Loading...
HomeMy Public PortalAboutFiscal Year 2024-2028 Capital Improvement ProgramGeorge J. Proakis City Manager CITY OF WATERTOWN Office of the City Manager Administration Building 149 Main Street Watertown, MA 02472 Phone: 617-972-6465 www.watertown-ma.gov cityingr@Watertown-ma.gov To: Honorable City Council From: George J. Proakis, City Manager�� Date: January 24, 2023 RE: Fiscal Year 2024-2028 Capital Improvement Program Pursuant to the provisions of the Watertown Home Rule Charter, the attached City Council Resolution on the Fiscal Year 2024 Budget Process, and the City Council Resolution on Watertown's Ongoing Capital Project Budget Guidelines, I herewith present the Proposed Fiscal Year 2024-2028 Capital Improvement Program (CIP). The proposed Fiscal Year 2024-2028 General Fund CIP totals $245,741,100. The general obligation bonding requirement for the Fiscal Year 2024-2028 CIP is $161,394,300. As you are aware, the Capital Improvement Program is the method used to realistically show relatively expensive and higher -cost equipment and projects that need to be planned to ensure the City's infrastructure is adequately maintained. Background While it is easy to not fund maintenance repairs and equipment replenishment until something either falls down or stops running, this is poor planning, for at least two reasons: 1. It does not reflect the true cost each year of an item. 2. By maintaining buildings and equipment in good repair, the useful life of the item can be extended at a reasonable cost. Many communities wait until buildings, vehicles or equipment are in such a state of disrepair that a major overhaul, repair, or replacement is required at much greater expense. Therefore, to maintain and improve its infrastructure, facilities, and equipment, the City should expect to make annual capital expenditures of at least 7.5% to 8% of the General Fund budget. A capital item is an asset with a useful life of at least two years and a purchase price of at least $15,000. Items costing less than $15,000 are included in the operating budget. In addition, items that are labeled "TR" or "tax revenue" are included both in the CIP (because of their relatively large expense) and in the "Capital Outlay" lines of the operating budget for the relevant departments. The attached document is the Proposed Fiscal Year 2024-2028 Capital Improvement Program. In the coming days we will update our projected debt chart to reflect this updated plan. Please note that, as we review financing, if we find that we are unable to afford all of the items in the early years of the CIP, some items may need to be adjusted, delayed, or removed from the chart. Parker Annex Building An exciting addition to the 2024-2028 Capital Plan is our new office building, the former Parker School, which we are calling the Parker Annex Building. While we now own this new asset, it comes with several new capital items to ensure that it remains in a state of good repair and meets the City's needs for additional office space. There are some items that need to be addressed this fiscal year, including but not limited to: 1. Carpet, painting, and minor wall relocations for office space. 2. Initial investment in providing network access to City departments in the building. 3. Regrading, repaving, and restriping the parking lot in order to create ADA-compliant parking spaces. 4. Design costs for a fire suppression system, the installation of which is proposed in the CIP in Fiscal Year 2024. We will submit a funding request in the coming weeks so that we can begin to address these items as soon as possible. There are additional upgrades in the next five years identified in the CIP under a new Parker Annex Building category. The IT department category is also impacted, with additional technology upgrades required for the new building. A Note about Inflation After many years of low interest rates and steadily escalating costs, the past year has seen significant increases in construction costs. This has already impacted some of the Fiscal Year 2023 CIP items as they have gone to bid in the past year. We anticipate that the rate of inflation will slow, but costs are unlikely to come down. Therefore, several cost estimates have been adjusted accordingly this year in anticipation of higher costs. We also continue to monitor interest rates on municipal bonds for their impact on city borrowing. 2 Long-range Planning As with all forecasts, the Proposed Fiscal Year 2024-2028 CIP may change, due to long-range planning efforts. In particular, we have focused on a few areas where forthcoming change may have an impact on CIP strategies. Parks and Open Space Included with this memo is a new schedule for parks and open space projects. This schedule is designed to address recent questions about the schedule of projects that are currently in design. Parks projects are a significant part of the list of proposed loan orders from previous years. To provide a full perspective and to get these projects back on track, we have begun working with three different landscape design firms and will likely seek a fourth firm to work for the City on the Walker Pond site. While this will accelerate the work on park and open space improvements, the projects still need to be lined up in a way that ensures adequate time for public involvement in design, resources and staffing for construction administration, and access to fields for school and recreation programs. The schedule on page 9 is designed to address those concerns and is consistent with numerous items confirming and reconfirming parks and open space investments from prior year CIPs. Additional Studies In the forthcoming year, we will seek to undertake studies that may have an impact on the later years of the Plan. These studies are: 1. City Building Use and Space Study: This was recently supported by a budget amendment approved by the City Council. This study will look at the Parker School, City Hall, and Phillips School/Senior Center campuses to ensure that we are placing the right uses in the right places. Capital repair items for the Phillips School and Senior Center may change based upon the results of this study. This study incorporates the Phillips School / Senior Center feasibility work identified in Fiscal Year 2023-2027 CIP recommendation #23. 2. Watertown Square Plan: The CIP includes $1 million in funds in Fiscal Year 2024 for the police station to most likely be demolished. Funds for a new building on this site have been removed. This strategy is consistent with the recommendation from the Economic Development & Planning Committee after reviewing the options for this building per Fiscal Year 2023-2027 CIP recommendation #29. The plan will look holistically at the Watertown Square area, will identify and refine future uses in the area and will identify potential future uses of the former police station site that may be appropriate to address in a future capital plan. Additional funds for streets, sidewalks, and parking lot upgrades may also be required if these improvements are identified in the plan. 3 3. Heating / Cooling Systems Analysis: The CIP identifies nearly $4.5 million of HVAC work for multiple buildings. The proposed Fiscal Year 2024 operating budget will include funding for a study of all City buildings that do not have a newly installed HVAC system to determine the useful life of the existing equipment and, consistent with the Resilient Watertown Climate and Energy Plan, plan for upgrades to more energy -efficient systems such as air -source or geothermal heat pumps. This study could affect the following CIP items in future years and could also generate new CIP items: Building Item Cost Year Administration HVAC HAU-1 above Council $650,000 FY 2024 Building Chambers Replacement Administration Fan Coil Units and Air Handling $900,000 FY 2025 Building Unit Ventilators Replacement Parker Annex Roof Top Units (RTUs) Heating $200,000 FY 2024 and Cooling Replacement $150,000 FY 2027 Main Fire Station HVAC Replacement $100,000 FY 2027 Library Chiller & Roof Top Units Design $50,000 FY 2024 Library Heating System & Controls $120,000 FY 2024 Replacement Design Library Chiller Replacement $200,000 FY 2024 Library Rooftop Compressors $416,300 FY 2024 Replacement Police Fire Range HVAC Upgrade $800,000 FY 2027 Middle School HVAC (VRF) Basement $72,000 FY 2024 $400,000 FY 2025 Phillips School Boiler #2 $200,000 FY 2024 Senior Center HVAC equipment $150,000 FY 2027 Skating Rink Boilers $50,000 FY 2025 Total $4,458,300 FY 2024 — 2028 4. Fleet Electrification and Replacement & Vehicle Charaina Infrastructure Studies: The proposed Fiscal Year 2024 operating budget will include funding for a systematic assessment of all City -operated vehicles (except for fire apparatus) with the primary goals of establishing replacement schedules for these vehicles and, consistent with the Resilient Watertown Climate and Energy Plan, identifying vehicle electrification opportunities. It will also include funding for a study to identify the electric vehicle infrastructure needed to support the City's transition to a more electrified fleet as well as provide EV charging stations for resident use at City buildings. This study could affect the following CIP items in future years and could also generate new CIP items: 4 Category Item Cost Year Fire Chief and staff vehicles (3) $80,000 FY 2025 Police Cruisers (3 annually) $209,500 escalated annually Annually Police Pick -Up Truck and Trailer $88,000 FY 2025 DPW Administration EV Stations $90,000 Annually Central Motors Inspectors' vehicles $70,000 Annually Central Motors Supervisor vehicle $50,000 FY 2026 DPW Highway Skid Steer $65,000 FY 2025 DPW Highway Rack Truck $150,000 FY 2024 DPW Highway Crew Truck $180,000 FY 2024 DPW Highway Heavy Duty Dump Truck $230,000 FY 2027 DPW Highway Electric Street Sweeper $600,000 FY 2027 DPW Highway Backhoe $150,000 FY 2028 DPW Highway Loader $325,000 FY 2028 DPW Highway Hot Box $300,000 FY 2026 DPW Highway Dump Truck with Sliding Sander & Plow $290,000 FY 2028 DPW Snow & Ice Removal Plows, Sanders, Salt Control Units / Replacement $80,000 per year Annually DPW Snow & Ice Removal Salter 6-Wheeler-Snow Fighter (5) $300,000 $320,000 $340,000 FY 2024 FY 2026 FY 2028 DPW Snow & Ice Removal Loader 3/4 Yard $107,000 FY 2025 DPW Snow &Ice Removal Sidewalk Tractor ($200,000 in FY 2027) $200,000 FY 2027 DPW Cemetery Off Road Utility Vehicle 44 $30,000 FY 2025 DPW Cemetery Backhoe $140,000 FY 2025 DPW Property/Building Heavy Duty 44 Forklift $100,000 FY 2024 DPW Property/Building Rough Terrain Forklift $95,000 FY 2026 DPW Parks & Forestry Tree Chipper $75,000 $75,000 FY 2024 FY 2025 DPW Parks & Forestry Utility Truck $65,000 FY 2024 DPW Parks & Forestry Farm Tractor $80,000 FY 2027 DPW Parks & Forestry Backhoe $140,000 FY 2027 DPW Parks & Forestry 44 Landscape Dump Truck $160,000 FY 2027 Public Buildings New Maintenance EV $70,000 FY 2024 Public Buildings Sidewalk snowblower/cabs $60,000/year FY 2025, FY 2026 & FY 2027 Public Buildings Pick Up Truck with Plow $60,000 FY 2025 Total 1 $7,402,600 FY 2024 - 2028 5. Comprehensive Plan: As you are aware, Watertown is currently updating the citywide Comprehensive Plan. While we are not yet able to identify CIP items that may be impacted or required by the plan at the end of the process, there may be necessary CIP updates in coming years to implement the comprehensive plan. Community Preservation Funds CPA funds are distributed after a vote from the Community Preservation Commission (CPC) and the City Council. Due to the important advisory role of the CPC, the CIP will not identify an item as CPA funded until the CPC has approved such an item. But, there are a few items in the CIP this year marked as "TBD" that could be funded with CPA funds, if approved by the CPC. These include: 1. Gazebo at Saltonstall Park ($900,000 in Fiscal Year 2024) 2. Bike Path — Waverley Avenue to Main Street ($500,000 in Fiscal Year 2024) 3. Design and Construction at Walker Pond ($250,000 in Fiscal Year 2024 and $2.5 million in Fiscal Year 2025) Unfunded Items In addition to the items listed above for which we will seek community preservation funds, the funding sources of the following items have not been determined and are identified as TBD: 1. Former North Branch Library Renovation/Reuse ($1.1 million in Fiscal Year 2024) 2. Multi -Service Center Renovation ($500,000 in Fiscal Year 2024) Grant Funds In the last twelve months, our state and federal government have proposed several new grant opportunities that could be beneficial to Watertown. We are grateful to our state delegation for securing a $900,000 grant towards the work at Saltonstall Park and to our federal delegation for securing $240,000 to install 15 stormwater tree trenches. We are monitoring state efforts around dedicated funds and new state programs that will hopefully come from the incoming Governor's administration. We are also seeking potential opportunities for direct local grants of funds under the federal Bipartisan Infrastructure Bill and the Inflation Reduction Act (which includes numerous grants for energy efficiency and climate priorities). As you are aware, the Honorable City Council is working to address the use of the $10.5 million in federal funds that the City received through the American Rescue Plan Act of 2021 (ARPA). These funds may be used for a variety of purposes, but many capital items qualify to use ARPA funds, including improvements to drinking water, wastewater and stormwater systems, and expanded access to broadband. A School Department The Fiscal Year 2024-2028 CIP includes funding of various school improvements totaling $106,977,000 over the next five fiscal years. The breakdown of these improvements are as follows: New High School Project $100,000,000 Cunniff School Projects $275,000 Hosmer School Projects $455,000 Lowell School Projects $60,000 Middle School Projects $2,957,000 High School Furniture $125,000 Phillips School $1,995,000 District $1,110,000 TOTAL $106,977,000 The School Department CIP includes funds for projects on two recently opened elementary schools. Some of these items are important for the operation of these new schools, but have not been, to date, included in the scope of the original school construction project. They have been placed in the CIP in forthcoming years to ensure that each year's school capital projects operating budget remains in the $300k to $400k range. Per Fiscal Year 2023-2027 CIP recommendation #24, this capital appropriation request in Fiscal Year 2023 was approved at $310,000. In the event that these schools finish under budget, additional project budget may replace tax revenue to cover items on the CIP in these new buildings that were not in the original project scope but are nonetheless related to the original project. These include such items as audio systems, wallpaper/decals, cell communication enhancements at the two elementary schools as well as the north parking lot swing gate, power shades and shade structure above the playground at the Hosmer School. In the alternative, funds from the Fiscal Year 2023 School Capital Projects operating budget may also be able to be repurposed for these topics, thereby accelerating their completion. The School Department CIP also includes funds for work at the Phillips School, and that information may change as a result of the outcome of the forthcoming City Building Use and Space Study. This larger study including the Parker Annex and the Administration Building will incorporate the Feasibility Study for the Phillips School / Senior Center site per Fiscal Year 2023-2027 CIP recommendation item #23. The Honorable City Council's Fiscal Year 2024 Budget Policy Guideline II.C. reads as follows: Continue support for Building for the Future Initiative funding in collaboration with the School Building Committee, for the Three Elementary Schools project, and for the MSBA High School project, without debt exclusion funding. 7 Based on that Budget Policy Guideline, $100 million for the New High School Project has been included in the CIP in Fiscal Year 2024, which is in addition to the $100 million that was in the previous CIP in Fiscal Year 2023, both of which are consistent with the Council's approval of a $200 million loan order in 2022. CIP memos from previous years include a robust introduction to the history and schedule of the Building for the Future Initiative, and the administration can provide that information to the Honorable City Council upon request. Streets and Sidewalks Street and sidewalk maintenance is one of the top priorities in the Honorable City Council's Fiscal Years 2009 through 2024 Budget Policy Guidelines. Within the Fiscal Year 2024-2028 CIP, $72,855,600 is designated for street and sidewalk improvements. This includes the Mt. Auburn Street corridor project, which is substantially covered by state transportation funding. Local funds for non -participatory work, land acquisition, and project lay-down/storage space are included in the CIP. The CIP also includes a new item for ornamental street lighting. Chapter 90 funds are increased to $375,000 per year. Locally funded projects including the connector roads/long streets project as well as locally funded highway reconstruction and sidewalk reconstruction have all been increased to reflect higher construction costs. The CIP also recommends adding another year of funding for underground duct work in Fiscal Year 2028. Parks and Recreation Proiects The City has undertaken, with the support of the Honorable City Council, significant parks and open space upgrades and improvements through the CIP in recent years. With the arrival of the pandemic, the uncertainty around the recession and supply chain challenges, many of these projects are behind schedule. To ensure that we are working towards a common schedule for project completion, I recommend that the Honorable City Council confirm a new schedule for parks completion. This schedule is aggressive but achievable, as long as there are no financing, operational, or staffing challenges that limit the ability to complete this schedule. It will ensure that we have excellent park facilities, while providing adequate space for our recreation programs during construction. This is consistent with Fiscal Year 2023-2027 CIP recommendation #30, suggesting that construction phasing be consistent with citywide field usage needs. Recommendation #30 also suggested an assessment of the turf at Victory Field. This will be addressed in a forthcoming memo and recommendation to the City Council. Consistent with Fiscal Year 2023-2027 CIP recommendation #31, the special needs baseball/softball diamond remains on the CIP and has been moved to 2025 while we work to determine if there is an appropriate site in Watertown for this very meaningful community investment. Below is the proposed construction schedule: Project Construction Timeline Calendar Year CIP Fiscal Year Irving Park Spring/Summer 2023 none (CPA) Moxley Court Summer 2023 2016 Filippello Splash Pad Summer 2023 2021 Upgrade Victory Field Turf June 2023 2023 Upper Saltonstall Park / Gazebo Fall 2023 - Spring 2024 2024 Arsenal Phase B Fall 2023 - Spring 2024 2021 Victory Phase II Spring/Summer 2024 2017 Lower Saltonstall Summer 2024 2019 Lowell Playground Summer 2024 2020 Casey Park and Playground Summer 2024 2017 Walker Pond Summer 2024/2025 2025 Howe Playground Summer 2025 2023 Bemis Playground Summer 2025 2021 and 2024 Sullivan Playground Summer 2026 2022 Victory Phase III Summer 2026 2023 Filippello Grove Playground Summer 2026 2026 Moxley Field Fall 2026—Spring 2027 2026 and 2027 Filippello Arlington Playground Summer 2027 2027 Victory Tot Lot Summer 2028 2028 Additional Items to Note Administration 1. City Hall Roof Replacement has been moved out two years. 2. City Hall fire alarm system has been increased by $100,000. Community Development 1. CIP includes new commitment to public art, with increased funding for this item. Information Technology 1. Additional funds have been added across a number of lines to address higher costs. 2. New items have been added for Hybrid Meeting Technology and IT Governance. 3. Video Security and Access Control is changed from BE to TR. 4. Fiber Loop Build -out and Cabling is changed from BE to TR. 5. We are increasing the annual budget for document scanning, as this has become a very effective strategy for cleaning out the old police station, opening up space at City Hall, and effectively organizing our records. 6. An additional year has been added to the Public Wi-Fi project. 0 Fire Department 1. Funds for the East End Station have been adjusted and assigned to Fiscal Year 2027. 2. Main Station Concrete Coating for Apparatus floor changed from BR to TR. 3. Kitchen ductwork project is rolled into the Main Station interior project. 4. Station alerting system increased by $15,000. 5. Vehicle costs increased to address inflation. 6. Firefighter protective outer gear increased by $20,000. 7. New items added in Fiscal Year 2028 to replace Main Station shop air compressor, boat, and special rescue trailer. Police Department 1. Budget includes funding for in -cruiser video system and body worn cameras. These items are currently subject to collective bargaining. 2. Computer -aided dispatch records management system increased by $19,000. 3. New items for replacing the training simulator computer system in Fiscal Year 2025, and HVAC upgrade for the firing range in Fiscal Year 2027. Public Works Department: 1. New items in DPW include: o Design of solar canopy in Fiscal Year 2024 o Backhoe in Fiscal Year 2028 o Loader in Fiscal Year 2028 o Hot Box in Fiscal Year 2026 o Dump Truck with Sliding Sander and Plow in Fiscal Year 2028 o Backhoe for Cemetery Division in Fiscal Year 2025 2. We are adding an additional three years of commitment to EV station installations citywide, through Fiscal Year 2028 and also studying this item as part of the Fleet Electrification and Replacement & Vehicle Charging Infrastructure Studies. 3. Salt shed repair has become an immediate issue. This is identified as a Fiscal Year 2024 item. 4. Saltonstall Park is a project that includes a $900,000 earmark and $150,000 for design as well as $900,000 for the final gazebo. As noted above, the gazebo will be requested from CPC and is therefore TBD on the plan. Public Buildings 1. Sidewalk snowblower/cabs and equipment inventory are moved out one year. Senior Center See note above about the Senior Center. Capital items have been moved out in anticipation of the study on the future of the building. New items for Fiscal Year 2027 are in place for HVAC equipment and meeting room flooring, which may change pending decisions about the building and the Heating / Cooling Systems Analysis. 10 Skating Rink 1. Electric ice servicing machine and lighting upgrades have been moved out one year. 2. Major work at skating rink remains to be done in Fiscal Year 2023, including: a. Handicap ramp (in 2021 CIP) b. Boards glass (in 2022 CIP) c. Replacement of the ammonia detection system (via budget transfer) d. Replacement of stands (in 2023 CIP) Water and Sewer Enterprise Funds Capital Improvement Program (CIP) The proposed Fiscal Year 2024-2028 Water and Sewer Enterprise Funds CIP is forthcoming and will be submitted to the Honorable City Council in the coming days, along with a memo summarizing relevant background information. All of the work to the water, sewer, and drain systems directly impacts water and sewer rates. Interest -free loans and grants, when secured, will enable the City to perform necessary work with little or minimal impact on ratepayers. Loan Orders from Previous Fiscal Years The following items were incorporated in previous years' CIP documents and re -confirmed by the Honorable City Council in recommendations during the review of the Fiscal Year 2023-2027 CIP in March of 2022. Fiscal Year 2016 Unfinished CIP Protects Project Amount Council Rec. Status Moxley Courts $1.3 mil Reconfirmed #1 scheduled 2023 Fiscal Year 2017 Unfinished CIP Proiects Project Amount Council Rec. Status Casey Park Renovation $950k Reconfirmed #2 scheduled 2024 Victory Phase II $3.0 mil Reconfirmed #3 scheduled 2024 Fiscal Year 2018 Unfinished CIP Proiects Project Amount Council Rec. Status Community Path Design $325k Reconfirmed #5 in process Fiscal Year 2019 Unfinished CIP Proiects Project Amount Council Rec. Status Saltonstall Lower Park Improvements $300k Reconfirmed #6 scheduled 2024 11 Fiscal Year 2020 Unfinished CIP Protect Project Amount Council Rec. Community Path Taylor to Linear $3.0 mil Reconfirmed #8 Fiscal Year 2021 Unfinished CIP Proiects Project Amount Council Rec. Arsenal Park Renovation Phase B $6.35 mil Revised amount #9 Filippello Spray Park $400k Reconfirmed #11 Skating Rink Improvements $300k Reconfirmed #12 Fiscal Year 2022 Unfinished CIP Proiects Status estimated 2024 Status scheduled 2023-24 scheduled 2023 scheduled 2023 Prolect Amount Council Rec. Status Various (Middle) School Improvements $3.1 mil confirmed #15 forthcoming Connector Roads / Long Streets $1.5 mil confirmed #17 underway (Moore St) Sullivan Playground $425k confirmed #19 scheduled 2026 Design of Victory Field House Addition $375k confirmed #20 scheduled 2026 Skating Rink Improvements $265k confirmed #21 scheduled 2023 Fiscal Year 2023 Unfinished CIP Proiects Project Amount Status Admin Building Design Masonry & Metal $40k forthcoming Admin Building Design HVAC-HAU CC $120k forthcoming Admin Building Design lighting/access $60K forthcoming Admin Building Design roof repairs $45k forthcoming IT Infrastructure improvements $300k forthcoming IT Permitting/transparency dashboards $100k forthcoming IT document scanning $100k forthcoming Library repair children's room water $125k forthcoming Library replace boilers and pumps $200k forthcoming Library design chiller & RF $50k forthcoming DPW Admin Bldg. Roof Replacement $2 million forthcoming Cemetery off road vehicle $30k forthcoming Prop/Bldg. Boiler replacement $200k forthcoming Victory Field House Addition/Renovation $4 million scheduled 2026 Victory Field Turf Replacement $1.5 million scheduled 2023 Howe Park Playground $500k scheduled 2025 Senior Center Roof Repairs / Replacement $150k under review Senior Center Painting $50k under review Rink replacement of stands $200k scheduled 2023 rnnrh icinn I look forward to working with the Honorable City Council in their review and adoption of conceptual recommendations on the Fiscal Year 2024-2028 Capital Improvement Program. cc: Honorable School Committee Honorable Library Board of Trustees School Building Committee All Department Heads 12 Watertown City Council Administration Building 149 Main Street Watertown, MA 02472 Phone: 617-972-6470 ELECTED OFFICIALS: Mark S. sideris, RESOLUTION # �� 2022 — R — Council President Vincent J. Piccirilli, Jr., RESOLUTION ON THE FISCAL YEAR 2024 BUDGET PROCESS Vice President & District C Councilor WHEREAS: Article 5 of the Watertown Home Rule Charter sets out a process for the John M. Airasian development and adoption of the annual operating budget and capital improvement Councilor At Large program; and Caroline Bays, Councilor At Large WHEREAS: The City Council wishes to establish a timeline, consistent with the Charter, by which it will provide policy guidance to the City Manager on the John G. Gannon, Councilor At Large development of the budget and capital improvement program; and Anthony Palomba, WHEREAS: Such a timeline will also give City residents notice of their opportunity Councilor At Large to offer input on these important financial matters; Nicole Gardner, District A Councilor NOW THEREFORE BE IT RESOLVED: That the City Council of the City known Lisa J. Feltner, as the City of Watertown establishes the following timeline for the development of the District B Councilor Fiscal Year 2024 operating budget and capital improvement program: Emily Izzo District D Councilorget vervew wpresented ty 1. The Fiscal Year 2024 PreliminaryBud Overview be d to the City Council by October 11, 2022. 2. The City Council will adopt its Fiscal Year 2024 Budget Policy Guidelines by November 22, 2022. 3. The proposed Fiscal Year 2024-2028 Capital Improvement Program will be presented to the City Council by January 24, 2023. 4. The City Council will adopt its conceptual recommendations on the Fiscal Year 2024-2028 Capital Improvement Program by March 14, 2023, subject to the availability of funds. Council Member I hereby certify that at a regular meeting of the City Council for which a quorum was present, the above Resolution was adopted by a vote of q for, Oagainst, and 0 present on September 13, 2022. Marily . Pronovo t, Council Cleric Mark S. Sideris, Council President ELECTED OFFICIALS: Mark S. Sideris, Council President Stephen P. Corbett, Vice President John A. Donohue, Councilor At Large Susan G. Falkoff, Councilor At Large Anthony Palomba, Councilor At Large Angeline B. Kounelis, District A Councilor Cecilia Lenk, District B Councilor Vincent J. Plccirilli, Jr., District C Councilor Watertown Town Council Administration Building 149 Main Street Watertown, MA 02472 Phone: 617-972-6470 Resolution# 2013- 116 Resolution: Watertown's Ongoing Capital Pn•oject Budget Guidelines WHEREAS the Town Council adopts budget policy guidelines each year pursuant to Section 5-1 of the Watertown Home Rule Charter, so that the Town Manager cats develop budgetary goals and the Town budget for the next fiscal year, and WHEREAS in the Fiscal Year 2014 budget policy guidelines, Attachment A "ADDITIONAL RECOMMENDATIONS ON CAPITAL PROJECTS" was included to use the Town's capital project fluids in the most efficient manner, and to improve the efficiency and transparency of the Capital Improvement Program (CIP) process, and WHEREAS these recommendations have become standard operating procedure for the Town of Watertown, and do not need to be revised each year. Kenneth M. Woodland NOW THEREFORE BE IT RESOLVED that tine Town Council of the City -known as District D Councilor tine Town of Watertown hereby establishes the following recommendations on capital projects as permanent budget policy guidance, to be followed annually: 1. Status of existing capital fluids and projects: As part of the January CIP submission by the Town Manager, include from each departnnent, a listing of all existing unspent capital finds (including Chapter 90, developer mitigation, grant funds, etc.) and a status on each project or acquisition, including how and when remaining funds will be spent, effective November 30th. a. Include project funds appropriated by the Town Council to the School Department. b. Include Water/Sewer Enterprise Fund reporting of capital projects &fluids as a new section of the CIP separate from the General Fund. 2. Details on new projects: As part of the January CIP submission by the Town Manager, provide details for all items in the CIP that have been previously shown as annual lump sums in a single line. a. Include the School Department's "various school improvements". b. Include "highway reconstruction" and "sidewalk reconstruction", with a forecast of streets to be done each year. c. Include Water/Sewer Enterprise Fund capital projects as a new section of the CIP separate from the General Fund, with a forecast of streets to be done each year. d. Include transportation or water/sewer and stornnvater projects which have or will be proposed in the firiure, with no funding source yet identified. 3. Coordination Issues Related to Public Works projects: The increasing volume and complexity of public works projects requires a rethinking of how the Town does its planning to maximize the use of capital funds and departmental resources, as well as providing information to the public in a timely, readily accessible fashion. a. To this end, the CIP needs to have a five-year forecast of what water/sewer/storinwater, road reconstruction, and sidewalk reconstruction are planned, by specific street, which will: i. Insure that work is sequenced to obtain the maximum life from road and sidewalk reconstruction without major water/sewer work compromising their integrity. ii. Allow utility companies adequate time to plan underground service replacements prior to road and sidewalk reconstruction, to avoid compromising their integrity. iii. Allow time for the Zoning Enforcement Office to notify property owners of non- conforming driveways, while giving the owners adequate time to seek a variance. iv. Allow developers time to plan their projects in coordination with the Town, and avoid digging up newly installed roads and sidewalks. v. Allow abutting homeowners, who may want to pay for granite curbs on streets scheduled for asphalt curbs, time to arrange contracting and payment. vi. Allow time for the Tree Warden to notify abutters who may want a street tree in front of their property, to allow for the placement of a tree pit prior to the installation of a new sidewalk. vii. Provide more transparency to citizens on public works projects and spending. viii. Allow the Public Works Conrrnittee or other appropriate committee adequate time to review the proposed work and provide policy guidance on the above as it relates to Watertown's goals. b. Issues of coordination and timing need to be improved to insure the most efficient use of fluids, and bonding of annual street construction projects should be coordinated with bidding such.that contractors can begin by April and be completed by November. c. The Public Works Department should address, on an ongoing basis: L Assure adequate supervisory capacity to eliminate decision bottlenecks and improve timeliness of responses for construction work. ii. Notification to the public of wbat construction is happening and where and when it will occur must be improved, and should be available on the website and updated regularly. iii. Improve completion of punch list items on projects needs to be improved, including painting of roadway markings, installation of traffic signs, removal of temporary construction signs, cleanup of construction debris, etc. 4. Protection of investirients: With millions of dollars being spent each year in Watertown on street and sidewalk construction, the administration should take a more aggressive role to protect the value of these investments to insure that maximum life is obtained from the new surfaces. BE IT FURTHER RESOLVED that this resolution shall be incorporated by reference into the annual budget policy uidelines that are adopted each year. CCouncil Member I hereby certify that at a regular meeting of the Town Council for which a quorum was present, the above Resolution was adopted by unanimous voice vote on December 9, 2013, Valet- Papas, Council Clerk --py -W Mark S. Sideris, Council President FY 2024 - FY 2028 CIP General Fund C D E F G H I J K L M N 1 TOTALS FY '24 FY '25 FY '26 FY '27 FY '28 2 ADMINISTRATION 3 Administration Building Improvements/Renovations 125.0 25.0 TR 25.0 TR 25.0 TR 25.0 TR 25.0 TR 4 Former Police Facility 1,000.0 1,000.0 BR 5 Multi -Service Center Renovation 500.0 500.0 TBD 6 Renovation/Reuse former North Branch 1,100.0 1,100.0 TBD 7 Replace Carpets 90.0 45.0 TR 45.0 TR 8 Paint Hallway/Offices 100.0 50.0 TR 50.0 TR 9 Masonry & Metal Repairs by door entrances 500.0 500.0 BR 10 replace HVAC HAU-1 above council chambers 650.0 650.0 BR 11 Ligthing Fixtures & Accessibility Issues 637.0 60.0 BR 577.0 BR 12 Roof Shingle Replacement/Roof Refurbishment 200.0 200.0 BR 13 Replace Fan Coil Units & Air Handling Unit Ventilators 900.0 900.0 BR 14 Upgrade Fire Alarm System 250.0 50.0 BR 200.0 BR 15 Upgrade Fire Protection System 590.0 90.0 BR 500.0 BR 16 Upgrade Lighting 300.0 300.0 BR 17 18 19 PARKER ANNEX 20 Replace Main Electrical Service 100.0 100.0 BR 21 Install Building Generator 300.0 300.0 BR 22 Replace 2 RTU Heating and Cooling 200.0 200.0 BR 23 Point/Repair Exterior Masonry Facade 250.0 125.0 BR 125.0 BR 24 Move of Departments 75.0 75.0 TR 25 1 Interior Painting/Carpets 250.0 50.0 TR 50.0 TR 50.0 TR 50.0 TR 50.0 TR 26 Replace 2 Roof Top Package Units 150.0 150.0 BR 27 Install Fire Supression System 750.0 750.0 BR 28 Renovate Public Restrooms 100.0 100.0 BR 29 ADMINISTRATION & PARKER SUBTOTAL 9,117.0 5,270.0 1,795.0 1,652.0 225.0 175.0 30 31 32 COMMUNITY DEVELOPMENT 33 Monument Restoration & Replacement 75.0 15.0 TR 15.0 TR 15.0 TR 15.0 TR 15.0 TR 34 Public Art 200.0 30.0 TR 35.0 TR 40.0 TR 45.0 TR 50.0 TR 35 Commander's Mansion 150.0 30.0 TR 30.0 TR 30.0 TR 30.0 TR 30.0 TR 36 COMMUNITY DEVELOPMENT SUBTOTAL 425.0 75.0 80.0 85.0 90.0 95.0 37 38 Page 1 of 10 FY 2024 - FY 2028 CIP General Fund C I D E F G H I J K L M N 1 TOTALS FY '24 _ FY '25 FY '26 FY '27 FY '28 39 INFORMATION TECHNOLOGY 40 Additional Equipment 65.0 11.0 TR 12.0 TR 13.0 TR 14.0 TR 15.0 TR 41 Replacement of Equipment 650.0 120.0 TR 125.0 TR 130.0 TR 135.0 TR 140.0 TR 42 IT Infrastructure Improvements 1,500.0 300.0 BE 300.0 BE 300.0 BE 1 300.0 BE 300.0 BE 43 Permitting and Transparency Dashboards 300.0 150.0 BE 150.0 BE 44 Video Security and Access Control 500:0 100.0 TR 100.0 TR 100.0 TR 100.0 TR 100.0 TR 45 Fiber Loop Build -out and Cabling 500.0 100.0 TR 100.0 TR 100.0 TR 100.0 TR 100.0 TR 46 Document Scanning 1,000.0 200.0 BE 200.0 BE 200.0 BE 200.0 BE 200.0 BE 47 MUNIS Financial System Enhancements 450.0 150.0 BE 150.0 BE 150.0 BE 48 Public Wifi 1,500.0 500.0 BE 500.0 BE 500.01 BE 49 Hybrid Meeting Technology 250.0 50.0 TR 50:0 TR 50.0 TR 50.0 TR 50.0 TR 50 IT Governance 500.0 100.0 BE 100.0 BE 100.0 BE 100.0 BE 100.0 BE 51 Parker Annex Technology 1,500.0 500.0 BR 500.0 ,BR 500.0 BR 52 INFORMATION TECHNOLOGY SUBTOTAL 8,715.0 1,781.0 2,287.0 - 2,143.0 1,499.0 1,005.0 53 54 55 FIRE DEPARTMENT 56 ALS Ambulance Medical Equipment 200.0 40.0 TR 40.0 TR 40.0 TR 40.0 TR 40.0 TR 57 Chiefs, & staff vehicles (3) 160.0 80.0 TR 1 1 80.0 TR 58 Fire Building Improvements/Renovations 300.0 60.0 TR 60.0 TR 60.0 TR 60.0 TR 60.0 TR 59 East End Fire Station HVAC/Plumbing 126.0 126.0 BR 60 East End Fire Station Painting -Carpet -Lighting 121.0 121.0 BR 61 Main Station- Interior Painting 0.0 62 North Station - Fencing 0.0 63 Headsets for Radios in Apparatus 0.0 64 Main Station - Concrete Coating Apparatus Floor 85.0 85.0 TR 65 Main Station Interior Repairs 200.0 100.0 BR 100.0 BR 66 Main Station Emergency Generator Replacement 90.0 90.0 BE 67 Station Alerting System 120.0 120.0 BE 68 Main & North Stations Apparatus Doors 65.0 65.0 BR 69 DOT Type III Emergency Ambulance Vehicle 1,000.0 500.0 BE 500.0 BE 70 Engine Truck, replacement for 2011 Engine 1 885.0 885.0 BE 71 Incident Command Vehicle (Deputy Chief) 100.0 100.0 TR 72 Firefighters Protective Outer Gear 400.0 400.0 BE 73 East End Station Replacement 10,000.0 10,000.0 BR 74 Main Station HVAC Replacement 100.0 100.0 TR 75 Engine Truck, replacement for 2013 Engine 3 1,250.0 1,250.01 BE Page 2 of 10 FY 2024 - FY 2028 CfP General Fund C D E F G H I J K L M N 1 TOTALS FY '24 FY '25 FY '26 FY '27 FY '28 76 Main Station Shop Air Compressor Replacement 20.0 20.0 TR 77 Boat Replacement for 2000 Marine 1 50.0 50.0 TR 78 Trailer Replacement for 1998 Special Rescue Trailer 15.0 1 15.0 TR 79 FIRE DEPARTMENT SUBTOTAL 15,287.0 742.0 1,630.0 600.0 11,530.0 785.0 80 81 LIBRARY 82 Design/Engineer Chiller & Roof Top Units 50.0 50.0 BR 83 1 Design Heating System & Controls Replacement 120.0 120.0 BR 84 Replace Chiller 200.0 200.0 BR 85 Replace Roof Top Units/Compressors 416.3 416.3 BR 86 Repair/Replace Roof 300.0 300.0 BR 87 Feasability Study for Library Expansion 100.0 100.0 BR 88 Painting 200.0 40.0 TR 40.0 TR 40.0 TR 40.0 TR 40.0 TR 89 Building Renovations/Replacement of Equip 305.0 61.0 TR 61.0 TR 61.0 TR 61.0 TR 61.0 TR 90 LIBRARY DEPARTMENT SUBTOTAL 1,691.3 887.3 101.0 ' 501.0 101.0 101.0 91 92 POLICE DEPARTMENT 93 1 Police Cruisers (3 annually) 1,157.6 209.5 TR 220.0 TR 231.0 TR 242.5 TR 254.6 TR 94 IRadio Infrastructure/specialized equipment 200.0 40.0 TR 40.0 TR 40.0 TR 40.0 TR 40.0 TR 95 Police Building Improvements/Renovations 150.0 30.0 TR 30.0 TR 30.0 TR 30.0 TR 30.0 TR 96 In Cruiser Video System 128.0 128.0 BE 97 Replace Access Control/Bldg Video Syst. Servers 37.0 37.0 BE 98 Replace Tactical Bullet Proof Vests 13.6 13.6 TR 99 Replace Computer Aided Dispatch -Records Mgmt 969.0 1 969.0 BE 100 Replace Training Simulator Computer System 90.0 90.0 BE 101 Pickup Truck and trailer 88.0 88.0 BE 102 Body Worn Cameras 780.0 780.0 BE 103 Firing Range HVAC Upgrade 800.0 800.0 BR 104 POLICE SUBTOTAL 4,413.2 316.5 1,376.0 314.6 2,081.5 324.E 105 106 PUBLIC WORKS DEPARTMENT 107 Administration 108 Design of Solar Canopy 125.0 125.0 TR 109 Roof Replacement 2,000.0 2,000.0 BR 110 Solar Canopy DPW Parking Lots 1,250.0 1,250.0 BR 111 Add EV Stations 450.0 90.0 BR 90.0 BR 90.0 BR 90.0 BR 90.0 BR 112 ADMINISTRATION SUBTOTAL 3,825.0 1,465.0 1 2,090.0 90.01 90.01 90.0 Page 3of10- FY 2024 - FY 2028 CIP General Fund C D E F G H I J K L M N 1 TOTALS FY '24 FY '25 FY '26 FY '27 FY '28 113 114 Central Motors 1151nspectors' Vehicles 350.0 70.0 TR 70.0 TR 70.0 TR 70.0 TR 70.0 TR 116 Supervisor Vehicle 50.0 50.0 BE 117 CENTRAL MOTORS SUBTOTAL 400.0 70.0 70.0 120.0 70.0 70.0 118 119 Highway 1201 Skid Steer 65.0 65.0 BE 121 Rack Truck 150.0 150.0 BE' 122 Crew Truck 180.0 180.0 BE 123 Heavy Duty Dump Truck 230.0 230.0 BE 124 Electric Street Sweeper 600.0 600.0 BE 125 Backhoe 150.0 150.0 BE 126 Loader 325.0 325.0 BE 127 Hot Box 300.0 300.0 BE 128 Dump Truck with Sliding Sander & Plow 290.0 290.0 BE 129 HIGHWAY SUBTOTAL 2,290.0 330.0 1 65.0 300.0 830.0 765.0 130 131 Snow & Ice Removal 132 Plows, Sanders, Salt control units/Replacement 400.0 80.0 TR 80.0 TR 80.0 TR 80.0 TR 80.0 TR 133 Salter 6 Wheeler - Snow Fighter (5) 960.0 300.0 BE 320.0 BE 340.0 BE 134 Salt Shed Repair 400.0 400.0 BE 1351 Loader 3/4 Yard 107.0 107.0 BE 136 Sidewalk Tractor 200.0 200.0 BE 137 SNOW & ICE REMOVAL SUBTOTAL 2,067.0 780.0 187.0 400.0 280.0 420.0 138 139 Cemetery 140 Off Road Utility Vehicle 4X4 (2) 30.0 30.0 BE 141 Backhoe 140.0 140.0 BE 142 CEMETERY SUBTOTAL 170.0 - 170.0 - - - 143 144 145 Property/Building 146 Heavy Duty 4x4 Forklift (Lull) 100.0 100.0 BE 147 Rough Terrain Forklift 95.0 95.0 BE 148 PROPERTY/BUILDING SUBTOTAL 195.0 100.0 - 95.0 - - 149 Page 4 of 10 FY 2024 - FY 2028 CIP General Fund C D E F G H I J K L M N 1 TOTALS FY '24 FY '25: FY '26 FY '27 FY '28 150 Parks & Forestry 151 Gazebo at Saltonstall Park 900.0 900.0 TBD 152 Walker Pond Design/Construction 2,750.0 250.0 TBD 2,500.0 TBD 153 Tree Chipper 150.0 75.0 BE 75.0 BE 154 Utility Truck 65.0 65.0 BE 155 Farm Tractor 80.0 80.0 BE 156 Backhoe 140.0 140.0 BE 157 4x4 Landscape Dump Truck 160.0 160.0 BE 158 PARKS & FORESTRY SUBTOTAL 4,245.0 1,290.0 2,575.0 - 380.0 - 159 160 161 TOTAL DPW - TBD 3,650.0 1,150.0 TBD 2,500.0 TBD 0.0 TBD 0.0 TBD 0.0 TBD 162 TOTAL DPW - TR 875.0 275.0 TR 150.0 TR 150.0 TR 150.0 TR 150.0 TR 163 TOTAL DPW - BE 4,967.0 1,270.0 BE 417.0 BE 765.0 BE 1,410.0 BE 1,105.0 BE 164 TOTAL DPW - BR 3,700.0 1,340.0 BR 2,090.0 BR 90.0 BR 90.0 BR 90.0 BR 165 PUBLIC WORKS SUBTOTAL 13,192.0 4,035.0 5,157.0 1,005.0 1,650.0 1,345.0 166 167 168 RECREATION & PARKS 169 Tot Lot/Court Resurfacing as needed 565.0 140.0 TR 125.0 TR 150.0 TR 150.0 TR 170 Filippello (Grove) Court Resurface 65.0 65.0 TR 171 Study of Pickleball Courts 50.0 50.0 TR 172 Bemis: Design, Plygrd Equip, new surf. & spray park 85.0 85.0 TR 173 Bemis: Install Plygrd Equip, new surf. & spray park 960.0 960.0 BR 174 Special Needs baseball/softball diamond 800.0 800.0 BR 175 Filippello (Grove) Design, plygrnd equip and resurface 100.0 100.0 TR 176 Filippello (Grove) Install plygrnd equip and resurface 750.0 750.0 BR 177 Lowell Design Playground Equip & resurface 85.0 85.0 TR 178 Lowell Install Playground Equip. & resurface 650.0 650.0 BR 179 Filippello (Arlington) Design, plygrnd equip & resurface 100.0 100.0 TR 180 Filippello (Arlington) Install plygrnd equip & resurface 800.0 800.0 BR 181 Moxley Park: Design: Field, Nets, Bleachers, Dugouts 250.0 250.0 BR 182 Moxley Park: Install: Field, Nets, Bleachers, Dugouts 5,000.0 2,500.0 BR 2,500.0 BR 183 Victory Field Design Tot -Lot 100.0 100.0 TR 184 Victory Field Install Tot -Lot 800.0 800.0 BR 185 RECREATION & PARKS SUBTOTAL 11,160.0 850.0 1,985.0 3,725.0 3,550.0 1,050.0 186 Page 5 of 10 FY 2024 - FY 2028. CIP General Fund C D E F G H I J K L M N 1 TOTALS FY '24 FY '25 FY '26 FY '27 FY '28 187 SCHOOL DEPARTMENT 188 CUNNIFF SCHOOL 189 Replace classroom furniture 60.0 15.0 TR 15.0 TR 15.0 ITR 15.0 TR 190 Install Audio System in the Cafetorium 50.0 50.0 TR 191 Install Wallpaper/Decals to Stairway Walls 30.0 ( 30.0 TR 192 Cell Communication Enhancement 35.0 35.0 TR 193 Interior Painting 100.0 25.0 TR 25.0 TR 25.0 TR 25.0 TR 194 Total for Cunniff 275.0 50.0 40.0 70.0 75.01 40.0 195 196 HOSMER SCHOOL 197 Update building furniture 100.0 25.0 TR 25.0 TR 25.0 TR 25.0 TR 198 Install Power Shades on Gym Upper Windows 50.0 50.0 TR 199 Install Audio System in the Cafetorium 50.0 50.0 TR 200 Install Wallpaper/Decals to Stairway Walls 30.0 30.0 TR 201 Install Shade Structure Above Playground 50.0 50.0 TR 202 Install Swing Gate to the North Parking Lot 40.0 40.0 TR 203 Cell Communication Enhancement 35.0 35.0 TR 204 Interior Painting 100.0 25.0 TR 25.0 TR 25.0 TR 25.0 TR 205 Total for Hosmer 455.0 50.0 140.0 80.0 85.01 100.0 206 207 LOWELL SCHOOL 208 Replace and update classroom furniture 60.0 20.0 TR 20.0 TR 20.0 TR 2091 Total for Lowell 60.0 0.0 0.0 20.0 20.0 20.0 210 211 WATERTOWN MIDDLE SCHOOL 212 Replace/update classroom furniture 125.0 25.0 TR 25.0 TR 25.0 ITR 25.0 TR 25.0 TR 213 Paint Hallways/Classrooms 200.0 40.0 TR 40.0 TR 40.0 TR 40.0 TR 40.0 TR 214 Remodel Bathrooms (8 baths) 120.0 120.0 BR 215 Upgrade camera system 50.0 50.0 TR 216 Classroom Shades 15.0 15.0 TR 217 Roofing Refurbishing 550.0 50.0 TR 500.0 IBR 218 Library Furniture 60.0 60.0 ITR 219 ReKey Doors & Update Locks 0.0 220 New Exterior Electronic Sign 0.0 221 HVAC (VRF) Basement 472.01 72.0 BR 400.0 BR 222 Carpeting Damage (Various Areas) 80.0 40.0 TR IBR 40.0 TR 223 Replace Auditorium/Gym HVAC Units 600.01 600.0 Page 6 of 10 FY 2024 - FY 2028 CIP General Fund C D E F G H I J K L M N 1 TOTALS FY '24 FY '25 FY '26 FY '27 FY '28 224 Relocate Nurses Office 110.0 10.0 TR 100.0 BR 225 Building Envelope Repairs/Masonry Pointing 250.0 250.0 BR 226 Portable Wall Dividers 25.0 25.0 TR 227 Soundproofing the Cafeteria 150.0 150.0 BR 228 Soundproofing the Lower Gym 110.0 110.0 BR 229 Sound proofing the band room 40.0 40.0 TR 230 Total for Middle School 2,957.0 292.0 1,155.0 765.0 530.0 215.0 231 232 233 WATERTOWN HIGH SCHOOL 234 Replace classroom furniture 125.0 25.0 TR 25.0 TR 25.0 TR 25.0 TR 25.0 TR 235 Total for High School 125.0 25.0 25.0 25.0 25.0 25.0 236 237 238 PHILLIPS SCHOOL 239 Furniture/Equipment/Furnishings - Phillips 75.0 15.0 TR 15.0 TR 15.0 TR 15.0 TR 15.0 TR 240 Bathroom Fixture Upgrades 240.0 60.0 STBD 60.0 STBD 60.0 STBD 60.0 STBD 241 Window Damages/Replacements 700.0 100.0 STBD 600.0 STBD 2421 Fire Alarm Upgrades 200.0 200.0 STBD 243 Replace Boiler #2 200.0 200.0 STBD 244 Design and Install New Generator 300.0 300.0 STBD 245 Repave Parking Lots 100.0 100.0 STBD 246 ReKey Doors 30.0 30.0 STBD 247 Roof Repairs 150.0 75.0 STBD 75.0 STBD 248 Total for Phillips School 1,995.0 975.0 705.0 150.0 150.0 15.0 249 250 251 DISTRICT 252 Update Food Service Equipment 135.0 30.0 TR 30.0 TR 30.0 TR 30.0 TR 15.0 ITR 2531 Security System Enhancements 475.0 95.0 BR 95.0 BR 95.0 BR 95.0 BR 95.0 BR 254 School Technology 500.0 100.0 SA 100.0 SA 100.0 SA 100.0 SA 100.0 SA 255 Total for District 1,110.0 225.0 225.0 225.0 225.0 210.0 256 257 NEW HIGH SCHOOL PROJECT 258 High School & Related Costs (Town) 75,000.0 75,000.0 BR 259 High School & Related Costs (MSBA) 1 25,000.0 25,000.0 MSBA 260 TOTAL RENOV./RECONSTR. 1100,000.0 100,000.0 1 0.0 1 0.01 0.0 0.0 Page 7 of 10 FY 2024 - FY 2028 CIP General Fund C D E F G H I J K L M N 1 TOTALS FY '24 FY '25 FY '26 FY '27 FY '28 261 262 SCHOOL DEPARTMENT TOTALS 263 Total School Technology - SA 500.0 100.0 SA 100.0 SA 100.0 SA 100.0 SA 100.0 SA 264 Total Various School Improvements - TR 1,780.0 390.0 TR 385.0 TR 305.0 TR 380.0 TR 320.0 TR 265 Total Various School Improvements- STBD 1,920.0 960.0 STBD 690.0 STBD 135.0 STBD 135 00 STBD 0.0 STBD 266 Total Various School Improvements - MSBA 25,000.0 25,000.0 MSBA 0.0 MSBA 0.0 MSBA 0.0 MSBA 0.0 MSBA 267 Total Various School Improvements - DE 0.0 0.0 DE 0.0 DE 0.0 DE 0.0 DE 0.0 DE 268 Total Various School Improvements - BE 0.0 0.0 BE 0.0 BE 0.0 BE 0.0 BE 0.0 BE 269 Total Various School Improvements - BR 77,777.0 75,167.0 BR 1,115.0 BR 795.0 BR 495.0 BR 205.0 BR 270 SCHOOL DEPARTMENT SUBTOTAL 106,977.0 101,617.0 2,290.0 1,335.0 1,110.0 625.0 271 272 273 PUBLIC BUILDINGS 274 Purchase New Maintenance EV 70.0 70.0 TR 275 Sidewalk snowblower/cabs 180.0 60.0 BE 60.0 BE 60.0 BE 276 Maintenance Division Furniture 15.0 15.0 TR 277 Pick Up Truck with Plow 60.0 60.0 BE 2781 Equipment Inventory 150.0 150.0 BE 279 PUBLIC BUILDINGS SUBTOTAL 475.0 70.0 270.0 75.0 60.0 0.0 280 281 282 SENIOR CENTER 283 Building Renovation (desk, curtains, blinds) 75.0 15.0 TR 15.0 TR 15.0 TR 15.0 TR 15.0 TR 284 Design Canopy & walkway 20.0 20.0 TR 285 Re -Build Canopy & walkway w/exterior lighting 50.0 50.0 BR 286 Upgrade Fire Alarm System 240.0 40.0 BR 200.0 BR 287 Roof Repairs/Replacement 150.0 150.0 BR 2881 Exterior Painting 50.0 50.0 BR 289 Design Back Porch/walkway 15.0 15.0 ITR 290 Repair/Enhance back porch/walkway 50.0 50.0 BR 291 Paint Hallway/Offices/Meeting Rooms 60.0 30.0 TR 30.0 TR 292 Replace HVAC equipment 150.0 150.0 BR 2931 Replace Meeting Room Flooring 80.0 80.0 BR 294 SENIOR CENTER SUBTOTAL 940.0 15.0 155.0 310.0 445.0 15.0 295 296 297 Page 8 of 10 FY 2024 - FY 2028 CIP General Fund C D E F G H I J K L M N 1 TOTALS FY '24 FY '25 FY '26 FY '27 FY '28 298 SKATING ARENA 299 Building Renovations 150.0 30.0 TR. 30.0 TR 30.0 TR 30.0 TR 30.0 TR 300 Rebuild of Compressors 20.0 20.0 BR 301 Electric Ice Resurfacing Machine 150.0 150.0 BE 302 Electrical Panel Upgrades 21.0 21.0 'BR 303 Upgrade of Internal Lighting to LED 30.0 30.0 BR 304 Energy Management System 42.0 42.0 BE 305 Enclosure of outside walls 30.0 30.0 BR 306 Replace Boilers 50.0 50.0 BR 307 SKATING ARENA SUBTOTAL 493.0 201.0 202,0 30.0 30.0 30.0 308 309 STREETS & SIDEWALKS 310 Mt. Auburn St.Corridor (Irving St -Coolidge Sq.- Cambridge line) 30,000.0 7,500.0 TIP 7,500.0 TIP 7,500.0 TIP 7,500.0 TIP 311 Land Acq. Storage Space 2,000.0 2,000.0 BR 312 Mt. Auburn St. Non participatory funds 1,500.0 1,500.0 BR 313 Ornamental Street Lighting 1,200.0 300.0 BR 300.0 BR 300.0 BR 300.0 BR 314 Bike Path - Waverley Ave to Main Street 500.0 500.0 TBD 3151 Highway reconstruction (Chap 90) 1,875.0 375019 375.0 C9 375.0 C9 375.0 C9 _ _375.0 C9_,_ - 3161 Highway reconstruction (Tax Revenue) 3,565.3 645.2 TR 677.5 TR 711.4 TR 746.9 TR 784.3 TR 317 Highway reconstruction (Bonds) 11,500.0 2,100.0 STB 2,200.0 STB 2,300.0 STB 2,400.0 STB 2,500.0 STB 318 Highway reconstr.- Connector Roads/Longer Streets 11,500.0 2,100.0 STB 2,200.0 STB 2,300.0 STB 2,400.0 STB 2,500.0 STB 319 Sidewalk reconstruction (Chap 90) 1,875.0 375.0 C9 375.0 C9 375.0 C9 375.0 C9 320 Sidewalk reconstruction (Tax Revenue) 3,565.3 645.2 TR 677.5 TR 711.4 TR 746.9 TR 784.3 TR 321 Underground Duct for Utilities 900.0 300.0 BR 300.0 BR 300.0 BR 322 Sidewalk reconstruction (Bonds) 2,875.0 525.0 SWB 550.0 SWB 575.0 SWB 600.0 SWB 625.0 SWB 323 STREETS & SIDEWALKS SUBTOTAL 72,855.6 17,065.4 16,355.0 15,447.8 15,443.8 8,543.6 324 3251 GENERAL FUND CIP 245,741.1 132,925.2 33,683.0 27,223.4 37,815.3 14,094.2 326 327 328 329 330 331 332 333 Page 9 of 10 FY 2024 - FY 2028 CIP General Fund C D E F G H I J K L M N 1 TOTALS FY '24 FY '25 FY '26 FY '27 FY '28 334 335 COSTS BY SOURCE OF FUNDS 336 GENERAL OBLIGATION BONDS 33 (( EQUIPMENT) 16,636.0 2,567.0 4,600.0 2,475.0 4,789.0 2,205.0 338 ( REMODELING) 118,883.3 84,536.3 9,175.0 7,712.0 15,565.0 1,895.0 339 ( STREET) 23,000.0 4,200.0 4,4010 4,600.0 4,800.0 5,000.0 340 ( SIDEWALK) 2,875.0 525.0 550.0 575.0 600.0 625.0 341 SUBTOTAL GENERAL OBLIGATION BONDS 161,394.3 91,828.3 18,725.0 15,362.0 25,754.0 9,725.0 342 343 APTER 90 FUNDS 3,750.0 750.0 750.0 750.0 750.0 760.0 344 SCHOOL BUILDING ASSISTANCE 25,000.0 25,000.0 0.0 0.0 0.0 0.0 345 T EXCLUSION 0.0 0.0 0.0 0.0 0.0 0.0 346 SCHOOL TO BE DETERMINED 1,920.0 960.0 690.0 135.0 135.0 0.0 347 TAX REVENUE 17,426.8 3,536.9 3,418.0 3,376.4 3,576.3 3,519.2 348 SCHOOL APPROPRIATION 500.0 100.0 100.0 100.0 100.0 100.0 349 TRANSPORTATION IMPROVEMENT PROG. 30,000.0 7,500.0 7,500.0 7,500.0 7,500.0 0.0 350 TO BE DETERMINED 5,750.0 3,250.0 1 2,500.0 0.01 0.0 0.0 3511SUBTOTAL OTHER 84,346.81 41,096.9 1 '14,958.0 11,861.4 1 12,061.3 4,369.2 3521 GRAND TOTAL 245,741.11 132,925.2 1 33,683.01 27,223.41 137,815.3114,094.2 Page 10 of 10