Loading...
HomeMy Public PortalAbout GULF STREAM CORE IMPROVEMENTS Presentation 3-12-2024Town of Gulf Stream Core Area Neighborhood Improvements March 12, 2024 Pre -Construction Public Outreach Meeting Title Town of Gulf Stream| Core Area Neighborhood Improvements 2 Project Team Project Owner Construction Project Manager Richard Chipman, CGC Construction Inspector Ron Sellers Project Manager/Utilities Sira “Jockey” Prinyavivatkul, PE Project Engineer/Stormwater Jeff Hiscock, PE Construction ContractorConsulting Engineer Town Commission Scott Morgan, Mayor Thomas Stanley, Vice Mayor Robert Canfield, Commissioner Michael Greene, Commissioner Joan Orthwein, Commissioner Town Manager Greg Dunham Managing Member Silvio Rubi Senior Project Manager Thomas Weeks Jr, P.E. Project Manager Jorge Perez Title Town of Gulf Stream| Core Area Neighborhood Improvements 3 Meeting Agenda Project Objectives Project Summary Construction Management Introduction of Construction Contractor Construction Schedule & What Residents Can Expect How to Stay Informed Title Town of Gulf Stream| Core Area Neighborhood Improvements 4 ■Roadway ─Replace damaged pavements. ─Improve surface drainage. ■Stormwater Management ─Reduce flooding/ponding. ─Improve water quality. ■Water Main ─Replace asbestos cement pipes. ─Upsize for improved fire flows. ─Relocate meters from alley. Project Objectives Title Town of Gulf Stream| Core Area Neighborhood Improvements 5 ■Demolish and remove existing pavement. ■Regrade roadway. ■Install new pavement. ■Install Type F Curb and Gutter at strategic locations. ■Install 2-foot Valley Gutters throughout. Project Summary: Roadway Improvements Title Town of Gulf Stream| Core Area Neighborhood Improvements 6 Project : Roadway –Existing Conditions Title Town of Gulf Stream| Core Area Neighborhood Improvements 7 Project Summary: Roadway –Existing Conditions Title Town of Gulf Stream| Core Area Neighborhood Improvements 8 Project Summary: Roadway Improvements Title Town of Gulf Stream| Core Area Neighborhood Improvements 9 Project Summary: Roadway Improvements BEFORE AFTER Title Town of Gulf Stream| Core Area Neighborhood Improvements 10 Project Summary: Stormwater Drainage Assessment Title Town of Gulf Stream| Core Area Neighborhood Improvements 11 Stormwater Improvements ■Replacing 24” Pipe with 48” Pipe ─Increase Discharge Rate ■Additional stormwater inlet/culvert network ─Reduce nuisance ponding ■Water Quality Improvements ─Exfiltration Trench Title Town of Gulf Stream| Core Area Neighborhood Improvements 12 Project Summary: Water Main Improvements ■Replacing aging asbestos cement potable water mains. ■Increase pipe diameters in strategic areas to improve fire flow. ■Relocate water meters from alleys to roadways. ■Replace and add fire hydrants for improved fire protection coverage. Title Town of Gulf Stream| Core Area Neighborhood Improvements 13 Project Summary: Water Main Improvements ■Replacing aging asbestos cement potable water mains ■Increase pipe diameters in strategic areas to improve fire flow. ■Relocate water meters from alleys to Roadways Title Town of Gulf Stream| Core Area Neighborhood Improvements 14 Project Summary: Project Phasing Title Town of Gulf Stream| Core Area Neighborhood Improvements 15 Construction Management ■Resident Concerns ■Coordination of Resident Needs with Contractor & Town ■Daily Communication with Contractor ■Complaint Resolution ■Inspections ■Quality Assurance ■Project Updates ■Contract Administration CONSTRUCTION CONTRACTOR: Roadway Construction LLC. Miami, FL Title 16Town of Gulf Stream| Core Area Neighborhood Improvements Construction Schedule APRIL 22 Initial mobilization: light activity, surveying, setting up Maintenance of Traffic devices, erosion control material delivery APRIL 24 Phase 1 begins at Golfview Drive with Clearing & Grubbing operations MAY 03 Removal of existing drainage begins on Polo Drive JUNE 17 Watermain & Storm Water installation begins on Polo Drive JULY 02 Phase 1 begins at Palm Way with Clearing & Grubbing operations AUGUST 21 Phase 1 begins at Banyan Road with Clearing & Grubbing operations NOVEMBER 06 Phase 1 begins at Wright Way with Clearing & Grubbing operations DECEMBER 11 Phase 1 begins at Old School Road with Clearing & Grubbing operations FEBRUARY 16 Phase 1 is substantially complete FEBRUARY 17 Phase 2 begins with initial mobilization, light activity, setting up Maintenance of Traffic devices, erosion control material delivery FEBRUARY 20 Phase 2 begins at Gulfstream Road & Golfview Drive with Clearing & Grubbing operations FEBRUARY 27 Watermain & Storm Water installation begins on Gulfstream MARCH 20 Phase 2 begins at Middle Road with Clearing & Grubbing operations 2024 2025 Title 17Town of Gulf Stream| Core Area Neighborhood Improvements Construction Schedule APRIL 17 Phase 2 begins at Lakeview Drive with Clearing & Grubbing operations JUNE 15 Phase 2 begins at Banyan Road with Clearing & Grubbing operations JULY 16 Phase 2 begins at Oleander Way with Clearing & Grubbing operations SEPTEMBER 02 Phase 2 begins at Bermuda Way with Clearing & Grubbing operations OCTOBER 14 Phase 2 is substantially complete OCTOBER 15 Final Asphalt placement begins on Phase 1 and Phase 2 DECEMBER 13 Final Completion of the Project 2025 Title Town of Gulf Stream| Core Area Neighborhood Improvements 18 What Residents Can Expect Title Town of Gulf Stream| Core Area Neighborhood Improvements 19 What Residents Can Expect We will be a Good Neighbor during construction! Traffic Control Contractor will be required to maintain access to driveways/individual properties. Emergency vehicle access shall be maintained. Impacts to Gulf Stream School drop off and pickup loop shall be minimized to the extent possible. Access for residents with special needs shall be maintained. Mail Delivery Trash Pick-Up Site Restoration The contractor is responsible to prepare a pre-construction video and restore in-kind areas damaged during construction including driveways, and front-yard grass areas. Final restoration will be completed as one of the last stages of construction. A preconstruction video will be completed to document the existing conditions along the project area before the contractor begins work. Title Town of Gulf Stream| Core Area Neighborhood Improvements 20 How to Stay Informed After construction begins, call the project hotline with any questions and let us know how we’re doing! Toll -Free Project Hotline: 855-228-3436 ■The construction of this project will disrupt normal daily transportation and other activities in the neighborhood ■Your patience and cooperation during these important infrastructure improvements are sincerely appreciated ■For updates visit the Project Web site, https://CoreAreaRoadwork.com Town of Gulf Stream Core Area Neighborhood Improvements Pre-Construction Public Outreach Meeting Thank You for Attending! Please let us know if you have any questions