Loading...
HomeMy Public PortalAbout12.28.22 FinCom PacketTown of Brewster Finance Committee 2198 Main St., Brewster, MA 02631 fincommeeting@brewster-ma.gov (508) 896-3701 MEETING AGENDA Brewster Town Hall 2198 Main Street December 28, 2022 at 6:00 PM Pursuant to Chapter 107 of the Acts of 2022, this meeting will be conducted in person and via remote means, in accordance with applicable law. This means that members of the public body may access this meeting in person, or via virtual means. In person attendance will be at the meeting location listed above, and it is possible that any or all members of the public body may attend remotely. No in-person attendance of members of the public will be permitted, and public participation in any public hearing conducted during this meeting shall be by remote means only. Members of the public who wish to access the meeting may do so in the following manner: Phone: Call (929) 436-2866 or (301) 715-8592. Webinar ID: 862 2956 9696 Passcode: 565167 To request to speak: Press *9 and wait to be recognized. Zoom Webinar: https://us02web.zoom.us/j/86229569696?pwd=MUhJNGpoU3VocTZ0cTU0VGpYcWdVQT09 Passcode: 565167 To request to speak: Tap Zoom “Raise Hand”, then wait to be recognized. When required by law or allowed by the Chair, persons wishing to provide public comment or otherwise participate in the meeting, may do so by accessing the meeting remotely, as noted above. Additionally, the meeting will be broadcast live, in real time, via Live broadcast (Brewster Government TV Channel 18), Livestream (livestream.brewster-ma.gov), or Video recording (tv.brewster-ma.gov). Finance Committee Harvey (Pete) Dahl Chair Frank Bridges Vice Chair William Meehan Clerk Andrew Evans William Henchy Alex Hopper Honey Pivirotto Robert Tobias Robert Young Town Administrator Peter Lombardi Finance Director Mimi Bernardo 1.Call to Order 2.Declaration of a Quorum 3.Meeting Participation Statement 4.Recording Statement 5.Public Announcements and Comment: Members of the public may address the Finance Committee on matters not on the meeting’s agenda for a maximum 3-5 minutes at the Chair’s discretion. Under the Open Meeting Law, the Finance Committee is unable to reply but may add items presented to a future agenda. 6.Town Administrator/Finance Director Report 7.Reserve Fund Transfer 8.Nauset Regional High School Project – Debt Exclusion for Additional Funding – Discussion and Vote 9.Liaison Reports and Assignments 10.Approval of Minutes 11.Request for agenda items for future meetings 12.Matters Not Reasonably Anticipated by the Chair 13.Next Finance Committee Meeting 14.Adjournment Date Posted:Date Revised:Received by Town Clerk: 12/21/22 Request for Transfer from the Reserve Fund (To be submitted in triplicate) Date December 21st, 2022 To:Finance Committee From: Tom Thatcher, Facilities Director A request is hereby made for the following transfer from the Reserve Fund in accordance with Chapter 40, Section 6, of the Massachusetts General Laws: Amount Requested: $15,000.00 To be transferred to: Town Facilities Operating Budget- Repairs & Maintenance account Current balances in said appropriation: $2,016.09 The amount requested will be used for (give specific purpose): To repair HVAC mechanical systems in the two archival vaults. This expenditure is extraordinary and/or unforeseen for the following reasons: See attached: Letter from Facilities Director to Brewster Finance Committee requesting RFT Letter from Facilities Director to notify the Assistant Town Administrator of the situation Quote & Invoice from McDonnel Mechanical for HVAC system repairs Letter from Town Administrator to DCAMM for Emergency Waiver Email from DCAMM to Approve Emergency Waiver Action of the Finance Committee Date of meeting: ______________ Committee Members present and voting: _______  Transfer approved in the amount of $____________________  Transfer disapproved. Finance Committee Chair Requests should be made and approved by the Finance Committee before any expenditure in excess of the appropriation is incurred. . From: Tom Thatcher, Facilities Manager Sent: Tuesday, December 20, 2022 To: Finance Committee Subject: Reserve Fund Transfer Request for Town Hall Vault HVAC Replacement Project The Maintenance Department is seeking a reserve fund transfer in the amount of $15,000.00 to satisfy an unforeseen repair to one of our most critical Town Hall HVAC systems. On 11/15/2022, our outdoor condenser unit that supplies climate control temperatures and relative humidity settings to our two vault systems, was no longer operable. The two vaults house and preserve delicate recordings of all departmental current and most importantly archival materials. After days of research and diagnostic reporting, it was determined that the current 14-year- old Fujitsu system had two failed control boards in addition to an active filter module. We were then notified by the manufacturer that the replacement parts may not be available for an extended period with no firm date, due to the age of the unit. Our second approach was to replace the condenser unit entirely but discovered that the unit would not be compatible with the indoor air handler/ coil system. After further evaluation and recommendation from our contracted maintenance HVAC vendor, I believe that it is in the Town’s best interest to take a more conservative approach and seek design of replacing the entire HVAC system to our two vault units. I recently received a proposal from McDonnell Mechanical in the amount of $13,300.00 to replace the existing (2) Fujitsu air handlers, (1) Fujitsu outdoor unit and (1) Fujitsu touch panel controller. Also, we need to pay an invoice in the amount of $1,092.25 for the service call of the initial inspection when the ductless splits stopped working. It is recommended that a stable temperature between 60 -70 degrees, and a stable relative humidity between a minimum 30% and a maximum of 50% is to be maintained to preserve the records. We are currently five weeks out from the initial shutdown of these systems. A nonfunctioning system will contribute significantly to the breakdown of materials and mold issues. Town of Brewster OFFICE OF: 2198 Main Street MAINTENANCE BREWSTER, MASSACHUSETTS 02631 Phone:(508) 896-3701 EXT. 1118 Fax: (508) 896-8089 Email: tthatcher@brewster-ma.gov Therefore, the Town sought and received an emergency waiver of the bidding and advertising requitements of G.L. c. 149 through the Division of Capital Asset Management and Maintenance (DCAMM). With your approval of emergency funding costs as it relates to this project, we would then implement the coordination of the replacement components. Respectfully, Tom Thatcher Facilities Director. . December 14, 2022 Town of Brewster 2198 Main Street Brewster, MA 02631-1898 Phone: (508) 896-3701 Fax: (508) 896-8089 Division of Capital Asset Management and Maintenance One Ashburton Place, 15th Floor Boston, MA 02108 Attn: Office of the General Counsel Office of: Select Board Town Administrator The Town of Brewster is seeking a waiver of the bidding and advertising requirements of G.L. c. 149 due to an emergency situation with a failure of the air control systems in our Town Hall vault where critical town records are stored. The Town Clerk became aware of an issue with the temperature of the vault on November 15, 2022 and contacted the Town's facilities manager who arranged to have our HVAC maintenance firm look at the issue. After evaluation and research, it was determined that the cooling units could not be repaired and must be replaced. The vault houses the Town's archival materials which are at risk of breakdown of materials and molding. We have reached out to two firms, have received one quote for the work and the second firm has a backlog of work before they can look at the issue. There is a shortage of HV AC companies on the Cape who perform municipal work and they are months out. The Town acknowledges that the prevailing wage law (all projects), bonding requirements (all projects) and the DCAMM contractor certification requirements (projects over c. 149 building project threshold) apply to emergency projects. The Town will also follow proper contracting procedures for the emergency project. If you require any other information, please do not hesitate to contact me. Peter Lombardi, Town Administrator CC: Tom Thatcher, Facilities Manager www.brewster-ma.gov Emergency Waiver No. 4274 Granted December 15th, 2022 By Attorney Susan Goldfischer December 13, 2022 Tom Thatcher Town of Brewster 2198 Main St. Brewster, MA 02631 Re: Administrative Offices HVAC Dear Tom, The intent of this proposal is to provide the scope of work and cost to replace, in-kind, the two concealed- ceiling air handlers and the outdoor unit for two archival storage rooms located at 2198 Main St Brewster. The recommendation is detailed below with a total cost. This proposal is based on the prevailing wage hourly rate. Recommendation: Replace existing (2) Fujitsu air handlers and (1) Fujitsu outdoor unit with the following: •(1) Fujitsu AOU24RLXFZ Airstage Multi Zone (2 to 5 Zones) Hybrid Flex Inverter •(2) Fujitsu ADUH09LUAS1 Airstage mini-split systems Slim Duct air handler •(1) Fujitsu UTY-RNRUZ5 VRF Control - Individual Touch Panel Controller (Wired Remote) Cost - $13,300.00 Warranty: McDonnell Mechanical Services, Inc. will warranty the installation for one year. The warranty covers all labor and materials to repair any deficiencies with the installation and/or replace any parts covered by the manufacturer’s warranty. Payment Schedule: Twenty-Five Per Cent (25%) when contract is signed Fifty Per Cent (50%) the day the work begins Twenty-Five (25%) when the work is completed Customer Signature______________________________ Date________________________________ Customer Printed Name_______________________________________________________________ Thank you for the opportunity to bid on this project. Regards, Tom Lynch McDonnell Mechanical Services, Inc. 79 School Street West Dennis, MA 02670 508-394-0005 www.mcdonnellmechanical.com Town of Brewster Brewster Town Hall 2198 Main Street Brewster, MA 02631 Invoice November 16, 2022 2617-29118 ROGER 11/16/2022 11/16/2022 Brewster Town Hall 2198 Main Street Brewster, MA 02631 508-326-5732TOM This invoice covers the requested service to check ductless split units not working at the listed address 11/16/22: Roger Upon arrival, Tech found breaker on the electrical panel tripped Tech inspected the ductless split system and reset the breaker Once power restored wired the control panel Once control panel was wired, system tested and Error Code E:EE came on Reset control immediately and error code E:EE came back Called Fujitsu Tech Support who after troubleshooting determined units needed various parts (power board, control board and active filter module) Due to age of equipment and the amount of parts needed for a repair, Tech Support suggested replacing the units. (units over 10 years old) Reviewed with Tom Labor Roger 4.25hrs Labor Subtotal Total 1092.25 1092.25 $1,092.25 THANK YOU FOR YOUR BUSINESS. WEEKLY PAYROLL RECORDS REPORT & STATEMENT OF COMPLIANCE In accordance with Massachusetts General Law c. 149, §27B, a true and accurate record must be kept of all persons employed on the public works project for which the enclosed rates have been provided. A Payroll Form has been printed on the reverse of this page and includes all the information required to be kept by law. Every contractor or subcontractor is required to keep these records and preserve them for a period of three years from the date of completion of the contract. In addition, every contractor and subcontractor is required to submit a copy of their weekly payroll records to the awarding authority. This is required to be done on a weekly basis. Once collected, the awarding authority is also required to preserve those records for three years from the date of completion of the project. Each such contractor or subcontractor shall furnish to the awarding authority directly within 15 days after completion of its portion of the work, a statement, executed by the contractor, subcontractor or by any authorized officer thereof who supervised the payment of wages, this form. STATEMENT OF COMPLIANCE December 8 -------, 20 22 I, James McDonnell _P_r_es_id_en_t ____________ _ (Name of signatory party) (Title) do hereby state: That I pay or supervise the payment of the persons employed by McDonnell Mechanical Services, Inc. on the Brewster Town Hall --------------(Contractor, subcontractor or public body) (Building or project) and that all mechanics and apprentices, teamsters, chauffeurs and laborers employed on said project have been paid in accordance with wages determined under e provisions of sections twenty-six and twenty-seven of chapter one hundred and fort ine of the General Laws. 09/11 MASSACHUSETTS WEEKLY CERTIFIED PAYROLl-REPORT FORM Hours • Worked Employee ,s I I Appr. I IOSHA 10 Work Classmcation: ��� Su. I I I I I 1 Mo. Tu. I We. I Th. Fr. Sa. Hvac Mech □ □ □ □ □ NOTE: Pursuant to MGL Ch. 149 s.27B, every contractor and subcontractor is required to submit a "true and accurate" copy of their weekly payroll records directly to the awarding authority. Failure to comply may result in the commencement of a criminal action or the issuance of a civil citation. Total Gross I Check No. Wa_[es (H 325.72 TBD Date recieved by awarding authority Page of Nauset Regional School District- Financing Scenario- 25 Year Bond 11/28/2022 11/2022 $133M Bond / Int 4.650% Avg 2023 2023 Projected Total TEMP.SHORT Level Debt BOND ANNUAL 47.4074%IMPACT IMPACT Median 47.4074%IMPACT IMPACT Median Change in Change in FISCAL DEBT PRINCIPAL TERM BOND INTEREST DEBT NET RESID.$100,000 Home Value NET RESID.$100,000 Home Value Cost Per Cost from YEAR ISSUED OUTSTAND. INTEREST PRINCIPAL 4.500%SERVICE DEBT SVC TAX RATE HOUSE 636,700.00$ DEBT SVC TAX RATE HOUSE $636,700 Avg. Taxpayer Interest 2022 $133,100,000 $0 $0 0 $0 0 2023 $133,100,000 $0 $0 0 $0 $0.00 $0.00 0 $0.00 $0.00 2024 $130,115,000 2,985,000 5,989,500 8,974,500 $4,254,577 $0.73 $73.26 $466.47 3,941,522 $0.68 $67.87 $432.14 ($34.32)-$313,054.77 2025 $126,995,000 3,120,000 5,855,175 8,975,175 $4,254,897 $0.73 $73.27 $466.50 3,942,085 $0.68 $67.88 $432.20 ($34.30)-$312,811.80 2026 $123,735,000 3,260,000 5,714,775 8,974,775 $4,254,707 $0.73 $73.27 $466.48 3,942,814 $0.68 $67.89 $432.28 ($34.20)-$311,893.28 2027 $120,325,000 3,410,000 5,568,075 8,978,075 $4,256,272 $0.73 $73.29 $466.65 3,943,599 $0.68 $67.91 $432.37 ($34.28)-$312,673.14 2028 $116,765,000 3,560,000 5,414,625 8,974,625 $4,254,636 $0.73 $73.26 $466.47 3,941,958 $0.68 $67.88 $432.19 ($34.28)-$312,677.88 2029 $113,045,000 3,720,000 5,254,425 8,974,425 $4,254,542 $0.73 $73.26 $466.46 3,942,634 $0.68 $67.89 $432.26 ($34.20)-$311,907.51 2030 $109,155,000 3,890,000 5,087,025 8,977,025 $4,255,774 $0.73 $73.28 $466.60 3,943,035 $0.68 $67.90 $432.31 ($34.29)-$312,739.51 2031 $105,090,000 4,065,000 4,911,975 8,976,975 $4,255,750 $0.73 $73.28 $466.59 3,943,050 $0.68 $67.90 $432.31 ($34.28)-$312,700.40 2032 $100,840,000 4,250,000 4,729,050 8,979,050 $4,256,734 $0.73 $73.30 $466.70 3,942,570 $0.68 $67.89 $432.26 ($34.44)-$314,164.10 2033 $96,400,000 4,440,000 4,537,800 8,977,800 $4,256,142 $0.73 $73.29 $466.64 3,941,484 $0.68 $67.87 $432.14 ($34.50)-$314,657.14 2034 $91,760,000 4,640,000 4,338,000 8,978,000 $4,256,236 $0.73 $73.29 $466.65 3,942,053 $0.68 $67.88 $432.20 ($34.45)-$314,183.06 2035 $86,915,000 4,845,000 4,129,200 8,974,200 $4,254,435 $0.73 $73.26 $466.45 3,941,686 $0.68 $67.88 $432.16 ($34.29)-$312,748.99 2036 $81,850,000 5,065,000 3,911,175 8,976,175 $4,255,371 $0.73 $73.28 $466.55 3,942,642 $0.68 $67.89 $432.27 ($34.29)-$312,728.84 2037 $76,555,000 5,295,000 3,683,250 8,978,250 $4,256,355 $0.73 $73.29 $466.66 3,942,332 $0.68 $67.89 $432.23 ($34.43)-$314,023.06 2038 $71,025,000 5,530,000 3,444,975 8,974,975 $4,254,802 $0.73 $73.27 $466.49 3,943,014 $0.68 $67.90 $432.31 ($34.18)-$311,787.80 2039 $65,245,000 5,780,000 3,196,125 8,976,125 $4,255,347 $0.73 $73.28 $466.55 3,942,100 $0.68 $67.88 $432.21 ($34.34)-$313,247.95 2040 $59,205,000 6,040,000 2,936,025 8,976,025 $4,255,300 $0.73 $73.28 $466.55 3,941,847 $0.68 $67.88 $432.18 ($34.37)-$313,452.99 2041 $52,895,000 6,310,000 2,664,225 8,974,225 $4,254,447 $0.73 $73.26 $466.45 3,942,037 $0.68 $67.88 $432.20 ($34.25)-$312,410.03 2042 $46,300,000 6,595,000 2,380,275 8,975,275 $4,254,945 $0.73 $73.27 $466.51 3,942,448 $0.68 $67.89 $432.24 ($34.26)-$312,496.54 2043 $39,405,000 6,895,000 2,083,500 8,978,500 $4,256,473 $0.73 $73.30 $466.67 3,942,860 $0.68 $67.90 $432.29 ($34.38)-$313,612.99 2044 $32,200,000 7,205,000 1,773,225 8,978,225 $4,256,343 $0.73 $73.29 $466.66 3,943,054 $0.68 $67.90 $432.31 ($34.35)-$313,289.43 2045 $24,675,000 7,525,000 1,449,000 8,974,000 $4,254,340 $0.73 $73.26 $466.44 3,942,807 $0.68 $67.89 $432.28 ($34.16)-$311,532.99 2046 $16,810,000 7,865,000 1,110,375 8,975,375 $4,254,992 $0.73 $73.27 $466.51 3,941,900 $0.68 $67.88 $432.18 ($34.33)-$313,091.51 2047 $8,590,000 8,220,000 756,450 8,976,450 $4,255,502 $0.73 $73.28 $466.57 3,942,484 $0.68 $67.89 $432.25 ($34.32)-$313,018.03 2048 $0 8,590,000 386,550 8,976,550 $4,255,549 $0.73 $73.28 $466.57 3,941,855 $0.68 $67.88 $432.18 ($34.39)-$313,693.58 2049 $0 $0.00 $0.00 0 $0 $0.00 $0.00 $0.00 3,942,166 $0.68 $67.88 $432.21 $432.21 $3,942,165.90 2049 $0 $0.00 $0.00 0 $0 $0.00 $0.00 3,943,084 $0.68 $67.90 $432.31 $432.31 $3,943,084.42 2049 $0 $0.00 $0.00 0 $0 $0.00 $0.00 3,941,910 $0.68 $67.88 $432.19 $432.19 $3,941,909.90 2049 $0 $0.00 $0.00 0 $0 $0.00 $0.00 3,943,163 $0.68 $67.90 $432.32 $432.32 $3,943,162.64 2049 $0 $0.00 $0.00 0 $0 $0.00 $0.00 3,941,661 $0.68 $67.87 $432.16 $432.16 $3,941,661.01 2049 $0 $0.00 $0.00 0 $0 $0.00 $0.00 0 $0.00 $0.00 $0.00 $0.00 $0.00 2049 $0.00 $133,100,000 91,304,775 $224,404,775 $106,384,469 $1,831.92 $11,663.84 118,271,856 $2,036.62 $12,967.16 $1,303.32 $11,887,386.59 Interest rate subject to change based upon market rate environment Does not include short-term interest Terms of Debt to be Voted by the Nauset Regional School Committee Total FY23 Valuation for 'New Financing Schedule' is $5,807,261,160.00 Brewster Per 1,000 30 YEAR LEVEL DEBT25 YEAR LEVEL DEBT 11/2022 $133M Bond / Int rate 4.5% Brewster Per 1,000 Nauset High School Building Project Nauset Regional School Committee Presented By Chris Easley, Chair Judith Schumacher, Vice Chair 1 Proposed Nauset Regional High School 2 PROBLEM DEFINED IN 2014 50-year-old High School Building IN NEED OF MILLIONS OF DOLLARS IN REPAIRS TO BRING UP TO CURRENT BUILDING CODE 2014 SEARCH FOR A SOLUTION BEGAN IN EARNEST 3 SOLUTION TIMELINE 2014 to 2022 ●2015 Application to MSBA Building Program Rejected ●2016 Application to MSBA Building Program Accepted !!!! ●Spring 2017 Town Meetings Voted and Approved $1.3 million to fund the Building Project Feasibility Study 4 2018-2019 ●Forums held in each member town to get community input of priorities for new High School ●Building Committee Formed; Owner's Project Manager & Architect Hired ●13 Potential design options were developed and reviewed ●Preferred Building Design Selected and presented in forums held in each District member town 5 February 2020 MSBA Approves Nauset’s Building Design & Project Budget MSBA Awards Approximately $36 million In State Funding for the NRHS project 6 Spring 2020 ●Town Meetings Canceled as a result of Covid ●Vote Postponed on Funding High School Building Project March 30, 2021 .District-wide Vote Approves $131,825,665 to fund the Nauset Regional High School Building project as proposed -70%+ Voter Approval 7 March 2021 to Present ●Building design developed into Blueprint & Bid Documents ●37 Mobile Trailer Units Purchased and Installed at High School for Temporary Classrooms ●Design modifications made to reduce costs without compromising Educational Plan - $7.3 Million in reductions 8 June 2022 Building Project Put out for Bids October 2022 Two bids received: ●Brait Builders won the bid at $134.4 million ●2nd bidder - $15 million more at $159.8 million ●Low Bid represents a $29.7 million increase from the December 2019 Construction Cost Estimate ●Note:Estimate is 3 Years Old November 2022 ●At its Meeting the Nauset School Committee Voted to ask the Taxpayers for the additional funds to construct the High School as Planned 9 ADDITIONAL FUNDING REQUEST FOR CONSTRUCTION COSTS & CONTINGENCY Additional Construction Costs - $29,675,835 Additional Construction Contingency Funds - $ 5,984,665 Soft Cost & Administration - $ 1,000,000 FF&E/IT (escalation cost) - $ 814,500 Construction Testing & Inspection Services - $ 125,000 Moving Services & Storage Containers - $ 100,000 Builder’s Risk Insurance - $ 400,000 Total Estimated Additional Costs - $38,100,000 Current Total Project Budget: $131,825,665 Revised Total Project Budget: $169,925,665 Total New Funding Request: $38,100,000 10 Here is a look at the Estimated Tax Consequences of the Revised Building Budget for each of Our Nauset Towns 11 Tax Impact Estimates 30 Year Bond ●4.65 % Interest Rate, Based on a 30-Year Level Debt Bond (Subject to change) ●Calculations Based On Individual Town Property Tax rates as well as the town’s percentage of students in the Nauset system First Year and Every Year (per $100,000 of assessed value) Brewster:$67.87 Eastham:$38.42 Orleans:$37.41 Wellfleet:$29.55 12 Tax Impact Estimates 25 Year Bond ●4.5 % Interest Rate, Based on a 25-Year Level Debt Bond (Subject to change) ●Calculations Based On Individual Town Property Tax rates as well as the town’s percentage of students in the Nauset system First Year and Every Year (per $100,000 of assessed value) Brewster:$87.91 Eastham:$51.70 Orleans:$40.38 Wellfleet:$40.10 13 OUR OPTIONS ●One We can vote to provide the additional Funding and build the High School as Proposed ●Two We can vote down the additional funding and start all over again Let Us take a look at Both Options 14 Option One Vote to Provide Additional funding to build the High School as Proposed. WHY ?? ●Current Plan Eight years in the Making - 1000’s of Person Hours Invested ●The New High School as Proposed is the Community-Selected solution to our problem of a 50 year old High School ●15 ●$28 Million has been Borrowed and has been Expended and/or Committed for work done and contracted to date ●The $36 Million MSBA Grant will not be lost ●Quality General Contractor - Brait Builders, who won the project with the lowest bid, is the same quality Contractor that built Cape Tech 16 Option Two Vote Against Additional Funding ●Without Additional Funding the Current Project IS DEAD. We Start All Over. ●We must still Pay the $28 Million already borrowed towards this agreed Solution. ●We lose the $36 Million MSBA Grant, with little to no hope of getting another grant. 17 ●We lose a quality Construction Company in Brait Builders. ●We lose having a KNOWN COST for the Solution to our Problem !!! ●We wait another 4 to 5 years for the Development of a New Solution with an UNKNOWN COST ●We must continue to Maintain a 50 Year Old High School Building & the 37 Mobile Trailer Classrooms ●We risk having to bring the Entire High School Building Complex up to code if any major system breaks down and requires replacement 18 The Financial Impact of your VOTE!!! A Vote to Provide the Additional Funding Required keeps the Project Moving Forward and protects the $28 Million already committed to this solution, while also ensuring that we maintain our $36 Million Grant Funding from the State Which Makes it a $64 Million Question 19 Questions? 20 TOTAL VE SAVINGS DD, 60% CD, 90% CD, 100% CD 7,323,465$ ADDITIONAL 100% BID SET VALUE ENGINEERING June 15, 2022 VE-57b District Space B Building -Remove three toilet rooms previously serving Lower Cape TV, leave as storage rooms. No separate entrance at district space- ramp, punch through wall, buzz system, double storefront system 75,000$ VE-61 Gymnasium -Provide (6) new backstops; reuse (2) existing backtops; install (1) scoreboard for game court 18,000$ VE-62 Gymnasium -Remove curtain in middle of main court 22,000$ VE-65b General Classrooms -Remove half of casework and all shelves at 33 locations 87,000$ VE-70b Innovation Studio D Building -Reduce half of casework and half of vented cabinets 7,500$ VE-71 Woodshop -Remove outdoor dust collection and use portable dust collection at station 50,000$ VE-72 Kitchen -Reuse Kitchen food di gester or buy new as FFE 30,000$ VE-74 Jewlery -Remove garage doors and replace with 4' Door 25,000$ VE-76 Woodshop -Replace epoxy floor with LVT (4,200 sf) where hot work will be conducted conrete will be the finish 18,500$ VE-78 Research Center -Replace Welded Linoleum Sheet with MCT in Group Seminar rooms (SF 1,900)4,200$ VE-79 Science Labs -Replace Welded Linoleum Sheet with MCT in Science Labs (SF 14,400)35,500$ VE-80 Culinary Arts -Convection Oven to be removed from base bid and provided by owner 25,000$ VE-82 TV Studio -Lighting to be removed from base bid; electrical provisions and switching to be provided 63,700$ VE-83 Black Box Theater -Lighting to be removed from base bid; electrical provisions and switching to be provided 64,500$ VE-84 New PVC roofs to White TPO, except at green roof areas 28,600$ Electrical VE-19rev Provide Lightning Protection System only for Building E and Building F Audiorium (3-story buildings)$ 84,000 Plumbing VE-85 Replace hardwired controls with manual for toilets, urinals, and sinks (170 fixtures) with manual flush valves and faucets $ 51,000 Landscape VE-86 Reduce tree and shrub planting budget by 50%$ 150,000 VE-87 Reduce driveway to Woodworking delivery door $ 30,000 VE-88 Remove pick-up/drop-off zone at east side of teacher parking $120,000 100% BID SET VALUE ENGINEERING SAVINGS 989,500$ 100% BID SET VALUE ENGINEERING June 8, 2022 Landscape VE-28 Reduce parking at Student Parking Lot (30 spaces) 170 total spaces 28,000$ Civil Engineering VE-75 Partial water line loop by others 200,000$ Architecture VE-11c (rev)Replace 48" Plastic Laminate Wainscot w/ Epoxy Paint ALTERNATE #5 320,000$ VE-47 Replace porcelain tile with luxury vinyl tile ALTERNATE #6 230,700$ VE-58 Research Center-Remove 1'-2" Wood platform, stairs and ramp 14,000$ VE-59 Student Commons, Research Center, Cafeteria, Auditiorium, & Gymnasium-Utilize more economical projector, sound system and screen 75,000$ VE-60 Student Commons & Cafeteria -Reduce motorized shades scope 32,000$ VE-64 Teacher Planning -Reduce counter and base/upper cabinets from 8'-0" to 4'-0" at 7 locations; Full size fridge to mini fridge 54,700$ VE-66 N Building -Exterior material changes 65,000$ VE-67 Existing glazing to remain various areas 260,200$ VE-68 Remove mechanical roof screen on north side of new academic building ALTERNATE #10 113,200$ VE-69 Research Center -Reduce glazing at second floor bridge hallway 20,000$ VE-73 Auditorium -Remove depressed “fore stage” and system 25,000$ Electrical VE-18 Downsize generator from 1000kW to 800kW 434,000$ 100% BID SET VALUE ENGINEERING SAVINGS 1,871,800$ 90% CONSTRUCTION DOCUMENTS VALUE ENGINEERING May 18, 2022 Landscape VE-9 Reuse existing gate at emergency drive south entry, new speed table at north entry, new signage 6,900$ VE-25 Reduce exterior seat benchs by 60lf 55,335$ VE-26 Lawn inlieu of concrete walkways 43,400$ VE-27 Reduce sitework at Phase 3 modular classroom area 40,145$ VE-29 Reduce bollards by 50%, replace with boulders 20,000$ Architecture VE-30 Epoxy flooring inlieu of porcelain tile in bathrooms 49,050$ VE-31 Reduce wainscot to high traffic hallways 27,125$ VE-32 48" wainscot over one layer of GWB with reveal, 2 layers above 63,280$ VE-33 Roof Canopy E-wing north site at Marine Biology (remove) including structure 20,810$ VE-34 Canopy at N Building south side Metal/Woodworking (remove)59,675$ VE-35 Stucco under canopies inlieu of metal panel and wood 71,575$ VE-36 Solid surface sills to plastic laminate sills 54,075$ VE-37 Remove greenroof tray system and precast pavers ALTERNATE #4 143,000$ VE-38 Replace accordion door at Research Center Large Group rooms with painted GWB 21,700$ VE-39 Remove wood slat ceiling at Building D 39,060$ VE-40 Reduce shot clocks to 2 (delete 4)43,400$ VE-41 Reduce mechancial roof screen to 2,000 sf total (700 sf reduction)97,475$ VE-42 Replace folding glass door at Biotechnology Prep (E-103) with solid wall and door 7,500$ VE-43 Reduce windows 100,000$ VE-44 Enclose 1st-floor bridge between D and E, add ramp from C to D, remove elevator in D, no stair 229,645$ VE-45 Remove stair, canopy, and storefront at Building E 145,000$ VE-48 Eliminate one-story link between building G to building N, keep ramp connection. Replace with a fence.162,750$ VE-49 Reuse existing kilns in ceramics 5,000$ VE-50 Remove base and upper cabinets from Ceramics (N-110) provide wire shelving 20,000$ Electrical VE-51 Reduce interior lighting/exterior pole lighting package 100,000$ VE-52 Do not relocate existing generator during Phase 1 construction 21,700$ VE-53 Remove card reader access at gated entries 29,300$ Plumbing VE-54 Reduce 13 roof drains to scuppers and downspouts 50,000$ VE-55 Fire Protection- convert dry heads in custodial receiving area to wet heads 15,000$ 90% CONSTRUCTION DOCUMENTS VALUE ENGINEERING SAVINGS 1,741,900$ 60% CONSTRUCTION DOCUMENTS VALUE ENGINEERING January, 5 2022 Landscape VE-1a Remove Shade Structure Pavilion ALTERNATE #3 67,200$ VE-2 Eliminate School sign ALTERNATE #9 28,200$ VE-3 Remove Outdoor Classroom near A & C-Wings, Replace with Lawn 81,665$ VE-4 Remove Wood Deck,Replace with Shrub Plantings at D-Wing 59,800$ VE-5 Replace Concrete Unit Pavers with Cast in Place Concrete at Student Entrance 23,960$ VE-6 Remove Concrete Unit Pavers, (2) Straight Benches at F-Wing Entrance 34,075$ VE-7 Remove Amplitheater, Reclaimed Granite Seat Wall ALTERNATE #7 83,250$ VE-8 Remove Concrete Unit Pavers, (5) Curved Benches at Cafeteria 134,215$ VE-9a Manual Gate at Emergency Drive 14,000$ Architecture VE-10 Interior Flooring: Change Bluestone Tile to Porcelain Tile 44,175$ VE-11a Replace 48" Porcelain Wainscot w/ Plastic Laminate at all Marmoleum Flooring Corridors 86,000$ VE-11b Replace 48" Porcelain Wainscot w/ Plastic Laminate at all Poreceain Flooring Corridors 27,400$ VE-12 Replace Precast Wall Panel with Wood (Keep Precast Base)115,000$ VE-14 Reduce Allowance for Existing Roof Patching from 6,500sf to 3,500sf 100,800$ VE-15 Remove Continuous Counter at Café ALTERNATE #8 26,880$ VE-17 Remove Vinyl Wall Graphics 19,000$ Plumbing VE-24 Remove Sprinkler System in Abandoned Basement of Building G (not required by code)61,510$ VE-25 Remove Floor Drains in Science Labs (10 total)11,200$ 60% CONSTRUCTION DOCUMENTS VALUE ENGINEERING SAVINGS 1,018,330$ DESIGN DEVELOPMENT VALUE ENGINEERING ADDITIONAL DESIGN DEVELOPMENT VALUE ENGINEERING October 20, 2021 HVAC VE Value VE-12b Reduce current 830-ton to 720-ton ASHP 350,000$ DESIGN DEVELOPMENT VALUE ENGINEERING October 6, 2021 Landscape VE Value VE-1b Change all granite curbing to precast (+/-4,595 lf)55,140$ VE-3b Reduce plantings by 35%185,200$ VE-4 Target additional 5,000 cubic yard onsite for reuse 189,000$ VE-5 Eliminate sidewalk and curb along Cable Road (keep 6' legnth at both driveways)21,515$ VE-6 Eliminate athletic field parking lot 163,200$ Architecture VE-9 Replace Trespa with Kebony wood cladding (27,500sf)625,000$ VE-11b Eliminate (30) electric hand-driers 48,000$ Site Lighting VE-13 Remove (3) SL1 fixtures from the emergency access drive 12,420$ VE-14 Remove (6) W3 fixtures 5,040$ VE-15 Reduce basement fixtures by half (43qty Fixture type S5)15,000$ Electrical VE-16 Remove (2) data drops per classroom (allow 39 rooms)32,420$ DESIGN DEVELOPMENT VALUE ENGINEERING SAVINGS 1,701,935$ Nauset Regional Schools Capital Project Expenditure Report From 07/01/2022 to 06/30/2023 31 - Capital Projects 1102 - HS MSBA Renovation Project Account Description Budget Amended/ Original Transfer Current YTD Expend Encutnb Balance % Rem 3I005 OPM Feasibility Study 0001-0000 31006 A&E Feasibility Study 0002-0000 31007 Environmental & Site 0003-0000 31008 Other 0004-0000 320,000.00 825,000.00 120,000.00 35,000.00 -95,000.00 100,000.00 -5,000.00 225,000.00 925,000.00 120,000.00 30,000.00 249,000.00 964,910.18 39,930.00 80,687.10 -24,000.00 -39,910.18 80,070.00 -50,687.10 -10.66 % -4.31 % 66.72 % -168.95 % 41 Total Feasibility Study Agreement Su 31009 Legal Fees 0101-0000 15,000.00 15,000.00 61,843.08 8,666,42 -55,509.50 -370.06 % 31010 OPM-Design Development 0102-0400 210,000.00 210,000.00 210,000.00 0.00 % 31011 OPM-Construction Contract Does 0102-0500 425,000.00 425,000.00 425,000.00 0.00 % 31012 OPM-Bidding 0102-0600 100,000.00 100,000.00 100,000.00 0.00 % 31013 OPM-Construction Contract Admin 0102-0700 2,610,000.00 2,610,000.00 40,000.00 2,570,000.00 0.00 % 31014 OPM-Closeout 0102-0800 125,000.00 125,000.00 125,000.00 0.00 % 31015 Advertising 0103-0000 2,000.00 2,000.00 5,556.48 -3,556.48 -177.82 % 31017 Owner's Insurance 0105-0000 105,000.00 105,000.00 105,000.00 100.00 % 1,300,000.00 1,300,000.00 1,334,527.28 -34,527.28 -2.65 % 42 Total Administration 3,592,000.00 3,592,000.00 842,399.56 2,703,666.42 45,934.02 1.27 % 31018 A&E-Design Development 0201-0400 2,491,250.00 2,491,250.00 2,491,250.00 0.00 % 31019 A&E-Construction Contract Does 0201-0500 3,164,400.00 3,164,400.00 3,244,900.00 -80,500.00 -2.54 % 31028 A&E-Geotech & Geo-Env. 0204-0300 125,000.00 125,000.00 82,149.51 42,850.49 0.00 31029 A&E-Site Survey 0204-0400 20,000.00 20,000.00 20,000.00 0.00 % 31031 A&E-Traffic Studies 0204-1200 20,000.00 20,000.00 20,000.00 0.00 % 31020 A&E-Bidding 0201-0600 433,600.00 433,600.00 439,350.00 -5,750.00 -1.32 % 31021 A&E-Construction Contract Admin 0201-0700 3,374,400.00 3,374,400.00 323,537.50 3,079,612.50 -28,750.00 -0.85 % 31022 A&E-Closeout 0201-0800 276,800.00 276,800.00 276,800.00 0.00 % 31023 A&E-Other Basic Services 0201-9900 184,550.00 184,550.00 184,550.00 0.00 % 31025 A&E-Printing 0203-0200 25,000.00 25,000.00 25,000.00 0.00 % 31026 A&E-Other Reimbursable Costs 0203-9900 10,000.00 10,000.00 10,340.00 -340.00 -3.40 % 31027 A&E-Hazardous Materials 0204-0200 200,000.00 200,000.00 200,000.00 0.00 % 43 Total Arcllitectual/Engineering 10,325,000.00 10,325,000.00 6,591,527.01 3,848,812.99 -115,340.00 -1.11 User: jimnowack Report: gl expend2 328142810 11/28/2022 04:08:42 PM Page 1 46 Total Misc. Project Costs Nauset Regional Schools Capital Project Expenditure Report From 07/01/2022 to 06/30/2023 31- Capital projects 1102 - HS MSBA Renovation Project Account Description Budget Amended/ Original Transfer Current YTB Expend Eneumb Balance % Rem 31032 Construction Budget 0502-0001 31033 Construction Contingency 0507-0000 44 Total Construction Contract 104, 708,165.00 5,200,000.00 104,708,165.00 5,200,000.00 104,708,165.00 5,200,000.00 100.00 % 100.00 % 109,908,165.00 109,908,165.00 109,908,165.00 100.00 % 31034 Utility Company Fees 0601-0000 175,000.00 175,000.00 4,711.00 170,289.00 97,30 % 31035 Testing services 0602-0000 130,000.00 130,000.00 8,500.00 1,500.00 120,000.00 92.30 31036 Swing SpacefModulars 0603-0000 3,000,000.00 3,000,000.00 3,851,421.76 1,736,609.94 -2,588,031.70 -86.26 ° 31037 Other Project Costs (Mailing & Moving) 0699-0000 140,000.00 140,000.00 21,637.01 5,519.72 112,843.27 80.60 3,445,000.00 3,445,000.00 3,886,269.77 1,743,629.66 -2,184,899.43 -63.42 31038 Furniture, Fixtures and Equipment 0701-0000 1,719,500.00 1,719,500.00 1,719,500.00 100.00 31039 Technology 0703-0000 1,086,000.00 1,086,000.00 1,086,000.00 100.00 % 47 Total Furnishings and Equipment 2,805,500.00 2,805,500.00 2,805,500.00 I00.00 % 31040 Owner's Contingency 0801-0000 450,000.00 450,000.00 450,000.00 100.00 48 Total Owner's Contingency 450,000.00 450,000.00 450,000.00 100.00 % 31050 BondBANServices 87,107.78 -87,107.78 -100.00 % 50 Total Total Non -Reimbursable Expense 87,107.78 -87,107.78 -100.00 1102 Total HS MSBA Renovation Project 131,825,665.00 131,825,665.00 I2,741,831.40 8,296,109.07 110,787,724.53 84.04 % User jimnowack Page 2 Report: gl expend2 328142810 11/28/2022 04:08:42 PM ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● ● • Please Remember to VOTE !!! January 10, 2023 - 11:00 am - 7:00 pm NRHS Building VOTE Update Public Presentations: December 5, 2022 - Brewster Select Board @ 6:30PM Please CLICK HERE to join the Brewster Meeting December 6, 2022 - Public Forum @ 6:00PM Please CLICK HERE to join the Forum December 12, 2022 - Joint School Committee Meeting @4:30PM Please CLICK HERE to join the JSC Meeting December 14, 2022 – Orleans Select Board @ 5:00PM Link will be added when available December 15, 2022 - Public Forum 6:00PM Please CLICK HERE to join the Forum December 19, 2022 - Eastham Select Board @5:30PM Link will be added when available December 20, 2022 – Wellfleet Select Board @7:00PM Link will be added when available Nauset Regional School District- Financing Scenario- 30 Year Bond 11/29/2022 Avg TEMP.SHORT Level Debt BOND ANNUAL 47.4074%IMPACT IMPACT 19.5885%IMPACT IMPACT FISCAL DEBT PRINCIPAL TERM BOND INTEREST DEBT NET RESID.$100,000 NET RESID.$100,000 YEAR ISSUED OUTSTAND. INTEREST PRINCIPAL 4.650%SERVICE DEBT SVC TAX RATE HOUSE DEBT SVC TAX RATE HOUSE 2022 0 $133,100,000 $0 $0 $0 0 0 2023 $0 $133,100,000 $0 $0 $0 0 0 $0.00 $0.00 0 $0.00 $0.00 2024 $130,975,000 $0 2,125,000 6,189,150.00 8,314,150.00 3,941,522 $0.68 $67.87 1,628,617 $0.38 $38.42 2025 $128,750,000 $0 2,225,000 6,090,337.50 8,315,337.50 3,942,085 $0.68 $67.88 1,628,850 $0.38 $38.42 2026 $126,420,000 2,330,000 5,986,875.00 8,316,875.00 3,942,814 $0.68 $67.89 1,629,151 $0.38 $38.43 2027 $123,980,000 2,440,000 5,878,530.00 8,318,530.00 3,943,599 $0.68 $67.91 1,629,475 $0.38 $38.44 2028 $121,430,000 2,550,000 5,765,070.00 8,315,070.00 3,941,958 $0.68 $67.88 1,628,797 $0.38 $38.42 2029 $118,760,000 2,670,000 5,646,495.00 8,316,495.00 3,942,634 $0.68 $67.89 1,629,077 $0.38 $38.43 2030 $115,965,000 2,795,000 5,522,340.00 8,317,340.00 3,943,035 $0.68 $67.90 1,629,242 $0.38 $38.43 2031 $113,040,000 2,925,000 5,392,372.50 8,317,372.50 3,943,050 $0.68 $67.90 1,629,249 $0.38 $38.43 2032 $109,980,000 3,060,000 5,256,360.00 8,316,360.00 3,942,570 $0.68 $67.89 1,629,050 $0.38 $38.43 2033 $106,780,000 3,200,000 5,114,070.00 8,314,070.00 3,941,484 $0.68 $67.87 1,628,602 $0.38 $38.42 2034 $103,430,000 3,350,000 4,965,270.00 8,315,270.00 3,942,053 $0.68 $67.88 1,628,837 $0.38 $38.42 2035 $99,925,000 3,505,000 4,809,495.00 8,314,495.00 3,941,686 $0.68 $67.88 1,628,685 $0.38 $38.42 2036 $96,255,000 3,670,000 4,646,512.50 8,316,512.50 3,942,642 $0.68 $67.89 1,629,080 $0.38 $38.43 2037 $92,415,000 3,840,000 4,475,857.50 8,315,857.50 3,942,332 $0.68 $67.89 1,628,952 $0.38 $38.43 2038 $88,395,000 4,020,000 4,297,297.50 8,317,297.50 3,943,014 $0.68 $67.90 1,629,234 $0.38 $38.43 2039 $84,190,000 4,205,000 4,110,367.50 8,315,367.50 3,942,100 $0.68 $67.88 1,628,856 $0.38 $38.42 2040 $79,790,000 4,400,000 3,914,835.00 8,314,835.00 3,941,847 $0.68 $67.88 1,628,751 $0.38 $38.42 2041 $75,185,000 4,605,000 3,710,235.00 8,315,235.00 3,942,037 $0.68 $67.88 1,628,830 $0.38 $38.42 2042 $70,365,000 4,820,000 3,496,102.50 8,316,102.50 3,942,448 $0.68 $67.89 1,629,000 $0.38 $38.43 2043 $65,320,000 5,045,000 3,271,972.50 8,316,972.50 3,942,860 $0.68 $67.90 1,629,170 $0.38 $38.43 2044 $60,040,000 5,280,000 3,037,380.00 8,317,380.00 3,943,054 $0.68 $67.90 1,629,250 $0.38 $38.43 2045 $54,515,000 5,525,000 2,791,860.00 8,316,860.00 3,942,807 $0.68 $67.89 1,629,148 $0.38 $38.43 2046 $48,735,000 5,780,000 2,534,947.50 8,314,947.50 3,941,900 $0.68 $67.88 1,628,773 $0.38 $38.42 2047 $42,685,000 6,050,000 2,266,177.50 8,316,177.50 3,942,484 $0.68 $67.89 1,629,014 $0.38 $38.43 2048 $36,355,000 6,330,000 1,984,852.50 8,314,852.50 3,941,855 $0.68 $67.88 1,628,755 $0.38 $38.42 2049 $29,730,000 6,625,000 1,690,507.50 8,315,507.50 3,942,166 $0.68 $67.88 1,628,883 $0.38 $38.42 2050 $22,795,000 6,935,000 1,382,445.00 8,317,445.00 3,943,084 $0.68 $67.90 1,629,263 $0.38 $38.43 2051 $15,540,000 7,255,000 1,059,967.50 8,314,967.50 3,941,910 $0.68 $67.88 1,628,777 $0.38 $38.42 2053 $7,945,000 7,595,000 722,610.00 8,317,610.00 3,943,163 $0.68 $67.90 1,629,295 $0.38 $38.43 2054 $0 7,945,000 369,442.50 8,314,442.50 3,941,661 $0.68 $67.87 1,628,675 $0.38 $38.42 2055 --0.00 0 $0.00 $0.00 0 $0.00 $0.00 $0.00 $133,100,000 116,379,735.00 249,479,735.00 118,271,856 $2,036.62 48,869,338 $1,152.78 Interest rate subject to change based upon market rate environment Does not include short-term interest Based upon 2023 Assessed Valuations-Brewster, Eastham and Wellfleet (analysis based upon split tax base.) Orleans-based upon 2022 Assessed Valuations Brewster Per 1,000 Eastham Per 1,000 Nauset Regional School District- Financing Scenario- 25 Year Bond 11/9/2022 Avg TEMP.SHORT Level Debt BOND ANNUAL 47.4074%IMPACT IMPACT 19.5885%IMPACT IMPACT 21.0700%IMPACT IMPACT 11.9342%IMPACT IMPACT IMPACT FISCAL DEBT PRINCIPAL TERM BOND INTEREST DEBT NET RESID.$100,000 NET RESID.$100,000 NET RESID.$100,000 NET OTHER RESID.$100,000 YEAR ISSUED OUTSTAND.INTEREST PRINCIPAL 4.500%SERVICE DEBT SVC TAX RATE HOUSE DEBT SVC TAX RATE HOUSE DEBT SVC TAX RATE HOUSE DEBT SVC TAX RATE TAX RATE HOUSE 2022 0 $133,100,000 $0 $0 $0 0 $0 2023 $0 $133,100,000 $0 $0 $0 0 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0.00 2024 $130,115,000 $0 2,985,000 5,989,500 8,974,500 $4,254,577 $0.88 $87.91 $1,757,970 $0.52 $51.70 $1,890,927 $0.40 $40.38 $1,071,035 $0.19 $0.40 $40.10 2025 $126,995,000 $0 3,120,000 5,855,175 8,975,175 $4,254,897 $0.88 $87.92 $1,758,102 $0.52 $51.70 $1,891,069 $0.40 $40.39 $1,071,115 $0.19 $0.40 $40.10 2026 $123,735,000 3,260,000 5,714,775 8,974,775 $4,254,707 $0.88 $87.91 $1,758,024 $0.52 $51.70 $1,890,985 $0.40 $40.39 $1,071,068 $0.19 $0.40 $40.10 2027 $120,325,000 3,410,000 5,568,075 8,978,075 $4,256,272 $0.88 $87.94 $1,758,670 $0.52 $51.72 $1,891,680 $0.40 $40.40 $1,071,461 $0.19 $0.40 $40.11 2028 $116,765,000 3,560,000 5,414,625 8,974,625 $4,254,636 $0.88 $87.91 $1,757,994 $0.52 $51.70 $1,890,953 $0.40 $40.39 $1,071,050 $0.19 $0.40 $40.10 2029 $113,045,000 3,720,000 5,254,425 8,974,425 $4,254,542 $0.88 $87.91 $1,757,955 $0.52 $51.70 $1,890,911 $0.40 $40.38 $1,071,026 $0.19 $0.40 $40.10 2030 $109,155,000 3,890,000 5,087,025 8,977,025 $4,255,774 $0.88 $87.93 $1,758,465 $0.52 $51.71 $1,891,459 $0.40 $40.40 $1,071,336 $0.19 $0.40 $40.11 2031 $105,090,000 4,065,000 4,911,975 8,976,975 $4,255,750 $0.88 $87.93 $1,758,455 $0.52 $51.71 $1,891,449 $0.40 $40.40 $1,071,330 $0.19 $0.40 $40.11 2032 $100,840,000 4,250,000 4,729,050 8,979,050 $4,256,734 $0.88 $87.95 $1,758,861 $0.52 $51.73 $1,891,886 $0.40 $40.41 $1,071,578 $0.19 $0.40 $40.12 2033 $96,400,000 4,440,000 4,537,800 8,977,800 $4,256,142 $0.88 $87.94 $1,758,616 $0.52 $51.72 $1,891,622 $0.40 $40.40 $1,071,429 $0.19 $0.40 $40.11 2034 $91,760,000 4,640,000 4,338,000 8,978,000 $4,256,236 $0.88 $87.94 $1,758,656 $0.52 $51.72 $1,891,665 $0.40 $40.40 $1,071,452 $0.19 $0.40 $40.11 2035 $86,915,000 4,845,000 4,129,200 8,974,200 $4,254,435 $0.88 $87.91 $1,757,911 $0.52 $51.70 $1,890,864 $0.40 $40.38 $1,070,999 $0.19 $0.40 $40.09 2036 $81,850,000 5,065,000 3,911,175 8,976,175 $4,255,371 $0.88 $87.93 $1,758,298 $0.52 $51.71 $1,891,280 $0.40 $40.39 $1,071,235 $0.19 $0.40 $40.10 2037 $76,555,000 5,295,000 3,683,250 8,978,250 $4,256,355 $0.88 $87.95 $1,758,705 $0.52 $51.72 $1,891,717 $0.40 $40.40 $1,071,482 $0.19 $0.40 $40.11 2038 $71,025,000 5,530,000 3,444,975 8,974,975 $4,254,802 $0.88 $87.91 $1,758,063 $0.52 $51.70 $1,891,027 $0.40 $40.39 $1,071,091 $0.19 $0.40 $40.10 2039 $65,245,000 5,780,000 3,196,125 8,976,125 $4,255,347 $0.88 $87.92 $1,758,288 $0.52 $51.71 $1,891,270 $0.40 $40.39 $1,071,229 $0.19 $0.40 $40.10 2040 $59,205,000 6,040,000 2,936,025 8,976,025 $4,255,300 $0.88 $87.92 $1,758,269 $0.52 $51.71 $1,891,248 $0.40 $40.39 $1,071,217 $0.19 $0.40 $40.10 2041 $52,895,000 6,310,000 2,664,225 8,974,225 $4,254,447 $0.88 $87.91 $1,757,916 $0.52 $51.70 $1,890,869 $0.40 $40.38 $1,071,002 $0.19 $0.40 $40.09 2042 $46,300,000 6,595,000 2,380,275 8,975,275 $4,254,945 $0.88 $87.92 $1,758,122 $0.52 $51.70 $1,891,090 $0.40 $40.39 $1,071,127 $0.19 $0.40 $40.10 2043 $39,405,000 6,895,000 2,083,500 8,978,500 $4,256,473 $0.88 $87.95 $1,758,753 $0.52 $51.72 $1,891,770 $0.40 $40.40 $1,071,512 $0.19 $0.40 $40.11 2044 $32,200,000 7,205,000 1,773,225 8,978,225 $4,256,343 $0.88 $87.95 $1,758,700 $0.52 $51.72 $1,891,712 $0.40 $40.40 $1,071,479 $0.19 $0.40 $40.11 2045 $24,675,000 7,525,000 1,449,000 8,974,000 $4,254,340 $0.88 $87.90 $1,757,872 $0.52 $51.70 $1,890,822 $0.40 $40.38 $1,070,975 $0.19 $0.40 $40.09 2046 $16,810,000 7,865,000 1,110,375 8,975,375 $4,254,992 $0.88 $87.92 $1,758,141 $0.52 $51.71 $1,891,112 $0.40 $40.39 $1,071,139 $0.19 $0.40 $40.10 2047 $8,590,000 8,220,000 756,450 8,976,450 $4,255,502 $0.88 $87.93 $1,758,352 $0.52 $51.71 $1,891,338 $0.40 $40.39 $1,071,267 $0.19 $0.40 $40.10 2048 $0 8,590,000 386,550 8,976,550 $4,255,549 $0.88 $87.93 $1,758,371 $0.52 $51.71 $1,891,359 $0.40 $40.39 $1,071,279 $0.19 $0.40 $40.10 2049 $0 0 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0.00 2050 $0 --0 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0.00 2051 $0 --0 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0.00 2053 $0 --0 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0.00 2054 $0 --0 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0.00 2055 --0 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0 $0.00 $0.00 $0.00 $0.00 $133,100,000 91,304,775 $224,404,775 $106,384,469 $2,198.14 $43,957,529 $1,292.75 $47,282,086 $1,009.80 $26,780,915 $1,002.57 Interest rate subject to change based upon market rate environment Does not include short-term interest Based upon Member Towns' 2022 Assessed Valuations-Wellfleet analysis based upon split tax base. Brewster Per 1,000 Eastham Per 1,000 Orleans Per 1,000 Wellfleet Per 1,000 Archive d: Friday, December 16, 2022 3:02:47 PM From: brian Sosner Se nt: Mon, 12 Dec 2022 19:22:58 To: Christopher Easley; Judith Schumacher; Brooke Clenchy; Giovanna Venditti; Brewster School Committee; Timothy whelan; Sarah Peake Cc: Cynthia Bingham; Peter Lombardi; John Kelly; Molly Bates; Andrea Shaw Reed; Jamie Demetri; Ryan Curley; Richard Waldo; Jacqueline Beebe; Christine.N olan@massschoolbuildings.org; James.MacDonald@massschoolbuildings.org Subje ct: Urgent Review ! N auset Regional school district agreement ; amendment of admission of additional towns and undue tax burden review! Se ns itivity: N ormal Attachme nts : Provincetown Tuition Agreement.pdf; Nauset Regional School District Agreement.pdf; Truro Tuition Agreement.pdf; SKM_654e22031712180 Truro ptown 6- 8 tuition students 2021.pdf; Urgent Action Nauset Reg Sc Dist Agreementv1 (2) (4).docx.pdf; \u-257 ? \u-257 ? \u-257 ?To All- \u-257 ? \u-257 ? <Urgent Action Nauset Reg Sc Dist Agreementv1 (2) (4).docx.pdf> \u-257 ? <N auset Regional School District Agreement.pdf> <Truro Tuition Agreement.pdf> <Provincetown Tuition Agreement.pdf> <SKM_654e22031712180 Truro ptown 6-8 tuition students 2021.pdf> Please acknowledge receipt and notice for followup action, discussion, and operational and legal review. This is of utmost importance and urgency to citizens of the current four town school district ahead of the January 10 warrant. Issues , guidelines and details are contained within the letter with attachments . We look forward to next steps in analyzing and correcting these issues. Brian Sosner together with concerned citizens of Brewster, Orleans , Wellfleet and Eastham TO: Christopher Easley, Chair December 12, 2022 Judith Schumacher, Vice Chair Brooke Clenchy, Superintendent Nauset Regional School Committee Nauset Public Schools 79 Eldredge Park Way Orleans, MA 02653 CC: Select Boards and Town Administrators: Town of Brewsrer Town of Orleans Town of Eastham Town of Wellfleet Rep. Tim Whelan Brewster Rep. Sarah Peake Massachusetts School Building Authority RE: CHAPTER A201: Nauset Regional School District Agreement AMENDMENT TO SECTION VI AND VIII ADMISSION OF ADDITIONAL TOWNS AND UNDUE BURDEN LEGAL REVIEW To all of the above: In accordance with Section VIII of the Nauset Regional School District Agreement, concerned citizens of the four towns comprising the current Nauset Regional School District, require the immediate take up of the allowed process to amend such Agreement into a six town school district, to include the towns of Truro and Provincetown in accordance with the Agreement. This letter instructs the Committee to immediately initiate this by 1) a majority vote of the RDSC committee and/or to also 2) initiate a Warrant to be presented to each of the four towns to gather 10% of the registered voters to bring such Amendment. This requires NRSD to take up immediate discussion with the towns of Truro and Provincetown whose Tuition agreements expire in 2024 ( attached) . They currently send approx 80 students to Nauset Regional for which no capital cost is paid to, or planned to be paid under the present plan now slated for a January 10 vote to the four towns increasing the total project cost from approx. $130MM to $170MM. By sending approx 12% of the current enrollment, an allocation of similar proportion must be allocated to the operating and capital budgets including amounts spent to date. Several operating deficiencies and legal challenges are present insofar as potential violations of these current Agreements. First, the fact that the two towns may soon contribute nothing to the operating costs, trailering, staging and pre-development costs without an amended Agreement. The current tuition costs by agreement only approximate $20,000 per student ($1.8MM combined annually) but current budget costs are actually closer to $30,000 per district student. As to paying the share of development and capital costs, Truro and Provincetown will pay nothing and the municipal and undue burden arguments are obvious. The four towns cannot pay for the capital and operating costs of six, and the other two towns may not receive a free ride to a new $170MM school. Is denial of enrollment when these towns have no facilities in the cards for them? Will they Choice-in and pay a meager $5,200 per student? Their share of capital costs need to be proposed to these two towns of approx $17MM (12%) in the same form as the four district towns are facing today. The burden here of the four towns is grossly inequitable. The real estate taxation of a Brewster or Orleans resident for a Truro or Provincetown student to attend public school is without precedent and an undue burden. Approval to build and bonding such cost, cost overrun and debt service measures by January 10, 2023 is inappropriate and needs to be legally reviewed and operationally corrected through these Agreements. We strongly urge the committees, District and State Boards and their legal councils to take swift review, amendment action, and if necessary postpone and or correct the January 10 Warrant and the upcoming vote to incorporate an equitable six town district. Regards, Concerned citizens of Orleans, Brewster, Eastham and Wellfleet