HomeMy Public PortalAboutTENTH ST_502.pdf2 City of Tybee island, Georgia
9 12 -472-5030 - Fax 912-786-9539
APPLICATION FOR BUILDING PERMIT
Property Address: PIN.,
Name mailing Address 1 1 etepnon a
Home-
'e none
Owner
,e k4w 5;j Cell: I- E79(-"- 6 )f
-Architect or UTTIce:
Enaineer Cell:
Office:
9
Contractor S/11/Ani,,1k Cell:
Check all that apply
Single Family Discovery/Tearout [] Demolitio r
., !1elocation
❑ Duplex Footprint Changes E) Other A,r,, ieel-
0 Multi-Family — units additional square
D * Commercial, unit(s) feet heated/cooled
A commercial project requires 2 sets of sealed drawings by a design professional and construction by a contractor with
the appropriate State of Georgia professional license, A commercial project may require Site Plan Approval.
? 11
Details of Project'.
Estimated Cost of Construction: $ . ... .. (materials + labor + profit/overhead)
If applicable, attach a copy of the certified elevation certificate an n,
acrd /or survey of property, Depending upon
the scope of the work, two sets of construction drawings and/or a site plan may be required.
Year Built: .,)O 0 Listed on National Historic Register or located within a National Historic District? Y I N
• Buildings older than 50 years may be eligible to be listed on the State / National Register, With this designation, you
may be eligible to take advantage of various tax incentive programs while preserving the heritage of Tybee Island,
• Also see the Tybee Island Land Development Code Article 14: Historic Preservation
During construction:
On -sits restroom facilities will be provided through
by ?/4 Vy' ^ Ai l Cc v F,'$ _ by means of _
I Construction debris will be disposed
I understand that I must comply with ZgR!0gJ!g2d
�@aulata ns I reahze tNEil 11 ri:itl li ".1 1::ij, I; Jacy o rainage of t is property so that surrounding property is in no way
adversely affected as required by Article 16, Siormwater Management, I accept responsibiiity for any corrective actions
that may be necessary to restore drainage impaired by this permitted construction,
Date:
Printed Name of ApplSignature: icant: 4"'7'41d` c "oA,
historic structure may be longer.
LEAD-BASED PAINT RRIP RULES
Ordinary renovation and maintenance Ye8d. Contractors who per-form
renovation, repairs, and painting jobs in pre-1978 housing and child-occupied facilities must, before beginning
work, provide owners, tenants, and child-care facilities with a copy of EPA's lead hazard information pamphlet
RenoVate RLqht., Important, Lead Hazard information for Families, Child Care Provjders and Schools.
Contractors must document compliance with this requirement. After April 22, 2010, federal law will require you
to be certified and to use lead-safe work practices. Georgia Environmental Protection Division Lead-Based
Paint and Asbestos Program (404) 363-7026,
When disturbing lead-based painted or coated surfaces oy components more than 6*2 per interior
room or20 ft2Ut exterior surfaces AND all window replacements and partial demolitions mf any size,
Asbestos/Environmental Notification to Georgia EPD for
novatlon
The undersigned hereby acknowledges that the issuance of this permit does not in any way grant Permission
to the owner, owner's representative, or permit holder to proceed with demolition, wrecking, or renovation of a
structure prior to the filing of any required ten (10) day "'Project Notification for Asbestos RenOVation
Encapsulation or Demolition" form in accordance with the Georgia Asbestos Rules. The Georgia
Environmental Protection Division administers the rules. In most cases, the rules require both the owner, and
the involved contractors to assure the portion of the building involved in the project is thoroughly inspected by
an Accredited Asbestos Inspector for materials that contain asbestos; and the removal of the asbestos before
renovation, wrecking, or demolition begins almost without exemption, Georgia EPD requires a completed
demolition notification from be submitted 10 workings days in advance even if no asbestos is present in the
building, Further guidance for regulatory compliance and contact telephone numbers are provided by the
brochures entitled Asbestos& Renovation and Asbestos and Demolition. Other environmental issues such
as asbestos removal techniques, lead abatement, ground contamination, or unusual site conditions may have
EPD regulations that could affect the project.
BMPs
While BMP deficiencies are not noreeserk/ the fault of the ov/Umr or his ogort. BK8PS are their responsibility,
Two speom of deficiencies are in the most basic and common B&1Pm; Co — Construction EAt and Sd1—
Sediment Barrier. Correct installation information can be found in the Field Manual for Eros/on and Sediment
Control in Georgia, Fourth Edition 2002, Georgia Sail and Water Conservation Commission;
Problems with the CO is not UrnKed to the installation, but to material. The stone will be a representation of
1.57-3.5^ stone or large[
Type AaedinOent barriers have been installed where Type C is required and shown on the permit drawi0gs.
Where two rows are no|gd for they will be installed with a separation that Ed\nws for the first one to fail ��|
over) whhnm1impacting the aocmOd ona. The complete assembly and installation must beooDnp|iant; steel 'nr
wood posts, post spacing, Type C or A
�� �� �
Date
sion or recej�t Of Le
Printed Name
DATE ISSUED: 12-23-2014
WORK DESCRIPTION
WORK LOCATION
OW'rl'ER 1AME
ADDRESS
CITY, sT, zip
CONTRACTOR NAME
ADDRESS
CITY STATE ZIP
PROJECT VALUATION ,
CITY OF TYBEE ISLAND
NEW ROOF
502 TENTH ST
ELLEN O'LEARY
502 10TH ST
TYBEE ISLAND GA 31328-8808
SAVANNAH ROOFS, LLC
305 JOHNSTON ST
SAVANNAH GA 31405
I}
$ 76.00
4-0012-01-021
tt
PERMIT #: 140827
TOTAL BALANCE DUE: $ 76.00
It is understood that if this permit is granted the builder will at all times comply with the zoning, subdivision, flood control, building, fire, soil
and sedimentation, wellands, marshlands protection and shore protection ordinances and codes whether local, state or federal, including all
environmental laws and regulations when applicable, subsequent owners should be informed that any alterations to the property must be
approved by the issuance of another building permit. Perinit holder agrees to hold the City ofTybee Island harmless on any construction
covered by this permit.
This permit must be posted in a conspicuous location in the front of building and protected from the weather. If this permit is not posted work
will be stopped. The building contractor well replace curb paving and gutter broken during construction, ']'his permit will be voided unless
work has begun within six montlas of the date of` issuance.
Signature of Building Inspector or Authorized Agent:
11, 0. Box 2749 - 403 Ruder Avenue, Tybee Island, Georgia 31328
012) 786-4573 - FAX (9 12) 786-9539
%vwNVAtyor1yl)Ve,0rg
Chatham County Board of Assessors: 2013 Property Record Card 4-.
Property Record' Card
APPRAISER pdwillia LOT 129 WARD 3 TYREE ISLAND SAVANNAH BEACH
LAST INSP 05129/2007
APPR ZONE 000008
SALES BOOK/ INS VI OU RSN PRICFI
PAGE
01 Feb 2002 2310 0190 CC I U UO
GRANTOR:OLEARY ELLEN
GRANTEE:OLEARY& BEROUIST ELLEN &
12 Jan 2000 2091 0246 OC B U UN
GRANTOR:OLEARY JOSEPJ ETAL
GRANTEE:OLEARY ELLEN
127 Apr 1999 202T 687 GC V U UN
GRANTOR:OLEARY DAVID ET AL
ORANTEE:OLEARYJOSEPH ET AL
PERMITS TYPE DATE AMOUNTI
00 -00198 NO 27 Jun 2000 Issued 28,125
COMMENTS:
09 Aug 2002 ADD CHG PER PO CARD
I
8 -9 -02 SYI
22 Jul 2002
ADD CHG PER LTR 7 -22 -02 SYI
01 Feb 2002
CODE 1 O ENT 2/1/02 RD"
185,200
RETURN VALUE ENT 2/1/02
213,800
ROT
22 Jan 2002
ADD CHG PER LET 1- 22 -02 /BS
18 Dec 1997
1998 NEW PIN; SPLIT OUT OF
Cama
4-12-1-8 12/18/97 * DANIEL
202,500
OTEARY, JOHN S O'LEARY &
251,000
DAVID F OTEARY
EXTRA FEATURES
htip.// I) oa. cllathaiTICOUllty. org/I7esktopModules /CliathaiiiC otimy /Boar...
4 -001 2 -01 -021
502 10TH ST TYDEE ISLAND
OLEARY & BEROUIST ELLEN &0TH PETER T
,CAMA ASMFF
101,200 101,200 LAND 2
TYBE,E ISLAND GA 51328''44,500 44,500 BLDG 1
7,500 7,5007 OBXF 2
153,200 153 „200 Cast - MS
,CODES --
!PROPERTY 0006 RESIDENTIAL
USE
UTA, 0004 Tybee Island
NBHD 020222.00 T222 TYREE
HORSE PEN
EXEMPTIONS L1 L9 51 L8
[Click for larger picture)
L r*
;yoywµ
ItSTORY
LAND
IMPR
TOTAL
OL UNUT PRICE
2012
185,200
48,600
213,800
Coma
2011
185,200
58,900
224,100
Cama
2010
202,500
48,500
251,000
MAV
2009
202,500
48,500
251,000
Over
2008
311,500
49,000
360,500
Cama
2007
261,500
49,000
310,500
Cama
2006
292,000
80,000
372,000
Cama
2005
168,000
80,000
248,000
Cama
12004
124,500
64,500
189,000
Cama
2003
73,000
63,000
136,000
Cama
2002
122,500
NC
2001
47,000
40,500
87,500
Cama
2000
23,500
23,500
Cama
1999
23,500
23,500
Cama
11998 23,500 23,500 Carna j
ID#
BLDG # SYSTEM DESC
DYM 1
DIM 2 UNITS
OL UNUT PRICE
RCN AYB EYB DT ECON FLING SP SP%
RCNLD
MKT VALUE
141112
86651 Solid Wall /Slab AV
12
12 144.00
A 27,66
3,983 2000 2000 IR
3,545
3,500
141113
86651 AV CPT FLAT /SHED RF
0
0 532.00
A 8.43
4,485 2000 2000 IIR
3,992
4,000
LAND
ID#
USE DESC FRONT
DEPTH
UNITS JTYPE
PRICE ZONING LCTN TOPO O "rHER ADJ1 ADJ2 ADJ3
ADJ4
MKT VALUE
111315
SINGLE FAMILY RES 0
0
4,500,00 -SF
38.00 R2
90600
,111316
SINGLE FAMILY RES 0
0
2,100.00 -SF
38.00 R2
SZ -75
10600
I of 2 42/23/201e4 2:27 PM
Chatham County Board of assessors: 2013 Property Record Card 4 -.., littp:// boa. chatliaiiicoutity, org/ DesktopModulcs /Clizithat- n(.,oulity/Botr...
2013 Chatham County Board of Assessors
352
4- 0012 -01 -021
Property Retard Card
402
502 10TH ST TYBEE ISLAND
BUILDING SECTION
CONSTRUCTION TYPE RCN ' AYB EYB DEP TYPE
PHYS ECON FUNC OBSV / % TOTAL
DEP % RCNLD U,FACTOR MKT VAL
66651.1 -2013
Residential 62,52 2000 MS
11.00 0.00 0.00 0.00 11.00
55,650 44,500
12' 14'
SECTION TYPE
1 - Main
Slab Perch (SF) with Roof
(AREA
676
TYPE
1 - Single -family Residence
1
1 StVP 1
°
FRAME
1 - Stud Frame
Wall Poreh
STYLE
1 - One Stony
QUALITY
3.00
Base Living Area
2
'
CONDITION
3.00
144 CPT
# UNITS
0
1 L�
I' Carport
# OF BEDS/ BATI °iS
211.00
1�
Base. Living Area
(COMPONENTS
Units ✓ QUAL
533'
IR1 1013 Frame, Siding, Wood
100.00
26'
I R2 206 Composition Shingle
100.00
' mill', �tilflil' i1111illipol�lClrllrllry ]w'IuuG1QJw1N'mPN iI�VIIYvVICI((I 1'I�vVI)nrV011 °(Yrill�a
II�Ih11V Ili I� ° I �V ' II� 1 � Pu 19b i 1I
� I II "I�17�^J��IGIN161�� I�I����uti�� M� �G t 11'n,��Ilo iA��Ililil`ul, "1i1� IIIIG�J�vld���l i' ,
I 8+11G(� vI1I�1(nmlm �i IGIIPptI� � t�1��Y I�o(Ip��� 11u1`�II� G� S�I I
I It�ll I"I 1 141 I �I '1111 I h IuVGr�1VgI�,J 1� n>r,GI�� li
IINf Il olii I u 11 1J I °11 w
I Ilii' ^I' "IIIiV�I "jlli� °III° °loid l ll1 J' "''� III,. i1)III,1� IIIIV114i1)J71Mf
... ...................... I..,---------------- --- --- ----------
[Click for larger picture]
R3
352
Heal Pump
R4
402
Automatic Floor Cover Allowance
R6
601
Plumbing Fixtures (#)
I R6
602
Plumbimg Rough -ins (t6)
R6
622
Raised Subfloor (% or SF)
R11
904
Slab Perch (SF) with Roof
1 00.00
7.00
1.00
10000
206.00
2 of 2 12/23/2014 2:27 PM