Loading...
HomeMy Public PortalAbout2015.181 (10-06-15)RESOLUTION NO. 2015.181 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD ADOPTING THE PLANS, CONTRACT DOCUMENTS AND WORKING DETAILS FOR THE PEDESTRIAN SAFETY IMPROVEMENTS AT VARIOUS SCHOOLS IMPROVEMENT PROJECT; FEDERAL PROJECT NO. HSIPL 5250(025); AND AUTHORIZING THE DEPARTMENT OF PUBLIC WORKS ENGINEERING STAFF TO SOLICIT BIDS FOR CONSTRUCTION WHEREAS, the Pedestrian Safety Improvements at Various Schools Improvement Project, Federal Project No. HSIPL 5250(025) is funded with federal funds; and WHEREAS, the plans, contract documents, and working details for this project have been completed and are ready for adoption by the City Council; and WHEREAS, the construction cost of the project is estimated to be around $357,000; and WHEREAS, the Department of Public Works of the City of Lynwood has determined that said project is in accordance with the California Environmental Quality Act (CEQA) and is categorically exempt pursuant to Section 15301 (C) of the CEQA guidelines pertaining to statutory exemptions; and WHEREAS, On September 24, 2015, the City received the Authorization to Proceed (E -76) with the construction on the project from Caltrans (see attachment); and WHEREAS, the project is ready to be advertised for the solicitation of bids. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LYNWOOD DOES HEREBY RESOLVE, DECLARE, DETERMINE AND ORDER AS FOLLOWS: Section 1. That the Pedestrian Safety Improvements at Various Schools Improvement Project, Federal Project No. HSIPL 5250(025) is in conformance with the California Environmental Quality Act (CEQA) and is categorically exempt. Section 2. That the City Council of the City of Lynwood hereby adopts the Plans, Contract Documents and Working Details for Pedestrian Safety Improvements at Various Schools Improvement Project, Federal Project No. HSIPL 5250(025). Section 3. That the City Council of the City of Lynwood authorizes the solicitation of bids for said project. , Section 4. This Resolution shall go into effect immediately upon its adoption. Section 5. The City Clerk shall certify as to the adoption of this Resolution. PASSED, APPROVED and ADOPTED this 6t" day of October, 2015. ATTEST: a APPROVED AS TO FORM: Cam✓ �� David A. Garcia, City Attorney -f jw — Luis Solache, APPROVED AS TO CONTENT: 4AArnonldo Beltran, City Manager i i m rSfraicker, P.E Director Public Works/ City Engineer [THIS SPACE INTENTIONALLY LEFT BLANK] AA STATE OF CALIFORNIA ) ) SS. COUNTY OF LOS ANGELES ) I, the undersigned, City Clerk of the City of Lynwood, do hereby certify that the foregoing Resolution was passed and adopted by the City Council of the City of Lynwood at a regular meeting held on the 6th day of October, 2015. AYES: COUNCIL MEMBERS ALATORRE, SANTILLAN -BEAS AND SOLACHE NOES: NONE ABSENT: NONE ABSTAIN: NONE STATE OF CALIFORNIA ) ) SS. COUNTY OF LOS ANGELES ) CASTRO, HERNANDEZ, I, the undersigned, City Clerk of the City of Lynwood, and the Clerk of the City Council of said City, do hereby certify that the above foregoing is a full, true and correct copy of Resolution No. 2015.181 on file in my office and that said Resolution was adopted on the date and by the vote therein stated. Dated this 6th day of October, 2015. aria Quinone2, C 3 U FEDERALAID PROGRAM DLA LOCATOR: 07- LA-0 -LNY PREFIX: HSIPL PROJECT NO: 5250(025) SEQ NO: 1 STATE PROJ N0: 0716000094L -N AGENCY: LYNWOOD ROUTE: TIP DATA MPD: SCAG FSTIP YR: 14115 STIP REF: 20970001052 DISASTER NO: BRIDGE NO'S; _ FROG CODE_ _ __ LINE NO MS30 30 MS30 31 ATTACHMENT AMENDMENT MODIFICATION SUMMARY - (E-7S3 PROJECT LOCATION: CALIFORNIA DEPARTMENT OF TRANSPOF IN THE VICINITY OF FIRESAUGH HIGH SCHOOL, WILL ROGERS SCHOOLAND J.P. ABBOTT SCH TYPE OF WORK- INSTALL WARNING LIGHT SYSTEM, RADAR SPEED FEEDBACK PREY RUTH I AGREE DATES: FED RR NOS: PE: PUC CODES: may. PROJ OVERSIGHT: OELEGATEDILOCAL ADMIN CON: ENV STATUS / DT: DELEG TO STATE USC 326/SEC 60D4 08292012 SPR: RW STATUS / OT: 1 0$/0412015 MCS: INV RTE: OTH: BEG MP: PE END MP: IMPVTYPE FUNC SYS URBAN AREA URBIRURAL DEMO ID 21 M MAP21 LOS ANGELES-LONG BEACH- URBAN 17 M MAP21 LOS ANGELES -LONG BEACH- URBAN FUNDING SUMMARY PHASE PROJECT COST FEDERAL COST AC COST ' PREV, OBLIGATION SD.00 50.00 $0.00 PE THISREQUEST 50.00 50.00 SD.00 SUBTOTAL 50.00 $0.00 50,00 PREY. OBLIGATION 50.00 $0.00 $0.00 R/W THIS REQUEST 50.09 50.00 50.00 SUBTOTAL 50.00 SO.DD $0.00 PREY. OBLIGATION SO,00 SO,DO SD.00 CON THIS REQUEST 5356,959.00 3321,262.00 SD.00 SUBTOTAL 5356,959.00 5321,252.00 $0.00 TOTAL: 535&,959.00 $321,262.00. 50.00 STATE REMARKS 061242015 Seg51: This request is for 5321,262 of Fedral Funds for CONST. phase of the projecL 0=512015 Seq 1: This seq is to auMor ze CON 5295,561 and CE 525,701 M63D. (Total is $321.262) Lumpsum FL. HSIP3 -07 -032 Napa Revalldated: 072212015, Contigency over 15% approved by DLAE. email on file PEwas done usingHSiPL- 5250(D24). NAA 06252015 Agreement End Date:1213=016 FEDERAL REMARKS AUTHORIZATION AUTHORIZATION TO PROCEED WITH REQUEST: C0N PREPARED IN FADS BY: AGHASHARIF- HMO FOR: CON & CENG REVIEWED IN FADS BY: ULAT, ALICIA DOCUMENT TYPE: AMOD SUBMITTED IN FADS BY: ABDIN, NAHED PROCESSED IN FADS BY: FOGLE.JEPILYNN APPROVED IN FMIS BY: VENESHIA SMITH ON 08/2412015 620.2324 ON 06/252015 653 -4150 ON 09/082015 FOR CALTRANS ON 097142015 FOR FHWA ON 097162015