HomeMy Public PortalAboutMission Street ConstructionWelcome to the Mission Street
South City Limits to Deinhard Lane
Virtual Public Hearing
M I S S I O N S T R E E T | K E Y N O . 2 0 1 4 6
McCall, Idaho
Project Sponsor: City of McCall
Project Administrator: Local Highway Technical Assistance Council (LHTAC)
This project is funded through Idaho Transporation Department Reimbursable Agreement with
Local Match as part of STP Rural Federal Aid Program, administered by Local Highway Technical
Assistance Council (LHTAC).
Project Team
M I S S I O N S T R E E T | K E Y N O . 2 0 1 4 6
Local Sponsor: City of McCall
Project Administrator: Wayne Herbel, Local Highway
Technical Assistance Council (LHTAC)
Design Consultant Project Manager: Stephen
Waldinger, Forsgren Associates, Inc
Public Involvement Sub-Consultant: Sarah Beardsley,
Bionomics
The City of McCall is designing improvements to Mission St.
from South City Limits to the intersection of Deinhard Lane.
The existing roadway has begun deteriorating in the form of
potholes, cracking, and broken edges.
Reconstructing the road will improve safety, driving surface,
roadway drainage, and bicycle and pedestrian facilities.
Mission Street
M I S S I O N S T R E E T | K E Y N O . 2 0 1 4 6
South City Limits to Deinhard Lane
Construction is anticipated to begin 2027.
Design Details
The project will include a detached multi-modal pathway along a segment
of Mission St. to connect a missing section of North Valley Rail Trail
System from southern city limits to a multi-modal pathway at Jacob
Street. Other Improvements will include:
New 10' wide pathways will be constructed from South City
Limits to Jacob Street.
M I S S I O N S T R E E T | K E Y N O . 2 0 1 4 6
Mission Street will be rehabilitated and repaved throughout the
length of the project.
4' bicycle lanes will be constructed from Jacob Street to
Deinhard Lane.
Improve entrance to future Riverfront Park.
Construct roadside swales to help with stormwater conveyance,
snow storage capacity, and access management.
Project Location &
Limits
M I S S I O N S T R E E T | K E Y N O . 2 0 1 4 6
Located on Mission Street from South City Limits (just
south of Smokejumper Base) to Deinhard Lane.
The length of the project is approximately 0.6 miles.
Generally, the road runs south-north between the
North Fork Payette River and SH-55, west of the City of
McCall Airport.
Vicinity Map
Construct new 10’ wide paved pathway from South City Limits to
Jacob Street.
This will connect the missing link in the North Valley Rail Trail
system.
Primary Improvements & Impacts
Rehabilitate and repave Mission Street throughout length of
project.
Construct 4’ wide bicycle lanes from Jacob Street to Deinhard Lane.
M I S S I O N S T R E E T | K E Y N O . 2 0 1 4 6
Improvements:
Impacts:
Mission Street and business access will remain open throughout construction.
Construction traffic to be closed in one direction. Flaggers and
temporary signals are anticipated to control construction traffic.
Construct roadside swales to help with stormwater conveyance, snow
storage capacity, and access management.
Reduced access points to properties along Mission Street.
Project Funding
This project is funded through Idaho Transportation
Department Reimbursable Agreement with Local Match as
part of STP Rural Federal Aid Program, administered by
Local Highway Technical Assistance Council (LHTAC).
M I S S I O N S T R E E T | K E Y N O . 2 0 1 4 6
The City of McCall (Local Sponsor) responsible for 7.34%
match of project costs. The City's share of the project is
utilizing funds gained through the Local Option Tax (LOT).
Project Timeline
Preliminary Design
2020
Stakeholder Outreach
Fall 2021
Final Design
Spring 2022
Construction
Summer 2027
Please note: all project timeline dates are tentative
M I S S I O N S T R E E T | K E Y N O . 2 0 1 4 6
Bid Document
Delivering
Fall 2022
South City Limits to Jacob Street
M I S S I O N S T R E E T | K E Y N O . 2 0 1 4 6
Jacob Street to Deinhard Lane
M I S S I O N S T R E E T | K E Y N O . 2 0 1 4 6
We value your input.
If you would like to provide a verbal testimony about this project
please contact Sarah Beardsley at Bionomics by September 12, 2021
Phone: (208) 939-1022
E-mail: sarahb@bionom.com
Please note that all testimonies will be recorded for documentation
purposes.