HomeMy Public PortalAbout20091210INFRAGENDA.pdfINFRASTRUCTURE COMMITTEE MEETING AGENDA
City of Tybee Island
December 10, 2009
5:30 pm
Approval of the Minutes of the Previous Meeting
New Business:
Old Business:
I. 14th STREET RESTROOM LOCATION – POTENTIAL COST OF MOVING
RESTROOM
If city moves restroom to the location near where the rental trailer is located and
don’t block the sidewalk with the porches and stairs, the cost is estimated at
$10,000. The drawback for the location is that the vehicle parked in the parking
lot will probably back into the rear of the trailer and damage it sometime in the
future. The positive to the location is that the City gains about three to four legal
parking spaces. (We don’t gain exactly the spaces that were drawn on the
presented proposed plan because they were laid out in the wrong direction)
If the city moves the restroom to the end of 15th Street in the parking lot (in
front of the cross-over) with the porches and stairs facing outwards, and this
move would cost an estimated $7,500 . You end up losing parking spaces at
that location, but trading them for the three to four spaces at the old location, so
that is a neutral impact. You also cover up a sewer man hole, but John Dowel
says that the sewer line is accessible from other manholes. The possible negative
impact is having a restroom closer to the pier and MSC restroom when you need
restrooms facilities for the people coming off the beach further North in the
parking lot.
II. LAZARETTO CREEK AREA WATER AND SEWER SYSTEMS
III. 1501 CHATHAM AVENUE DRAINAGE
A. Soil Stabilization Specialist Fee Proposal
IV. CHATHAM AVENUE TO PUMP STATION NO. 2 SEWER LINE RELOCATION
V. FT. SCREVEN WATERLINE
A. Summary Change Order
VI. 14th STREET DRAINAGE
A. Construction Underway
VII. FLOODPROOF BATHROOMS
VIII. PUMP STATION 3 AND 6 FORCEMAIN REPLACEMENTS
IX. WWTP EFFLUENT LINE EXTENSION
A. Permitting Timeline
A quorum of City Council members may be present which would constitute a
meeting.