HomeMy Public PortalAboutGAC Minutes 1990 09/06GOLF COURSE ADVISORY COMMITTEE MINUTES SEPTEMBER 6, 1990 7:00 P.M. Attending: D. Engen M. Williamson D. McCarty T. Whiteman D. Hormaechea Also Attending: C. Jackson J. Drips A. Laidlaw B. Schmidt B. Killen D. Medley J. Larson J. Drips Minutes from the August 14, 1990 meeting will be reviewed at the next committee meeting. New Business Clubhouse: Laidlaw presented the punch list dated August 31, 1990. Laidlaw told committee members there would be a meeting on September 8, 1990 with Rich Hormaechea and LT. General to discuss final grade of parking lot. Furthermore, Laidlaw listed additions: a. Slab on north side; b. A seven day extension; c. Monies to rehab parking lot. Laidlaw then asked the committee to confirm substantial completion. Whiteman then motioned to recommend to the City Council to accept substantial completion contingent upon the completion of the punch list. Engen seconded, all were in favor. the motion carried unanimously. Bill Killen Killen stated he has roughed out a form of agreement on behalf of golf course assistant pro Carl Hoss. The committee agreed that presentation of this agreement would be inappropriate at this time. Organizational Agreement of the Golf Course The committee discussed several reasons in opposition to the city running golf course operations. Some of those being no other golf course has been successful with a city employee for a golf pro; there's a $100,000 to $150,000 city investment needed; Class A golf professionals are schooled in the practices of merchandising and teaching rules etc., and the present program is highly successful. Whiteman motioned to recommend to the City Council the continuation of the present structure of management fee / concessionaire for golf professional services including practice range. Williamson seconded, all were in favor. The motion passed unanimously. Hormaechea motioned to recommend to the City Council the advisory committee be involved in development of specifications, negotiating a contract and selection of the golf professional. Williamson seconded, all were in favor. The motion passed unanimously. D & D Land Trade The committee will physically look at properties in question, and will discuss this proposal at their next scheduled meeting. No Smoking Sections in Clubhouse McCarty relayed a recommendation by the ladies association that there be no smoking in the Pro- Shop. After a brief discussion, Hormaechea motioned to restrict smoking in the Pro -Shop and only allow smoking in the lounge at the north end of the bar. The motion died from lack of second. Whiteman then motioned to reconsider the smoking issue if it is not mandated by state code at a future date. Hormaechea seconded. There was one vote against and three in favor. The motion carried. The meeting adjourned at 10:00 p.m. The next meeting is scheduled for September 17, 1990 at the clubhouse. Lytle_ Dave Engen, Chairman O9/06/90 15:5E $ 12083788007 LT GENERAL GENERAL CORPORATION GENERAL ENGINEERING CONTRACTOR 2604 ?2XN. Cole Rd. • Boise, Idaho 83704 Andrew Laidlaw McCall Design 8 Planning P.O. Box 729 McCall, Idaho 83638 September 6, 1990 Andy, As I have discussed with you, I do not believe that it is our responsibili bring the parking lot beck to a condition ready for paving. The landscaping contractor dug holes and piled Material in the parking lot the planters. He also used a portion of the east edge to store top soil e later for a disposal pile. The chip seal contractors have stockpiled their gravel on the SE corner. have dug into the berm in the SW corner. They have used the lot to stage equipment as well as cleaned the equipment out leaving large puddles of o that will need to be cleaned up. °The portions of the lot that are not to grade have been moved several time. Golf Course personnel making temporary cart paths. 10 put the entire perking lot back into a condition suitable for paving I estimate the cost will total $2,680.00. I will cover the costs of final gi and compaction for $767.00. This will leave $1,823.00 for excavation, compaction, cleaning, rough regrade, and gravel to be added to the contra°. - Allan T, Chandler REEDY ASPEN ALLEE 0 0 sPNvcE sr >•••••I� .0 N'IY7 e0 Nt 17! .KC... II INJI 10I•I5.•310, &re NMN7 Jnr eev11 .•rnr, N IJSII !OI•III•!NI f re ray.. h nn SKre7•y .O Soo ISJ Ntcel• y ISOM !OI • I JI •!N( I.'Y•••l MMItIJ: SO I• 'WI taw.. 2•I lr R7 N no.. r fwry•e/..f7 S /I r•K.w/ nor Noes /•17 r••r•Y.II 11 // /rrr, rrw ewI trwNrw 111...W., yI I•.•rt r I J Nrinal / Low Low el•.I//Kr ! ++r! I Oew1•I7 IIIYYwIy/ I •r. OrY IIyI !••• • II ISI K t ••fet/ yI • y.IS/.I /I ;�••lnr Y. • Ifll .411 ey• 11• 14390•I II CrMYw•we•• Ne • S//Is R N. PAINVIAr r woof tr AV:WM r TIMBERL OST VI SUBDIVISION 0 !S 50 L0 ISO JOO gZZ 0 6/ ,So•Z£I oM „0 ,00 098 N P ZO OZ t r'" I 0„_ 0Z8 N Of 9170 01 CO /gi ,pg 6.9b1 w :8i N '0 7 / 0cb yti / 8 d • N . _4.4 8 ni' co • • Gv ., VI O/ tA O 3 ..00 ,60 0£ 8 s a * g i/bZ 0v58, by 1 9 t£•9£I 3 ! IN)v 3..00,a£ 008 s H • 90b'O N v 8:ZbZ'o Z £/ 6 � �2 • ' to aoI$ cn GI igl ro 3'"00•££olt S f SZ'O )6s - .b8'96 •g/ 3 s O/I %2 „Ai bb 068 S A il 2 , £b0bt S • ^ �S �l 03 oiZ o ad ti / / / / /\ I , /g 8£I , c ••• • s 00• Q\ /''''‘ OO 4, /Za •/ /o,' / g /*- S'a�' 4 1 *- cP i 8� � �s / • F 9 „9£ , Lb 068 S •• 2'1 co v ti 2 • �m S,[D d f0 Oa •bd ` 1 .ijg 1L 5 It `/ /d7 .Ye 6 .p ,512 3Nd7 S1 N3 A13 - .( G� 33 tl 0 Jogai„8/g puny oN !su/ d 9 dJ cn 0 a O/ 6 F fr dDo ssofq punoj .,,./0 4. z,� rC 7 /0-as o a 0✓ //0.' w r s f)ij MC CALL GOLF COURSE CLUBHOUSE PUNCH LiST B/31/90 SITE Repair low spot at road junction ,,vi th Ready Lane. Dress road to profile sho,,,, n in drawings Find clean up cut bank. Parking lot - Remove and recompact soft spot: at planters (n. i. c.). Verify that fill along the edge in the area of the S. W. of the parking lot is properly compacted. Grade lot evenly and accurately to required grades. The south center portion of the parking lot slopes away from the catch basic-,. The east edge of the lot needs to be cleaned up, graded and compacted. - Slope lot to basin and fill lo'v'v' spot to West of basin. Remove dirt_ from the basin(n. i. c.). Parking lot should be ready for asphalt. A stub for po'yver is needed on the south side of the cart path at the SE corner building►: n. i. c.:►. Site grading Bring grade up higher @ entry stair. Use rocks from site to stabilize the earth. Complete _:and and grease trap to the _atisfa►_tion of the plumbing inspector. Slope grade away from the cover of the grease and sand trap. Add grade to P.IE corner of building to create a s'•,vale to allow drainage to the north side of the building. Finish painting steel parts of lift station. EXTERIOR Patch concrete walks and walls in the area of the repaired rails near the entry to the building. Ramp/step @ parking lot juncture may cause someone to trip. Something should be dune about this. Ends of handrail €1, 850. patio and at the bottom of tie pro shop stair wobble. They must be atrenthened Sand and touch up exterior door. The edges of many doors; are rough. Sand and touch up exterior door jambs. Astri cal at door # 10 is split out. INTERIOR General note- the. edges of most door._; are rough as are many jambs. Faces should also be touched up or repainted where required. Food Prep # 204 Install missing piece of base at East_ wall. Electrical room #205 Insulate attic access cover. Reconstruct insulation curb above access: cover. `service #20 Laminate counter Peas.: numerous: scratches. Pro Shop # 219 Entry door requires an additional cane bolt to the fluor. Women #21 There is a dent in the first toilet partition. Corridor # 104 Improve weather stripping and loci: action on door # G Locker Room # 102 Some lockers stick, #5, #20 Some locker doors are scratched'#46. Cart Storage # 1 U 1 Seal where electrical conduit goes through ceiling. Provide signs at ventilation closures. Attic Eaffels at eave vents are not as specified. This is impossible to fix now. insulation subcontractor should give the city a credit for this unauthorized substitution. Electrician to beat. tape sprinkler pipe over giulam as per EC1 request. Substantial Completion granted a:'' 3 1:' 0. Contractor to furnish the architect with lien releases from all subs and materials supplier's for monies paid to dote. MC CALL GOLF COURSE CLUBHOUSE PUNCH LIST 0/24/90 SITE Repair low spot at road junction with Ready Lane. Dress road to profile shown in drawings and clean up cut bank. Parking lot - Remove and recompact soft spots. Grade lot evenly and accurately to required grades. Note that the grader on site has. a crown in the blade. Slope lot to basin and fill low spot to 'v. est of basin. Parking lot should be ready for asphalt. - Site grading Bring grade up higher entry stair. Use rocks from site to stabilize the earth. Bring grade to above damproofing @ SE corner of building. Additional f i 11 is needed around the sewer lift station. Paint steel parts of .:.-:;ewer lift station. EXTERIOR South side handrail ramp rail- Remove lo,Her 24' of ramp rail. Remove upper ramp rail and . Install pickets similar to detail on North deck. Remove stair rails and install vfith Rawl Stud:_ to longer 4x41's along stair stern wall. Remoi..e guard rail in area of front door and install with longer 4r4's and Rawl Studs. Install pickets similar to detail on North deck. Siding on door of trash enclosure to be vertical. Screw plywood to back. Construct a screen fence to North of loading dock area. Construct gate loading dock ramp as per Addendum ° 1. Stain glulams under deck and paint structural :_steel. Deck zlx4 verticals on the NV.1 corner are not plumb. Side by side deck verti cah--; should be tied together. 95 )Zt' TL$ )05'£$ )00'S£$ )00'8$ )00'S$ )00'S$ )0Z$ 305'tT$ 0$ 00T$ OZT$ OZt' TL$ OOS'£$ 000'S£$ OOO'8$ 000'S$ 0001S$ OOZ$ 00S'tT$ 0$ OOT$ OZT$ OW TL$ 005'£$ 0001S£$ 000'8$ 000'S$ 000'5$ OOZ$ OOS'tT$ 0$ OOT$ OZT$ 006' 85$ 005'Z$ 00010T$ 000'8$ 000'S$ 0001S$ OOZ$ 0051tT$ OOZ'£$ 0001S$ OOS$ 0001S$ OW T9$ OOS'Z$ 000'0T$ 000'8$ 000'S$ 000'S$ OOZ$ OOS'tT$ OOZ'£$ 000'S$ 0001£$ 000'S$ h4D/seotA19S J914 O Te40AT, squalaoeTcled aagabd sdnNooH mPti squezpAH aaTd Puna Kouafa ewa •dTnb'3 / sduand-saTedaH guatudTnba-saTeded sbuTPTTng-saTedad seTgTTTZ' eoueansui spunjall aaa uoT4pauuoJ eoueuaquTeyi eapm430S buTaaauTbua seoTAxas TeuoTssajo d asuv o GMV saDTAmas 2imiI+O 50'ZW TO'Ot tO'ZW TO'Ot £0'ZW TO'Ot ZO'ZW TO'Ob TO'ZW TO'Ot 00' Z9t' TO' Ot 00'09t'TO'Ot 00'ZSfi+'T0'017 00'9W TO'Ot 00'gtV'TO'Ot ZO'Ztt'TO'Ot TO'ZtV'TO'0t 00' Ztt' TO' Ot 00' Ott' TO' Ot 000'5$ 000'S$ 0001S$ 000'S$ 0001S$ 000'S$ 0001S$ 000'S$ 006'L$ 0001S$ OOZ'Z$ OOL$ saTTddnS TRIAL seTTddns guamqapdaa abegsod saTTddns aoTJJO abegsad / saTTddnS aoTJJO S32 HMS 00'Z£t'TO'Ot ZO'T£fi'T0'017 TO'T£t'TO'Ot 00'TWTO'Ot 00' 0£i7' TO' 0V TeAoaddv TTounop ' oaa 'uTmpv gsanbag 'gdaa 06-686T gabpnS 68-8861 gabpn8 aTgTs 404(40 aecipun i 404g0 PTO qu'amiclaedaQ) guaiugapdaa aoueuequTpw pup suoT4eaadO aageM - asuadxS jo sgoaEgO 0'0 0'0 0'0 0'0 0'0 Teuuosaad jo xagwnN 6S8' £Z8$ 658' Ztt$ 6S8' Zi7t$ 6£L' S6Z$ TtL' T6T$ sesn ammo pue saangTpuada Tegoz 8LZ'OTT$ T95'Z$ 009'Z09$ 000'Z£$ 0Zb' TL$ 0001S$ 8LZ'OTT$ T951Z$ 009'TZZ$ 000'Z£$ OZv' TL$ 000`S$ 8LZ'OTT$ T9S1Z$ 009'TZZ$ 000'Z£$ OZfir' TL$ 0001S$ 8LL'£ZT$ T951Z$ 005'S0T$ 0$ 006' 85$ 000'S$ OTT'LOT$ T95'Z$ OLL'ZT$ 0$ OOi, ` T9$ 0061L$ qnO saa4sueay buTgeaadO aoTAxas ggaa AennO TegTdeo uoTgeToaadaa sabaem pue seowas aeg40 s jTcldnS TP-A.0add`d 'oau uTupTi 16-066T gsenbed gdaa T6-0661 06-686T gabpng quaazn.D 68-886T 49bpnt3 snoTAa d uoTgeoTJTsseTO aangTpuada TTounoO 16-066T panuTguoO - (Ot puna) punj aageM TeToueu d Jo A4TO T6-066T A&clA TeosTd - ueTd TTPDPYd INTERIOR General note- the edges of most doors are rough as are many jambs. Faces should also be touched up or repainted ;,rhere required. Food Prep # 204 Install missing piece of base at East wall. Electrical room #205 Tape ceiling of elec. rm #205 and paint room. Provide attic access hatch. Seal poor fitting duct on itaAle:t wall of room. Service #206 Laminate counter has numerous scratches. Edge all cabinet doors. Lounge 0201 Window sill to left of door i6 is scratched up. Cover plate in NE clg corner does not fit well. What is it for?? Pro Shop # 219 Entry door requires an additional cane bolt to the floor. What is cover plate in Stir corner clq. for?':' Provide slider buttons @ cabinet. Rental #216 Paint sprinkler riser pipes. Edge cabinet doors. Coors to be the same color- as the face frame e,ieri f y). Sand and repaint base shelf beg storage. Women #21 There is a dent in the first toilet partition. Fire Sprinkler Room '0` 103 Sprinkler system is not hooked up to the alarm. Alarm should dial the City of McCall direct. Repair hole in NE corner of ceiling. Install missing dry,ivall on West wall. Fire tape drywall. Grade lot evenly and accurately to required grades. Note that the grader on site has a 2" cro,ivn in the glade. Slope lot to basin and fill low spot to ',..Vest of basin. Parking lot should be ready fur asphalt. Site grading Bring grade up higher @ entry stair. Use rocks from site to stabilize the earth. Bring grade to above darnproofing @ SE corner of building. Additional fill is needed around the sewer lift station.