HomeMy Public PortalAbout12) 7I Rosemead Bvd Project Budget AdjustmentAGENDA
ITEM 7.1.
MANAGEMENT SERVICES DEPARTMENT
DATE: November 6, 2012
MEMORANDUM
TO: Honorable Mayor and City Council
FROM: Jose E. Pulido, City Manage'
By: Brian Haworth, Assistant to the City Manager
SUBJECT: BUDGET ADJUSTMENT FOR THE ROSEMEAD BOULEVARD
SAFETY ENHANCEMENT AND BEAUTIFICATION PROJECT
RECOMMENDATION:
It is recommended that the City Council increase the construction budget by $1,089,375
for the Rosemead Boulevard Safety Enhancement and Beautification Project through the
following actions:
a) A reappropriation of $600,000 in programmed Gas Tax monies; and
b) An allocation of $489,375 from the Economic Development Fund Reserve.
BACKGROUND:
1. On October 16, 2012, the City Council (Council) rejected all responsive bids for the
project as the bids exceeded the $14.65 million construction budget by more than
five percent (i.e., the lowest responsive bid received was $15.66 million).
2. On October 19, 2012, staff issued an expedited schedule to solicit contractor bids for
the project with the same construction budget. Construction bids are due to the City
on November 8, 2012. An award of construction contract is tentatively scheduled for
Council consideration on November 20, 2012.
3. On October 31, 2012, the City hosted a mandatory bid walkthrough to introduce the
project to potential bidders. Eleven general contractors as well as several
subcontractors were in attendance.
City Council
November 6, 2012
Page 2
ANALYSIS:
Based on the recently rejected bids received for the project, costs are expected to
exceed the City's $14.65 million construction budget. In order to obtain competitive bids
and move the project into construction by early next year, staff is recommending that
the Council consider increasing the construction budget by $1,089,375 (i.e., for a total of
$15.74 million) through the following two measures:
Measure 1: ReaDDropriation of $600.000 in Proarammed Gas Tax Monies
The Fiscal Year (FY) 2012-13 City Budget contains a $750,000 Gas Tax line item
appropriation (i.e., CIP Project No. 13-02) for a pavement conditions survey, and
repaving of streets as recommended by the survey findings. The existing
allocation of funds is as follows:
Pavement Conditions Survey $ 50,000
Rei)avina of Streets $700,000
TOTAL $750,000
According to the City's Public Safety and Services Division, work on the
pavement conditions survey will not begin until early next year, concluding in May
2013. It is most likely that those streets identified in the survey for repaving would
not be programmed for work until July 2013, meaning that the available $700,000
in appropriations would remain unspent and require a rollover into the next FY
City Budget. Given this timing circumstance, and the fact that the City receives
over $1 million annually in Gas Tax revenues, staff is recommending that the
street repaving allocations identified by the survey be considered as part of the
FY 2013-14 City Budget.
With this in mind, staff is recommending that the Council move forward with a
reallocation of the $750,000 in Gas Tax funds to assist the project as follows:
Rosemead Boulevard Project $600,000
Detour Street Improvements $100,000
Pavement Conditions Survev $ 50,000
TOTAL $750,000
This scenario allows $600,000 in additional construction funding for the project,
as well as $100,000 for improvements to primary detour roads that will
accommodate vehicular traffic during project construction, and nearby Baldwin
Avenue underpass improvements. By early next year, detour roads—including
segments along Temple City Boulevard, Broadway and Sultana Avenue—are
planned to receive pothole repairs, road patching, adequate pavement markers
City Council
November 6, 2012
Page 3
and striping refreshing (as needed). The recommended reallocation still allows
for the pavement conditions survey to continue as planned.
Measure 2: Allocation of $489,375 from the Economic Development Fund
Reserve
A $489,375 appropriation from the City's Economic Development Fund is being
requested. This appropriation will most likely allow some bid alternates to be
included with the project (e.g., colored concrete, pavers, larger street tree sizes,
specialty signage and monuments).
It should be noted that the Council previously made an appropriation from the
Economic Development Fund Reserve to the project on October 2, 2012 in the
amount of $510,625. The requested and additional appropriation of $489,375
from this fund source will realize $1 million toward leveraging a $20.57 million
project.
Attachment "A" contains the project's proposed and revised construction budget, should
the Council approve the aforementioned measures. If the Council chooses not to fully
fund the project's proposed and revised construction budget at $15.74 million, and if on
November 8, 2012 the construction bids come in higher than the current budget of
$14.65 million, staff would have to re -bid the project while delaying a couple months
implementation of this important capital improvement project.
CONCLUSION:
Since the City is required by Caltrans to disclose the construction budget for the project
prior to bid opening on November 8, 2012, staff is requesting the Council to increase the
budget from $14.65 million to $15.74 million. This action will minimize the risk of over
budget bids and maximize the opportunity to move the project into construction by
January 2013.
FISCAL IMPACT:
There is no fiscal impact to the FY 2012-13 City Budget as the requested $600,000
reallocation of Gas Tax funds essentially shifts funds from one project to another.
However, there will be financial impact to the Economic Development Fund Reserve,
should the additional $489,375 appropriation be approved by the Council.
City Council
November 6, 2012
Page 4
ATTACHMENT:
A. Revised Proposed Budget
Attachment A
ROSEMEAD BOULEVARD SAFETY ENHANCEMENT and BEAUTIFICATION PROJECT
Budget Overview October 2012
Total Local & State Funds $ 16,250,508
Total Federal Funds $ 4,317,717
TOTAL FIRM BUDGET $ 20,568,225
Total Encumbrances (pre -con) to date $ (3,662,354) 18%
Construction phase expenses budget $ 16,905,871
IPA
3670 W. Temple Ave., 4278, Pomona, CA 91768 Avant Garde Inc.
ROSEMEAD BOULEVARD SAFETY ENHANCEMENT and BEAUTIFICATION PROJECT
Lighting & Landscaping Assessment District (LLD) - funds
Guaranteed
Potential
M locally generated by assessment -
$ 2,000,0001$ - $
reimbursement
2,000,0001
Future Fiscal Year
supplemental
Fund
Cashinthe Bank
funds,
1 $ 386,000 $ - 1 $
(FY) Allocations<
funds,
Total per Fund
STPL- federal reimbursement funds distributed annually
1$ 650,000 1 $ - $
- 1$
600,000 I$
1,250,000 1
Economic Development Reserve
$ 510,625 1
A per capita
$ -
$
641,710
$ 366,103
$ -
$ 1,007,813
1HPLU - federal reimbursement funds earmarked from
No additional grant funds are being pursued at this time
Call for Projects (CFP) funds
B congressional legislation
$ -
$
719,920
$ -
$ -
$ 719,920 1
HSIP- Highway Safety Improvement Program, federal
„Annual or other per capita dispersements based on projections
C reimbursement competitive grant
$
1 $
340,000
1 -
$
$ -
$ 340,000
I 1
secured through 1$
DICMALACM4TAfCal fral orrProectsemen[funds
-
1$
2,249,9841$
-
$ -
$ 2,249,984
Iatnrar¢uNIi3'T � _ _ (
Prop A - monthly receipts of County sales taxes for transit
E functions
$ 1,500,000
$
-
$ -
$ -
$ 1,500,000
receipts of County sales taxes For
Flt ans por ationhly
1
$ 4,939,210
l $
-
1 $ 448,000
1 $ 5,387,210 l
Measure R - monthly receipts of County sales tax initiative
G fortransit.&transportation
$ 483,700
$
-
l $ 336,4401
$ 820,140 1
Prop 1B - State -generated bond funds distributed per capita
H in two allocations
$ 1,131,010
$
-
$ -
$ -
$ 1,131,010
Traffic Congestion Relief (TCR) funds - quarterly receipts of
I State generated sales taxes on gasoline s 1
$ 422,898
1 $
-
1 $ -
1 $ -
1 $ 422,898
I RAC - Rubberized Asphalt Concrete, State reimbursement
J competitive grant awarded 1
$ - 1
$
110,2501
$ -
1 $ - 1
$ 110,2501
TA -Bicycle Transportation; State reimbursement funds,
K competitive grant awarded 1
I I
$ - 1
1
$
443,000 1
I
$ -
$ - 1
I I
$ 443,000 1
I
Lighting & Landscaping Assessment District (LLD) - funds
M locally generated by assessment -
$ 2,000,0001$ - $
$
2,000,0001
General Fund Account: Payment from Caltrans (non -
IN restrictive) s
1 $ 386,000 $ - 1 $
- 1 $
- 1 $
386,000 1
Gas Tax Funds
1$ 650,000 1 $ - $
- 1$
600,000 I$
1,250,000 1
Economic Development Reserve
$ 510,625 1
1$
489,375 1$
1,000,0001
ITotal Funds
$ 13,823,443 $ 4,504,864 1 $
1,150,543 1$
1,089,375 1$
20,568,225 1
No additional grant funds are being pursued at this time
Call for Projects (CFP) funds
Funds are encumbered for the project, Expenses must be paid in
advance and submitted for reimbursment
„Annual or other per capita dispersements based on projections
s Funds must be spent within two fiscal years per program
a Funds are direct payment from Caltrans re: relinquishment; non-restrictive
and designated for specialty soft costs