Loading...
HomeMy Public PortalAbout2006-07-14 JFOC Staff Report MEMORANDUM rTh r To: Bruce Hutchins, Grand County No. 1 Water Sanitation District Kirk Klancke, Winter Park West Water Sanitation District From: Alison Naschak and Joe Fuqua, Fraser Sanitation District Date: July 14, 2006 Bruce and Kirk, Attached is Joe's Superintendent Report with regards to matters of importance concerning operations at the treatment plant. Also enclosed is a copy of the DMR. If you have any questions, or would like additional details about any of the information in Joe's report or the test results please feel free to call him directly. There was an additional claim related to the sludge spill of last January in the amount of $9,369 from Brown's Hill for replaced digester analytical instruments. This bill was paid by us in June and the claim was sent to St. Paul Travelers at the same time. A check was received from St. Paul Travelers for the total amount and was applied to the JFOC books for June also. We also denied a bill from Brown's Hill in the amount of $2,62.50 as it was for replaced soft rTh starters. It was felt that this was a warranty issue and that Brown's Hill would have to take it up with John T. Jones. We have not received any additional response from Brown's Hill. The 2005 audit for Fraser Sanitation District has been completed and our auditor attended the Board meeting in July. Our auditing firm has prepared audit pages that identify JFOC related' functions and accounting information. Copies will be provided once the document has been finalized and submitted to the State. There were no concerns with any of the accounting functions, and the transition of all of the accounting for 2006 has been completed. That's all I have. If you have any questions, please do not hesitate to call me anytime. Thank you, FRASER SANITATION DISTRICT P.O. BOX 89 FRASER, COLORADO 80442 (970) 726 -9172 Fax (970) 726 -5518 June 14, 2006 Mr. Ted Wille Brown's Hill Engineering and Controls 8020 Shaffer Parkway, suite 200 Littleton, CO 80127 Re: Invoices No. 1441 1442 Dear Mr. Wille: The Fraser Sanitation District has made a decision to reimburse Brown's Hill for Invoice No. 1442 as it appears that the expenses are directly related to work that was done by Brown's Hill to repair damages as a result of the sludge overspill in January of 2005. It should be noted that this invoice was not presented to the District until late December of 2005. With regards to Invoice No. 1442 for $2,672.50; final acceptance of the project from John T. Jones Construction was January 20, 2005 and a notice was published with regards to final payment. Since Brown's Hill is a subcontractor with John T. Jones Construction Company, and the repairs were made within the one year warranty period, the matter of payment for these expenses will need to be worked out with John T. Jones Construction Company. Sincerely, Joe Fuqua District Operations Superintendent Fraser Sanitation District Cc: John Walker, Cazier McGowan Fraser Sanitation District Board of Trustees SUPERINTENDENTS UPDATE Plant Operations- 1. Have removed covers from SBR, were the covers touched the concrete walls inside the basin, has ripped and worn out the PVC type material that they are made of. The violent manner in which the SBR mixes is the biggest cause of that pre mature failure of the covers. The manufacture has stated that fact many times over years. 2. Have shut down #2 trains for repairs. The new packing installed in RAS pump #2, fixed the problem of leaking. The power supply cords for submerged mixers and pumps are not rated for underwater use, damaged cords have been replaced, and the ground water level rose to high to fast in the basin there by making the inspection of underwater parts imposable. 3. Centrifuge we shipped out for repairs in Feb, damaged in shipment back to us, sent back to Andritz Mar 24 for more tile replacement. The scroll was reinstalled in late Apr with at least one broken tile. We attempted to run machine at the speeds that were factory set. High vibration alarms along with shut down have been problems since. Andritz sent a service tech Jun 2 and lowered primary bowl speed to 2801 •m. We are going to run with new setting and see what happens. Wt a'e I filled 00 jj'J containers aili7 o lems: 4. UV system bulbs have over 12000 hrs of run time. Factory recommended n, replacement is 12000 hrs. New bulbs for one complete bank has been ordered with two more computer boards also being replaced, one still being operator ional at 100% power, and shutting down at 50% power. 5. Ground water is leaking under corbel in pump room. The leaks stop and start when J C starts and stops the irrigation ditches. None of the leaks is very severe. 6. Parker AG is scheduled to return and finish composting on or about the end of July 2006. 7. The plant has been performing very well, based on all lab work. The enclosed is reported to the state. 13- Jul -06