HomeMy Public PortalAboutr 20-101Poaltffou of #4e J90.rVUg4 of Tarr f, N �� No. #20 -101 Date of Adoptio June 25, 202 RESOLUTION AUTHORIZING A PROFESSIONAL SERVICES CONTRACT FOR ENGINEERING SERVICES WITH T &M ASSOCIATES FERRY TERMINAL PERMITS AND APPROVALS WHEREAS, the Borough of Carteret is in need of engineering services with regard 'to additional services related to Tasks 1 -4 with regard to the Ferry Terminal Project; and WHEREAS, the Borough's Consulting Engineers, T &M Associates, possess the requisite skill and expertise for said services; and WHEREAS, T &M Associates has submitted a proposal to provide said engineering services at a total cost not to exceed $240,000.00; and WHEREAS, the Mayor and Council have reviewed said proposal; WHEREAS, the Chief Financial Officer has certified that funds are or will be available for said purpose. Account # e -04 -16 -102 -201 NOW, THEREFORE, BE IT RESOLVED by the Mayor and Council of the Borough of Carteret, County of Middlesex, State of New Jersey, as follows: 1. That the proposal from T &M Associates for engineering services with regard to Tasks 1 -4 for the Ferry Terminal Project at a total cost not to exceed $240,000.00 at the rate set forth in T &M's existing contract with the Borough is hereby approved. 2. That annexed hereto is a copy of said proposal. 3. That this action is approved as an award of a professional services contract pursuant to N.LS.A. 40A:11- 5(l)(a) in accordance with the Borough's Fair and Open Process as authorized by law. 4. That a copy of this resolution be forwarded to the Borough's Purchasing Department, T &M Associates and Borough Director of Engineering. Adopted this 25" day of June, 2020 and certified as a true copy of the original on June 26, 2020. CARMELA POGORZELSKI Acting Municipal Clerk RECORD OF COUNCIL VOTE COUNCILMAN YES NO NV A.B. COUNCILMAN YES NO NV A.B. BELLINo X JOHAL DIAZ X KRUM DIMASCIO X NAPLES X X - Indicate Vote AB - Absent NV -Not Voting XOR- Indicates Vote to Overrule eto Adopted at a meeting of the Municipal Council "} J, - 25 1 202 Acting Municipal 6)erw U 2020 12:53PM No. 1247 P. i BOROUGH OF CAR TERET - , panielA ACTING .M.UNICIP.A.L CLERK To: PatuckJ. DeBlasio, Treasurer 0 Borough of Carteret iJ f REQUEST FOR CERTIFICATION OF AVAILAI3U FUNDS: For: PROFESSIONAL SERVICES CONTRACC - T & M ASSOCIATES - FERRY TERMINAL PERMITS AND APPROVALS Name of Account: T & M Associates Amount to be encumbered: Resolution #: #20 -101 1 ■YY YYY YYY�I��YY��••1���• ■YYYYYYY YY �����••�u��iu l����YI�YY�YYi YYY YYYY YY CERTIFICATION OF AVAILABILITY OF FUNDS I, Treasurer of the Borough of Carteret, do bereby certify that there are sufficient fdnds available in the current budget to enable the Borough Council to authorize the entering into a contract between the Borough of Carteret and; - fi M d-SSac , a, @ 5 Thefunds available for this contract are in the budget, in the account of: in the amopnt of: .2- �a P By this certification, I have hereby encumbered the above named account for the amount of the contract pending Council action. PafiW. DeBlasio, Treasurer Date: ( 2 f Memorial Municipal Building ♦ 61CookeAvenue 0 Carteret,NeWlersey07008 Tel: 732 - 541 -3800 ♦ Pax; 732 -541 -8925 0 W=cMt0%tn0 AFFIDAVIT OF PUBLICATION The following is a true copy of an Ordinance or Resolution of the Borough of Carteret that has appeared in the Home News Tribune, a newspaper which is printed in Freehold, New Jersey and published in Neptune, in said County and State and of general circulation in said county. One 1 time(s), once in each issue as follows: June 30, 2020 Acting Municipal Clerk Notary Public of New Jersey DANA C. ARCHEVAL NOTARY PUBLIC OF NEW JERSEY MYCOMMW n Expires 1/12/2022 /-it Carniela Pogorzelsl as aucnonzea by Jaw. Sworn and subscribed before Awarded to: T &M Assodates Services: - .Professional -�' Engineering Services, Re: me this ;� day of (, /!jll� < , e �C��C'� Carteret Ferry Project. tesolutlon 420- 101 >. ost Not to exceed $24Q000.0 illlabla In accordance with.4 xistinq contract. ''... 0 e^�Awbl'- AN9 rir Y OUR GOA1S MISSIO CART -02200 Mayor Daniel J. Reiman Borough of Carteret Municipal Building 61 Cooke Avenue Carteret, New Jersey 07008 RE: CARTERET FERRY TERMINAL PROPOSAL FOR PERMITS AND APPROVALS Dear Mayor Reiman: May 18, 2020 In response to your May 4th email requesting a revised proposal, T &M Associates (T &M) has modified both the form and the content of this proposal. This revised proposal captures the effort for the services established in fall of 2019 for CED and project permitting. Upon your authorization, T &M will continue with the project Counsel and the NJDOT team. We will advance applications by REVISING / UPDATING preliminary plans and reports to current standards and any new or revised Borough's plans for this project. BACKGROUND T &M and our project team and staff are uniquely qualified to continue to advance the project to the benefit of the Borough. The coordination by the current team and the successes we have had with nudti- permit meetings and individual agency meetings will assure a smooth transition through this process. T &M proposes to provide the following scope of services for the preparation and submission of the permit applications related to the ferry terminal as specified in the details below. The intent of this proposal is to address the regulatory requirements, thus providing a better understanding of the final design parameters. Accordingly, this proposal does not include final design, construction administration and inspection services and building design services. These services will be addressed at a future date. TASK 1. SITE LAYOUT Due to a significant change in existing conditions (Agrico Site), as well as the NJDEP and USACOE regulations, the site layout will need to be redesigned. Specifically, the adjacent grading and the new storrnwater rules will require significant analysis of the site layout and redesign. This effort includes coordination with the Geosyntec (Agrico) site capping, review of the site elevations for impacts to the site plan, drainage plans, permitted Riverwalk, viewing platform, ADA ramps, gangway layout, the addition of a stairway from the viewing platform to loading platform and additional bulkheading surrounding the viewing platform layout. T &M will review these features in comparison to the basemap obtained and provided to T &M by the Borough for use in developing the required permit plans. T &M ASSOCIATES, 1455 Broad Street, Suite 250, Bloomfield, NJ 07003 IN 973.614.0005 U 973.338.5067 M tandmassociates.conv CART -02200 May 18, 2020 Page 2 Re: CARTERET FERRY TERMINAL PROPOSAL FOR PERMITS AND APPROVALS TASK 2. PRELIMINARY MARINE DESIGN (FOR PERMITTING TASK) The US Bulkhead Line and US Pier Line restrict the ferry slip layout and its amenities. The concept plans as prepared by T &M Associates in 2013 and revised in November 2019 will be used as the basis for the site plan revisions. This configuration will permit installation of the wave screen system within the US Pier Line limits and allow for future expansion if desired. In advance of the ferry operator selection the Borough has selected to utilize a ferry vessel that is 80' long, carrying 149 passengers and has prepared specifications in February 2020 for purchase of the vessel. As pall of the revised marine design, we will refine the 2014 preliminary plan layout to accommodate the actual site conditions noted in the revised field survey, site plan revisions and future vessel specifications (freeboard and draft). Overall this effort includes coordination with the site elevation revisions and impacts to the site plan, Riverwalk elevations, viewing platform, ADA ramps, gangway layout, the addition of a stairway from the viewing platform to loading platform and additional bulkheading surrounding the viewing platform layout. Secondary impacts include revisions to the dredging of the waterway, permitting, channel location, wave screen, pile systems, fenders, ADA accessibility to the dock and boat (gangways and intermediate platforms) and plans previously developed for the smaller vessel. T &M will develop the permit plan submission for the marine facilities and coordinate review of S.T. Hudson's performance specification for the wave attenuators where necessary to obtain the required permits. T &M will prepare drawings and specifications to the extent necessary to apply for required enviromnental permits. Furthermore, it is our understanding that an updated hydrographic survey, by others, will be obtained within 6 months of the permit submission as required by NJDEP, We anticipate interim design plans for the submission of all permit applications. TASK 3. REQUIRED STATE, FEDERAL AND AGENCY APPROVALS After recent meetings with the Borough and stakeholders we have identified the following approvals are required. NJDEP APPROVALS NJDEP Waterfront Development Permit The ferry terminal site is subject to the tidal flow of the Arthur Kill. Installation of the ferry terminal at this site will require construction activities at and below the Mean High -Water Line (MHWL) of the Arthur Kill. These activities include dredging, pile driving, bulkhead construction, and associated improvements. A NJDEP Waterfront Development Permit is required to authorize these activities. T &M will prepare the Waterfront Development Permit application in accordance with the Rules on Coastal Zone Management (N.J.A.C. 7:7E -11 et seq.). The application will include an executed LURP Form, Compliance Statement, site location maps and color photographs, public notice documentation, and fifteen (15) sets of signed and sealed interim design plans. These plans may require revisions based on the regulatory agency review. As a portion of this task, we will coordinate with the NJDEP to confirm that the existing sediment samples will be accepted given the duration of time between sampling and application submittal CART -02200 Re: CART FRET FERRY TERMINAL PROPOSAL FOR PERMPl'S AND APPROVALS May 18, 2020 Page 3 and to confirm whether a new hydrographic survey will be required. If additional sampling or survey are required, we assume the Borough will contract these services separately. Tidelands Grant Modification T &M has determined that a tidelands grant has been issued for the site currently identified as Block 5.02, Lot 1.01. T &M will prepare the necessary documents and coordinate with the Department's Bureau of Tidelands Management in order to obtain a grant modification. The grant modification will be designed to include the entire area of the ferry terminal. Freshwater and/or Coastal Wetland Permit The project area contains a very limited area of coastal wetlands in the southeastern portion of the site. The remainder of the waterfront portion of the site is classified as State Open Water. These areas have already been delineated and surveyed at the site. The wetlands are regulated by the NJDEP under the Freshwater Wetland Protection Act since available mapping does not identify the area as containing coastal wetlands. The current concept design may require installation of an outfall structure and associated scour protection in order to convey storm water from the proposed parking area. If necessary, T &M will prepare and submit a Freshwater Wetland General Permit Number 11 (GP -11) to authorize grading and construction of the outfall structure. A Compliance Statement demonstrating compliance to the regulatory criteria of GP - II will be prepared and submitted with the Waterfront Development Permit. The total wetland impact will be calculated by comparing the design to the completed delineation. T &M will make every effort to minimize wetland impacts while still meeting the goals of the project. If the freshwater wetland impacts exceed 0.25 acres, they have to be mitigated on a 2:1 to 3:1 ratio. Intertidal / Subtidal Shallows Mitigation The project will impact inter -tidal and sub -tidal shallows of the Arthur Kill. In accordance with applicable USACOE/NJDEP regulations, mitigation for the impacts will be required on a 1:1 basis. T &M will prepare a concept for completing the mitigation for review by the agencies. The concept effort will include identification of potential mitigation sites, concept mitigation plan, consultation with the agencies, and preparation of an assessment of potential mitigation alternatives. The final design of the wetlands mitigation is subject to NJDEP approval of the concept plan. A final design service for wetlands mitigation is not included in this scope of services. Once we receive concept plan approval from the NJDEP and USACOE, we will provide a final design proposal to the Borough for the wetlands mitigation. CART -02200 May 18, 2020 Page 4 Re: CARTERET FERRY TERMINAL PROPOSAL FOR PERMITS AND APPROVALS FEDERAL APPROVALS Army Corps of Engineers — Individual Permit Application Preliminary conversations with the USACOE indicate that the proposed project does not qualify for a Nationwide Permit. As such, T &M will prepare and submit the information required to apply for an Individual Permit. This submission will include a full description specifying the need for the project; identification of temporary and permanent impacts; and any applicable measures taken to mitigate project impacts on sensitive areas. Essential Fish Habitat Assessment An Essential Fish Habitat Assessment will be prepared and submitted to the National Marine Fisheries. The assessment will contain a detailed written and graphic presentation of all life stages of marine and estuarine finfish that may potentially use the waters of the project area. The assessment will also present a detailed analysis of how the project may impact the life stages of these finfish and will include a list of mitigative measures that will eliminate and /or reduce the project impacts. US Coast Guard /NJ State Police/Honrcland Security Clearance T &M will work with representatives from the US Coast Guard, State Police, and Homeland Security in order to obtain all appropriate security approvals. It is anticipated that approvals will be obtained by preparation of a Facility Security Plan in accordance with 33 CFR Part 105; the plan will be submitted to the Coast Guard Captain of the Port for review and approval. The plans will also incorporate the requirements of State, County, and local security regulations. The plan will contain facility physical security systems and maintenance, access control, security plans, personnel training, and other fequired topics COUNTY APPROVALS Soil Erosion Plans We will review the final revised Dupont Corporation filling and grading plans and Maser Riverwalk plans to determine any impacts to the previously developed soil erosion and sediment control submittal and make any required revisions to the application documents. These revisions will encompass the plans, details, notes and application forms. TASK 4. CATEGORICAL EXCLUSION DOCUMENT (COORDINATION & SUPPORT) The Interagency Review Committee (IRC) determined on March 22, 2018 that a Categorical Exclusion Document would be accepted in place of the Environmental Assessment Process. The CED is being led by NJDOT and McCormick Taylor with extensive support from T &M to satisfy the NEPA process. As you are aware this process requires close coordination with the NJDOT and their subconsultant McCormick Taylor including providing copies of the pertinent design studies and plans developed since the inception of the project in 2011. Additional elements of work required to secure the CED are weekly coordination meetings with the Borough, NJDOT and CART -02200 Ile: CARTERET PERRY TERMINAL PROPOSAL FOR PERIMITS AND APPROVALS May 18, 2020 Page 5 McCormick Taylor, participation in Stakeholders meetings (USCG, Army Corps, NJ Transit, Harbor Ops, etc.) and Public Information Centers, coordination with NJDEP, supplemental reports and project documentation excluded from our original proposal. CLARIFICATIONS • Estimated fees for the permits outlined herein are anticipated to be a total of approximately $70,000. These permit fees are the responsibility of the Borough and have not been included in our fee proposal. • This scope of services assumes all hazardous material remediation design services (specifications, etc.) will be provided by others (Dupont, EXCEL and /or NJDEP). This scope of services does not include set-vices to design, construct and /or monitor wetlands mitigation. This scope of services does not include services for additional assessments or impact analysis tasks that may result from agency environmental reviews, including threatened & endangered species studies, or cultural resource studies, Hydrographic survey and sediment sampling, if required, will be directly paid / contracted by the Borough of Carteret. All expenses including miscellaneous expenses and /or any subcontractor fees will be paid directly by the Borough of Carteret in accordance with our standard agreement with the Borough. This proposal does not include final design plans, construction administration and inspection services. A subsequent proposal will require approval for that effort. • This proposal does not include building design or utility design for the ferry terminal facility or extension/approval for offsite utilities for the facility or site activities. FEE SUMMARY To advance the Ferry Terminal project through the permitting process, T &M requests that the Borough authorize a fee of $240,000. This fee will allow its to advance from the fall of 2019 forward and continue the permit acquisition elements described herein utilizing the revised plans referenced above to advance the project towards completion and prepare for subsequent phases and future final design. Our proposal anticipates this phase of the project would be completed within twelve (12) months from authorization as follows: FEE BY TASK 1. Site Layout $27,500 2. Preliminary Marine Design (For Permitting Task) $55,000 3. Required State, Federal and Agency Approvals $82,500 4. Categorical Exclusion Document (Coordination and Support) $75,000 TOTAL FEE $240,000 CART -02200 May 18, 2020 Page 6 Re: CARTERET FERRY TERMINAL PROPOSAL FOR PERMITS AND APPROVALS PROJECT SCHEDULE ➢ Design Plans, Coordination of CED with NJDOT September 2019 through July 2020 ➢ Receive CED approval (estimated) November 2020 ➢ Submit Permits to Agencies (estimated) October 2020 ➢ Receive permit approvals after 120 days permit review by Agencies on (estimated) February 2021 Thank you for considering this request; if you have any questions or require additional information, please feel free to contact me directly. Very truly yours, T &M ASSOCIATES Nicholas C. Rotonda, PE, PP, CME, LEED Vice President, Regional Client Manager CC: John DuPont, PE, Borough Engineer Michael Sica, Esq., James Buczek, T &M Associates Kris Krzyston, T &M Associates George Dakes, T &M Associates G:\ Projects \CARn022001Correspondencc\Ferry Redesign Proposal_5- 18- 2020.doex Pogorzelski, Carmela From: Mayor Sent: Friday, June 19, 2020 10:51 AM To: Dupont, John; Nicholas Rotonda; Pogorzelski, Carmela Subject: FW: Ferry Terminal Proposal Attachments: Ferry Redesign Proposal_5- 18- 2020.pdf The attached ferry proposal is approved to proceed and for placement on the agenda Mayor Daniel J. Reiman Borough of Carteret This email communication, together with any attachments hereto or links contained herein, is for the sole use of the intended recipient(s) and may contain information that is confidential, privileged, or legally protected, and as such, may not be a public document. If you are not the intended recipient, you are hereby notified that any review, disclosure, copying, dissemination, distribution or use of this communication is STRICTLY PROHIBITED. If you have received this communication in error, please notify the sender immediately by return e-mail message and delete the original and all copies of the communication, along with any attachments hereto or links herein, from your system. From: Dupont, John Sent: Friday, June 19, 2020 10:46 AM To: Mayor Subject: FW: Ferry Terminal Proposal From: Nicholas Rotonda [ mailto :NRotonda_@tandmassociates.com Sent: Friday, June 19, 2020 10:45 AM To: Dupont, John Cc: George Dakes; Kristopher Krzyston; James Buczek Subject: FW: Ferry Terminal Proposal John as discussed. 5/18/2020 proposal attached. ($240,000 to approvals) 3/26/2020 REJECTED proposal is attached for reference. NICHOLAS ROTONDA, PE, PP, CME, LEED -GA VICE PRESIDENT, REGIONAL CLIENT MANAGER OJT { 1455 Broad Street, Suite 250, Bloomfield, NJ 07003 T 973.614.0005 D 732.865.9605 M 732.241.8566 NROTONDA @TANDMASSOCIATES.COM I TANDMASSOCIATES.COM 1 From: Nicholas Rotonda Sent: Tuesday, May 19, 2020 9:39 AM To: Mayor< @carteret.net Cc: Sica, Michael < sicam @carteret. net >; duoontl @carteret.net George Dakes < gdakes @tandmassociates.com Kristopher Krzyston < I <Krzyston @tandmassociates,com >; James Buczek < JBuczek @tandmassociates.com Subject: Ferry Terminal Proposal Mayor attached is the revised proposal for the Ferry Terminal Project. The scope of services will advance the project through permitting to meet the Borough's needs and objectives for future ferry operation. We are available to discuss and start as soon as authorized. Stay healthy. Nick NICHOLAS ROTONDA, PE, PP, CME, LEED -GA 40 0 VICE PRESIDENT, REGIONAL CLIENT MANAGER uA 1455 Broad Street, Suite 250, Bloomfield, NJ 07003 1 T 973.614.0005 D 732.865.9605 C 732.241.8566 NROTONDA @TANDMASSOCIATES.COM I TANDMASSOCIATES.COM 4In►> f