement a rural land stewardship area do not count toward the limitation on frequency of amending comprehensive plans. Created to provide that evaluation and appraisal reports evaluate whether criteria in the land use element were successful in achieving land use compatibility with military installations. 2005 {Ch. 2005-157, ss 1, 2 and 15; Ch. 2005-290; and Ch. 2005-291, ss. 10-12, Laws of Florida] 144 163, F.S. Citations 163.3191(2)(n) N/A 145 Added the definition of "financial feasibility." (2): Required comprehensive plans to be "financially" rather than "economically" feasible. (3)(a)5.: Required the comprehensive plan to include a 5 - year schedule of capital improvements. Outside funding (i.e., from developer, other government or funding pursuant to referendum) of these capital improvements must be guaranteed in the form of a development agreement or interlocal agreement. (3)(a)6.b.1.: Required plan amendment for the annual update of the schedule of capital improvements. Deleted provision allowing updates and change in the date of construction to be accomplished by ordinance. Creates ss. 163.3164(32) 163.3177 X x Wallace Roberts & Todd, LLC 161 Addressed (where/how) Procedural; Capital Improvements and Future Land Use Elements Amendment Needed By Element VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 163, F.S. Citations N/A Addressed (where/how) Amendment Needed By Element (3)(a)6.c.: Added oversight and penalty provision for failure to adhere to this section's capital improvements requirements. (3)(a)6.d.: Required a long-term capital improvement schedule if the local government has adopted a long-term concurrency management system. (6)(a): Deleted date (October 1, 1999) by which school sitting requirements must be adopted. (6)(a): Add requirement that future land use element of coastal counties must encourage the preservation of working waterfronts, as defined in s.342.07, F.S. (6)(c): Required the potable water element to be updated within 18 months of an updated regional water supply plan to incorporate the alternative water supply projects selected by the local government to meet its water supply needs. (6)(e): Added waterways to the system of sites addressed by the recreation and open space element. (11)(d)4.c.: Required rural land stewardship areas to address affordable housing. X Wallace Roberts & Todd, LLC 162 Capital Improvements Element Procedural Infrastructure and Intergovernmental Coordination Elements Recreation and Open Space Element VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 163, F.S. Citations N/A Addressed (where/how) Amendment Needed By Element (11)(d)5.: Required a listed species survey be performed on rural land stewardship receiving area. If any listed species present, must ensure adequate provisions to protect them. (11)(d)6.: Must enact an ordinance establishing a methodology for creation, conveyance, and use of stewardship credits within a rural land stewardship area. (11)(d)6 j.: Revised to allow open space and agricultural land to be just as important as environmentally sensitive land when assigning stewardship credits. (12): Must adopt public school facilities element. (12)(a) and (b): A waiver from providing this element will be allowed under certain circumstances. (12)(g): Expanded list of items to be to include colocation, location of schools proximate to residential areas, and use of schools as emergency shelters. (12)(h): Required local governments to provide maps depicting the general location of new schools and school improvements within future conditions maps. x X X Wallace Roberts & Todd, LLC 163 Interlocal agreement with County School Board Interlocal agreement with County School Board Interlocal agreement with County School Board Interlocal agreement with County School Board VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 146 147 Changes to Chapter 163, F.S. 1998-2005 (12)(i): Required DCA to establish a schedule for adoption of the public school facilities element. (12)(j): Established penalty for failure to adopt a public school facility element. (13): (New section) Encourages local governments to develop a "community vision," which provides for sustainable growth, recognizes its fiscal constraints, and protects its natural resources. (14): (New section) Encourages local governments to develop a "urban service boundary," which ensures the area is served (or will be served) with adequate public facilities and services over the next 10 years. See s. 163.3184(17). 163.31776 is repealed (2): Required the public schools interlocal agreement (if applicable) to address requirements for school concurrency. The opt -out provision at the end of Subsection (2) is deleted. (5): Required Palm Beach County to identify, as part of its EAR, changes needed in its public school element necessary to conform to the new 2005 public school 163, F.S. Citations 163.31776 [Now: Repealed) 163.31777 N/A X X Wallace Roberts & Todd, LLC 164 Addressed (where/how) Interlocal agreement with County School Board Addressed in 2020 Community Vision Process Addressed in Intergovernmental Coordination Element Amendment Needed By Element VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 163, F.S. Citations N/A facilities element requirements. (7): Provided that counties exempted from public school facilities element shall undergo re-evaluation as part of its EAR to determine if they continue to meet exemption criteria. X Addressed (where/how) Amendment Needed By Element 148 (2)(g): Expands requirement of coastal element to include strategies that will be used to preserve recreational and commercial working waterfronts, as defined in s.342.07, F.S. 149 (1)(a): Added "schools" as a required concurrency item. 1613178 Addressed in Recreational and Open Space Element (2)(a): Required consultation with water supplier prior to issuing building permit to ensure "adequate water supplies" to serve new development is available by the date of issuance of a certificate of occupancy. (2)(c): Required all transportation facilities to be in place or under construction within 3 years (rather than 5 years) after approval of building permit. (4)(c): Allowed concurrency requirement for public schools to be waived within urban infill and redevelopment areas (163.2517). (5)(d): Required guidelines for granting concurrency Wallace Roberts & Todd, LLC 163.3180 165 Interlocal Agreement w/ County School Board Intergovernmental Coordination Element Procedural Capital Improvements Element VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 exceptions to be included in the comprehensive plan. (5)(e) — (g): If local government has established transportation exceptions, the guidelines for implementing the exceptions must be "consistent with and support a comprehensive strategy, and promote the purpose of the exceptions." Exception areas must include mobility strategies, such as alternate modes of transportation, supported by data and analysis. FDOT must be consulted prior to designating a transportation concurrency exception area. Transportation concurrency exception areas existing prior to July 1, 2005 must meet these requirements by July 1, 2006, or when the EAR -based amendment is adopted, whichever occurs last. (6): Required local government to maintain records to determine whether 110% de minimis transportation impact threshold is reached. A summary of these records must be submitted with the annual capital improvements element update. Exceeding the 110% threshold dissolves the de minimis exceptions. (7): Required consultation with the Department of Transportation prior to designating a transportation concurrency management area (to promote inf 11 development) to ensure adequate level -of -service standards are in place. The local government and the DOT should 163, F.S. Citations N/A X X Wallace Roberts & Todd, LLC 166 Addressed (where/how) Procedural Amendment Needed By Element VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 work together to mitigate any impacts to the Strategic Intermodal System. (9)(a): Allowed adoption of a long-term concurrency management system for schools. (9)(c): (New section) Allowed local governments to issue approvals to commence construction notwithstanding s. 163.3180 in areas subject to a long-term concurrency management system. (9)(d): (New section) Required evaluation in EAR of progress in improving levels of service.. (10): Added requirement that level of service standard for roadway facilities on the Strategic Intermodal System must be consistent with FDOT standards. Standards must consider compatibility with adjacent jurisdictions. (13): Required school concurrency (not optional). (13)(c)1.: Requires school concurrency after five years to be applied on a "less than districtwide basis" (i.e., by using school attendance zones, etc). (13)(c)2.: Eliminated exemption from plan amendment 163, F.S. Citations N/A X Wallace Roberts & Todd, LLC 167 Addressed (where/how) Intergovernmental Coordination Element; Interlocal Agreement with County School Board Procedural Evaluation and Appraisal Report Interlocal Agreement w/ County School Board Interlocal Agreement w/ County School Board Procedural Amendment Needed By Element VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 163, F.S. Citations N/A adoption limitation for changes to service area boundaries. (13)(c)3.: No application for development approval may be denied if a less-than-districtwide measurement of school concurrency is used; however the development impacts must to shifted to contiguous service areas with school capacity. (13)(e): Allowed school concurrency to be satisfied if a developer executes a legally binding commitment to provide mitigation proportionate to the demand. (13)(e)1.: Enumerated mitigation options for achieving proportionate -share mitigation. (13)(e)2.: If educational facilities funded in one of the two following ways, the local government must credit this amount toward any impact fee or exaction imposed on the community: • contribution of land construction, expansion, or payment for land acquisition (13)(g)2.: (Section deleted) — It is no longer required that a local government and school board base their plans on consistent population projection and share information regarding planned public school facilities, development and redevelopment and infrastructure needs of public school Addressed (where/how) lnterlocal Agreement wi County School Board Amendment Needed By Element Wallace Roberts & Todd, LLC 168 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 facilities. However, see (13)(g)6.a. for similar requirement. (13)(g)6.a.: [Formerly (13)(g)7.a.] Local governments must establish a uniform procedure for determining if development applications are in compliance with school concurrency. (13)(g)7. [Formerly (13)(8)8.] Deleted language that allowed local government to terminate or suspend an interlocal agreement with the school board. (13)(h): (New 2005 provision) The fact that school concurrency has not yet been implemented by a local government should not be the basis for either an approval or denial of a development permit. (15): Prior to adopting Multimodal Transportation Districts, FDOT must be consulted to assess the impact on level of service standards. If impacts are found, the local government and the FDOT must work together to mitigate those impacts. Multimodal districts established prior to July 1, 2005 must meet this requirement by July 1, 2006 or at the time of the EAR -base amendment, whichever occurs last. (16): (New 2005 section) Required local governments to adopt by December 1, 2006 a method for assessing 163, F.S. Citations N/A X Wallace Roberts & Todd, LLC 169 Addressed (where/how) Interlocal Agreement wl County School Board Procedural Capital Improvements Element: Concurrency Amendment Needed By Element 150 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Changes to Chapter 163, F.S. 1998-2005 proportionate fair -share mitigation options. FDOT will develop a model ordinance by December 1, 2005. (17): (New 2005 section) If local government has adopted a community vision and urban service boundary, state and regional agency review is eliminated for plan amendments affecting property within the urban service boundary. Such amendments are exempt from the limitation on the frequency of plan amendments. (18): (New 2005 section) If a municipality has adopted an urban infill and redevelopment area, state and regional agency review is eliminated for plan amendments affecting 163, F.S. Citations N/A Addressed (where/how) Amendment Needed By Element 163.3184 X Procedural Wallace Roberts & Todd, LLC 170 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 151 152 Changes to Chapter 163, F.S. 1998-2005 property within the urban service boundary. Such amendments are exempt from the limitation on the frequency of plan amendments. (1)(c)1.f.: Allowed approval of residential land use as a small-scale development amendment when the proposed density is equal to or less than the existing future land use category. Under certain circumstances affordable housing units are exempt from this limitation. (1)(c)4.: (New 2005 provision) If the small-scale development amendment involves a rural area of critical economic concern, a 20 -acre limit applies. (1)(o): (New 2005 provision) An amendment to a rural area of critical economic concern may be approved without regard to the statutory limit on comprehensive plan amendments. (2)(k); Required local governments that do not have either a school interlocal agreement or a public school facilities element, to determine in the EAR whether the local government continues to meet the exemption criteria in s. 163.3177(12). 163, F.S. Citations 163.3187 163.3191 N/A X X Wallace Roberts & Todd, LLC 171 Addressed (where/how) Procedural Housing Element Evaluation and Appraisal Report; Interlocal agreement with County School Board Amendment Needed By Element VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN 153 Changes to Chapter 163, F.S. 1998-2005 (2)(1): The EAR must determine whether the local government has met its various water supply requirements, including development of alternative water supply projects. (2)(o): (New 2005 provision) The EAR must evaluate whether its Multimodal Transportation District has achieved the purpose for which it was created. (2)(p): (New 2005 provision) The EAR must assess methodology for impacts on transportation facilities. (10): The EAR -based amendment must be adopted within a single amendment cycle. Failure to adopt within this cycle results in penalties. Once updated, the comprehensive plan must be submitted to the DCA. (10) New section designating Freeport as a certified community. (11) New section exempting proposed DRIs within Freeport from review under s.380.06, F.S., unless review is requested by the local government. 163, F.S. Citations 163.3246 N/A x x x Wallace Roberts & Todd, LLC 172 Addressed (where/how) Evaluation and Appraisal Report Evaluation and Appraisal Report Procedural Amendment Needed By Element VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN (2) Recommended Amendments to Achieve Compliance with the Local Government Comprehensive Planning and Land Development Regulation Act, Chapter 163 (Part 11), F.S. To address the deficiency in the Comprehensive Plan regarding 149.5(d), the following amendment is being recommended: • In compliance with Chapter 163, F.S. (5)(d), provisions should be included for granting concurrency exceptions. (See Section 6 Conclusions and Recommendations, Recommendation CI1) Wallace Roberts & Todd, LLC 173 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN c. Rule Chapter 9J-5, F.A.0 A table demonstrating the manner in which the Village of Key Biscayne complies the requirements of Rule Chapter 9J-5, Florida Administrative Code follows. (1) Manner of Compliance with Chapter 9J-5, F.A.C. See table on followings pages. Wallace Roberts & Todd, LLC 174 VILLAGE OF KEY BISCAYNE EVALUATION AND APPRAISAL REPORT (EAR) OF THE KEY BISCAYNE MASTER PLAN Nove 1 2 3 4 Changes to Rule 9J-5, F.A.C. 1989-2003 mber 22, 1989 Defined availability or available, concurrency, concurrency management system, currently available revenue sources, and public facilities and services. Note: the definition of availability or available was repealed March 23, 1994 and the definition of public facilities and services was repealed February 25, 2001. Required comprehensive plan amendments applicable to the Wekiva River Protection Area to meet requirements of section 369.301, F.S., in addition to meeting compliance requirements of section 163.3184, F.S. Required local governments to adopt a concurrency management system in their comprehensive plans and established requirements for such systems. Required the capital improvement element to include requirements to ensure an adequate concurrency management system is implemented. Clarified requirements relating to projected revenue sources that are contingent upon ratification by public referendum. April 2, 1992 9J-5, F.A.C. Citations 9J-5.003 9J-5.005(8) 9J-5.0055 9J-5.016 NA X Addressed (where/how) Procedural Conservation Coastal Management and Capital Improvements Elements Capital Improvements Element (Obj 1.4) Amendment Needed By Element 9J -5.016(4)(a)2. Procedural Wallace Roberts & Todd, LLC 175 5