Loading...
HomeMy Public PortalAboutORD08229 r �.. BILL NO. ' -...,_._-.... INTRODUCED BY COUNCILMAN ORDINANCE NO. AN ORDINANCE PROVIDING FOR THE C014STRUCTION OF SEWERS IN SEWER DISTRICT #115 WITHIN THE CITY OF JEFFERSON, MISSOURI . BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS: SECTION 1. That the City Council of the City of Jefferson, Missouri, hereby declares that it deems it necessary for the health and comfort of the inhabitants of the City, and for sanitary purposes, that there must be constructed as soon as possible in Sewer District #115, as established by ordinance, a sanitary sewer, and it is ordered that the same be made and constructed without unnecessary delay, and that the said district sewer be connected with and into the present sewer at manhole No. 119, Station -1+94, and manhole No. 1102A, Station 5+35, Moreau River Trunk Line Sewer. SECTION 2 . The outlet line of said sewer shall begin at manhole No. 119 at Station -1+94 Moreau River Sewer; thence de- flecting 74 degrees 39 minutes to the left from the forward tangent, 24.40 feet; thence deflecting 80 degrees 10 minutes to the right, 146.7 feet to Station 1+71.10; thence deflecting 24 degrees 21 minutes to the left, 373 .67 feet; thence deflecting 6 degrees 21 minutes to the left 192.18 feet . Lateral "A" of said sewer shall begin at aforementioned Station 1+71.10 on the outlet line; thence deflecting 100 degrees 46 minutes to the right from the back tangent extended foward, 218.0 feet. Lateral "B" of said sewer shall begin on the east right-of- way line Green Meadow Drive at a point which is 5 feet north of Aft the southwest corner of Lot 37 of Section One of Greenberry Hills Subdivision as per plat of record in Plat Book 5, page 7, Cole County Recorder's Office; thence southerly along the east right-of-way line of Green Meadow Drive, 545 .30 feet; thence deflecting 94 degrees 59 minutes to the right, 205.6 feet to Station 14+96.6. . Lateral "C" of said sewer shall begin at the aforementioned Station 14+96.6 Lateral "B" ; thence deflecting 85 degrees 01 minutes to the right from the back tangent, 870.30 feet; thence deflecting 16 degrees 20 minutes to the right, 359.00 feet. Lateral "D" of said sewer shall begin at manhole No. 1102A Station 5+35 Trunk A Moreau River Sewer; thence deflecting 93 degrees 34 minutes to the left from the foreward tangent, ` 138.05 feet, thence deflecting 8 degrees 33 minutes to the left I+ 167 .7 feet, thence deflecting 39 degrees 32 minutes, 110.27 feet. SECTION 3 . Said sewer shall be constructed in all respects as provided by ordinance and shall be constructed of standard glazed sewer pipe, shall be constructed according to the plans and specifications of the Director of Public Works. All crafts and classes of labor used in the construction of this sewer shall be paid the prevailing hourly rate as determined by the Depart- ment of Labor and Industrial Relations for the State of Missouri. SECTION 4. This ordinance shall take effect and be in force from and after its passage and approval. t Passed: Approved: TJ/� ARk F sident of th c6undilu M r Attest: Gity Cl Fr k 1