Loading...
HomeMy Public PortalAbout20130808Eng Opinion of Constr Cost-LS#6 FM-Hwy 80.pdfCIty of Tybee Island Item Description Quantity Units Unit Price Total 1 12" ˘ C-900 PVC Force Main w/ Restr. Jts.300 LF $ 40.00 $ 12,000.00 2 24" Steel Casing Jacked or Bored Under Hwy 80 100 LF $ 280.00 $ 28,000.00 3 Fittings 800 lbs $ 8.00 $ 6,400.00 4 Connect New 12" ˘ Force Main to Existing 12 ˘ Force Main 2 LS $ 2,000.00 $ 4,000.00 5 Remove/Replace Asphalt Pavement 190 SY $ 70.00 $ 13,300.00 6 Remove/Replace Gravel 50 SY $ 30.00 $ 1,500.00 7 Erosion & Sedimentation Control 1 EA $ 1,500.00 $ 1,500.00 8 By-pass Pumping 1 EA $ 3,500.00 $ 3,500.00 9 Traffic Control 1 LS $ 4,000.00 $ 4,000.00 $ 74,200.00 $ 8,904.00 $ 11,130.00 $ 94,234.00 Since the Engineer has no control over the cost of labor, materials, equipment, the Contractor's methods of determining prices, or over competitive bidding or market conditions, the Opinions of Probable Construction Costs provided for herein are made on the basis of the Engineer's experience and qualifications.  These opinions represent the Engineer's best judgment as a design professional familiar with the construction industry.  However, the Engineer cannot and does not guarantee that proposals, bids, or the construction cost will not vary from Opinions of Probable Construction Costs prepared by him/her.  Sub-Total, SANITARY SEWER SYSTEM Contingencies Engineer's Opinion of Probable Construction Cost - Hwy 80 Crossing SANITARY SEWER SYSTEM Surveying, Engineering, DOT Permit & Constr. Admin. TOTAL PROJECT ESTIMATE Page 1C:\Users\acs\Documents\tybee\Eng Opinion of Constr Cost-LS#6 FM.xls