HomeMy Public PortalAbout2016.130 (06-21-16)RESOLUTION NO. 2016.130
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF LYNWOOD APPROVING
CONTRACT CHANGE ORDER NO. 1, IN AN AMOUNT NOT TO EXCEED $75,000
BETWEEN THE CITY AND ALL AMERICAN ASPHALT FOR THE STATE STREET
AND CEDAR AVENUE IMPROVEMENT PROJECT, PROJECT NO. 4011.68.031 AND
AUTHORIZING THE MAYOR TO EXECUTE THE CONTRACT CHANGE ORDER
WHEREAS, on April 21, 2015, the City Council awarded a contract to Hushmand
Associates, Inc. to perform the geotechnical and soils engineering study for the
intersection of State Street and Cedar Avenue; and
WHEREAS, according to the geotechnical and soils engineering study, the
subsiding area indicated a presence of peat moss layer and clay layer which are
compressible and may need to be chemically grouted to stabilize the area; and
WHEREAS, on March 17, 2016, the City awarded contract to Infrastructure
Engineers for the design of the repairs to the State Street and Cedar Avenue
intersection; and
'WHEREAS, on May 26, 2016, the City advertised for the construction of State
Street and Cedar Avenue intersection repair through an informal bidding procedure, and
All American Asphalt was the apparent lowest responsible bidder, with a base bid of
$124,860 and with an alternate bid item of $75,000; and
WHEREAS, per Lynwood Municipal Code section 6 -3.15 "Change Order", any
amount that exceeds 25 percent of the contract price or $50,000 whichever is less,
requires City Council approval; and
WHEREAS, the potential cost of this change order is $75,000 (alternate bid item
cost). After City Council approval, staff will wait to see if this work is needed prior to
preparing the appropriate contract change order form for the Mayor's execution; and
WHEREAS, State Street and Cedar Avenue is eligible for the use of Prop. C
funding and the City has received a confirmation from MTA to use Prop. C funds for the
construction work on the repair of the intersection.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LYNWOOD DOES
HEREBY FIND, PROCLAIM, ORDER AND RESOLVE AS FOLLOWS:
Section 1. That the City Council hereby approves contract change order No. 1
in the amount not to exceed $75,000 to All American Asphalt, and authorizes the Mayor
to execute the contract change order.
1
Section 2. That this Resolution shall take effect immediately upon its adoption.
Section 3. The City Clerk shall certify as to the adoption of this City Council
Resolution.
PASSED, APPROVED and ADOPTED this 21st day of June, 2016.
Maria Quirionez;
City Clerk
APPROVED AS TO FORM:
/ 11�
David A. Garcia,
City Attorney
Edwin E. Hernand
Mayor
J. Arnoldo Beltran,
City Manager
APPROVED AS TO CONTENT:
rivAVA
Raul Godinez II, .,
Director of Public Works / City Engineer
2
STATE OF CALIFORNIA )
) SS.
COUNTY OF LOS ANGELES )
I, Maria Quinonez, the undersigned, City Clerk of the City of Lynwood, do hereby certify
that the foregoing Resolution was passed and adopted by the City Council of the City of
Lynwood at a regular meeting held on the 21St day of June, 2016, and passed by the
following vote:
AYES: COUNCIL MEMBERS ALATORRE, SANTILLAWBEAS, SOLACHE,
CASTRO AND MAYOR HERNANDEZ
NOES: NONE
ABSENT: NONE
ABSTAIN: NONE
mom
AN
STATE OF CALIFORNIA )
) SS.
COUNTY OF LOS ANGELES )
I, Maria Quinonez, the undersigned, City Clerk of the City of Lynwood, and the Clerk of
the City Council of said City, do hereby certify that the above foregoing is a full, true and
correct copy of Resolution No. 2016.130 on file in my office and that said Resolution
was adopted on the date and by the vote therein stated. Dated this 21" day of June,
2016.
Maria Quinonez, ity Clerk
City I ������
fats VUuung Ofnffcbso tII p Ii
us]o avuUs ROAD V D V
UNWOOO, CALIFORNIA 00262
pto) Cot 0220
CONTRACT CHANOF ORDER (COO)
i DEPARTMENT OF PUBLIC WORKS
Date; _ 6/812016 000 No,; 1 EDEN AceL No,: 4011.67.088.62015
Pro)ect Title: I Fernwood Avenue & Bullls Road Traffic Signal Improvement Project
Plan Reference: Item Reference:
Contractor: Fleenor Belco Fleolrle, Inc,
Show as separate numbered paragraphs: (1) Reason for Change; (2) Deserlpllon of Change; (3) Location of
Change (Stallons, etc.); (4) Change In Contract Cost; (5) Extenslon of Contract, If warranted; and (6) New
Contract Total Including all Contract Change Orders,
1, To upgrade the traffic signal at the intersection of Cortland Avenue &
Bullie Road which was noL park of the original contract,
2. Synchronize both intersections by upgrading traffic signal poles,
conduits, pedestrian push buttons, traffic loops, curb ramps, eto.
3, Intersection of Cortland Avenue & Bullie Road,
4, Work to be done per attached flAdditional Bid Items'f,
5. NUMBER OF WORKING DAYS TO BE ADDEDI Teri (10) Working Days
6, ORIGINAL CONTRACT ANOUNTI 0 173,124,00
THIS CONTRACT CHANGE ORDER A14OUNT PER RES.- 2016,115t $ 54,794.00
TOTAL NEW CONTRACT MIOVNTt $ 227,918,00
Is there an Attachment "A" for a sketch and /or additional Informallon? Yes — No X
Recommended BV:
Proec Enginn�e�e✓r Date Recommended
69W
Dlre�r o P� ublic Wok (sraneta e) Dale Recommended
Date Approved
'Mayo r City Manager (Signature) / Date Approved
Dlslrlbullon: 01191nal to Offi Ily Engineer Copy to Prajaol Manager
Copy to Copy to supervlsor 01 mspector(s)
Copy to Finance Ureclor Copy to Inspector(s)
Page I of I
ELECNOR BELCO ELECTRIC, INC.
4331 SCHAEFER AVE.
CHINO, CA 91710
TEL.: 909 993 -5470
tier criOr group
FAX: 909993 -5476
www.el ecnorbel co.com
License No. 738518,
C10
DIR No. 1000004804, Exp. 6130116
QUOTATION
'Y'lAi IOM
PROJECT DESCRIPTION
PHASE B TRAFFIC SIGNAL IMPROVEMENTS
BULLIS @ FERNIVOOD ADDITIONAL
AGENCY I OWNER
CITY OF LYNNOOD
13ID DATE I TIME
5120116
ITEM
NO. DESCRIPTION
QTY
UNIT UNIT PRICE
EXTENSION
1
UTILITYPOTHOLES
2
IFURNTSH BBS WITH BATTERIES & EXTERNAL CABINET
10
EA $ 300,00
$
3,000.00
3
11 2' LUMINAM MAST ARM
I
EA S 4,500.00
S
4,500.00
4
IPEDESTRIAN PUSH BUTTON
3
EA S 250.00
S
750.00
5
IPEDESTRIAN PUSH BUTTON PLATE
4
EA $ 170.00
$
680.00
6
FCIRNISH PEDESTRIAN PUSH BUTTON POST 1V /ANCHOR BOLTS
4
EA $ 70.00
8
280.00
7
PBDESTRLIN PUSH BUTTON POST FOUNDATION
2
EA S 410.00
S
820.00
8
INSTALL PEDES TRIAN GUSH BUTTON POST
2
EA $ 500.00
S
1,000.00
3 -LED VEHICLE HEAD
2
EA S 100.00
$
200.00
LED PEDESTRIAN HEAD PI
8
EA S 600.00
S
4,800.00
11
LED PEDESTRIANHEADP2
2
EA $ 492.00
$
984.00
12
INSTALL 'ROUND LOOPS
1
EA S 760.00
S
760.00
13
112 CONDUCTOR SIGNAL CABLE
24
EA S 220.00
$
5,280.00
14
13 CONDUCTOR SIGNAL CABLE
3300
LF S 2.50
$
8,250.00
IS
REMOVE IA STANDARD
3500
LF S 1.00
is
3,500.00
16
REMOVE IA STANDARD
1
EA S 200.00
$
200.00
17
IREMOVE 17 STANDARD
I
EA S 200.00
.S
200.00
IS
REMOVE TYPE IA FOUNDATION
3
EA $ 250.00
S
750.00
19
REMOVE TYPE 19 FOUNDATION
I
EA $ 300.00
$
300.00
20
FURNISH TYPE 15TS STANDARD W ANCHOR BOLTS
3
EA $ 400.00
$
1,200.00
21
TYPE 15TS STAND-
2
EA S 1,650.00
S
3,300.00
22
INSTALL TYPE 15B STANDARD
2
EA $ 2,000.00
S
4,000.00
23
TYPE 19 STANDARD FOUNDATION
2
EA S 360.00
$
720.00
24
2 -PAIR DETECTOR LEAD -IN CAB LE
I
EA S 3,100.00
$
3,100.00
25
2LE
LF S 1.20
$
2,400.00
26
Nu . 6
N0 PUL L BOX
1600
LF S 0.70
S
1,120.00
6
EA IS 450.00
$
2,700.00
TOTAL BASE BMI
s
cnoae nn