HomeMy Public PortalAboutVETERANS DR_7.pdfDATE ISSUED: 12-31-2014
- m
Q
OWNERNAME
ADDRESS
CITY, ST, ZIP
PHONE NUMBER
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
PROJECT VALUATION
1ybM1t
CITY OF TYBEE ISLAND
RELOCATE SHED FROM 121 LEWIS
7 VETERANS DR
JOY POHJALAINEN
PO BOX 7
TYBEE ISLAND GA 31328
404-293-4456 OWNER
JOY POHJALAINEN
PO BOX 7
TYBEE ISLAND GA 31328
P
$ 25.00
4-0002-04-013
I gj'
9 t K
PERMIT #: 140837
TOTAL BALANCE DUE: $ 25.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wetlands, inarshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations wben applicable, subsequent owners should be imil'onned that any alterations to the property must be
approved by the isstianceofanother building permit. Permit holder agrees to hold the City ofTybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspienom local io it in the front of building and protected from the weather. lftliisperinitisni)tpostudwoi,h
-
will be stopped. The buildi rig contractor will replace c cirb paving and gutter broken during construction. This permit will be voided unless
work has begun within sN months of the date of issuance.
Signature of Building Inspector or Authorized Agent:
P. O Box 2749 • 4(13 Builivi, Avenue, Tybee 1sland, Georgia 31.328
f912) 786 -4573' FAX (912) 786-9539
www.dt37oftyh(,e.urg
irytsYr A-`
4ii
City of Tybee Island, Georgia
912-472-5030 • Fax 912-786-9539
APPLICATION FOR BUILDING PERMIT
L
Property Address: PIN: a
19" 'Single Family
❑ Duplex
❑ Multi-Family — units
❑ * Commercial unit(s)
Check all that apply
❑ DiscoveryfTearout
❑ Footprint Changes
❑ additional square
feet heated/cooled
(Y' Demolition or"Relocation
El Other
A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State o�f Georgia professional license. A commercial project may require Sr i. te Plan al p� p-ry ov� al.
Le"� c4 X
Details of Project:
N
J 40 a
Estimated Cost of Construction: $ (materials + labor + profit/overhead)
If,applicable, attach a copy of the certffied elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
* Buildings older than 50 years may be eligible to be listed on the State /National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On-site restroom facilities will be provided through Construction debris will be disposed
by by means of I understand that I must comply with zoning, flood
is ensure t e adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage paired by this permitted construction. r-e
P '' - I –
Date: Signature-
Printed Name of Applicant(
Note: A permit normally takes 7 to 10 days to Drocess. Processing time for a
historic structure mav be loncer.
Approvals: Signs D t
Planning &Zoning Manager
Building Official
Water/Sewer
Storm/Drainage
City Manager
Name
Mailing Address Telephone
Owner
Home-". _W 1)
Cell'. 2 � `,
Architect or
office:
Engineer
Cell:
Contractor
Office:
Cell:
19" 'Single Family
❑ Duplex
❑ Multi-Family — units
❑ * Commercial unit(s)
Check all that apply
❑ DiscoveryfTearout
❑ Footprint Changes
❑ additional square
feet heated/cooled
(Y' Demolition or"Relocation
El Other
A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State o�f Georgia professional license. A commercial project may require Sr i. te Plan al p� p-ry ov� al.
Le"� c4 X
Details of Project:
N
J 40 a
Estimated Cost of Construction: $ (materials + labor + profit/overhead)
If,applicable, attach a copy of the certffied elevation certificate and/or survey of the property. Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: Listed on National Historic Register or located within a National Historic District? Y / N
* Buildings older than 50 years may be eligible to be listed on the State /National Register. With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island.
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On-site restroom facilities will be provided through Construction debris will be disposed
by by means of I understand that I must comply with zoning, flood
is ensure t e adequacy of drainage of this property so that surrounding property is in no way
adversely affected as required by Article 16, Stormwater Management. I accept responsibility for any corrective actions
that may be necessary to restore drainage paired by this permitted construction. r-e
P '' - I –
Date: Signature-
Printed Name of Applicant(
Note: A permit normally takes 7 to 10 days to Drocess. Processing time for a
historic structure mav be loncer.
Approvals: Signs D t
Planning &Zoning Manager
Building Official
Water/Sewer
Storm/Drainage
City Manager