AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, APPROVING CHANGE
ORDER NUMBER ONE TO A CONTRACT WITH DON SCHNIEDERS EXCAVATING FOR
PROJECT NUMBER 2129 PERTAINING TO EAST MCCARTY NORTH BLUFF, AND
HAYS STREETS.
BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS
FOLLOWS:
Section 1 . The Mayor and City Clerk are hereby authorized to execute, on behalf
of the City, Change Order No. 1 to a contract with Don Schnieders Excavating for Project
Number 2129 pertaining to East Mccarty North Bluff, and Hays Streets, said change order
being attached hereto and by this reference incorporated herein as if more fully and
completely set out.
Section 2. This Ordinance shall be in full force and effect from and after the date
of its passage and approval.
Passed: Z C� _ Approved: S'.
?residing Officer Mayor
ATTEST: APPROVED AS TO ORM:
City Clerk r City Counselor
DEPARTMENT OF COMMUNITY DEVELOPMENT
ENGINEERING DIVISION
320 EAST MCCARTY STREET
JEFFERSON CITY, MISSOURI 65101
Change Order No. One (1) Project No. 32020 Date: July 26, 2004
Job& Location: ROADWAY IMPROVEMENTS: EAST MCCARTY ST., N. BLUFF ST., AND HAYES
ST.
Contractor: Don Schnleders Excavating
..................................................................................................................................
It is hereby mutually agrood that when this change order has been signod by the contracting parties, the following described
changos In the work required by tho contract shall be oxocutod by the contractor without changing the terms of(tic contract
except as heroin stipulated and agrood.
..................................................................................................................................
Description of Changos: SEE ATTACHED :SHEET'
...................................................................................................................,,..............
CONTRACTORS PROPOSAL FOR THE ABOVE DESCRIBED CHANGES:
I/Wo horoby agree to the modifications of the contract as doscrihod above and agree to furnish all materials;and labor and
perform all work In connection thorowith in accordance e with the roquironionts for slinilar work in existing contract except as
otherwise stipulated horoln, for tho following censidorations:
Contract Amount -Add To -or Deduct from - the Contract Amount $145,182.00 (One Hundred Forty Five
Thousand Ono Hundred Eight Two and 001100 Dollars)
Contract Time -Add To - or Deduct from - the Contract is _ 20 Working - Calendar days
STATEMENT OF CONTRACT AMOUNT:
Amount % Change 'rime
ORIGINAL CONTRACT $1,251,450.31 90
PREVIOUS APPROVED CHANGE ORDERS $0,00 0.0% 0
TOTAL THIS CHANGE ORDER $145,182.00 11.6% 20
TOTAL OF ALL CHANGE ORDERS $145,182.00 11,6% 20
CONTRACT AMOUNT TO DATE $1,396,632.31 110
................................................,..yam ................. ..................................................
Don Schnieders Excavating
DE o
1
, G�Recommended by: �1%
Engineofing Division Director. gate
Verification of Encumbrance: �i - 3 (�
Rnyco Dirpctor
Accepted by: r� }>v
Ownor "City Administrator DA
A'I TACI IMENT TO CI IAN61: ORDl':It NC). I
ROADWAY IMPIMI:MENTS: BAST MCCA10"i" ST., N. 111,1A.F ST., AND IIA)TS ST,
Pltt),II;C T NO. 32020
July 26,2004
Contmetor: Don Schnieders Excavating Company
1307 fairgrounds Road
Jefferson City, 1\40 65109
The first three items of thus change order address the instability ol'thc Slit)grad:: nmwrild fotuld tlpoll 1110 removal oFthe
existing pavement. These items co►lstitane the solution to the instability of the sub haze. 'I'hc lilurth item adjusts the contract
(file to errors in the design in the original storm wiper system.
Note: Items noted its IoW (extra work)are new line items with negotiated costs. The cost.lustilication for each of the items
is listed in parentheses at the end ol'cach explanation
1'I.1��1 EW 19 - I'Thick Sub-base Removal
SCOPF OF WORK:
The work included in this item shall include file I'll-nishilip ol'all labor,equipment, and material toil'the exc"wiltion o1'an
! additional foot of sub grade material and its removal from the site. The al'Icctcd area is csfinimcd io he 12140 square yards.
The item will be utilized after the still grade elevation has been established and it is determined that unsuitable nmterial
remains.
COST AND TIME':
The cost o1'this item shall be paid for at the rate of $2.75 per square yard. Tell days will he added to the contract for this
requirement. MSMcans 023-10-•110-4040 and 02320-200-0540)
ITEM EW 20 - 2" Base Rock (two G" lifts)
SCOPF(.)f WORK:
The work included in this item shall include the furnishing ol'all labor, equipment,and nmterial for the placement and
compaction ol'two 6" lifts o1'2" base rock under the typical cross Section of Fast McCarty Street. This item will be used in
conjunction with item I.W It).
COST AN1)TINA :
The cost o1'this item shall be paid liar al the rate ol'$14.10 per ton. Ten days will be added to the Crmtrild fin•this
requirement. M'Skleans 02300-4.10-0200 and 02320-200-0550)
ITEM EW 21 - Marifi 500x Geofabric (or equal)
SCOPE 01" WORK:
The work included in this item shall include the 1u1-nishing 01',111 Inhar,equipment. and material lux the placement of
geofabric. The filbric shall be used, as determined by the engineer, in areas where the tII1SUil IhIC 111;11CI'lill exists to I depth
Which is inlp►•actical to remove oncl replace.
COST AND TIM1i:
The cost of this item shall be laid for at a rate o1*$2.25 per square yard,using approximalely 2428 square yards. No
additional time will be given Cor this requirement. (RSMcans 02340-500.1500)
ITENI EW 22 - Stromwater Structure and Plpe Revisions
SCOPE Of WORK:
The work included in this item shall include the liu-nishing ol'all labor,equipment,and materit►I Ibr the changes needed due
to a design error. T'hesc changes arc detailed in the revised storm water profile shccls dated 5-13-04.
COST AND T'IMI':
The cost of this item shall be paid for as it fund sum totaling$0,244,00. No additional time will be given for this
requirement. ('Phis cost was based on lime and materials)
N
N
G
C
CU
CJ .�..
G
_C
O ..0
O U
i v
E O
U) V O v Ln
GV
O pi 00 >
C7 O
-
N c O L
cL3) - O
U O U
co 3 O U G U O
CV
`uJ .LUNG Cl N a .D L.
�) N O 3 O U G r
O
C
d t7 } 4 O O O
_.
7 p Q U C N O Cl O CL
CD (T O - (5C� CJ Q C:CL
X
o 0-
-G
i C
lu
o 0 Ml
r� a N 'v
�,. 3 —
40
1
r
U io o s 0-
c
O ---- - 8 O G� qbj G
(V 0 N — O
t!) y G C ..C O
U •x $
V) N a >
U) C7 '_p C
O O O 0
.t.
Ln Cn
w N G 0
� N ti N Cu
uJ r G C
0