HomeMy Public PortalAboutORD13759 BILL NO. 2004-50 SPONSORED BY COUNCILMAN MARTIN ORDINANCE NO._ f AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, APPROVING CHANGE ORDER NUMBER ONE TO A CONTRACT WITH DON SCHNIEDERS EXCAVATING FOR PROJECT NUMBER 2129 PERTAINING TO EAST MCCARTY NORTH BLUFF, AND HAYS STREETS. BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS: Section 1 . The Mayor and City Clerk are hereby authorized to execute, on behalf of the City, Change Order No. 1 to a contract with Don Schnieders Excavating for Project Number 2129 pertaining to East Mccarty North Bluff, and Hays Streets, said change order being attached hereto and by this reference incorporated herein as if more fully and completely set out. Section 2. This Ordinance shall be in full force and effect from and after the date of its passage and approval. Passed: Z C� _ Approved: S'. ?residing Officer Mayor ATTEST: APPROVED AS TO ORM: City Clerk r City Counselor DEPARTMENT OF COMMUNITY DEVELOPMENT ENGINEERING DIVISION 320 EAST MCCARTY STREET JEFFERSON CITY, MISSOURI 65101 Change Order No. One (1) Project No. 32020 Date: July 26, 2004 Job& Location: ROADWAY IMPROVEMENTS: EAST MCCARTY ST., N. BLUFF ST., AND HAYES ST. Contractor: Don Schnleders Excavating .................................................................................................................................. It is hereby mutually agrood that when this change order has been signod by the contracting parties, the following described changos In the work required by tho contract shall be oxocutod by the contractor without changing the terms of(tic contract except as heroin stipulated and agrood. .................................................................................................................................. Description of Changos: SEE ATTACHED :SHEET' ...................................................................................................................,,.............. CONTRACTORS PROPOSAL FOR THE ABOVE DESCRIBED CHANGES: I/Wo horoby agree to the modifications of the contract as doscrihod above and agree to furnish all materials;and labor and perform all work In connection thorowith in accordance e with the roquironionts for slinilar work in existing contract except as otherwise stipulated horoln, for tho following censidorations: Contract Amount -Add To -or Deduct from - the Contract Amount $145,182.00 (One Hundred Forty Five Thousand Ono Hundred Eight Two and 001100 Dollars) Contract Time -Add To - or Deduct from - the Contract is _ 20 Working - Calendar days STATEMENT OF CONTRACT AMOUNT: Amount % Change 'rime ORIGINAL CONTRACT $1,251,450.31 90 PREVIOUS APPROVED CHANGE ORDERS $0,00 0.0% 0 TOTAL THIS CHANGE ORDER $145,182.00 11.6% 20 TOTAL OF ALL CHANGE ORDERS $145,182.00 11,6% 20 CONTRACT AMOUNT TO DATE $1,396,632.31 110 ................................................,..yam ................. .................................................. Don Schnieders Excavating DE o 1 , G�Recommended by: �1% Engineofing Division Director. gate Verification of Encumbrance: �i - 3 (� Rnyco Dirpctor Accepted by: r� }>v Ownor "City Administrator DA A'I TACI IMENT TO CI IAN61: ORDl':It NC). I ROADWAY IMPIMI:MENTS: BAST MCCA10"i" ST., N. 111,1A.F ST., AND IIA)TS ST, Pltt),II;C T NO. 32020 July 26,2004 Contmetor: Don Schnieders Excavating Company 1307 fairgrounds Road Jefferson City, 1\40 65109 The first three items of thus change order address the instability ol'thc Slit)grad:: nmwrild fotuld tlpoll 1110 removal oFthe existing pavement. These items co►lstitane the solution to the instability of the sub haze. 'I'hc lilurth item adjusts the contract (file to errors in the design in the original storm wiper system. Note: Items noted its IoW (extra work)are new line items with negotiated costs. The cost.lustilication for each of the items is listed in parentheses at the end ol'cach explanation 1'I.1��1 EW 19 - I'Thick Sub-base Removal SCOPF OF WORK: The work included in this item shall include file I'll-nishilip ol'all labor,equipment, and material toil'the exc"wiltion o1'an ! additional foot of sub grade material and its removal from the site. The al'Icctcd area is csfinimcd io he 12140 square yards. The item will be utilized after the still grade elevation has been established and it is determined that unsuitable nmterial remains. COST AND TIME': The cost o1'this item shall be paid for at the rate of $2.75 per square yard. Tell days will he added to the contract for this requirement. MSMcans 023-10-•110-4040 and 02320-200-0540) ITEM EW 20 - 2" Base Rock (two G" lifts) SCOPF(.)f WORK: The work included in this item shall include the furnishing ol'all labor, equipment,and nmterial for the placement and compaction ol'two 6" lifts o1'2" base rock under the typical cross Section of Fast McCarty Street. This item will be used in conjunction with item I.W It). COST AN1)TINA : The cost o1'this item shall be paid liar al the rate ol'$14.10 per ton. Ten days will be added to the Crmtrild fin•this requirement. M'Skleans 02300-4.10-0200 and 02320-200-0550) ITEM EW 21 - Marifi 500x Geofabric (or equal) SCOPE 01" WORK: The work included in this item shall include the 1u1-nishing 01',111 Inhar,equipment. and material lux the placement of geofabric. The filbric shall be used, as determined by the engineer, in areas where the tII1SUil IhIC 111;11CI'lill exists to I depth Which is inlp►•actical to remove oncl replace. COST AND TIM1i: The cost of this item shall be laid for at a rate o1*$2.25 per square yard,using approximalely 2428 square yards. No additional time will be given Cor this requirement. (RSMcans 02340-500.1500) ITENI EW 22 - Stromwater Structure and Plpe Revisions SCOPE Of WORK: The work included in this item shall include the liu-nishing ol'all labor,equipment,and materit►I Ibr the changes needed due to a design error. T'hesc changes arc detailed in the revised storm water profile shccls dated 5-13-04. COST AND T'IMI': The cost of this item shall be paid for as it fund sum totaling$0,244,00. No additional time will be given for this requirement. ('Phis cost was based on lime and materials) N N G C CU CJ .�.. G _C O ..0 O U i v E O U) V O v Ln GV O pi 00 > C7 O - N c O L cL3) - O U O U co 3 O U G U O CV `uJ .LUNG Cl N a .D L. �) N O 3 O U G r O C d t7 } 4 O O O _. 7 p Q U C N O Cl O CL CD (T O - (5C� CJ Q C:CL X o 0- -G i C lu o 0 Ml r� a N 'v �,. 3 — 40 1 r U io o s 0- c O ---- - 8 O G� qbj G (V 0 N — O t!) y G C ..C O U •x $ V) N a > U) C7 '_p C O O O 0 .t. Ln Cn w N G 0 � N ti N Cu uJ r G C 0