HomeMy Public PortalAbout20101014_Alley 3 Engineering Costs.pdfHUSSIEY, BELL & DE 01.,"NG, INC.
EV j -
N",
Septembcr 2("), 2010
Ms-. Diane D. Schlelcher
City Manager
("Itv of TNI)ee Isku-nd
P. O. Box 2-749
Tybee Island, Georgia 3 l 328-2-749
R1 kLLEY 3 DR-A.INAGE AND PANTING IMPROVEMENT
FEE PROPOSAL
Dear Ms, ScInkich,0r,
Husscv, Gad, Befl &- DC)'OLM1 is PICZISC(I to Pres-Cilt thl'S proposal to provide enoince6m,
assocluied with the refereiiced prQject. The gneral scope ofwork- is the completion ofsenTi
lees
necessary to dee lop plans and doCLIMC111S, for the completion of road-wuy and draillaUc
improvements associaled with redevelopment of Alley 3, The specific scope of 1vork is as
1'011tms
Visit the sito arras ni(:et with City representatives to del-Ine and better understand the ex"Cill
alict nature of the proposed prqjcct and to determine suney requirements.
I Co-)plete field survcys of the pr,�jeet area.
I
P rc 1)arc -1 s1ketch Plan or plans shov,71ric, parking, access and tumaround layout N%Ahln the
confines of A. Icy 3
4. Present tile ,);etch plan or P !ans to the City wl th oil explaiiation of the benel its and
Omwbat'ks �'-�ssnciated ik 11h tho improvements.
TASK R - DESIGN
Ulpon approval of a project layoui, develop construction plans for the 1111provements.
This %vill HICIUde pawment improvements for park'111-, 2CCeSS 1111d VC11iCL11ar tUrnaround.,
replacement of drainage pipe from Chatham AVr
g
C11L)e to the rig cr (includin.- lunclion box
w1th lid'V u�lte)m placement ref bollards at the end ofpavemew, and a retaining Nvall along
the cast side of the right -of -w -ay to SLIPPOFt the higher adjacent ground. All estimate of
cost for the improvements m,dl be prepared.
'Ms. Diane D. Sclilelcher
S eptem bcr 2t p, 2010
Pao
c No. 2
2. present plans and cast estimate to City Im- review and comment. Incorporate City
comments into pr(ject plans and prepare final plans and speci ficati Oils.
TASK C -PERNIFT TING AND CONSTRUCTION PHASE SERVICES
We will coordinate with the DNR and other agencies and obtain pernaits necessary to
1111pienlent the project.
We will assist the City with advertising fior bids, attend the pre-bid conference, re\ieiv all
bids and make a recommendation of award to the owner. We will roview necessarN, shop
drawin-s and rl-LILICStS for infori-nation submitted by the contractor. We will provide
periodic site visits to deteri-nine that the contractor completes the project in reasonable
accordance with the plans and spec 1 Fications. We will review periodic PHN' 1-CqUCStS
submitted by the contractor and make a recommendation l'br payment to the cityWe
yvi I I prepare record drawin -s based on information provided by the contractor and provide
reqUiFed Closeout docunicrits,
We propose to complete the above services on an hourly basis in accord with the attached rate
schcdi-ile. Fees forTask A --- Support Scr-v-ices and Task B Desim will not exceed S15.000t ,00
without your approval, Fees !or Task C' Perrnitt-Ing and Construction Phase Services \i,111 lac on
an hourly basis. If requested, an allowance -for these items can be Pro ided aftr-the pro - jec! has
been desigmed. We propose to begin work within 10 days of receipt ol'Notice to Proceed and to
completc the �Nork io the point ot'plan completio ith ,
1, n w] - 45 days of Notice to Proceed,
Your Sil'natLirebelcm' k% fl] indicator YOUr acceptance of this proposal.
We look !'orward to %vorking with the City on this project. Please contact ii-�c or Bill Nicholson
with anNqucqtions.
sincerely
WILLIAM 11. LOVET T
m
ACCEPTED BY: DAT E:'
Principo Engineer
160.00
Professional Engineer (Testimony and Preparation)
185.00
Engineer IV
125.00
Engineer 1H
115.00
Engineer U
110.00
Engineer 1
105.00
Assistant Engineer
100.00
Technician IH
95.00
Technician 11
90.00
Technician 1
80.00
Landscape Architect
100.00
Senior Project Representative
72.50
Project Representative
65.00
Assistant Construction Technician
57.50
Pennitting Technician
57.50
Environmental Scientist
105.00
Registered Land Surveyor
i00.00
3® Survey Crew
125.00
2 -Man Survey Crew
120.00
3 -Man GPS Survey Crew
130.00
2 -Man OPS Survey Crew
125.00
1- GPS Survey Crew
115.00
Hydrographic Boat and Equipment
60.00
Clerical
55.00