HomeMy Public PortalAboutBRW W/S Change Order 7-6-15 CHANGE ORDER NO. 2 (Summary) J-24609 PROJECT: Tvbee Island Water and Sewer Improvements PROJECT NO.: J-24609 DATE: July 6. 2015 OWNER: City of Tvbee Island CONTRACTOR: BRW Construction Group. LLC The Contractor is hereby requested to comply with the following changes from the contract plans and specifications: Description of Changes—Quantities, Unit Decrease In Increase In Item# Prices, Units, Etc. Contract Price Contract Prices Division 1 —Jones Avenue Water Main Improvements 3 I Testing (-) 1 EA @ $500.00 $ 500.00 4 Soil Borings(3 Places) ' (-) 1 LS @ $500.00 500.00 Water Main 1 I 8"Diameter PVC Water Main (+) 138 LF @ $21.25 $ 2,932.50 2 6" Diameter PVC Water Main (-) 19 LF @ $12.00 i 228.00 3 Directional Drill 8"FPVC Water Main (+) 10 LF @ $99.00 990.00 4 2"Lateral (+) 634 LF @ $9.00 5,706.00 5 1" Lateral — (+) 2,178 LF @$2.50 5,445.00 6 Connect to 1" Service (+) 55 EA @ $600.00 33,000.00 7 Connect to 2" Service (-) 11 EA @$675.00 7,425.00 8 I 8" Gate Valve in Valve Box (+) 10 EA @$1,180 11,800.00 9 6"Gate Valve in Valve Box (+) 3 EA @$880.00 2,640.00 10 2"Gate Valve in Valve Box (+) 8 EA @$540.00 4,320.00 11 Install New Fire Hydrant Assembly (+) 3 EA @ $3,150.00 9,450.00 12 I Remove Existing Fire Hydrant (+) 1 EA @$225.00 225.00 14 I 8"x 8"Tee (4-)4 EA @$450.00 1,800.00 T:\FORMS\T&H\CCChange 15 8"x 6" Tee (+) 8 EA @ $400.00 3,200.00 16 8"x 2"Tee (+) 8 EA @ $350.00 2,800.00 17 6" x2"Tee (+) 1 EA @ $280.00 280.00 18 2"x 2"Tee (-) 1 EA @$324.00 324.00 19 8" x 6" Wye (-) 1 EA @ $475.00 475.00 20 8"x 6"Reducer (+) 3 EA @ $280.00 840.00 21 8"x 8"Cross (-) 2 EA @$555.00 1,110.00 22 8"x 6" Cross (-) 5 EA @ $550.00 2,750.00 23 8"90° Bend (-) 7 EA @ $270.00 1,890.00 24 8"45° Bend (+) 61 EA @ $375.00 22,875.00 25 6"90° Bend (-) 20 EA @$270.00 5,400.00 26 6"45° Bend (+) 30 EA @ $350.00 10,500.00 27 2" 90° Bend (-) 10 EA @$280.00 2,800.00 28 8"Cap (+) 2 EA @ $170.00 340.00 29 6" Cap (+) 5 EA @ $140.00 700.00 30 2" Cap (+) 3 EA @ $130.00 390.00 32 Tie Into Existing 6"Water Main (+)4 EA @$960.00 3,840.00 33 Remove&Replace Concrete Driveway (-) 54 SY @$75.00 4,050.00 34 Remove &Replace Stamped Concrete Driveway (-) 13 SY @ $130.00 1,690.00 35 Remove&Replace Oyster Shell Driveway (-) 14 SY @$130.00 1,820.00 37 Remove &Replace Gravel Driveway (+) 220 SY @ $15.00 3,300.00 38 Remove&Replace Asphalt Road (+) 114 SY @$60.00 6,840.00 39 PVC to AC Pipe Sleeve Transition (-)2 EA @$550.00 1,100.00 T:\FORMS\T&H\CCChange Erosion Control 3 Silt Fence (Type"A") (-) 7,630 LF @$0.90 6,867.00 Division 2—Lift Station#6 Force Main Replacement 3 Testing (-) 1 EA @ $500.00 500.00 Force Main Replacement 1 12"PVC Force Main (-) 10 LF @ $33.50 335.00 2 Directional Drill 16" Casing w/ 12"FPVC Force Main (+) 10 LF @$220.00 2,200.00 6 12"45° Bend (-) 1 EA @ $750.00 750.00 7 12"22.5° Bend (-)2 EA @$720.00 1,440.00 8 12" 11.25° Bend (-) 4 EA @ $720.00 2,880.00 9 Tie Into Existing 12"Force Main (+) 1 EA @ $2,400.00 2,400.00 10 Sand Backfill (-) 200 CY @$5.00 1,000.00 11 Stone Backfill (-) 200 CY @ $40.00 8,000.00 12 2"Air Release Valve (+) 1 EA @$7,450.00 7,450.00 13 Tie Into Existing Manhole (-) 1 EA @ $7,000.00 7,000.00 14 Remove&Replace Gravel Road (-) 178 SY @$10.00 1,780.00 15 Remove &Replace Gravel Driveway (-) 75 SY @ $15.00 1,125.00 16 Remove &Replace Asphalt Road (-) 847 SY @ $59.00 49,973.00 Erosion Control 2 Sampling Point (-) 2 EA @ $500.00 1,000.00 4 Silt Fence (Type"A") (-)2,420 LF @$1.00 2,420.00 5 Silt Fence(Type"C"—Double Row) (-)49 LF @ $6.00 294.00 6 Construction Exit (-) 2 EA @ $1,500.00 3,000.00 7 Concrete Headwall (-) 1 EA @ $1,520.00 1,520.00 9 18"RCP (+)2.5 LF @ $40.00 100.00 I I T:WORMS\T&H\CCChange 10 Grate Inlet (-) I EA @$2,100.00 2,100.00 11 18"Flared End Section (-) 1 EA @ $1,000.00 1,000.00 Change Order#1—FM#7 Along Hwy 80 1 8"Dia. PVC Force Main (+) 45 LF @ $21.25 956.25 3 8"45° &22.5° Bend(Sewer Fittings—401 Coated) (+) 16 EA @$560.00 8,960.00 4 Tie Into Existing 8"Force Main (-) 1 EA @ $970.00 970.00 5 Tie New 8"Force Main Into Existing Manhole (-)40% of$7,000.00 2,800.00 6 Remove &Replace Concrete Driveway (+) 7 SY @ $75.00 525.00 7 Remove&Replace Curb &Gutter (-) 54 LF @ $45.00 2,430.00 11 2"Air Release Valve (-) 52% of$37,250.00 19,370.00 12 Off-Site Disposal of Drill Material (-) 935 LF @ $6.50 6,077.50 Erosion Control 2 Silt Fence (Type"A") (-) 200 LF @ $1.00 200.00 Division 1 & 2 Extra Work 1 Second Street— 12"x 6" Tapping Sleeve Including Tap (+) 1 LS @ $5,800.00 5,800.00 2 Second Street— 8"Insertion Valve (+) 1 LS @ $9,700.00 9,700.00 3 Jones Avenue—Additional 8"Bell Restraints To Avoid Brick Driveways&Misc. Changes (+)42 EA @ $90.00 3,780.00 4 Lewis Avenue—Install 6" Gate Valve in Existing 6"Water Main at 175 Lewis Ave. (+) 1 EA @ $2,180.00 2,180.00 5 Force Main #7 — Install New 4" Emergency Connection w/8"x 4"at Pump Station#7. Connect to Existing PVC Pipe at Pump Station. Regrade, Furnish & Install White Rock (+) 1 LS @$4,400.00 4,400.00 6 Force Main #7 — Jack & Bore 12" Steel Casing under Post Office Exit Driveway (+) 20 LF @ $112.00 2,240.00 7 Force Main#7—8"FPVC inside 12" Steel Casing (+) 25 LF @ $30.00 750.00 T:\FORMS\T&li\CCChange 8 Lift Station#6 Force Main Replacement- Lower Existing 8"Force Main at Polk and Fort Streets to Install New 24" RCP (+) 1 LS @ $4,650.00 4,650.00 9 Lift Station #6 Force Main Replacement- Cut& Construct Brick Plugs on Abandoned 24"RCP at Fort and Polk Streets (2 each) (+) 1 LS @ $900.00 900.00 Total DECREASE I $ 156,893.50 Total INCREASE $191,204.75 Difference Col. (1) and(2) I $ 34,311.25 Net INCREASE Contract Price $ 34,311.25 The sum of$ 34,311.25 is hereby added to the total contract price of$ 1,473.310.25 and the total contract price to date is $ 1_507.621.50. The time provided for completion in the contract is unchanged. This document shall become an amendment to contract and all provisions of the contract will apply hereto. ACCEPTED DATE: -7 I (O 12 315 BRW Construction Group, LLC I RECOMMENDED BY: DATE: &(1-'i it 5 Thomas &Hutton Engineering Co. ? li qc S' APPROVED BY: ` DATE: $/d4! r City of Tybee Island Al-TKO V ED ! "TE: • Gcoigia r,nvironmental Finance Authority • T:\FORMS\T&H\CCChange