HomeMy Public PortalAboutR 19-144Y.ezvlution of the Pvrough of Tar #ere #,
No. 19 -144 Au
Date of Attention August 22 _ g , 2019
AUTHORIZING A PROFESSIONAL SERVICES CONTRACT
WITH MASER CONSULTING, RE; NJDEP ONRR GRANT
RIVER WALK NORTHERN SECTION PHASES 2.0 & 3.0
WHEREAS, the Borough of Carteret is in need of professional planning and surveying
services with regard to the NJDEP ONRR Grant, River Walk Phases 2.0 & 3.0; and
WHEREAS, Maser Consulting, 331 Newman Springs Road, Red Bank, New Jersey
07701, possesses the requisite experience and expertise to provide said services; and
WHEREAS, Maser Consulting has submitted a proposal to provide said services at a
total cost not to exceed $10,000.00; and
WHEREAS, the Mayor and the Council have reviewed said proposal; and
WHEREAS, the Chief Financial Officer has certified that funds are or will be available
forsaidpurpose. Acct. #: C- 04 -16- 108 -201
NOW, THEREFORE, BE IT RESOLVED by the Mayor and the Council of the
Borough of Carteret, County of Middlesex, State of New Jersey, as follows:
1. The proposal from Maser Consulting for professional planning
and surveying services with regard to the NJDEP ONRR
Grant, River Walk Phases 2.0 & 3.0, additional
permitting/approvals and additional engineering design &
construction does at a total cost not to exceed $10,000.00 is
hereby approved.
2. This action is approved as an award of a professional services
contract pursuant to N.J.S.A 40A:11- 5(1)(a) awarded pursuant
to the Borough's Fair and Open process as authorized by law.
3. A copy of this Resolution be forwarded to the Borough's
Purchasing Department, Director of Engineering and Maser
Consulting.
Adopted this 22n day of August, 2019
and certified as a true copy of the
original on August 23, 2019.
CARMELA POGORZELSKI
Assistant Municipal Clerk
RECORD OF COUNCIL VOTE
COUNCILMAN
YES
NO
NV
A.D.
COUNCILMAN
YES
NO
NV
A.D,
SELTJNO
JOHAL
DIAZ
KRUM
DIMASCIO
NAPLES
X - Indicate Vote An - Absent NV -Not Voting XOR- Indicates Vale mOverrule V to
Adopted at a meeting of the Municipal Council
. 0 0 � _Au 22 20
W'' on,
9
0
OFFICE OF
1CATIMEEN Al. BARNEY, RhIC /CaIC
MUNICIPAL CLERIC
61 COOL E AVE NUB
CARTERET, NBW JERSEY 07008
Date: Augur 2L 1.2019
To: PatrickDeBlaslo
Treasurer
Borough of Carteret
REQUEST FOR CERTIFICATION OF AVAILABLE FUNDS
Tor' AUTHORIZING A PROFESSIONAL SERVICES CONTRACT WITH MASER CONSULTING. BE;
NJDEP ON_RR GRANT RIVER WALK NORTHERN SECTION PHASES 2.0 & 3 0
Name of Account: ESOLCI I k - 1
AMOUNT TO BE ENCUMBERED; TOTAL COST NOT TO EXCEED X10 000 00 BILLAHL WITH 1
CONSULTING'S EXISTING CONTRACT WITH THE BOROUGH
&5{- •Munlcfpat Clerk
PIIraugh of &rfrirtf
MIDDLESEX COUNTY
' Wahl &roq
THL (732) 641.3800
PIAX (132) 611 -8026
CERTIFICATION OF AVAILABILITY OP FUNDS
I, Treasurer of the Borough of Carteret, do hereby certify that there are sufficient funds available lathe current
budget to enable the Municipal Council to authorize the entering into a Contract between the Borough of Carteret
end;
The funds available for this contract are in the Budget, in the account of:
r_nq- iL.IOB —]oe
J+
In the amount of: /,10-0--
By this certification, I have hereby encumbered the above named account for the amount of the contract pending
Council action. 4D
Patrl1W DoBlasio
Treasurer
Date: 147,11'1
AFFIDAVIT OF PUBLICATION
The following is a true copy of an Ordinance or Resolution of
the Borough of Carteret that has appeared in the Home News
Tribune, a newspaper which is printed in Freehold, New
Jersey and published in Neptune, in said County and State and
of general circulation in said county. One 1 time(s), once in
each issue as follows:
August 27, 2019
ry Public 6&Nwk J
CARMELA POGORZELSKI
NOTARY PUBLIC OF NEW JERSEY
* CaTIM189 n E*0 8127/2022
Kathleen M. Barney, MMC
Municipal Clerk
i
Sworn and subscribed before
me this L�day of ',�
BOROUGH OF CARTERET
NOTICE OF CONTRACT AWARD
'Borough of 'Carteret has awarded a contraa
, etitive bidding as a Professional Service pursuant
to: Maser Consulting
on #19-144
at to exceed $10,000.00 billable In accordance
contract.
i M. Barney, RMOMMC
al Clerk
Engineers
Planners
Surveyors
Landscape Architects
Environmental Scientists
August 2, 2019
Revised August 20, 2019
VIA EMAIL
Daniel J. Reiman, Mayor
Borough of Carteret
Memorial Municipal Building
61 Cooke Avenue
Carteret, NJ 07008
Corporate Headquarters
331 Newman Springs Road, Suite 203
Red Bank, NJ 07701
T: 732.383.1950
F: 732.383.1984
www.moserconsuiting.com
Re: Supplemental Proposal for Additional Services
NJDEP ORR Grant River Walk Phase II — Northern Section
Carteret Waterfront Park
Borough of Carteret, Middlesex County, NJ
MC Proposal No 17001048P
Dear Mayor Reiman:
Maser Consulting P.A. is submitting this supplemental proposal for additional services
performed to support the development of the proposed twenty foot (20') wide elevated walkway
along the Arthur IGII located at the Carteret Waterfront Park. These additional services were not
included in our original proposal (dated April 25, 2017, revised May 31, 2017) authorized by the
Borough of Carteret. Our original proposal (copy attached) was based on a concept of the
northern section of the River Walk provided by the Borough. Subsequent to that proposal, the
concept changed impacting design and permitting efforts. Specifically, two piers and an elevated
walkway were added over the water that impacted design and permitting. Also, the observation
deck (T &M plans) needed to be incorporated into our plans which required more work.
This proposal is divided into four sections as follows:
Section I — Scope of Services
Section II — Business Terms and Conditions
Section III — Technical Staff Hourly Rate Schedule and Reimbursable Expenses
Section IV — Client Contract Authorization
The following scope of services has been separated into phases so that it may be more easily
reviewed. The order in which the phases are presented generally follows the sequence in which
the project will be accomplished; however, depending on the project, the various authorized
services contained in this proposal may be performed in a sequence as deemed appropriate by
Maser Consulting to meet project schedules.
Customer Loyalty
through Client Sal
Daniel J. Reiman, Mayor
MC Proposal No. 17001048P
Revised August 20, 2019
Page 2 of 5
SECTION I — SCOPE OF SERVICES
We are requesting approval of the following additional services, some of which are in progress
and others to be performed:
PHASE 2.0 ADDITIONAL PERMITTING(APPROVALS
2.1 U.S. Army Corps of Engineers Permit — Observation Deck, elevated walkway and
piers
Phase 2.0 of our original proposal did not include submission to the U.S. Army Corps of
Engineers ( USACE). The original scope had all improvements upland of the main high
water line and as a result, only NJDEP approval was required at that time.
Under Section 10 of the Rivers and Harbors Act of 1899, USACE regulates all structures
located below the mean high - water line in navigable waters of the United States. The
Arthur Kill is classified as a navigable water. Therefore, a Section 10 permit will be
required from the USACE for the construction of the two piers, observation deck, and
elevated walkway. Our office has prepared and submitted an application for a Section 10
permit in accordance with USACE standards.
Phase 2.0 Lump Sum Fee
$4,650.00
PHASE 3.0 ADDITIONAL ENGINEERING DESIGN & CONSTRUCTION
DOCUMENTS
3.1 Structural Engineering Design & Construction Documents
Our office has prepared design drawings for the following structural elements that were
not in the original scope of work outlined in our original proposal. These items are now
part of the planned improvements for River Walk, Phase 2 — Northern Section, Carteret:
• Walkout Loop over water of elevated walkway (approx. 450', this section extends out
over water)
• Two (2) piers extending out into the water (approx. 130' long)
• Ramp systems as required for piers
• Miscellaneous site structural
Included are structural drawings of the above elements with preliminary sizing and layout
as required to illustrate at the permit -level phase, and as were included in the submission
for waterfront permits. Our structural drawings supplement the civil drawings of the
project.
Daniel J. Reiman, Mayor
MC Proposal No. 17001048P
Revised August 20, 2019
Page 3 of 5
The project's intention is to construct a new elevated timber walkway that would traverse
along (and above) the waterfront slope that abuts Arthur Kill. Further, the project
includes several offshoots from the walkway including two piers. The grade change
between the elevated main walkway and the deck and piers will be quite large and will
require an extensive ramping system to meet barrier free requirements. Included is a
code - compliant layout of the walkway systems that blends with the waterfront
environment while achieving all of the goals the Borough has for the walkway.
Permit -level drawings include required plans, sections and details. The designs are
preliminary, and if permit approval is granted, all structural design elements for these
additional items will be finalized.
3.2 Revised Permitting Plans per T &M Associates Observation Deck, and Grading Plan
changes
Maser Consulting had completed the permit plans for submission to the NJDEP when
changes were required of the plans. The first change was to incorporate the observation
deck and ferry terminal plans prepared by T &M Associates. This included changes to the
plans to incorporate the design provided by T &M into the Maser Consulting plans as well
as to update the prepared NJDEP and USACE reports for submission.
In conjunction with inclusion of the T &M plan, Maser Consulting was provided with a
revised final grading plan by Geosyntech and approved by the Borough. This raised
portions of the site by as much as 16" and required a regrading of the Riverwalk, revising
of the ADA access and updating the prepared profiles.
Phase 3.0 Lump Sum Fee
SCHEDULE OF FEES
$5,350.00
For your convenience, we have broken down the total estimated cost of the project into the
categories identified within the scope of services.
PHASE 2.0 ADDITIONAL PERMITTING /APPROVALS $ 4,650.00
PHASE 3.0 ADDITIONAL ENGINEERING DESIGN & CONSTRUCTION DOCS 5,350.0
TOTAL LUMP SUM FEE $10,000.00
This Contract is based upon the previously accepted Maser Consulting's Business Terms and
Conditions which was provided.
Daniel J. Reiman, Mayor
MC Proposal No. 17001048P
Revised August 20, 2019
Page 4 of 5
EXCLUSIONS AND UNDERSTANDINGS
Services relating to the following items are not included in this work. Therefore, any service
associated with the following items is specifically excluded from the scope of professional
services within this agreement:
• Services not specifically outlined above in Section 1;
• Boundary and Topographic Surveys;
• ALTA/ACSM Land Title Survey;
• Construction Administration/Observation;
• Property Title Search;
• Easement Preparation
• Geotechnical Services;
• Environmental Remediation Services;
• Architectural Services;
• offsite utility design;
• Exploratory or testing work, interpretations or conclusions related to determination of
potential chemical, toxic, radioactive or other type of contaminants on the site;
• Subdivision or lot consolidation plans;
• Application fees and escrow deposits to any regulatory review agencies; and,
• Changes or revisions beyond our control or changes in basic concept after design service has
been accomplished;
If an item not listed herein, or otherwise not specifically mentioned within our scope, is deemed
necessary, Maser Consulting may prepare an addendum to this proposal for your review,
outlining the scope of additional services and associated professional fees with regard to the
extra services.
SECTION II — BUSINESS TERMS AND CONDITIONS
This Contract is based upon the previously accepted Maser Consulting's Business Terms and
Conditions which was provided in our original proposal dated April 25, 2017 and Revised May
31, 2017 .
SECTION III — TECHNICAL STAFF HOURLY RATED SCHEDULE AND
REIMBURSABLE EXPENSES
The Rate Schedule is on file with Borough.
Daniel J. Reiman, Mayor
MC Proposal No. 17001048P
Revised August 20, 2019
MASER Page 5 of 5
911111f111 EA
SECTION IV — CLIENT CONTRACT AUTHORIZATION
I hereby declare that I am duly authorized to sign binding contractual documents. I also declare
that I have read, understand, and accept this contract.
Signature
Date
Printed Name Title
If you find this proposal acceptable, please sign where indicated above in Section IV, and
return one signed copy to this office. Invoices are due within 30 days. This proposal is valid
until October 21, 2019.
We continue to work towards receiving all permits for this project so that we can move forward
with the bidding and constriction phases.
We trust you will find a favorable response to our request. Should you have any questions
regarding the above additional services or require any additional information, please do not
hesitate to contact me directly.
Very truly yours,
MASER CONSULTING P.A.
James A. Priolo, P.E., P.P., CME, CPWM
Senior Principal
JAP /sab
cc: Michael Sica, Esq., Borough of Carteret
Peter Repetti, Maser Consulting P.A.
Ugfasl \general\ proposals \2017\17001048p \190820Jap_reiman addsery _river walk phase ii prop_rl.docx