Loading...
HomeMy Public PortalAboutORD13755 BILL NO._-P.9D�I-A 7 SPONSORED BY COUNCILMAN Mnrtin ORDINANCE NO. AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT WITH HORNER & SHIFRIN FOR HIGHWAY 54 PUMP STATION DESIGN AND CONSTRUCTION. WHEREAS, Horner & Shifrin has been selected (,Is the firm best qualified to provide professional services related to (lie Highway 54 Pump Station Design and Constructior't project; NOW, THEREFORE, BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS: $_ggtio►i 1 . Horner & Shifrin is hereby approved as the, best qualified firm to provide professional services and its proposal is hereby accepted. ,9%Lfig q2.. The Mayor and City Clerk are hereby at.rthorized to execute an agreement _ with Horner & Slilrlri for Highway 14 Pump Station Design and C011SIRICtion Section., substantially the same in form arid content as � _j. The agreement shall be SLII)SL that agreement attached hereto as Exhibit A. agqtmn 4, This Ordinance shall be in full force and effect from arid after the date of its passage and approval. Passed:_ Approvod:­­Z'.� PreSicing Officer Mayor AT*YF=ST-, APPROVED/AS Ty)FQRM: City Cl6rk City Counselor CONTRACTFOR PROFESSIONAL SERVICES THIS AGRETIMI;NT, made and entered till() this 3rd clay o[ August, 2004, by and boxcern the Cily of lefl'ersOn, Misso►rtri, a nlurlicipal corporation, hereinafter rel'ared to as the "C'ily" Willi offices at :320 F,,ist Mc( ';u(y, .1viTerson City, Missouri, 051(11 , ;tilt) llorner & Shit'-ill, Inc., hercinafler relcrred t(► as tilt "( 'o-nsrtllatit W ITN FISSFTI1: THAT, WIII;RIiAS, the City desires to engage Ilse Consullanl to render certain technical and prole"Ssional 1olarininlz services hereafter described in I;xhil►it A. WIIEIRI:AS, the ( 'ollsOlta111 made cerlairl mid :.I.Itelncnls ((, the City Willi respect Io (Inc 1ormisi0n of such sc�viccs and Ilse Ci(N has accepwd said proposal to enter into a contract with the ( '„nsuh<ull for the noel f0rnr►1)ces Of services by the ('01IS111tant. NOW, TllliRl-+ORI•., I'M the co nsider•aliuns herein expressed, it is aprecd by and between the 01y ;11)1.1 the COW,1111ar1t tls f(oll(rivs: 1 . Scope of Services. The Cily a,urees to eneaRe the services of the Consultant to per161-111 the services hereinafter set ford) in connection with the project descrihed in I xhibil A. 2. Additional Services. The City play add lu ('Onsultant Services or (icicle 01ercfr'0111 activities Ol`a sirnil;n nature to Owse set 1,01-111 in FXlliloil A, provided iha( the (Olal cost oI' suc:h work does not exceed Iltc local cost allowance as specified in paragraph 0 hercol'. The Consultant shall undertake such changed activities only upon tilt direction of the C'ily. All such directives and changes shall be in wrilte_n form and approved by (he Director of Community Development ,Ind Shall be ;lu(l)led ;old cuunlersip'ned by the Consult;lnt or its agreed represelntallvel-1. 3. I'.xislilig Dala. All I111(►1'111allml, data alld reports ati are exi`llllt!, al'adahlc ;Ind necessary fur the carrying (out ol, the v;t,rk. ~hall he I hull IR'd 10 the ('onsullanl without charge by the City, and the City shall cooperate with the Consull,rtll in every reasumlble way iu carrying ulll the scope of services. The Corlstlll;lnt >,hal1 nul he liahle for the accuracy of the inlornlatit►n furnished by lht: (.'it\ . 4. I'crsonrlel to be Provided. The ('onsrrlmill Ieprese►lts that Const►ftanl ha:. or will secure at its expense all personnel l-eclrlired too perform the se!vices t alle(I (or under this contra(( by the ( 'ollsltltanl. Snch pers0nrlcl shall 1101 he enlllovccs OI' u ' have any cuntraclual l'Chlli0llshil3 with the City excepl WI enllolOyeeS OI' the ('Onstlltanl. All ttl, (Ile services required hereunder will be perl'ornled by the C(mil.ultanl Or under the C'onsult;ult's direct supervision and all personnel engaged in the wol k shall he fully (luali(ied and shall be authorir.cd tinder state and local law to per (Orin such service!(. None of the work or services covered by this acontract shall be subeonlrctcled except Is provided in IAllibil A without the written approval of the City. l N (.41bn.1 I inn Ihmi�Ooldl�.nip r.l 11).qi..v '•IuP.n ho Ihn l l r,p�,,,n„n l rqn t i,i,ii,.I:,f.. Adak 5. Notice.(() Ih'ocecd. The services of the Consultant slit-111 commence as directed ill (lie Notice w Proceed and shall he undertaken and wnipleled in accordance will) the schedule contained in l;xhibil A. 6. ("(wu )ensafion. ']'Ile Cily '1prees to pay file Omstflm f it) aceordance with Ilse terms set forth in I.xhihil A, which shall constitute complete cOn►pcnsation fur ,til services to he reticlered under this contract. The final payment will be subject to receipt (4 a rc(luisilion For payment and a statement ()I' services rendered certifying that the ('onsulmilt fully performed all work to he paid 1,61. ill such pn)glress payments in u►nformmnc'e with the contract. It is expressly undersloo(I that in nu event will the total cunlperlsatiun and rcimbursenletlt to be paid to the ('otisull;ull tinder the terns of this contract exceed the sure (►I' One I lundred Nine- Two Thousand Eight Ihrndred Dollars ($192,800.00) 101. all design services and Sevcnty-A-Agiit Thousand One Hundred Dollars ($78. 100.00) for construction insl)(-cliun services unless spec'if'ically Mill Iuulu,111ti 8greed (5) i.I wr'itinfg, l y hall the ('it\! and CmIstlllanl. Such cOmpensation will be Laid in I)rmiress payments, as spccil'ied in Exhibit A-,1. No change in compensation s11a11 he made unless IhL')V is a Substantial and SWIlI icanl dil'ferelicc between the work originally contemplated by this agreement and the work actually re(luircd. 7. Faill,u'e_t() PCI-1,61.111, ("mcellation. If, )111-mi h any cause, the Cmisullaw shall fail to Fulfill in linlcly and I)roper manner its obligations under Ibis cO►ltract, or II' IhC CMISultanl shall violate any (f (he covenants, agreements, or stipulations (f this contract, the Cily shall thereupon have the right to lermina(e this conll-act by giving written node u I() the C'onsllllant Of such terrttination and specifying the effective date lhcreol', at lead five (5) days belowe the effective clay of such termination. The Consultant may wilhotil cause tennir►ale this corltr;tcl Upon 30 days prior written notice. III either Stich event all finished (u• (rnfinished (locunlc lls, data, studies, surveys, drawings, slaps, nuulefs, photographs, and reports or other materials pr'epar'ed by file C'onsuhant under this conlracl shall, al the ()Ilion ,►1' the Oly, hecome file City's property, and the cun►I)cns;►tion for any satisl'ac:tory work completed on stic:h (lucurnents and other materials shall be delel mille(l. Notwithstanding the above, the CmIS11hant shall not he t'elieved of liabilily to (110 OIN' for dar►►ages sustained by the City by virtue of any such hreach ( f contract by the ( 'OnstIIMill: and ('ily shall not he relieved Of resl)Mnsibility to pay Consultant fur that earl of the total wine satisfactorily con►I)letccl hN' ( 'orlsollant prior Iu any cancellation of this Agreement initiated by the City. H. fksslglllllerll. The CmIsultanl Shall not assign any inlerest in this contract, and shall not transfer any interest ill the sallies (whether by assignment or novatiort), without prior written consent of the City thereto. Any such assignment is expressly subject to all rights and remedies of file City under this agree mill, including the rigll► to change ur delete activities from the contract or 10 l HIMIatc the SaI1u: as l)rovidal herein, and [it) such assignmeill shall require the City to give any notice It) any such assignee of ;lily actions which the City may take under (his agreement, tho►Igh Cily will attempt lu so nolil.y ally such assignee. Q. C"c .nlid,entiality. Any reports, data ()r similar infurulalmll given t() or prepared or assembled by the ('unsull mt under this contract which the City requests to he kept as confidential shall not he made available to any individual or organiratinn by the (.'Onstlltant Without prior' written appr(wal of (he City. 2 1/ lunlrerlltlrrlhuJr»t,.ndl,5r'rrr,r'•llwnrt.l S; wbi. 1/.�; 1115,.,P'd.,nrnl',nn,t( aw.Id", 10. N1►ndiscri ill inatitill. The Consultant aLrees ill the pcI form;in:4 of tilt contract not to discr'imillale till tilt.' grounds of hecallse of race, creed, color, 11;111(mal origin or ancestry, sex, religion, handicap, age or political affill;t ion, agalnst a11y clilployce of Colistr1taill or applicant fill. employment and shall include a similar provision in all stlhconlricis lei or awarded hereunder. 11 . Independent (.'oniraclor. 'I'lle Consuharll is all i11(Icpenderlf contractor ;111(1 nothing herein ~hall conslittlfc or designale the ('onsul I'll t or ;illy of its ertlpfoyees as agents or employees of the ('ily, 12. Beneli(s not 1Availahlc. The Consultant Shall not he entitled to ally of the hencfits cstahlished fill' the t1 )lpf0yces of the City nor he covered by the Workmen's ('ompeltsali(►rl Program ()I, the ( 'ily, 13. 1 Jahility. The p.1nics nnl(ually afire- Ifi file 1'011mvillp: a. In no evclll shall the City Ile liahle to the ('onsullarll fur special, indirect, or conse(Iucntial damages, except thus( directly or approximately caused by the Cl(y arising out of or in ally way conneeled with this colill•am h. The C'onsul(ant shall defend, i11de1111lify, and hold the ('it)' harmless from and ® against ;Ill claims, losses, and liahililics ;wising fill( of personal injuries, !� inc{tidillL' Beath, and da111age to properly which are caused by the ('onsultant arisillg out of or ill any way connected with a11 mllisrJon by or negligence ()It tile. Dart of, (Ile (.'o11s(Ilta11t in the I)erli►rnlancc ill* Ibis Clillir;tct, 14. I)(lellnlelllti. '1'11,11 r(:hrodticihle of Tracings ;111d mall, peel ,i1'cd or oh(ained under (he terms of this Contract shall he delivered upon request to and heculllc 111e property of the City upon (el•rllilla(ioll of file contract or completion of work. Copies of hasic survey notes and sketches, charts, computations and other data prepared or ohlained under this Contract shall Ile made availahle, upon request, to the Cify without rc�triclions or limitations on their use. When such copies: arc rc(Iucs(c(I, the City a�',rees to pay the t'onsulfanf its costs of Copying and delivering Saille, IS. Nonsoficifation. The ('finsullallt warrants 111,11 he had not crnplfiyed m retained any companv or person, odler thall a holla fide employee working solely fur the Consultant, to solicil ol• secure this ('o11iract, and that lie has not paid or ;;greed (o pay any company or person, other 111,111 1 bona Fide employee working solely fur the ('onstdtant, any Tee, conlnlission, percentage, hrokerage fee, gifts, or any other consideration, contingent upon or resulting from file award or making of Ibis Contract. For hrcach or violation of this warranty, Ihr: City shall have the right !o ;.tnnul this ('onfract withoul liahility, (►r, in ifs discretion, to deduce I'r0111 the C'o11tracl price or consideration, or (►therwise recover the full amount of such fee, commission, perccnlage, hrokcragc lire, gills, or conlin)�ent fee. 3 11 Ipr11/Y1f'1l1/r'11'In��Ulurldl.�i ll ll r'1/hnrn'r 1:dp//In 1Hr //111 SI/'I✓n( t!,1/p.Il nibrll rnpdtl li 16. l3�u�ks c�nd.ltecrnds. The Conslillant and all his subconlractors shall nntitttain all books, documents, papet•s, ,Iccoutttittl! rIC"I" is and other evidence pertaining to costs incurred in connection with this Cownict, and shall make such materials; available at their respective offices; at all reasonable limes during tite Contract aril for a period of three (3) years Following Completion of' the Contract. 17. Delays. That the C'onsullstrn shall not be liable 161. delays resulting 11•orn causes beyond the reasonable control of the Consultaill, that the Cclnstlllanl has made no warranties, expressed or implied, which are not expressly set 1i61'111 in this Contract; and that under no Circumstances will the ('onsultanl be liable fcir indirecl or consequential damages. 18. Notices.. All notices required or permilted herein under• and required to be in writing; may be given by 1'irst class mail adchrssc:d to the Director of Corrmnrnity Development, 320 I{ast McCarl,y. .1010Soll City, �I1issouri, (151(11 , ,trtd the Consultant, at (dormer & Shit'rin, htc., 5200 Oakland wertue, St, Louis, Missouri, Of 10. The date and delivery of any notice shall be the elate falling on the second full clay after the clay of its mailing;. 4 11.iC onomi171evi'mfeulonal Son iroI,nnoN Ai njinln, Ibiv54hatq,ManonPngnr(cnnmhb, Ir / r� 1 1 EXECUTED TIIIS,4DAY OI , 2004. GITY' JEFFERSON CONSULTANT O Oil Title: V e Pre s,.ks mot' ZIA11 TEST: ATTEST: y � Cit C erk Title: APPR D , /�O FORM: City Counselor a J lhlConrracl P(lalPrajee,lonal Srn-lcrxlllorner h Shtfilfi Inelllny 54 Pump SraNnn Project Canrrarl.Aoc PROFESSIONAL SERVICES FEE PROPOSAL FORM Page 1 of 5 Exhibit "A" To: Mr. Eric Seaman, P.E. Assistant Wastewater Utilities Manager City of Jefferson — Dopartment of Community Development 2320 Hyde Park Road Jefferson City, MO 65109 Proposal Date: June 11, 2004 Project Namo: Highway 54 Pump Station, Force Main, and Gravity Sewer Design and Post-Design Engineering Services 1. This fee proposal Is for a contract format of "Lump Sum Fee". All work and services to be provided shall generally be in full accordance with the Contract For Professional Services between the City of Jefferson and Horner & Shifrin, Inc. dated Auqust_3,_2004; with the specific tasks to be performed consisting of the items of work indicated by the individual line items presented on the spreadsheets (Exhibits "A-1" and "A-2") enclosed with this Fee Proposal Form. 2. Specialty Services a. Estimate of Number and Type of Subsurface Investigations (with the indicated number of borings proposed to include rock coring) For force main (approx. 2,800 I.f.): Due to planned side-by-side installation of sewer and force, main along same alignment, borings below for gravity sewer will suffice for force main. Sub-Total Estimated Geotechnical Cost For Force Main $ Zero For gravity sewer (approx. 2,800 l.f.): Type: Standard borings Number = 3 Cost = $ 1,875. Type: Borings w/ rock coring Number = 3 Cost = $ 3,300. Type: Probes for rock depth Number = 0 Cost = $ 0. Geotechnical Report Cost = $_1 t=,00: Sub-Total Estimated Geotechnical Cost For Gravity Sewer a; 6,775. For pump station: Type: Standard borings Number = 1 Cost = $ 800. Typo: Borings w/ rock coring Number = 1 Cost = $ 1,300. Geotechnical Report Cost == $ 2,700. Sub-Total Estimated Geotechnical Cost For Pump Station $ 4,800. Total Estimated Geotechnical Investigation Costs $ 11,575. FEE PROPOSAL tCant'd Page 2 of 5 b. Estimate of Number of Easements to be Premed (including costs to prepare legal descriptions and produce recordable plats) Assumed number of properties requiring easements 12 or temporary construction licenses Assumed number of plats to be prepared 12 ( assuming 1 plat per property ] Cost per plat (including associated $ 495.00 legal descriptions and area calculations) Total Estimated Easement Cost (12 x $ 495.) $ 5,940. C. Strip Meat) Preparation Total Cost For Preliminary Strip Map $ 4,280. 'Total Estimated Cost of Title Searches Zero. (assuming no Win searches will be needed) Total Estimated Strip Map Cost $ 4,280. d. Tupographic and Boundary Surveys Total Topographic and Boundary Survey Cost $20,110. Total Estimated Survey and Easement Preparation Costs $ 30,330. SUB-TOTAL OF ITEMS 2.a., b.,c. & d. $41,905. GRAND TOTAL OF SPECIALTY SERVICES COSTS $ 44,000. ( assuming that no flood study is necessary for pump station site, and applying 1.05 subconsultant administration charge ] 3. Non-specialty (Basic Services) Design Costs: Consultant's Estimated Labor Expense Position Man 'Total Estimated (lassif.) Flours Labor Expense Project Principal 36 Project Manager 220 Project Engineer 255 Civil Engineer 34 Sr. Enviro. Engineer 116 Environmental Engineer 62 Sr. Struct. Engineer 38 Stri.rctural Engineer 74 Mechanical Engineer 60 Electrical Engineer 122 CADD Designer 32 Sr. CADD Technician 250 ® CADD Technician 176 Clerical _44 Total 1,520 * $ 139,382. * Note: Spreadsheet showing breakdown of labor by work task is attached, for reference. FEE PRO,, OSAL CCont'df Page 3 of 5 4. Non-Specialty (Basic Services) Design Costs: Estimated Direct Costs Estimated Total Consultants' Direct Costs $ 9,418. (per attached summary) GRAND TOTAL OF NON-SPECIALTY (BASIC SERVICES) DESIGN COSTS $ 148,800. [ Line Item 3. 4. 4. ] 5. LUMP SUM DESIGN FEE Sum of Specialty and Non-Specialty Design Costs9.$ QQ, [ Line Item 2. + 3. + 4. ] 6. List of Proposed Subconsultants, Descriptions of Design Work, and Fee Amounts Subconsultant Description of Work Amount Central MO Prof, Serv. Topographic and Boundary Surveys $ 20,110. Easement Preparation $ 5,940. Strip Map Preparation $ 4,280. Title Searches $ 01 Geotechnology, Inc. Geotechnical Investigations $ 7,275. Geotech. Engineering / Reports $ 4,300. TOTAL $ 41,905. FEE PROPOSAL Cont'd Page 4 of 5 7. Post-Design Services - Consultant's Estimated Labor Exponso Position Man Total Estimated �Classif )_ Hours Labor EVerisq Project Principal 14 Project Manager 124 Project Engineer 122 Civil / Structural Engineers 36 Electrical Engineer 116 Mechanical Engineer 36 CADD Technician 136 Clerical 40 Total 476** $ 63,612. ** Note: Spreadsheet showing breakdown of labor by work task is attached, for reference. 8. Post-Design Services — Consultant's Estimated Direct Costs a) Estimated Total Consultants' Direct Costs $ 3,778. (per attached summary) b) Estimated Total Survey Sub. Field Inspecfor $ 7,560. Reimbursement For Post-Design Services e) Estimated Total Geotechnical Subconsuitant $_ 3,150. Reimbursement For Post-Design Services d) Estimated Grand Total Direct Costs For Post-Design $14,488. 9. POST-DESIGN SERVICES LUMP SUM FEE $ 78,100. [ for performing items of work indicated for both Bidding-Phase and Construction-Phase Services on enclosed spreadsheet (Exhibit "A-2") j 10. List of Proposed Subconsultants, Descriptions of Post-Design Work, and Fee Amounts [ Costs have been included in Item 13., above. ) Subconsultant. Description of Work Amount Central MO Prof. Serv. Construction Staking $ 0. (assumed to be contractor's responsibility) As-built Survey $ 0. (assumed to be contractor's responsibility) Part-Time Constr. Inspector $ 7,200. Geolechnology, Inc. Field Changes Geotech. Consult. 3,000 TOTAL $ 10,200. FEE PROPOSAL (Cont'd Page 5 of 5 11. Completion Schedule shall be essentially as previously presented in Consultant's Proposal dated May 14, 2004, with adjustments as directed by City staff (copy attached for reference). 12. Project Manager Bently C. Green, P.E. (314) 531-4321 (phone) and Telephone Number: (314) 531-6966 (fax) 13. Signature and Title of Authorized Representative By: Leo A. Ebel, P.E. Title: Vice President 14. Consultant: Horner & Shifrin, Inc. Address: 5200 Oakland Avenue St. Louis, Missouri 63110 Highway 54 Pump Station, Force Main, and Gravity Sewer Summary cif_Direct, Casts Included in Design and Post-Design Services Lump Sum Fees Deslan Vehicle Use Mileage Reimbursement say $ 840, Document Photocopying or Printing say $ 1,610. Long Distance Telephone and Fax say $ 286. Field Equipment Use Reimbursement say $ 230. Computer Use Reimbursement say $ 6,256. Misc. Direct Expenses (e.g. expedited deliveries) say 196. TOTAL $ 9,418. Post-Design Vehicle Use Mileage Reimbursement say $ 678. Document Photocopying or Printing say $ 745. Long Distance Telephone and Fax say $ 515. Field Equipment Use Reimbursement say $ 0. ® Computer Use Reimbursement say $1,565. Misc. Direct Expenses (e.g. expedited deliveries) say $ 275. TOTAL $ 3,778. 0 By: Horner & Shifrin, Inc. ,June 10, 2004 .7 7,7, —I —--———————- 7 Ll P 7% 7, 7 7 7. l u — ————————— ul ul 7-1 7 7- � d u d {; v ,..1',Ala cl Iq "13 u `q j, t7, 14,VI ,r 51 31 21 IA OIIK EE92APPWl..SOC413MUL.L4a; ,JEFFERSON CrY,MISSOURI 14.vy.51 Pump 5lnflnn,romp Mnln A ut.war POfiFDESIGH ENOINEBRING FEE ESTIMATE: Gxlilltil;'L>:2:' Tn0 TAah LAbof Luvol _ �_ j�.�.lLtl2 TnvltUm,_rll�llug M,H, Cr,<j /'P {'M PE CL''SS CE ME C1 � E+sl CI Idd n„L_Plt•ian Smvbani (�_ _ _ _ _ __ ( ___ __ A Vfwdn colitis of F'Ieen%A c;peca I'K biddnp"'omr unl-t it !nssumns flint Gly w91 tit iosponvbla lot Ilna D Aftond r na.sls!mih A d(xvmonl ono 1':m ILd Aino;ug1 +n _ __tl_ 0 0 0 2 C Assisl n+City sluff tnspon-i to quoallonA dunng buldm, ,- ••1., 16 -^ i1J_ 1: f, U �`• 0 0 U I'mI mA nerossarY Addnndn to Nld Docuntnnis pt nrey) _.�-1,^ h �;0 u A U 11 0 4 F: AsalM filly alr.lf wnlh bid oveilunbon/constr conifttcl nwnnl•• 14 0 2 .. Admui t bid phn.+o snrvir:ma by dnvgn ongr f Ind (iC r.hncFml�- IG_ 0 6 TOTAL MO-PHASE MANHOLIRS: UfA 6 'M Sri A --20 6 12 0 14 TOTAL ESTIMATED BID•PNASE LABOR COSTS PP PM PE CFJSE EE jI�ME CT I Est CI ^-P 2 __....-���_ ��n.�d�-`--PSI T'?L�.P�1 �WP.1 Conairunfiotl•Pllaan Snrvlrati: `.f.. -J_�_ �_ 1 Aliond PrmConslnrcLon Cotefrnnm fe wdh Cunlrnr vv IC 0 if) 0 0 2 Nndnw conlinctor subudlfnls(SbUp do twins) 161 0 �tl `� ^1 U (Assuming 25 ddloront submittal, 3 Rmopond to conlrnelor hold qum:dion<tire rlmsnpe+nlrvd 9C 1 11. 1+� I: 1 N 12 0 4 4 Hnsiow Aqulpmmd-mnlrmn)substttuhon rwjtj, -; 3: -_•--.._._0 K A U tl 4 _ 0 01 6 Coo(dln 1 ovW,c vlo Anih by su Acuns In ob•,o"n mash wail 10 ��. �0_ !8 V �. -0 .,-_U _ 0 _ 0 f Assundnll four 8+,r Nsds pot inch of 9 merrily;comer period - 6 nmr.lop U t1 M ManuAl lur pump slrVioh I)? 0 9 !0 0 `I; 6 32 0 8 7 Ptopore m;ord dwq� bom mlo supplend b;C.untractor vvl CI 4 -�^�-0 4 �-i --. -- ) 0 40 0 •�-0 8 Ptwido slnd•ulnfol ml opnr'(1 mw,l to(Ay-„41 lo,purt{.sinhi ?•1 0 G, --OT U 0 0 9 F'mpnre,S subnnl Mo)tffi C•gbG,mlm of 6 U C ^•--C, 0 U 0 1 0 •• Admin'f wimif•phnsm du wpeor rumocm:!i J 0t;1 14 _ -- 0 C p --:121 0 0 4 (Ind monthly pnxlmss mig nHor.donca) —� TOTAL CONSTR.-PHASE MANHGUR3: •176 A AO 9•1 28 96 30 124 0 26 TOTAL ESTIMATED CONSTH.•PHASE LABOR COSTS; ~517,616~ AINWENSES: Total PERSONNEL CLASSIFICATIONS LEGEND; 11,_uq Unit C`r•+d Blddbut•Pit.tsn Sorvh_�on' f'I! Proloct Pdnupal Gooh+chnlcr4 Subcrneullnnl Rwmbun.om,m' tITE 1 um !C F'1.1 Prolecl Manegor Sufvoying SUbaOn'.lt'lHll Fn,e 40 PE Proj9cl Engineeer M1dleagn 300 "A-. ;.110 ME 10odinnlcnl F:nyineor Con.putnr Sy,,!om list*Chat( ::0 hers, :J•10 FE fanelnet+l[ngmear Rnpaxluchon r ph„bcopy�ny - ;;•�; SI!.0 CE BE Uml i Slrucfutnl Enymnnr Lory D,sl fo'nptwno A Fa. ';Ay $10p Esl Lslmmlor b4sc L'mnct Laponvrs SA, _-_ =P0 Cl Cloncal(ndmmistrnlrvo) TOTAL ESTIMATED BID•PIIASE DIRECT EXPENSES- $408 (Indudmp ndrnm chg 1 Conslruclion•Phaso Servb:us; —•_ Gautnchmcil C;ubconaehami Rrum.bum--^iwnt f JTL Suivoylny Subconsullnnl(f Well ln�peotor) NJI: Few $1.:00 t'ldnarin 131,16 mdm.; 5475 Cun,putw Si,to,u t'<o(Jwtio•. f'9 h i"m $1,0;0 Papmdwdwn&('hnl L,nnl fat* NO.phonn!.I re. .. ,:n} 5350 Fluid f ywpnunel h.mnlnl I+ 30 1.6•,c 1'unrl Fi.pro;r,o•. , _ 5150 TUTAL ESTIM. CONSTR-PHASE DIRECT EXPENSES: 513,Wri j!ncluding ndtrm chit l TOTAL ESTIMATED LUMP SUM FEE 1-^ FOR BIDDING•PHASF. SERVICF S. I ^S II X506 N spn,nd•.hnol is wlbmdh,d FOR INFOHMATION 01'1LY, to m.Plmn I h o dmerulioft of Iho mash ours and lump Sum Fue TOTAL ESTIMATED LUMP' SUM FEE I <hvan un tie„Viet,1'top+»'.nl Fam il'At aL•.a WAS subrNlled FOR CONSTR.•PHASE 5ERVICL.5. L�S61L 94 ��r GRAND TOTAL POST•DESION SERVICES LUMP SUM FEE rr 578,un1 L' Homier t.r Steil rin y June 11,2004 COST ESTIMATE: IIREAKDOWN 11I0672.00,41TG Junc 8, 2004 IIIC:IINVAY 54 LIff STATION, FORCE MAIN AND GRAVITY SENVER JEFFERSON CI'T'Y, MISSOURI SUBSURFACE EXPLORATION SCOPE: L,ifl station and 2,800 lineal IM o1'lnl'CC main and parallel gravity;;ewer Borings required at lill station, and at 400 it. intervals alone sewer alignment to 10 11. below flowlinc. Flowline is 10 to 12 11. deep. Anticipate rock rock shallow along, sewer aligmn►cul 7 borings to auger rcll►sal (10'.), core 4 borings t0 20' iI'rell sal occurs above !towline Lake adjacent to sctivcr alignment. Chcck liar pern►cable zones into sewer cxcavation. Recommend Inundations, pipe bedding, excavation/back fill ing;, and water inlillia(io►► considerations. 70 11. ol'auger drilling; 40 It. ol'NX rock coring; FEE: ITEM 11NIT f 11A.NTITY (�OST EX'TE'NSION TOTA1, Fieldwork Utilities& Boring Coordination Flour It 580,00 5.320.00 Mobilization/Dcu►obilization Each 1 5750.00 5750.00 Drill Rig & Crew flour 20 $135.00 S2,70000 Support Vehicle(Water 'truck) Day 3 5;0.00 S 150 00 ® Logging & Ficid Observation Hour 20 SOO.00 S 1.200.00 Per Dicn► Each 6 505.00 $390.00 Support Vehicle(Pick III)) Day 3 $50.00 S150.00 Subtotal $5,660.00 Laboratory Testing Water Content Each 10 S3.1_►0 53(1.00 Atterberg Limit Each 4 S()().()() $240.00 Unconlincd Compression [ ach 6 $60.00 $300,00 Triaxial (per point) I?ach 2 S200.00 S-100.00 Pern►cabilily'Fest Each I $300.00 5:100.00 . Boring Log Preparation Each 7 S 15.00 5105.00 Rock Core Photos Bach It S25.00 5100.00 Sublotal $1,535.00 Erer•iueerh►e, Analyses & Report Principal 1-10111 2 5120.00 $240.00 Project Mimager Hour 8 51 1O.()0 5880.00 Scnior ungincer Hour 30 590.()0 52,700.00 CADD Technician I lour 8 ;;50.00 5400.06 Word Processor 110111- t S40 00 S100.00 Sublolal $4,380.00 ® TOTAL 11:S'TIM;A.TED \IAXIM(I1M FEE $11,575.00 O 2604 i il?ll'I'I?r1Ni)k x iY,INC, CENTRAL MISSOURI IPROI?ESSIONAI, SERVICES, INC. Surveying Scope of Services For HORNER & SHIFRIN HIGHWAY 54 PUMP S'1_;ATION, GRAVITY ff WER, AND FQR!CE MAIN 06/11/04 1. JOB SET-UP/RESEARCH Engineering Tech 8 hours @ $ 65 per hr. $ 520.00 PE/PL,S 8 hours @ $ 85 per hr. $_68000 $ 1,200.00 I1. UTILITY COOROINArl,[ON Engineering 'rech 16 hours a) $ 65 per hr. $1,040.00 PE/PLS 4 hours @ $ 85 per hr. 1 340.00 $ 1,380.00 111. 3-AC. SITE TOPO. (PUMP STATION AND ACCESS ROAD) 3-Man Crew 16 hours n) $115 per hr. $1,840.00 Engineering Tech 8 hours a, $ 65 per Syr. $ 520.00 PE/PLS 8 hours @ $ 85 per hr. I—O. X00 $ 3,040.00 IV. PRE-ALIGN fO ENT--3,000 to 3,500 L. 3-Man Crew 16 hours @ $115 per hr. $1,840.00 Engineering Tech 8 hours @ $ 6.5 per hr. $ 520.00 PE/PLS 8 hours a) $ 85 per hr. 680.00 $ 3,040.00 V. 3,000 to 3,500 L.F. TOPU— 100' W IIDTII 3-Man Crew 40 hours ri) $115, per hr. $4,600.00 Engineering Tech 24 hours Ca), $ 65 per hr. $1,560.00 PE/PLS 8 hours a) $ 85 per 111'. �$_C)80.00 $ 6,840.00 Vl, PROPER'T'Y BOUNDARY SURVEY OF .3-AC:. SITE 3-Man Crew 8 hours a $115 per hr. $ 920.00 Engincering 'Fech 24 hours a $ 65 per hr. $1,560.00 PE/PLS 4 hours Ca), $ 85 per hr. 1__3iQ100 $ 2,820.00 VR. LOCATE BORINGS 3-Man Crew 4 hours a $115 per hr. $ 460.00 Engineering Tech 2 hours @ $ 65 per hr. $.–M.-O-0 $ 590.00 Vdll. SURMI'I"TAI.S / REVISIONS Engineering Tech 8 hours a, $ 65 per hr. $ 520.00 PE/PLS 8 hours @ $ 85 per hr. $ 680.00 ,200.00 SUB-TOTAL FOR TOPO. AND BOUNDARY SURVEYS $20,110.00 IX. PROPERTY (EASEMEN'I') SURVEYS–3.000 to 3,500 l.. F. FOR STRIP MAP 3-Man Crew 8 hours @ $115 per hr. $ 920.00 Engineering Tech 20 hours @ $ 65 per hr. $1,300.00 PF/PLS 8 hours a) $ 85 per hr. 68000 $ 2,900.00 X. EASEMENT PRELIM. STRAP MAP PREPARATION ® Engineering Tech 16 hours @ $ 65 per hr. $1,040.00 PE/PLS 4 hours @ $ 85 per hr. 340.00 �380.00 SUB-TOTAL FOR PRELIM. STRIP MAP PREPARATION $ 4,280.00 Xl. EASEMENT P1,AT PREPARATION – UNIT COST (PER PLAT) Engineering Tech 5 hours u $ 65 per hr. $ 325.00 PE/PLS 2 hours @ $ 85 per hr. $ 170.00 $ 495.00 Assuming 12 plats, total, far project; then easement Plat preparation total fee would be $ 5,940.00 Total Planning Budget Survey Estimate: $ 30,330.00 • 1• .1 11RO.11"IC 1' PROGRESS PAYMENT SCHE' DULL, FOR City ol'Jef erso►a City, Missouri 1-lighway 54 Pump Station, Force Main, and Gravity Sewer EX11113iT "A-3" Scheduled Cumulative Cumulative Completion Expected IV,) Actual 'Yo Anticipated Schedule Milestones Date Complete Complete Receive Notice to proceed from City 07/20/04 --- --- A. Site visit, data gathering, staff interviews 07/26/04 1.0 and kick-Ulf sleeting B. Submit draft Pre-design Study Rcport 08/02/04 3.0 to City fir review C. Submit draft DBN/l, PCSP, and I'CCI-' 05/16/04 10.0 to City for review D. Submit 501X0 complete plans & sl)ccs. 09/20/04 45.0 to City for review E. Submit 95'%O complete plans & specs. 10/12/04 85.0 to City for review F. Transmit fully-completed plans & specs., 1 1/01/04 95.0 easement acquisition documents, and permit applications to City for use G. Transmittal ofstatement to City certifying that 12/01/04 100.0 consultant has fully perlormed all work in conforrnance with this Contract Sum ol'Actual 'YO Complete (to be entered on Invoice worksheet) I have checked the above submittals for adherence to the City's quality conh•ol sta►ulards, and have made any appropriate changes prior to submittal. 1-1 & S Project I of I