HomeMy Public PortalAboutORD10116 BILL NO.
® SPONSORED BY COUNCILMAN
ORDINANCE NO.
AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI , AUTHORIZING
THE MAYOR AND CITY CLERK TO EXECUTE A CONTRACT WITH
WEATHERCRAFT, INC. FOR REROOFING THE AIRPORT TERMINAL AT THE
JEFFERSON CITY MEMORIAL AIRPORT.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF JEFFERSON,
MISSOURI, AS FOLLOWS:
Section 1. The Mayor and Clerk are hereby authorized and
directed to execute a contract with Weathercraft, Inc. for reroofing
the airport terminal at the Jefferson City Memorial Airport for the
sum of $18,588.00.
Section 2. The contract shall be substantially the same in form
and content as that contract attached hereto as Exhibit A.
Section 3. This Ordinance shall be in full force and effect from
and after the date of its passage and approval. c} G
Passed f — $ Approved
P siding Officer Mayor
ATTEST:
City Clerk
•
i0i1h
CONTRACT FOR REROOFING THE AIRPORT TERMINAL
AT THE "
JEFFERSON CITY MEMORIAL AIRPORT
JEFFERSON CITY, MISSOURI
This contract is entered into this `5 �' day of -�'�C.c�
1983, by and between the City of Jefferson, Missouri, hereinafter
called the City, and wPatr,Prcra£#.r,—Inr. ,hereafter
called the Contractor.
WHEREAS, the City Council of the City of Jefferson, Missouri,
did on the �day of h„z 1965 award to the
Contractor the contract for Reroofing the Airport Terminal at the
Jefferson City Memorial Airport.
NOW, THEREFORE, for and in consideration of the awarding of
this contract and the work thereunder by the City to the Contractor,
the said Contractor does hereby contract and agree to do and perform
said work, above specified and referred to and to accept payment
therefor in the following manner: Lump Sum of S18, 588 .00
dollars, upon completion and acceptance by the City.
NOW, BY THESE PRESENTS, it is agreed and understood by the
parties hereto, and this contract is entered into subject to all
existing ordinances , plans and specifications for such work on
file in the office of the City Clerk, and which shall be considered
a part and parcel of this contract: that all questions arising as
to the proper performance of this contract of such work in accordance
with the plans and specifications therefor, and estimates thereof,
shall be decided by the Director of Planning and Code Enforcement,
of the City of Jefferson, Missouri, or by such competent persons
s
( 11 )
appointed by the Mayor and the City •Council of the City of Jefferson
to supervise and superintend said work in the place of and instead
of such Director of Planning and Code Enforcement; that in the
case of improper workmanship,- the City of Jefferson reserves the
right at any time to suspend, re-let or order an entire reconstruction
of the work; that the Contractor agrees to commence work on or be-
fore a date to be specified in a written "Notice to Proceed" and to
fully complete the project work covered by the Contract within
Sixty (60 ) consecutive working days after the date established in
the Notice to Proceed. The City reserves the right at any time
to suspend, re-let or order an entire reconstruction of the work
awarded and to declare the contract forfeited; but that such suspen-
sion, re-letting or reconstruction or forfeiture shall not affect
the right of the City to recover all damages and penalties accuring
or due it by reason of the Contractor' s non-compliance with this
contract. Liquidated damages of fifty ($50. 00) dollars per day will
be assessed against the Contractor for each day the work covered
by the Contract remains incomplete following the completion date or
extension thereof.
The Contractor agrees to pay all classes and crafts of labor
used in the performance of this contract the prevailing hourly
rate of wages as determined by the Department of Labor and Industrial
Relations and Second Party acknowledges that he knows the prevailing
hourly rate of wages for all classes and crafts of labor to be
used in the performance of this contract because he has obtained the
prevailing hourly rate of wages from the contents of Special Wage
Determination No. 3-026-100, in which the rate of wages are set
® f orth.
(]S20
• The Contractor further agrees that he will keep an accurate
record showing the names and occupation of all workmen employed
by them in connection with the work to be performed under the terms
of this contract, which record shall show the actual wages paid to
each of said workmen in connection with the work to be performed
under the terms of this contract, and agrees further that the
aforementioned accurate record shall be available and open at all
reasonable hours for the inspection by the Director of Planning and
Code Enforcement or any other authorized employee of the City of
Jefferson, Missouri. in compliance with the Prevailing Wage Law,
as amended in Section 290. 210 and 290. 340 inclusive, Revised Statutes
of Missouri, 1969, effective October 13, 1969, not less than the
prevailing hourly rate of wages in the Jefferson City area shall be
paid to all workmen performing work under this contract, Section
290. 250. The Contractor shall forfeit to the City ten ($10. 00)
dollars for each workman, employee, for each calendar day, or portion
thereof, such workman is paid less than the stipulated rates for
any work done under this contract, by him or by subcontractors
under him, Section 290. 250.
The Contractor agrees to completely indemnify and hold harmless
the City for any and all damages, injuries, actions, costs, attorney' s
fees and all other expenses whatsoever arising out of the performance
of said 'work whether the property or persons damages are the
servants and employees of the Contractor, or third parties in no
manner connected with said work. All interlineations, corrections,
deletions and changes herein have been made prior to the execution
of this contract.
(13)
IN WITNESS WHEREOF, the parties have hereunto set their
hands and seals this L . day of t , 19
SATTEST t;
ty Clerk CITY OF JEFFERSON, MISSOURI
. BY
I JOFING CONTiA 'TORS
Box 57 Cedar CilLy N10 65022
/ �Contrac or
This contract, executed in duplicate, one copy being
deposited in the office of the City Clerk of the City of Jefferson,
and the other being retained by the Contractor.
•
(14)
a .
DEPARTMENT OF PLANNING AND CODE ENFORCEMENT
911 EAST MILLER STREET '.
JEFFERSON CITY, MISSOURI
Change Order No. No_ 1 _ Job No. 10116 Date 2/2/84
Location & Job Title Rernnfi.ng the Alrlinrt Terminal at 1CMA
Contractor Wentherrraft , Inc
It is hereby mutually agreed that when this change order has been signed by
the contracting parties, the following described changes in the work required
by the contract shall be executed by the contractor without changing the terms
of the contract except as herein stipulated and agreed. t
Description of Changes: SEE ATTACHED SHEET.
CONTRACTORS PROPOSAL FOR THE ABOVE DESCRIBED CHANGES:
I/we hereby agree to the modifications of the contract as described above
and. agree to furnish all materials and labor and perform all work in con- i
nection therewith in accordance with the requirements for similar work in
existing contract except as otherwise stipulated herein, for the following
considerations:
t
Contract Amount - Add to ( ) Deduct from ( X ) the sum of:
ndkThnii-sanfi Fi pht Hiindr _d Fifty and no/100 DOLLARS ($_ 1 ,850.00 )
Contractor Weathercraft , TnC _
Signature Date
Recommended by: Director of RX4N#XN4 X9X%44AXXXX0XX #NX#X Transportation
..Signature:
Accepted by:
Ma Date
City .Cler G�
STATEMENT OF CONTRACT AMOUNT
Original Contract Amount $ 18, 588.00
Previous Additions $ -0-
Total $ 18- 588_nn
Previous Deductions $ _n_ r ;
Net Prior to this Change $ 18,588.00
Amount of this Change Add _jL Deduct $ 1 .f35n_ n
CONTRACT AMOUNT TO DATE $ 17�738 On
i.
WEATHERCRAFT, I NC.
ROOFING CONTRACTORS - phone 314-635-0141
November 30 , 1983
Honorable Mayor and City Council
City of Jefferson
320 E McCarty Street
Jefferson City, MO 65101
Gentleman:
As per our conversation with your city engineer , we propose to
combine the 1" composite board insulation with the tapered EPS
system giving you a 3/16" per foot slope with an average R-10 . 10
value with slopes from 0 to 5 1/4" a high point . By using this
system we can offer you a $1�1, 0 . 0 deduction from the original base
bid . The rest of the speci ��ion �will be complied with. as
outlined in the bid package .
We look forward to working with you on this project . If you have
any questions please do not hesitate to call .
Sincerely,
Thomas L. Fife
President
ROOFING - SHEET METAL • INSULATION - COATING - WATERPROOFING
Dox 57 • Cedar City, Missouri 65022.0057