Loading...
HomeMy Public PortalAboutDecember 2020 Pending Project Report (PDF)Watertown, MA Property Permitting & Code Enforcement Information Date of Report: 11/17/2020 Click on the Case # link to see more detailed information and any associated documents. Please contact the Department of Community Development and Planning for any questions at (617) 972-6427. Recently Submitted Applications Case # Date Filed Street Name Street # Project Description Status Hearing Date PB-2020-01 11/10/2020 Pleasant St. 330-350 Special Permit for an adult use/retail marijuana facility. Pending (Planning Board only) 12/8/2020 ZBA-2020-19 11/10/2020 Arsenal St. 615 Amend Special Permit (ZBA-2016-16) to modify the existing parking lot to add 50 parking spaces. Pending 12/16/2020 ZBA-2020-20 11/10/2020 Boylston St. 174 Special Permit Finding to construct a second-floor addition within a non-conforming rear and side setback. Pending 12/16/2020 ZBA-2020-22 11/10/2020 Galen St. 66 Special Permit and Site Plan Review for a new 4/5 story, 199,537 sq. ft. Lab/R&D building with 277 lower level parking spaces. Pending 12/16/2020 ZBA-2020-23 11/10/2020 Perry St. 17 Special Permit Finding to construct a second story addition within non-conforming setbacks. Pending 12/16/2020 DC-2020-03 11/10/2020 Elm St. 23-29 The Proposed Project involves the construction of a new three-story building and lower level garage. The building has a total gross square footage of approximately 78,000 square feet. The building is intended to be developed for research and life science purposes. Pending 11/24/2020 Watertown, MA Property Permitting & Code Enforcement Information Date of Report: 11/17/2020 Click on the Case # link to see more detailed information and any associated documents. Please contact the Department of Community Development and Planning for any questions at (617) 972-6427. DC-2020-04 11/10/2020 Mt. Auburn St. 705 Site Plan Review for the redevelopment of 705 Mt. Auburn St. into Office/Lab/R&D space of 480,986 sq. ft. (see associated case: DC-2020-05) Pending 11/24/2020 DC-2020-05 11/10/2020 Grove St. 64 Site Plan Review for the redevelopment 64 Grove St. into Office/Lab/R&D space of 55,806 sq. ft. (see associated case: DC-2020-04) Pending 11/24/2020 Pending Applications Case # Date Filed Street Name Street # Project Description Status Hearing Date ZBA-2020-12 8/11/2020 School St. 90 Special Permit to finish the basement to incorporate a new 2-bedroom dwelling unit (3 units total); and Special Permit Finding to increase preexisting 3rd story. Pending 11/18/2020 ZBA-2020-14 10/6/2020 Piermont St. 45 Special Permit Finding to add second story to a single- family home within the front and side yard setbacks required by Sec. 4.06. Pending 11/18/2020 ZBA-2020-15 10/13/2020 Bradshaw 38 Special Permit under Sec. 5.05(r) to construct a two-family dwelling with FAR greater than 0.5 Continued to December 12/16/2020 ZBA-2020-16 10/14/2020 Kondazian St. 46 Special Permit to allow construction of two light industrial bays to the side of an existing structure within the required side setbacks, Sec. 5.05d Continued to December 12/16/2020 Watertown, MA Property Permitting & Code Enforcement Information Date of Report: 11/17/2020 Click on the Case # link to see more detailed information and any associated documents. Please contact the Department of Community Development and Planning for any questions at (617) 972-6427. ZBA-2020-17 10/14/2020 N. Beacon St. 48 Special Permit for an Adult Use Marijuana Establishment, Sec. 5.01.5.l; and a Special Permit Finding for continuance of existing non-conformity, as the site has parking area and existing structures within the setback requirements set forth by the Zoning Ordinance, Sec. 4.06 Pending 11/18/2020 ZBA-2020-18 10/14/2020 Arsenal St. 202 - 204 Special Permit/Site Plan Review to convert a previously approved retail building to 87,332 sq. ft. Lab/R&D facility with 1,240 sq. ft., ground floor retail space, Sec. 5.01.5. e.2 Continued to December 12/16/2020 ZBA-2020-13 9/8/2020 Forest St. 142 Application for a Variance from §6.02 (j) to allow construction of a driveway in the front yard or otherwise provide off-street parking. Continued to December 12/16/2020