Loading...
HomeMy Public PortalAbout 2534 Ave Au Soleil DrainagePage 1 of 1 fp''SHENANDOAH Pipe Inspection & Restoration Specialist 1888 NW 22nd Street Pompano Beach, FL, 33069 (954) 975-0098 lj�shenandoahus.com DATE: February 09, 2024 PROPOSAL #P33175 SUBMITTED TO: Gulf Stream, Town of STREET: 100 Sea Rd. Gulf Stream Fl. 33483-7427 CITY, STATE & ZIP: Gulf Stream, 0 PHONE: (561) 276-5116 FAX: (561) 737-0188 EMAIL: abeltran@gulf-stream.org JOB NAME: Place An Soleil CIPP Lining ATTENTION: Anthony Beltran We propose to furnish a crew and all necessary equipment to clean and install 1 CIPP liner from catch basin to outfall and post televise at the above mentioned job location. This work will be performed at our following hourly and/or unit prices: Post TV Includes Vac, Tv truck, Fuel, Water, (at $1,200.00 Lump Sum) I Lump Sum $1,200.00 Disposal, & Air Bag Pre cleaning Includes Vac, Fuel, Water, and (at $1,250.00 Lump Sum) 1 Lump Sum $1,250.00 Disposal CIPP liner (at $17,600.00 Lump Sum) I Lump Sum $17,600.00 Mobilization (at $1,200.00 Lump Sum) I Lump Sum $1,200.00 Estimated Total: $21,250.00 This proposal may be withdrawn if not accepted within 30 days. Payment terns net 30 days. (If we encounter an Insurance compliance fee requirement, this fee will be invoiced in addition to the above rates. If paid by credit card a 2.5% non-refundable administrative fee will be assessed.) All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Price above is only an estimate of foreseen conditions. Unforeseen conditions can affect the amount of time to complete the work, therefore increasing or decreasing estimate. All agreements are contingent upon strikes, accidents or delays beyond our control. Unless noted above engineering, permits, testing and bonds are not included in the pricing. Owner is to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workman\'s Compensation Insurance. Parties to this proposal/contract expressly waive all tort claims against each other and limit their remedies to breach of contract. Due to current fuel price increases, Shenandoah will add a 4.5% fuel surcharge to each invoice for services performed. One way travel time, 4 hour minimum charge will be applied to any hourly rate proposals. SIGNATURE: to SHENANDOAH GENERAL CONSTRUCTION CO. TITLE DATE Jose Vera Jr. Estimator 02/09/2024 ACCEPTANCE OF PROPOSAL / SIGN & RETURN The above prices, specification and c itions are satisfactory and are hereby accepted. You are authorized to do the work as specified. SIGNATURE: COMP N E:T` W M OF (5t U(,r- S_tRZA'" SATE: 3 X Z v2q -- REPRE ENTA IVE: 1 bWo (r�� 4-g TITLE: q (2-s-:4 ff f l 14AAA This document is the property of Shenandoah General Construction. It is intended only for the use of the individual or entity td which it is addressed and may contain information that is non-public, proprietary, privileged, confidential and exempt from disclosure under applicable law or may constitute as attorney work product. If you are not the intended recipient, you are hereby notified that any use, dissemination, distribution or copying of this communication of this document is strictly prohibited. If you have received this document in error, notify us immediately by telephone (954) 075-0098 or Email: help@shenandoahus.com and destroy this document immediately, if this is an electronic communication then delete immediately.