Loading...
HomeMy Public PortalAboutORD11041 BILL NO. 88-19 SPONSORED BY COUNCILMAN MASON ORDINANCE NO. 110V1 AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, AUTHORIZING THE MAYOR AND CITY CLERK TO EXECUTE AN AGREEMENT WITH BRYAN AND ASSOCIATES FOR MONITORING WEST MAIN STREET BRIDGE. BE IT ENACTED BY THE COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS: Section 1. The Mayor and Clerk are hereby authorized and directed to execute an agreement with Bryan and Associates for monitoring the West Main Street bridge for a sum not to exceed $13,886.45. Section 2. The agreement shall be substantially the same in form and content as that agreement attached hereto as Exhibit A. Section 3. This Ordinance shall be in full force and effect from and after the date of its passage and approval. Passed Approved '. - F residin fficer r ATTEST: City Clerk AGREEMENT FOR PROFESSIONAL ENGINEEKING SERVICES WORK PLAN 281002.5 BETWEEN CITY OF JEFFERSON, MISSOURI 1.. AND BRYAN & ASSOCIATES CONSULTING ENGINEERS INC. PROJECTS NO. 87-143 MARCH 2'2, 1988 BRYAN & ASSOCIATES 2717 INDUSTRIAL DR, JEFFERSON CITY,MO 66109 * 31416934477 CONSULTING ENGINEERS, INC. Work Plan 281002.5 BRYAN & ASSOCIATES 87-143 City of Jefferson AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES THIS CONTRACT, hereinafter called the "AGREEMENT", by and between the City of Jefferson, Missouri, with offices at the 320 East McCarty Street, Jefferson City, Missouri 65101 hereinafter called the "CITY" and BRYAN & ASSOCIATES, Consulting Engineers, Inc., 2717 Industrial Drive, Jefferson City, Missouri 65105, hereinafter called the "ENGINEER". WITNESSETH, that whereas the Federal Highway Administration has accepted the construction of Bridge No. 281002.5 for inclusion in the FAU Program as an experimental project. Said experimental project requires a work plan hereinafter called the "PROJECT". AND WHEREAS THE CITY is authorized and empowered to contract with the ENGINEER for engineering services for the PROJECT, AND WHEREAS necessary funds for payment of said services are available, NOW THEREFORE, THE CITY hereby hires and employs the ENGINEER in accordance with the following AGREEMENT: PART I-A - GENERAL DESCRIPTION OF WORK TO BE DONE: See attached "Work Plan" for scope of services, which is incorporated herein by reference .as though fully set out. PART I-B RIGHT-OF-WAY and TOPOGRAPHICAL SURVEY: ********* NOT APPLICABLE ********* PART I-C SUBSURFACE INVESTIGATIONS: ********* NOT APPLICABLE ********* FART I-D OBLIGATIONS OF CITY TO ENGINEER: The CITY, at its own expense, will make available to the ENGINEER all existing records, maps, plans and other data possessed by CITY when such are necessary, advisable or helpful to the ENGINEER in the prosecution of its work under this AGREEMENT. 1 Work Plan 281002.5 BRYAN & ASSOCIATES 87-143 City of Jefferson PART I-E INSPECTION OF DOCUMENTS: The ENGINEER and all his subcontractors shall maintain all books, documents, papers, accounting records and other evidence pertaining to costs incurred in connection with this AGREEMENT, and shall make such materials available at their respective offices at all reasonable times during the AGREEMENT period and for three years from the date of final payment under this AGREEMENT for inspection by the CITY, Missouri Highway & Transportation Department, Federal Highway Administration, or any authorized representatives of the Federal Government, and copies thereof shall be furnished, upon request. If copies are requested the CITY shall pay the ENGINEER the cost of making such copies. PART I-F CONFERENCES, VISITS TO SITE, INSPECTION OF WORK: Representatives of the CITY, the Missouri Highway & Transportation Department, and the Federal Highway Administration shall have the privilege of inspecting and reviewing the work being done by the ENGINEER and advising with him at any time. Conferences are to be held at the request of any of the above named parties or agencies. PART I-G ON SITE INSPECTION: The ENGINEER will conduct all on site inspection required by attached "Work Plan". PART I-H CHECKING OF SHOP DRAWINGS. The ENGINEER will review all shop drawings. PART I-I CONSULTANT'S SERVICES DURING CONSTRUCTION: ********* NOT APPLICABLE ********* PART I-J NUMBER OF COPIES: During the development of PROJECT plans, the ENGINEER will provide the number of copies of completed or partially completed PROJECT plans and reports as required by approving authorities for the proper prosecution of their respective responsibilities in connection with the PROJECT. PART II TIME OF BEGINNING AND COMPLETION: ********* REFER TO ATTACHED WORK PLAN ********* 1 This contract shall be deemed complete thirty (30) days after the rsubmittal of the final report to the CITY and approving agencies. 2 r Work Plan 281002.5 BRYAN & ASSOCIATES 87-143 City of Jefferson It is understood that certain parts of the work cannot begin until previous parts have been approved by the approving authorities. However, where feasible and practicable, some parts will be carried on simultaneously with the intent of completing the work under this AGREEMENT efficiently and effectively at the earliest possible date. PART III-A PAYMENTS: Method of Compensation: Compensation for the services hereinbefore described shall be on the basis of actual costs to the ENGINEER, plus a fixed LUMP SUM amount to cover profit only. Actual costs will be the sum of Items (1) through (4), inclusive, below. (1) Actual base salary cost for all employees for the time that they are productively engaged in work necessary to fulfill the obligations in connection with the services hereinbefore described. (2) An estimated percentage of Item (1) above for direct payroll overhead. (3) An estimated percentage of Item (1) above for indirect salary overhead, and an estimated percentage of Item ( 1) for indirect non-salary overhead. (4) Direct non-salary costs which are directly attributable and properly allocable to the PROJECT. These costs include the ENGINEER'S payments to others engaged by him in connection with the PROJECT and necessary to the fulfillment of the terms of this AGREEMENT. (5) A lump sum fixed amount, to cover profit only, of *** ONE THOUSAND SEVEN HUNDRED NINETY ONE and 71/100 DOLLARS ***($1791.71). (6) The percentages for direct payroll overhead Item (2) , indirect salary overhead and indirect non-salary overhead Item (3) are estimated as shown on the GENERAL SCOPE OF WORK - ESTIMATED COSTS for the purposes of .estimating the total compensation and of providing a method of monthly payments to the ENGINEER. Upon completion of the ENGINEER'S work under this AGREEMENT the final payment will be based on the actual rates experienced during the period of performance, as indicated by the ENGINEER'S accounting records, and as determined by. final audit of the ENGINEER'S records by MHTC. (7) The amount of compensation shall not EXCEED *** THIRTEEN THOUSAND EIGHT HUNDRED EIGHTY SIX and 45/100 DOLLARS *** ($13,886.45). See attached GENERAL SCOPE OF WORK - ESTIMATED COSTS for documentation of compensation. Said SPREADSHEET is incorporated herein by reference as though fully set out. PART III-B PROPERTY ACCOUNTABILITY: If during the period of this contract the acquisition of any specialized equipment is required, appropriate credits will be given for any residual value. PART III-C ALLOWABILITY OF COSTS: e The allowability of costs will be governed by Volume I, Chapter 7, Section 2 of the Federal-Aid Highway Program Manual (FHPS 1-7-2) and Part 1-15 of the Federal Procurement Regulations (FPR 1-15) . 3 r Work Plan 281002.5 BRYAN & ASSOCIATES 87-143 City of Jefferson PART III-D METHOD OF PAYMENT: Upon receipt, review and approval of properly documented statements the CITY will make monthly payments to the ENGINEER in accordance with the EN compensation as specified in this AGREEMENT. Monthly payments will include all items defined as "cost" for the period covered by each monthly statement plus a portion of the lump sum fixed amount. Monthly payments on account of the lump sum fixed amount shall be made in the amount of sums earned less previous partial payments and less an established percentage. For purposes of monthly payments, the amount of the lump sum fixed amount earned shall be computed as a proportion of the lump sum fixed amount, said proportion to be the same as the total costs incurred bear to the estimated (direct labor + overhead) costs. PART IV-A COVENANT AGAINST CONTINGENT FEES: The ENGINEER warrants that he has not employed or retained any company or person, other than a bona fide employee working solely for the ENGINEER, to solicit or secure this AGREEMENT, and that he has not paid or agreed to pay any company or person, other than a bona fide employee working solely for the ENGINEER, any fee, commission, percentage, brokerage, fee, gifts, or any other consideration, contingent upon or resulting from the award or making of this AGREEMENT. For breach or violation of this warranty, the CITY shall have the right to annul this AGREEMENT without liability, or in its discretion, to deduct from the AGREEMENT price or consideration, or otherwise recover the full amount of such fee, commission, percentage, brokerage fee, gifts, or contingent fee. Amok PART IV-B DESIGN STANDARDS: The PROJECT shall be analyzed using the latest edition, STANDARD SPECIFICATIONS For HIGHWAY BRIDGES adopted by the AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS. PART IV-C OWNERSHIP OF ENGINEERING DOCUMENTS: Tracings, plans, specifications, and maps prepared or obtained under the terms of this AGREEMENT shall be delivered to and become the property of the CITY upon termination or completion of the work. Copies of basic survey notes and sketches, charts, computations, and other data prepared or obtained under this AGREEMENT shall be made available, upon request, to the CITY without restriction or limitation on their use. When such copies are requested, CITY agrees to pay the ENGINEER its cost of copying and delivering same. If the CITY incorporates any portion of the ENGINEER'S work into any other project than that for which the work was performed, the CITY shall save the ENGINEER harmless from any claims or liabilities resulting from such action. 4 Work Plan 281002.5 BRYAN & ASSOCIATES 87-143 City of Jefferson PART IV-D CHANGES IN WORK: Compensation for major changes in scope, character or complexity of the work, for undue delay of the PROJECT through no fault of the ENGINEER, shall be by supplemental agreements. Said supplemental agreements may provide for changes in compensation and for equitable adjustments, either upward or downward, in the maximum amount of compensation . Supplemental agreements shall be signed by the CITY and ENGINEER and shall receive Missouri Highway & Transportation Department and Federal Highway Administration approval prior to authorization to proceed with any work covered thereby. PART IV-E DELAYS AND EXTENSIONS: The CITY will grant the ENGINEER extensions of time for delays recognized by the CITY as unavoidable, provided that extensions of time shall be requested in writing by the ENGINEER, stating fully the reasons for such requests. Unique delay is defined as that caused by substantially greater than normal time requirements for approval by the approving authorities or temporary suspension by the CITY of the work under this AGREEMENT, if through no fault of the ENGINEER. PART IV-F TERMINATION OR ABANDONMENT: Either party may terminate this contract upon failure of the other to perform in accordance with the provisions of the contract. Before terminating, the party desiring termination shall give the defaulting party seven days written notice of the manner in which the defaulting party has failed to perform the contract. The defaulting party shall have the seven-day notice period to cure the defect. If the defaulting party does not within the seven-day notice period cure the defect, the contract shall be terminated. PART IV-H RESPONSIBILITY FOR CLAIMS AND LIABILITY: The ENGINEER shall indemnify and save harmless the CITY, the Missouri Highway & Transportation Department and Federal Highway Administration from all claims or suits made or brought for injury to persons or property caused by the negligent acts of the ENGINEER, its agents, employees or subcontractors in the execution of the work or by reason of design defects. The cost of any insurance policies to meet this specific requirement, if not normally carried by the ENGINEER or its subcontractors, will be considered as a direct non-salary cost which is properly allocable to this PROJECT for compensation. 5 r Work Plan 281002.5 BRYAN & ASSOCIATES 87-143 City of Jefferson PART IV-I GENERAL COMPLIANCE WITH LAWS: The ENGINEER shall comply with all Federal , State and local laws, ordinances and regulations applicable to the work. He shall secure all licenses, permits, etc. , from public and private sources necessary for the fulfillment of his obligations under this AGREEMENT. PART IV-J SUBLETTING, ASSIGNMENT OR TRANSFER: The ENGINEER shall not sublet, assign or transfer any interest in the work covered by this AGREEMENT except with the prior written consent of the CITY. The use of subcontractors shall in no way relieve the ENGINEER from his primary responsibility for the performance of the work. If at any time, however, the ENGINEER concludes that it would be in the best interests of the CITY to change subcontractors or to change the amounts or types or work to be subcontracted, the ENGINEER shall so notify the CITY in writing, giving reasons for the proposed changes. Upon written consent of the CITY, the ENGINEER will then make such changes. No approval will be necessary for non-professional services such as reproductions, printing, materials and other services normally performed or provided by others. Ing PART IV-K ENGINEER'S ENDORSEMENT: The ENGINEER will endorse all plans, specifications, payment estimates AMIL and engineering data furnished by him. PART IV-L NON-DISCRIMINATION CIVIL RIGHTS ACT OF 1964: The ENGINEER agrees that he will comply with all Federal and State laws and Federal regulations and directives pertaining to nondiscrimination on the ground of race, color, or national origin in connection with this AGREEMENT, including procurement of materials and lease of equipment therefor, in accordance with attached Exhibit "A" incorporated in and made a part hereof. PART IV-M NON-DISCRIMINATION: The Engineer, with regard to the work performed by it after award and prior to completion of the contract work, will not discriminate on the ground of race, color, sex or national origin in the selection and retention of ■ subcontractors. The Engineer will comply with Title VI of the Civil Rights t� Act of 1964, as amended. More specifically, the Engineer will comply with the regulations of the Department of Transportation relative to nondiscrimination in federally assisted programs of the Department of Transportation , as contained in 49 CFR 21 through Appendix H and 23 CFR 710.405(b), which are herein incorporated by reference and made a part of this contract. In all solicitations either by competitive bidding or negotiation made by the Engineer for work to be performed under a subcontract, including procurements of materials or equipment, each potential subcontractor or supplier shall be 6 Work Plan 281002.5 BRYAN & ASSOCIATES 87-143 City of Jefferson notified by the Engineer's obligations under this contract and the regulations relative to non-discrimination on the ground of color, race or national origin. PART V ENCUMBRANCE: The total amount encumbered under this AGREEMENT is *** THIRTEEN THOUSAND EIGHT HUNDRED EIGHTY SIX and 46/100 DOLLARS *** ($13,886.45). and the CITY may authorize up to this amount without prior approval of the Missouri Highway & Transportation Department or Federal Highway Administration. WART VI CONCLUSION: IN WITNESS WHEREOF, the parties hereto have caused this AGREEMENT to be executed as of the day and year written below. Executed by the CITY this day of 1988, at City of Jefferson, Missouri. FOR: CITY OF JEFFERSON BY: o s ar ner, r ATTEST: ary c - Clerk- Executed by the ENGINEER this �Df day of 1988, at Jefferson City, Missouri. FOR: BRYAN & ASSOCIATES SUL ING ENGI ERS NC. BY: a".... o n rVan, ., Presldknf 1 ATTEST: o c My Commission expires 7 Bridge No. 281002.5 BRYAN & ASSOCIATES 87-143 City of Jefferson EXHIBIT A Between City of Jefferson, Missouri hereinafter referred to as "CITY" and BRYAN & ASSOCIATES, hereinafter referred to as the "CONTRACTOR" 1 During the performance of this contract, the CONTRACTOR, for itself, its assignees and successors in interest (hereinafter referred to as the "CONTRACTOR") agrees as follows: (1) Compliance with Regulations: The contractor will comply with the Regulations of e Department Ot Transportation relative to nondiscrimination in federally assisted programs of the Department of Transportation (Title 49, Code of Federal Regulations, Part 21, hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this contract. (2) Nondiscrimination: The contractor, with regard to the work performed by It atter awar and prior to completion of the contract work, will not discriminate on the ground of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix, "A", "B", and "C" of the Regulations. (3) Solicitations for Subcontracts" Including Procurements of Materials and E ui men in all solicitations either DY competitive i ng or negot ation made by the contractor for work to be performed under a subcontract, including procurements of materials or equipment, each potential subcontractor or supplier shall be notified by the contractor of the contractor's obligations under this contract and the Regulations relative to nondiscrimination on the ground of race, color or national origin. ( 4) Information and Reports: The contractor will provide all information ana reports required y the Regulations, or orders and instructions issued pursuant thereof, and will permit access to its books, records, accounts, other sources of information, and its facilities as may be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contract is in the exclusive possession of another who fails or refuses to furnish this information, the contractor shall so certify to CITY, Missouri Highway & Transportation Commission or the Federal Highway Administration, as appropriate, and shall set forth what efforts it has made to obtain the information. 8 Bridge No. 281002.5 BRYAN & ASSOCIATES 87-143 City of Jefferson (5) Sanctions for Noncompliance: In the event of the contractor's noncompliance with e nondi scrim scriml nation provisions of this contract, CITY shall impose such contract sanctions as it or the State Highway Commission or Federal Highway Administration may determine to be appropriate, including, but not limited to, (a) withholding of payments to the contractor under the contract until the contractor complies, and/or (b) cancellation, termination or suspension of the contract, in whole or in part. (6) Incorporation of Provisions: The contractor will include the provisions of paragraph roug 6) in every subcontract, including procurements of materials and leases of equipment unless exempt by the Regulations, order, or instructions issued pursuant thereto. The contractor will take such action with respect to any subcontractor or procurement as CITY, Missouri Highway & Transportation Commission or the Federal Highway Administration may direct as a means of enforcing such provisions including sanctions for noncompliance; provided however, that in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the contractor may request CITY, State or the United States to enter into such litigation to protect their respective interests. 1 9 WORK PLAN EXPERIMENTAL PROJECT - Category 2 BEBO Precast Concrete Arch - A42 PURPOSE: This experimental project is to evaluate the BEBO A42 to determine its ability to perform satisfactorily as a bridge member. This structure has been designed for replacement of Bridge No. 261002.5, West Main Street, Project BRM-3115(501 ) , Cole County, Missouri . INSTALLATION: The BEBO A42 system will be manufactured and installed under the supervision of Hancock Concrete Products Co. Inc. of Minneapolis, MN. The requirements contained in the contract, plans and specifications shall control . Control points will be set to allow measurement of movements of the precast units with respect to each other and as a total unit. INSPECTION: Site inspections will be by Bryan & Associates Consulting Engineers, Inc. personnel . FABRICATION: Already complete. Certifications and test reports will be reviewed for their conformance with the construction plans and specifications. TRANSPORTATION: Review method of loading and support of elements during transit. Observation of unloading operation. ERECTION: Still picture documentation of installing and connecting elements. Observation of erection procedure. SEALING: Observe installation of joint seals for compliance with manufacturers recommendations and construction plans and specifications. BACKFILLING: Observe type and placement of fill material for compliance to the construction plans and specifications. r 1 r 5 March 196® A field log will be maintained containing all information pertinent to this work plan. All construction related problems will be noted for use in determining the suitability of this product for future applications. r FUTURE INSPECTIONS: Field inspections will made during the months of January and July for a period of five years starting in January 1999 to monitor any movements of the structure or the individual elements with respect to each other. Any cracks or significant movements will be identified for future monitoring at successive inspections. rREPORTS: The first report will be prepared and submitted at the completion of the construction phase. This report will address any problems encountered during the fabrication, transportation, erection, and backfilling phases. Preliminary recommendations will be made concerning the procedures for future applications of this product. Progress reports will be submitted after each scheduled biannual inspection to report field observations, measurements and general inspection data. These progress reports will also indicate recommended changes in the scope of future biannual inspections dependent on actual observations different than anticipated at this time. A final report will be prepared at the completion of the last biannual inspection summarizing the findings of the work. 1 Attached is an itemized scope of work outlining estimated costs to perform the work. 1 1 2 1 GENERAL SCOPE OF WORK - ESTIMATED COSTS EXPERIMENTAL PROJECT - Category 2 Page 1 of i BEBO Precast Concrete Arch - A42 8&A B&A Manhrs per hr Labor Expenses Fabricat'n Documentat'n Review 8.0 15.00 120. 00 Site Installation Inspection 32.0 7.50 240.00 Backfilling Inspection 40.0 10.00 400.00 Office Analysis Time 20.0 15.00 300.00 Report of Construction 20.0 15.00 300.00 Photography 50.00 Subtotal : 120.0 1360.00 50.00 BIANNUAL INSPECTIONS: Field Observation/Inspection 2.0 15.50 31.00 Measurement of Movements 6.0 10.00 60.00 Office Analysis Time 8.0 15.50 124. 00 Progress Report 8.0 15.50 124.00 Photography 10.00 AAML ow Subtotal 24.0 339. 00 10.00 ----------------x-10-inspections-----240_0-------------3390-00----100_00- Final Report Preparation 32. 0 16.00 512.00 ----------.--------------------------------------------------------------- Total : 392.0 5262.00 150.00 Direct S&A Labor Cost: 5262.00 Overhead Percentage 127% as of 12/87 6682.74 Profit (15% of Direct Labor & Overhead) 1791. 71 B&A Direct Expenses 150.00 Total Contract -13886. 45 r