HomeMy Public PortalAbout20071025TYBRISA ST and STRAND AVENUE STREETSCAPE.pdfAbstract of Bids Tybrisa Street and Strand Avenue Streetscape for City of Tybee Island, Georgia CONTRACT A - BASE BID I.DEMOLITION Unit Total Unit Total Unit Total Item Description Est.Qty Price Price Price Price Price Price 1.Remove existing concrete sidewalk 1675 SY 10.00$ 16,750.00$ 4.25$ 7,118.75$ 11.25$ 18,843.75$ 2.Remove existing curbing 1565 LF 7.00$ 10,955.00$ 3.75$ 5,868.75$ 13.75$ 21,518.75$ 3.Remove existing asphalt paving and base course 9100 SY 8.00$ 72,800.00$ 3.75$ 34,125.00$ 8.47$ 77,077.00$ 4.Remove existing bike racks, sculp- ture, benches, etc 1 LS 500.00$ 500.00$ 2,500.00$ 2,500.00$ 625.00$ 625.00$ 5.Remove existing wooden walks 115 LF 1.00$ 115.00$ 8.00$ 920.00$ 7.50$ 862.50$ 6.Remove existing landscaping 1 LS 2,500.00$ 2,500.00$ 2,500.00$ 2,500.00$ 5,285.00$ 5,285.00$ 7.Remove existing signage 1 LS 500.00$ 500.00$ 1,000.00$ 1,000.00$ 625.00$ 625.00$ 8.Remove existing building 1 LS 8,000.00$ 8,000.00$ 3,700.00$ 3,700.00$ 3,750.00$ 3,750.00$ 9.Cap existing utilities to building 1 LS 500.00$ 500.00$ 600.00$ 600.00$ 7,775.00$ 7,775.00$ 10.Relocate existing anchor 1 LS 200.00$ 200.00$ 1,400.00$ 1,400.00$ 250.00$ 250.00$ 11.Remove existing street lighting 1 LS 2,500.00$ 2,500.00$ 3,000.00$ 3,000.00$ 6,975.00$ 6,975.00$ 12.Remove existing antenna pole 1 EA 100.00$ 100.00$ 500.00$ 500.00$ 150.00$ 150.00$ 13.Remove existing metal railing 1150 LF 1.00$ 1,150.00$ 3.75$ 4,312.50$ 3.75$ 4,312.50$ 14.Remove existing flag pole 1 EA 100.00$ 100.00$ 1,000.00$ 1,000.00$ 275.00$ 275.00$ 15.Remove existing 4' wood fence 845 LF 1.00$ 845.00$ 2.50$ 2,112.50$ 3.75$ 3,168.75$ 16.Remove existing storm drain pipe 1230 LF 11.00$ 13,530.00$ 9.00$ 11,070.00$ 14.65$ 18,019.50$ 17.Remove existing drainage inlets 14 EA 725.00$ 10,150.00$ 200.00$ 2,800.00$ 3,350.00$ 46,900.00$ 18.Remove existing metal bollards 31 EA 25.00$ 775.00$ 50.00$ 1,550.00$ 62.50$ 1,937.50$ Demolition - Subtotal 141,970.00$ 86,077.50$ 218,350.25$ II.PAVING, GRADING & DRAINAGE` 1.Site grading including construction staking, borrow material, bonds and misc. items not covered else- where in the bid schedule 1 LS 119,000.00$ 119,000.00$ 219,912.00$ 219,912.00$ 185,000.00$ 185,000.00$ 2.18" Concrete curb and gutter 4250 LF 11.50$ 48,875.00$ 16.50$ 70,125.00$ 18.75$ 79,687.50$ E & D Contracting Service, Inc. Savannah, Georgia Coastal Grading & Rental, Inc. Savannah, Georgia Earth and Stone of Savannah, LLC Savannah, Georgia E & D Contracting Service, Inc. Savannah, Georgia Coastal Grading & Rental, Inc. Savannah, Georgia Earth and Stone of Savannah, LLC Savannah, Georgia 3.12" Valley gutter 600 LF 14.00$ 8,400.00$ 16.25$ 9,750.00$ 18.75$ 11,250.00$ 4.Flush curb 270 LF 19.75$ 5,332.50$ 22.50$ 6,075.00$ 18.75$ 5,062.50$ 5.Header curb 210 LF 17.00$ 3,570.00$ 31.50$ 6,615.00$ 18.75$ 3,937.50$ 6.8" Graded aggregate base course 5400 SY 25.00$ 135,000.00$ 17.50$ 94,500.00$ 25.50$ 137,700.00$ 7.2" Asphaltic concrete surface course 5400 LF 11.80$ 63,720.00$ 9.50$ 51,300.00$ 13.65$ 73,710.00$ 8.Concrete pavers at sidewalks 8965 SF 6.80$ 60,962.00$ 8.00$ 71,720.00$ 6.25$ 56,031.25$ 9.Streetprint - imprint (lifetime)6800 SF 16.00$ 108,800.00$ 21.00$ 142,800.00$ 19.40$ 131,920.00$ 10.Handicapped ramps, truncated domes (2' wide)150 LF 75.00$ 11,250.00$ 31.00$ 4,650.00$ 123.00$ 18,450.00$ 11.Concrete sidewalks 2420 SY 31.40$ 75,988.00$ 48.75$ 117,975.00$ 53.75$ 130,075.00$ 12.Stamped concrete sidewalk within roundabout 86 SY 93.00$ 7,998.00$ 88.00$ 7,568.00$ 112.00$ 9,632.00$ 13.1-1/2" Asphaltic concrete surface course (overlay)5300 SY 10.50$ 55,650.00$ 7.25$ 38,425.00$ 11.25$ 59,625.00$ 14.Asphaltic tack coat (overlay)5300 SY 0.25$ 1,325.00$ 0.50$ 2,650.00$ 1.20$ 6,360.00$ 15.Grate inlets w/permanent drain-pac silt trap 3 EA 3,200.00$ 9,600.00$ 2,600.00$ 7,800.00$ 2,430.00$ 7,290.00$ 16.Curb inlets w/ permanent drain pac- silt trap 15 EA 3,500.00$ 52,500.00$ 3,000.00$ 45,000.00$ 3,125.00$ 46,875.00$ 17.15" RCP, O-ring 99 LF 57.00$ 5,643.00$ 33.50$ 3,316.50$ 52.85$ 5,232.15$ 18.18" RCP, O-ring 97 LF 61.00$ 5,917.00$ 37.50$ 3,637.50$ 55.75$ 5,407.75$ 19.24" RCP, O-ring 1465 LF 74.00$ 108,410.00$ 46.00$ 67,390.00$ 58.57$ 85,805.05$ 20.Storm manhole 3 EA 2,950.00$ 8,850.00$ 2,200.00$ 6,600.00$ 3,430.00$ 10,290.00$ 21.Proof rolling 30 HRS 1.00$ 30.00$ 95.00$ 2,850.00$ 87.50$ 2,625.00$ 22.Pavement markings (painted - thermo- plastic)1 LS 9,600.00$ 9,600.00$ 3,300.00$ 3,300.00$ 6,250.00$ 6,250.00$ 23.Traffic control 1 LS 7,500.00$ 7,500.00$ 5,500.00$ 5,500.00$ 21,000.00$ 21,000.00$ 24.Erosion control, silt fence 1300 LF 7.00$ 9,100.00$ 5.00$ 6,500.00$ 3.57$ 4,641.00$ 25.Temp. erosion control inlet protection incl. silt traps 18 EA 515.00$ 9,270.00$ 250.00$ 4,500.00$ 178.00$ 3,204.00$ 26.Construction entrance 2 EA 3,000.00$ 6,000.00$ 2,500.00$ 5,000.00$ 1,875.00$ 3,750.00$ 27.Wheel stops 177 EA 40.00$ 7,080.00$ 70.00$ 12,390.00$ 64.30$ 11,381.10$ 28.Steel edging at planters 260 LF 5.00$ 1,300.00$ 8.00$ 2,080.00$ 8.58$ 2,230.80$ 29.Acid washed concrete, Tybee Island logo at roundabout 1 LS 5,000.00$ 5,000.00$ 4,800.00$ 4,800.00$ 6,224.00$ 6,224.00$ 30.Concrete bollards 8 EA 575.00$ 4,600.00$ 660.00$ 5,280.00$ 525.00$ 4,200.00$ 31.Remove and replace existing asphalt paving as directed by Owner/ Engineer 100 SY 75.00$ 7,500.00$ 80.00$ 8,000.00$ 112.50$ 11,250.00$ E & D Contracting Service, Inc. Savannah, Georgia Coastal Grading & Rental, Inc. Savannah, Georgia Earth and Stone of Savannah, LLC Savannah, Georgia 32.Remove and replace unsuitable subgrade material 50 CY 35.00$ 1,750.00$ 32.50$ 1,625.00$ 68.75$ 3,437.50$ Paving, Grading & Drainage-Subtotal 965,520.50$ 1,039,634.00$ 1,149,534.10$ * III. WATER DISTRIBUTION & SANITARY SEWERS 1.Remove existing 8" water main at tie in (abandoned existing water main to remain)20 LF 21.50$ 430.00$ 42.75$ 855.00$ 35.75$ 715.00$ 2.Remove existing fire hydrant (turn over to City)1 EA 600.00$ 600.00$ 850.00$ 850.00$ 875.00$ 875.00$ 3.Disconnect existing service laterals at meter box and tie in new laterals to existing meter. (Abandon existing service laterals).10 LF 200.00$ 2,000.00$ 350.00$ 3,500.00$ 357.00$ 3,570.00$ 4.Remove existing meter boxes 12 EA 525.00$ 6,300.00$ 150.00$ 1,800.00$ 72.00$ 864.00$ 5.8" PVC (C-900) water main 420 LF 44.00$ 18,480.00$ 31.50$ 13,230.00$ 22.85$ 9,597.00$ 6.6" PVC (C-900) water main 20 LF 40.00$ 800.00$ 38.00$ 760.00$ 28.60$ 572.00$ 7.2" PVC water main 75 LF 19.50$ 1,462.50$ 23.25$ 1,743.75$ 17.10$ 1,282.50$ 8.3/4" Service laterals 300 LF 16.00$ 4,800.00$ 17.50$ 5,250.00$ 3.60$ 1,080.00$ 9.Fire hydrant w/6" valve & box 1 EA 3,000.00$ 3,000.00$ 3,750.00$ 3,750.00$ 3,392.00$ 3,392.00$ 10.Relocate existing fire hydrant 1 EA 2,500.00$ 2,500.00$ 3,500.00$ 3,500.00$ 2,285.00$ 2,285.00$ 11.8" Valve & box 2 EA 1,200.00$ 2,400.00$ 2,000.00$ 4,000.00$ 2,607.00$ 5,214.00$ 12.6" Valve & box (at relocated fire hydrant)1 EA 900.00$ 900.00$ 3,000.00$ 3,000.00$ 2,558.00$ 2,558.00$ 13.2" Valve & box 1 EA 700.00$ 700.00$ 1,200.00$ 1,200.00$ 357.00$ 357.00$ 14.3/4" Curb stop 10 EA 86.00$ 860.00$ 250.00$ 2,500.00$ 350.00$ 3,500.00$ 15.3/4" Corporation stop 10 EA 300.00$ 3,000.00$ 250.00$ 2,500.00$ 385.00$ 3,850.00$ 16.Install new meter boxes (to be provided by the City)13 EA 52.50$ 682.50$ 200.00$ 2,600.00$ 71.50$ 929.50$ 17.Plug existing 8" water main (abandoned)2 EA 400.00$ 800.00$ 400.00$ 800.00$ 800.00$ 1,600.00$ 18.Connect new 8" water main to exist- ing 8" water main (dry tap)2 EA 4,000.00$ 8,000.00$ 2,700.00$ 5,400.00$ 1,142.00$ 2,284.00$ 19.Connect new 6" water main (fire hydrant) to existing water main)1 EA 2,600.00$ 2,600.00$ 1,900.00$ 1,900.00$ 4,000.00$ 4,000.00$ 20.Connect new 2" water main to existing 8" water main 1 EA 700.00$ 700.00$ 1,900.00$ 1,900.00$ 1,142.00$ 1,142.00$ 21.6" PVC sewer service lateral 125 LF 74.00$ 9,250.00$ 30.00$ 3,750.00$ 53.14$ 6,642.50$ E & D Contracting Service, Inc. Savannah, Georgia Coastal Grading & Rental, Inc. Savannah, Georgia Earth and Stone of Savannah, LLC Savannah, Georgia 22.Sewer cleanout 2 EA 400.00$ 800.00$ 400.00$ 800.00$ 214.30$ 428.60$ 23.Connect new sewer lateral to existing manhole 1 EA 2,600.00$ 2,600.00$ 1,700.00$ 1,700.00$ 2,142.00$ 2,142.00$ Water Distribution & Sanitary Sewer - Subtotal 73,665.00$ 67,288.75$ 58,880.10$ IV.LANDSCAPING and IRRIGATION 1.Landscaping including all trees, shrubs, sod, mulch, groundcover, soil mixtures, steel edging, etc., complete and in place 1 LS 41,500.00$ 41,500.00$ 46,500.00$ 46,500.00$ 63,333.00$ 63,333.00$ 2.Irrigation including all piping, sleeves, sprinkler heads, drip irrigation, back- flow preventor, controller and electrical to controller, complete and in place (meter and tap by City of Tybee Island)1 LS 20,000.00$ 20,000.00$ 10,500.00$ 10,500.00$ 52,000.00$ 52,000.00$ Landscaping & Irrigation - Subtotal 61,500.00$ 57,000.00$ 115,333.00$ V.ELECTRICAL 1.Site electrical, complete and in place 1 LS 99,000.00$ 99,000.00$ 100,000.00$ 100,000.00$ 118,102.00$ 118,102.00$ Electrical - Subtotal 99,000.00$ 100,000.00$ 118,102.00$ CONTRACT A - ALTERNATES I.DEDUCTIVE ALTERNATE No. 1 Asphalt Overlay for Strand Ave, Parking Lot - Subtotal 1.Deduct asphaltic tack coat -5300 SY 0.25$ (1,325.00)$ 0.50$ (2,650.00)$ 1.20$ (6,360.00)$ 2.Deduct 1-1/2" asphaltic concrete surface course -5300 SY 10.50$ (55,650.00)$ 7.25$ (38,425.00)$ 11.10$ (58,830.00)$ 3.Add asphaltic sealant coat 5300 SY 2.00$ 10,600.00$ 2.25$ 11,925.00$ 3.66$ 19,398.00$ Deductive Alternate No. 1: Asphalt Overlay for Strand Ave. Parking Lot - Subtotal (46,375.00)$ (29,150.00)$ (45,792.00)$ E & D Contracting Service, Inc. Savannah, Georgia Coastal Grading & Rental, Inc. Savannah, Georgia Earth and Stone of Savannah, LLC Savannah, Georgia II.DEDUCTIVE ALTERNATE No. 2 Streetprint 1.Deduct for imprint (lifetime quarantine) streetprint -6800 SY 16.00$ (108,800.00)$ 21.00$ (142,800.00)$ 17.50$ (119,000.00)$ 2.Add for standard streetprint 6800 SY 9.00$ 61,200.00$ 12.50$ 85,000.00$ 8.00$ 54,400.00$ Deductive Alternate No. 2 - Street- print - Subtotal (47,600.00)$ (57,800.00)$ (64,600.00)$ CONTRACT B - TYBRISA STREET SIDEWALKS - No bid for this contract 1.Remove existing concrete sidewalk 1215 SY xxxxxx No Bid No Bid No Bid 2.Handicapped ramp truncated domes (2' wide)110 LF xxxxxx No Bid No Bid No Bid 3.Concrete sidewalk, 4"1410 SY xxxxxx No Bid No Bid No Bid Contract B: Tybrisa Street Sidewalks - Subtotal No Bid No Bid No Bid BID SUMMARY Part 1: Contract A - Base Bid Summary I.Demolition 141,970.00$ 86,077.50$ 218,350.25$ II.Paving, Grading & Drainage 965,520.50$ 1,039,634.00$ 1,149,534.00$ III.Water Distribution & Sanitary Sewers 73,665.00$ 67,288.25$ 58,880.10$ IV.Landscaping & Irrigation 61,500.00$ 57,000.00$ 115,333.00$ V.Electrical 99,000.00$ 100,000.00$ 118,102.00$ Contract A - Base Bid Summary Total 1,341,655.50$ 1,349,999.75$ *1,660,199.35$ Contract A - Alternates I.Deductive Alternate No. 1 Asphalt overlay for Strand Ave. parking lot (46,375.00)$ (29,150.00)$ (45,792.00)$ E & D Contracting Service, Inc. Savannah, Georgia Coastal Grading & Rental, Inc. Savannah, Georgia Earth and Stone of Savannah, LLC Savannah, Georgia II.Deductive Alternate No. 2 Streetprint (47,600.00)$ (57,800.00)$ (64,600.00)$ Contract A - Alternates Total (93,975.00)$ (86,950.00)$ (110,392.00)$ Part 2: Contract B - Tybrisa Street Sidewalks 1.Tybrisa Street sidewalks No Bid No Bid No Bid Contract B - Tybrisa Street Sidewalks Total No Bid No Bid No Bid Bid Bond 5%5%5% ______________________________________ I certify that this is a correct Abstract of *Denotes Correction Bids received October 25, 2007. Inman Beasley Hussey, Gay, Bell & DeYoung, Inc. Consulting Engineers, Savannah, Georgia Bid: October 25, 2007 Unit Total Unit Total Unit Total Price Price Price Price Price Price 15.00$ 25,125.00$ 23.00$ 38,525.00$ 40.00$ 67,000.00$ 10.00$ 15,650.00$ 10.50$ 16,432.50$ 13.00$ 20,345.00$ 10.00$ 91,000.00$ 23.00$ 209,300.00$ 17.00$ 154,700.00$ 3,500.00$ 3,500.00$ 5,750.00$ 5,750.00$ 25,000.00$ 25,000.00$ 10.00$ 1,150.00$ 80.50$ 9,257.50$ 80.00$ 9,200.00$ 3,000.00$ 3,000.00$ 5,750.00$ 5,750.00$ 10,000.00$ 10,000.00$ 3,500.00$ 3,500.00$ 2,300.00$ 2,300.00$ 7,500.00$ 7,500.00$ 15,000.00$ 15,000.00$ 11,500.00$ 11,500.00$ 75,000.00$ 75,000.00$ 500.00$ 500.00$ 4,100.00$ 4,100.00$ 50,000.00$ 50,000.00$ 500.00$ 500.00$ 3,450.00$ 3,450.00$ 15,000.00$ 15,000.00$ 1,000.00$ 1,000.00$ 17,250.00$ 17,250.00$ 21,000.00$ 21,000.00$ 300.00$ 300.00$ 115.00$ 115.00$ 500.00$ 500.00$ 5.00$ 5,750.00$ 11.50$ 13,225.00$ 11.00$ 12,650.00$ 100.00$ 100.00$ 120.00$ 120.00$ 3,500.00$ 3,500.00$ 10.00$ 8,450.00$ 5.75$ 4,858.75$ 5.00$ 4,225.00$ 10.00$ 12,300.00$ 34.50$ 42,435.00$ 18.00$ 22,140.00$ 1,000.00$ 14,000.00$ 1,050.00$ 14,700.00$ 3,500.00$ 49,000.00$ 200.00$ 6,200.00$ 230.00$ 7,130.00$ 100.00$ 3,100.00$ 207,025.00$ 406,198.75$ 549,860.00$ 400,000.00$ 400,000.00$ 765,000.00$ 765,000.00$ 815,000.00$ 815,000.00$ 23.00$ 97,750.00$ 17.25$ 73,312.50$ 15.00$ 63,750.00$ L-J, Inc. Columbia, SC Ellis Wood Contracting, Inc. Statesboro, Georgia Sandhill ALS Construction, Inc. Hardeeville, SC L-J, Inc. Columbia, SC Ellis Wood Contracting, Inc. Statesboro, Georgia Sandhill ALS Construction, Inc. Hardeeville, SC 23.00$ 13,800.00$ 22.00$ 13,200.00$ 35.00$ 21,000.00$ 23.00$ 6,210.00$ 20.00$ 5,400.00$ 12.00$ 3,240.00$ 25.00$ 5,250.00$ 26.50$ 5,565.00$ 12.00$ 2,520.00$ 20.00$ 108,000.00$ 26.00$ 140,400.00$ 24.50$ 132,300.00$ 20.00$ 108,000.00$ 12.50$ 67,500.00$ 12.75$ 68,850.00$ 11.00$ 98,615.00$ 9.50$ 85,167.50$ 9.00$ 80,685.00$ 15.00$ 102,000.00$ 18.00$ 122,400.00$ 19.00$ 129,200.00$ 25.00$ 3,750.00$ 220.00$ 33,000.00$ 87.00$ 13,050.00$ 40.00$ 96,800.00$ 44.00$ 106,480.00$ 42.50$ 102,850.00$ 300.00$ 25,800.00$ 172.50$ 14,835.00$ 70.25$ 6,041.50$ 18.00$ 95,400.00$ 10.00$ 53,000.00$ 12.75$ 67,575.00$ 5.00$ 26,500.00$ 0.25$ 1,325.00$ 0.10$ 530.00$ 4,000.00$ 12,000.00$ 2,800.00$ 8,400.00$ 4,560.00$ 13,680.00$ 4,000.00$ 60,000.00$ 3,100.00$ 46,500.00$ 4,560.00$ 68,400.00$ 60.00$ 5,940.00$ 58.00$ 5,742.00$ 46.00$ 4,554.00$ 90.00$ 8,730.00$ 75.00$ 7,275.00$ 52.00$ 5,044.00$ 100.00$ 146,500.00$ 86.00$ 125,990.00$ 69.00$ 101,085.00$ 4,000.00$ 12,000.00$ 2,700.00$ 8,100.00$ 3,840.00$ 11,520.00$ 50.00$ 1,500.00$ 115.00$ 3,450.00$ 100.00$ 3,000.00$ 20,000.00$ 20,000.00$ 11,500.00$ 11,500.00$ 10,000.00$ 10,000.00$ 40,000.00$ 40,000.00$ 57,500.00$ 57,500.00$ 75,000.00$ 75,000.00$ 3.00$ 3,900.00$ 8.00$ 10,400.00$ 5.75$ 7,475.00$ 150.00$ 2,700.00$ 700.00$ 12,600.00$ 250.00$ 4,500.00$ 2,000.00$ 4,000.00$ 2,875.00$ 5,750.00$ 3,500.00$ 7,000.00$ 100.00$ 17,700.00$ 115.00$ 20,355.00$ 75.00$ 13,275.00$ 10.00$ 2,600.00$ 11.50$ 2,990.00$ 7.00$ 1,820.00$ 8,500.00$ 8,500.00$ 17,250.00$ 17,250.00$ 6,500.00$ 6,500.00$ 150.00$ 1,200.00$ 865.00$ 6,920.00$ 300.00$ 2,400.00$ 75.00$ 7,500.00$ 98.00$ 9,800.00$ 65.00$ 6,500.00$ L-J, Inc. Columbia, SC Ellis Wood Contracting, Inc. Statesboro, Georgia Sandhill ALS Construction, Inc. Hardeeville, SC 25.00$ 1,250.00$ 87.00$ 4,350.00$ 100.00$ 5,000.00$ 1,543,895.00$ 1,851,457.00$ 1,853,344.50$ 50.00$ 1,000.00$ 28.00$ 560.00$ 24.00$ 480.00$ 1,000.00$ 1,000.00$ 1,500.00$ 1,500.00$ 550.00$ 550.00$ 300.00$ 3,000.00$ 350.00$ 3,500.00$ 120.00$ 1,200.00$ 100.00$ 1,200.00$ 290.00$ 3,480.00$ 300.00$ 3,600.00$ 35.00$ 14,700.00$ 40.00$ 16,800.00$ 30.75$ 12,915.00$ 30.00$ 600.00$ 35.00$ 700.00$ 24.00$ 480.00$ 15.00$ 1,125.00$ 29.00$ 2,175.00$ 16.00$ 1,200.00$ 8.00$ 2,400.00$ 34.50$ 10,350.00$ 11.00$ 3,300.00$ 6,000.00$ 6,000.00$ 6,900.00$ 6,900.00$ 3,360.00$ 3,360.00$ 3,000.00$ 3,000.00$ 2,875.00$ 2,875.00$ 3,360.00$ 3,360.00$ 2,000.00$ 4,000.00$ 1,450.00$ 2,900.00$ 2,175.00$ 4,350.00$ 2,000.00$ 2,000.00$ 1,120.00$ 1,120.00$ 1,563.00$ 1,563.00$ 200.00$ 200.00$ 775.00$ 775.00$ 1,008.00$ 1,008.00$ 200.00$ 2,000.00$ 145.00$ 1,450.00$ 480.00$ 4,800.00$ 200.00$ 2,000.00$ 190.00$ 1,900.00$ 480.00$ 4,800.00$ 800.00$ 10,400.00$ 865.00$ 11,245.00$ 900.00$ 11,700.00$ 300.00$ 600.00$ 1,400.00$ 2,800.00$ 300.00$ 600.00$ 1,500.00$ 3,000.00$ 4,000.00$ 8,000.00$ 12,000.00$ 24,000.00$ 1,000.00$ 1,000.00$ 3,450.00$ 3,450.00$ 9,360.00$ 9,360.00$ 500.00$ 500.00$ 1,400.00$ 1,400.00$ 1,800.00$ 1,800.00$ 100.00$ 12,500.00$ 87.00$ 10,875.00$ 265.00$ 33,125.00$ L-J, Inc. Columbia, SC Ellis Wood Contracting, Inc. Statesboro, Georgia Sandhill ALS Construction, Inc. Hardeeville, SC 100.00$ 200.00$ 350.00$ 700.00$ 600.00$ 1,200.00$ 1,500.00$ 1,500.00$ 3,100.00$ 3,100.00$ 5,000.00$ 5,000.00$ 73,925.00$ 98,555.00$ 133,751.00$ 35,000.00$ 35,000.00$ 69,000.00$ 69,000.00$ 65,160.00$ 65,160.00$ 15,000.00$ 15,000.00$ 23,000.00$ 23,000.00$ 22,200.00$ 22,200.00$ 50,000.00$ 92,000.00$ 87,360.00$ 43,500.00$ 43,500.00$ 208,100.00$ 208,100.00$ 286,350.00$ 286,350.00$ 43,500.00$ 208,100.00$ 286,350.00$ 5.00$ (26,500.00)$ 0.16$ (848.00)$ 0.10$ (530.00)$ 18.00$ (95,400.00)$ 7.00$ (37,100.00)$ 10.75$ (56,975.00)$ 3.00$ 15,900.00$ 2.10$ 11,130.00$ 3.75$ 19,875.00$ (106,000.00)$ *(26,818.00)$ (37,630.00)$ L-J, Inc. Columbia, SC Ellis Wood Contracting, Inc. Statesboro, Georgia Sandhill ALS Construction, Inc. Hardeeville, SC 15.00$ (102,000.00)$ 12.50$ (85,000.00)$ 15.00$ (102,000.00)$ 15.00$ 102,000.00$ 8.50$ 57,800.00$ 10.50$ 71,400.00$ $0.00 *(27,200.00)$ (30,600.00)$ No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid 207,025.00$ 406,198.75$ 549,860.00$ 1,543,895.00$ 1,851,457.00$ 1,853,344.50$ 73,925.00$ 98,555.00$ 133,751.00$ 50,000.00$ 92,000.00$ 87,360.00$ 43,500.00$ 208,100.00$ 286,350.00$ 1,918,345.00$ 2,656,310.75$ 2,910,665.50$ * (137,800.00)$ (26,818.00)$ (37,630.00)$ L-J, Inc. Columbia, SC Ellis Wood Contracting, Inc. Statesboro, Georgia Sandhill ALS Construction, Inc. Hardeeville, SC (204,000.00)$ (27,200.00)$ (30,600.00)$ (341,800.00)$ (54,018.00)$ (68,230.00)$ No Bid No Bid No Bid No Bid No Bid No Bid 5%5%5%