HomeMy Public PortalAboutORD10245 BILL NO. 84-63
SPONSORED BY COUNCILMAN Hequembourg
ORDINANCE NO. 1'0 a��
AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, AUTHORIZING THE
MAYOR AND CITY CLERK TO EXECUTE A CONTRACT WITH GREEN ELECTRIC,
INC. FOR ELECTRICAL REPAIRS ON ALL CITY ELECTRICAL SYSTEMS
INCLUDING BUILDINGS AND TWELVE ( 12 ) SANITARY SEWER PUMP STATIONS.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF JEFFERSON,
MISSOURI, AS FOLLOWS:
Section 1. The Mayor and Clerk are hereby authorized and
directed to execute a contract with Green Electric, Inc. for
electrical services and repairs on all City electrical systems
including buildings and twelve ( 12 ) sanitary sewer pump stations .
Section 2. The contract shall be substantially the same in
form and content as that contract attached hereto as Exhibit A.
Section 3. This Ordinance shall be in full force and effect
from and after the rd/ate of its passage and approval.r�
Passed pproved
76-B-Sicli-ng Off Yer Mayor
ATTEST:
City Clerk
a mmww�=
ELECTRICAL SERVICE CONTRACT
AftL This Contract is made and entered into this /0 day of
1984, by and between the City of Jefferson,
Missouri, a municipal corporation, hereinafter referred to as
"City" , and Green Electric, Inc. , hereinafter referred to as
"Contractor" .
Now, therefore, in consideration of the covenants and agreements
hereinafter set forth, it is agreed as follows :
1. Scope of Work. The work of this agreement consists of the
performance of authorized electrical work for the City of
Jefferson. Work required may involve service, repairs,
replacement or related work on all City electrical systems which
include buildings and twelve ( 12 ) sewer pump stations .
2. Contract Period. This contract will be in effect from May 15,
1984 , through May 14 , 1985. The City retains the right to extend
this contract from year to year with a maximum of three ( 3)
years . Increases, if any, may be requested by the Contractor and
negotiated with the City forty-five (45 ) days prior to the
contract termination.
3. Response Time. Some repairs under this contract are of an
emergency nature. Contractor is expected to respond within a two
(2) hour period. The Contractor shall have a licensed electrician
on call twenty-four ( 24 ) hours per day, seven ( 7 ) days per week.
4 . Prevailing Wage Law. The principal Contractor and all Sub-
contractors shall pay not less than the prevailing wage hourly
rate for each craft or type of workman required to execute this
contract as determined by the Department of Labor and Industrial
Relations of Missouri, pursuant to Sections 290. 210 to 290. 340
inclusive, of the Revised Statutes of Missouri.
5. Rates . Services will be provided at the following rates :
Foreman $29.00 per hour
Journeyman $27.00 per hour
Shopman $12.00 per hour
Any labor being performed from 5:00 P.M. through 8:00 A.M. Monday
through Saturday midnight would be at a rate of one and one half
times per hour.
Any labor being performed from 12: 00 A.M. Saturday midnight would
be at a rate of one and one half times per hour.
Any labor being performed from 12: 00 A.M. Saturday through 8: 00
A.M. Monday would be at a rate of two times per hour.
6. Parts and Material. Normally, the City of Jefferson shall
provide material and supplies necessary to complete -the work. In
the event that the City cannot supply certain materials , the
Contractor shall provide same and will be reimbursed in
accordance with the provisions of this contract. All parts ,
materials , and supplies shall conform to the applicable
provisions of the 1978 National Electrical Code, current and/or
any revised code as published by the National Fire Protection
Association.
7. Unclassified Work. Should the nature of a repair require
labor, equipment and/or material not susceptible to
classification under any items scheduled in the contract, the
City can authorize the use of the unclassified labor, in excess
of the number of hours actually worked and the repairs plus
reasonable travel time and will consist of the individual' s
hourly rate plus hourly fringe benefits plus employer' s payroll
contributions with a fifteen percent ( 15% ) additional for
overhead and profit.
Payment for equipment not susceptible to classification under any
scheduled items in the contract, will be limited to:
a. For equipment rented by the vendor: the actual rental
paid plus fifteen percent ( 15%) for overhead and profit.
b. For equipment owned by the vendor, the monthly rental
rate charged by recognized rental organizations times the
number of hours the equipment was necessary, for repairs
plus reasonable travel time from the storage location to the
site, all divided by one hundred seventy-six ( 176) hours .
Payment for material not susceptible to classification under any
scheduled items in the contract, will be applicable column price
plus fifteen percent ( 15% ) for overhead and profit.
Prior to payment being authorized, the Contractor shall submit an
itemized breakdown of the unclassified labor, equipment and/or
material. The breakdown shall include information and
documentation sufficient to substantiate the Contractor' s claim.
8. Inspection. Unless the nature and extent of the work is known
to the City, the Contractor will first receive a request to
inspect the proposed work and provide a written report of the
following to the City Electrical Inspector:
a. Description of the work necessary.
b. A list of the materials, parts, and supplied needed to
complete the work.
c. An estimate of work hours
9. Authorization to Repair. Once the City Electrical Inspector
determines the estimate of work hours and material, parts and
supplies required are reasonable, the report will be forwareded
to the appropriate department for preparation of a requisition
for the work.
Upon receipt of the purchase order, or purchase order number for
the work, the Contractor may begin work as soon as the materials ,
parts and supplies are made available.
10 . Normal Work Hours . The quantity of work during normal work
hours for which payment will be made will be the number of normal
work man hours actually performed at the site.
Payment for normal work hours will be paid for the quantity as
above determined at the unit price shown above, which price
includes cost of labor, equipment normally associated with the
type of repair, travel, benefits, overhead, profit, insurance and
all else necessary therefor and incidental thereto.
11 . Overtime Work Hours .
a. The quantity of work during the overtime work hours
from 5 :00 P.M. through 8 :00 A.M. for which payment will
be made will be the number of overtime work man hours
actually performed at the site. Payment for overtime
work hours during this period will be paid for the
quantity as above determined at one and one-half ( 1�)
times the unit price, which price includes cost of
labor, equipment normally associated with the type of
repairs, travel, benefits , overhead, profit, insurance
and all else necessary therefor and incidental thereto.
b. The quantity of work during overtime work hours from
12 :00 A.M. Saturdays through 8:00 A.M. Monday for which
payment will be made will be the number of overtime
work man hours actually performed at the site. Payment
for this overtime work will be paid for the quantity as
above determined at twice the unit price, which price
includes cost of labor, equipment normally associated
with the type of repairs , travel, benefits, overhead,
profit, insurance and all else necessary therefor and
incidental thereto.
12 . Maximum Amount of Contract. Contractor shall not perform
more than Twenty-five Thousand Dollars ( $25, 000 ) of work in one
year without first obtaining consent of the City Council.
IN WITNESS WHEREOF the parties hereto have set their hands and
seals on the day and year first above written.
CITY OF JEFFERSON, MISSOURI
By
Mayor
ATTEST:
ff City Clerk
CONTRACTOR
Green Electric, Inc.
By
ATTEST:
Ask
Secretary