HomeMy Public PortalAbout2006-09-13 JFOC Superintendent Update SUPERINTENDENTS UPDATE
Plant Operations Update as of 13 Sept.2006
rTh 1. I have been in touch with some engineering firms in regards to repair of SBR to
meet leakage standards imposed by state health department.
2. Parker AG has been on site to fmish composting operation; they should be
finished this fall.
3. We have a great staff with one employee taking certification exam last week. The
plant is operating very well. Josh passed his exam and is now a certified operator
4. We are currently pumping down SBR for inspection; ground water level has
dropped making it a little easer to pump. All of leaks thus far are at redwood slats
that were part of the design.
5. I have spoken with a couple of engineer firms, only verbal nothing in writing, and
have only received one proposal back. The cost estimate for engineer services is
about the same as ASCG's costs during construction.
6. I have heard no news on well issues last thing done by us had been to file well
report that John and I completed.
14- Sep -06