Loading...
HomeMy Public PortalAboutPond Property Committee packet 1.10.24 Town of Brewster Pond Planning Property Committee 2198 Main St., Brewster, MA 02631 (508) 896-3701 POND PROPERTY PLANNING COMMITTE MEETING AGENDA 2198 Main Street January 10, 2024 at 4PM This meeting will be conducted in person at the time and location identified above. This means that at least a quorum of the members of the public body will attend the meeting in person and members of the public are welcome to attend in person as well. As a courtesy only, access to the meeting is also being provided via remote means in accordance with applicable law. Please note that while an option for remote attendance and/or participation is being provided as a courtesy to the public, the meeting/hearing will not be suspended or terminated if technological problems interrupt the virtual broadcast or affect remote attendance or participation, unless otherwise required by law. Members of the public with particular interest in any specific item on this agenda, which includes an applicant and its representatives, should make plans for in-person vs. virtual attendance accordingly. Members of the public who wish to access the meeting may do so in the following manner: Please click the link below to join the webinar: https://us02web.zoom.us/j/89802325739?pwd=Y3dETmUvWHdoTlB0dklOaVlEekdxQT09 Passcode: 467353 US: +1 312 626 6799 or +1 929 436 2866 Webinar ID: 898 0232 5739 Passcode: 467353 To request to speak: Tap Zoom “Raise Hand”, then wait to be recognized. When required by law or allowed by the Chair, persons wishing to provide public comment or otherwise participate in the meeting, may do so by accessing the meeting remotely, as noted above. Additionally, the meeting will be broadcast live, in real time, via Live broadcast (Brewster Government TV Channel 18), Livestream (livestream.brewster-ma.gov), or Video recording (tv.brewster-ma.gov). Please note that the Pond Property Planning Committee may take official action, including votes, on any item on this agenda. 1. Call to Order 2. Declaration of a Quorum 3. Meeting Participation Statement 4. Recording Statement: As required by the Open Meeting Law we are informing you that the Town will be video and audio taping as well as broadcasting this public meeting. In addition, if anyone else intends to either video or audio tape this meeting they are required to inform the chair. 5. Public Announcements and Comment: Members of the public may address the Pond Property Planning Committee on matters not on the meeting’s agenda for a maximum of 3-5 minutes at the Chair’s discretion. The Pond Property Planning Committee will not reply to statements made or answer questions raised during public comment but may add items presented to a future agenda. 6. Review and Discuss Key Takeaways from Forum #3 & Public Comment – Reed Hilderbrand 7. Review and Discuss Pond Property Plan & Remaining Policy Decisions – Reed Hilderbrand 8. Review and Discuss Town Partnership with Mass Audubon 9. Short Term Uses of Property Updates a. Town plans for spring tour days- April 6 and 10th b. Town plans for interim parking for the property 10. FYIs 11. Approval of Minutes from October 18, 2023 and November 15,2023 12. Matters Not Reasonably Anticipated by the Chair 13. Questions from the Media 14. Next Meetings: January 23 (Joint with Select Board and Bay Property Planning Committee) and February 7, 2024, Virtual Community Forum #4 February 15, 2024 at 6pm 15. Adjournment Date Posted: Date Revised: Received by Town Clerk: 1/5/2024 Pond Property Planning Committee Doug Wilcock Chair- At Large Cynthia Baran Vice Chair-Water Commissioners Kari Hoffmann Select Board Cynthia Bingham Select Board Steve Ferris At Large Jan Crocker At Large Katie Gregoire At Large Elizabeth Taylor Open Space Committee Tim Hackert Housing Trust Chris Ellis Recreation Commission Chris Williams Natural Resources Commission Reed Hilderbrand LLC Landscape Architecture 130 Bishop Allen Drive Cambridge, MA 02139 MEMORANDUM ISSUE DATE POND AND BAY PROPERTIES COMPREHENSIVE PLANNING: FORUM #3: KEY TAKEAWAYS AND ITEMS FOR CLARIFICATION The Design Team has carefully considered and reviewed the feedback from the Community Forum #3 Breakout Groups and email feedback provided during the comment period. The range of opinions provided through the Breakout Groups and through emailed feedback were very similar in terms of opinions and ideas expressed. We received 116 emails, and while this number is much smaller than the number of survey respondents previously received, the emailed feedback was thorough, thoughtfully addressed different elements of the plans, and seemed representative of the community. There was one string of emails that seemed to arrive in response to a Brewster Conservation Trust email that encouraged feedback in opposition to housing on the Pond Property. Overall, in both emails and breakout groups, there was support and excitement for the plans. There were a few proposed plan elements that elicited mixed feedback and some areas where residents sought clarification. The below Key Takeaways summarize this feedback. Feedback pertaining to both Properties •There was excitement about the Mass Audubon partnership but there was also a desire to better understand the relationship with the Town. Questions included: o Would there be membership costs to residents and would the area always be accessible to the public? o Would the town receive revenue from Mass Audubon? o How much purview/ownership will Mass Audubon have over the portion of the site they occupy? •There was confusion around a wastewater treatment plant, including what it is and how it works, who it would serve, what it would look like, and concerns about odor. •Cost was a concern, especially for the Community Center. Some felt it was just too much money, many felt they needed to know the dollar amount of impact on their taxes, and many wanted more information on how phasing might help manage costs. •For those who supported housing, there was often a preference noted for denser housing options like townhouses. •The majority of residents supported housing on at least one of the properties, but there was mixed feedback on which property was preferred. Bay Property Feedback •There were mixed feelings about the Community Center. Some expressed full support and excitement, while others were more unsure due to the high cost, the perceived impact of a new large community center on the character of the property, and uncertainty about whether this is really needed in the community. •There was interest in how a community campus and a community center might be phased. January 3, 2024 TO Bay and Pond Property Planning Committees Town of Brewster Select Board COPIES TO Peter Lombardi, Town Manager Donna Kalinick, Assistant Town Manager MUNICIPALITY Town of Brewster FROM Reed Hilderbrand PROJECT Town of Brewster Sea Camps • There were continued questions about if the Eddy School may eventually become available for a Community Center, and the sentiment that this is a better option. • There was a good amount of support for housing on the Bay Property both for year-round affordable housing and an option combined with seasonal workforce, but interest in learning more about the ownership structure. • Overall, there was strong support for landscape amenities including trails, artist cabins, pool and beach access, and a playground. • While there was support for both the pollinator meadow and community gardens, there were also questions about if the community gardens would look tidy enough in the current location in the viewshed from 6A, and if the open lawn space would provide enough flexibility for events including space for the Pan Mass Challenge gathering. • There was mixed feedback on the tennis courts. While some support the courts, others were unsure they would be fully utilized. • There was concern about traffic impacts on Route 6A and relating to the intersection at Millstone Rd. • Many felt that new parking and trails should be permeable where possible. • There was a desire to consider revenue generation. Pond Property Feedback • There was strong support for landscape amenities at the Pond Property including trails, public beach access, and the Mass Audubon partnership. • There was mixed support for housing. Those who did support it felt very strongly in favor, while others were mixed with some favoring conservation. Some would like to avoid housing development in the Zone II area and are concerned about impacting the town’s drinking water supply and the watershed to Long Pond, while others feel housing can be balanced with conservation and that a wastewater treatment plant can address water quality concerns. There was a desire to understand whether or not housing would impact water quality if a wastewater treatment plant were introduced. • There was interest in better understanding the timeline for “future.” • Limited opinions were provided about reserving for future municipal uses, other than confusion around wastewater treatment. • There was support for improving vehicular, pedestrian, bike and ADA accessibility. Example comments pertaining to both Properties (Breakout groups) • Very excited to have Mass Audubon here! • Does the Mass Audubon partnership place any recreational usage restrictions? • Will the Audubon property be freely accessible, or will we have to pay? • What would the wastewater plans be for housing on the Bay property? We heard about a package treatment plant for the Pond property housing proposal. Would a similar facility be considered here? • [Interested in] more details about the water treatment plans incorporated into the development plans • It seems that most of the affordable housing being proposed is quite small. If we want families with children to stay in or move into town, are these dwellings of adequate size? • I'd like to say that I think year-round housing should be the primary goal for housing on the properties. Perhaps, since this would be town-owned housing, Brewster could do something similar to what Chatham's Housing Authority is doing with their MCI homes. Example comments pertaining to both Properties (Emails) • The partnership with Mass Audubon sounds like a good idea on the surface. I would be interested in learning more about the agreements – what are details regarding concessions being made to Audubon by the Town? What access to Audubon activities at the two sites will be given to Brewster residents? What sort of fee structures will be put in place by Mass Audubon? What will the Town be paying for and will the Town be receiving any of the fees collected for their programs? • Any affordable housing should maximize undeveloped land. Cluster housing is not only energy efficient, but leaves space for trees, pollinator gardens, and recreation. Town houses and/or two-story apartment or condo housing in an attractive configuration should be considered. • I'd like to focus on housing recommendations for the Bay and Long Pond properties. I support emphasis on the high end of the year-round housing provided. If not the highest density, then possibly combine some townhouse and some single to achieve a higher density. • My biggest concern is that Brewster needs a comprehensive wastewater plan before moving ahead with any housing projects. I assume that all of the building options on the Bay property depend on construction of a neighborhood sewage treatment plant. Example comments pertaining to the Bay Property (Breakout groups) • Could Brewster partner with another organization to defray the cost of building and maintaining a community center? • Who’s going to pay for the $66 million? My taxes are already unaffordable! • Could the new community center be built at a later date? • I think we need a new community center with COA and Recreation Facilities, like Harwich… • The community center although more expensive now seems to be more advantageous financially in the long term • It seems as though the Eddy School might serve some broader community needs in the future. How many years does the School Committee project before they expect to reconsider consolidation? • Prefer Campus-style community facilities and restoration of specifically of the historic Admin bldg. and Dining Hall in deference to sensitivity to the Sea Camps history and the many people with historic attachment to this property. Also, I feel this would allow for incremental additions. • Seasonal housing would better leverage existing structures but needs to be reimbursed to the Town of Brewster. For example, Ocean Edge would pay Brewster per unit per resident. • Prefer concept 4 - all desperately needed year-round housing and developer pays • If we are to build more housing on these properties, the Bay property would be the best location, as it is more central to transport and work and the Bay property is already developed. We should focus on the most efficient and dense options Town Houses or Condos) wherever we do it. • I’m so happy to see a playground included on the Sea Camps property and hope it will be designed to fit into the existing buildings. There is a great need for a covered area for playgroups for families with preschool children, so I hope the open pavilion stays. • I like the pollinator meadow in the front and don't think we should be constrained by historic camp use per se. • I love the pond woods • I love the walking paths around the property. And connecting the paths to Spruce hill also. • The careful planning and balance of activities and uses for the property is impressive. • Thinking more about community gardens, if they are up front and can be seen from the road, they might not be attractive in the winter. Might not be best place… • Tennis courts at Stonybrook are in big demand for pickleball; having dedicated tennis courts at this site would relieve the congestion tremendously • What is the impact of additional traffic on 6A /Millstone due to additional housing and community use of the property? • Please have a traffic planner look at the intersections. Very dangerous on the Cape! • Will there be an opportunity to generate revenue through user group fees (private camps, other programs)? • Is it likely any revenue would be generated to offset costs of a community center - for example from the sale of the existing COA or fees for certain activities on the campus? Example comments pertaining to the Bay Property (Emails) • I also want to express my support for a centralized newly built community center on the Bay property as opposed to the decentralized option. The current senior center building is woefully inadequate for the needs of our expanding senior population, and that has been the case for the 20 years that we lived full time in Brewster. • The cost of a brand new community center is simply too costly. I am in support of using existing buildings in Brewster to meet our recreation and meeting space needs. I suggest a strong hard look at consolidating Eddy and Stony Brook. • $66M is an expense that the Town of Brewster should not undertake. With the recent significant expenditures of the Cape Cod Tech School and Nauset Regional, the taxpayers should not be asked to fund another undertaking that the Town cannot afford. • Don't nibble around the edges. Go for the community center and the housing right up front. Affordable housing is my #1 priority, the community center is #2. I'm a year-round resident, and I feel strongly about doing what we can to help with the housing crisis; I also believe that a community center will help us further the building of community here in Brewster. Gathering places, be they the kitchen tables in affordable housing units or the all-purpose rooms of a community center, are important for the emotional health and social wellbeing of all Brewster-ites -- whether they realize it or not. • I would explore as many Public/Private ventures that make sense and are in keeping with public sentiment. This again could help reduce overall development costs. I would lean towards developing more housing on the site. • We can learn from Harwich. Their community center is the center of community life – and it produces revenue by renting space to about 150 community groups. • I would prefer a phased development of a community center. • I strongly believe that the secluded section of the Bay property is the perfect place for siting affordable housing. That site is about equidistant from shopping centers in Brewster and Orleans, and I presume the occupants would have transportation available. I believe any housing for seasonal workers should be much closer to the center of Brewster, where the jobs are likely to be found • Not in favor to build housing on the Bay property. Property should be used primarily for recreation and for residents enjoyment. I.E. Community center, pickle ball courts, nature trails and other activities. You will destroy the character of the town by placing housing at the bay property. • My concern is the traffic conundrum posed by this location on the parcel and its proximity to Millstone Road/6A intersection • Why more tennis courts? Don’t we have enough already? • As a neighborhood resident I see major traffic issues at the corner of Millstone and 6a. That corner is already a problem in the summer months. Traffic needs to be addressed!!! • I support the Pollinator Meadow but oppose the Community Gardens. • I love the idea of demonstrating sustainability thru native plants and pollinator meadows. I’d like to see those woven throughout the bay property, rather than the huge front-facing arrival fields area. Leaving some of that front area open allows for town events such as the Brewster in Bloom craft fair and Da Hedge, as well as parking for such events. • As an occasional cyclist I'm curious about the connection to Millstone. Will cyclists and pedestrians have a traffic control light to stop 6A traffic (as I believe they do near Fort Hill)? Will the Millstone renovation create a dedicated bike lane from 6A to CCRT? • I support recycling a few of the cabins to artist workshops, provided that occupants pay rent equal to the town's costs. • Where parking is being added consider the use of permeable pavers rather than asphalt. A portion of the Ocean Edge parking lot to the southwest of the mansion is permeable pavers filled with earth and grass. The result is green space aesthetically that can be parked upon. • It’d be great to have a full-size outdoor sports court, basketball court. • Walking Trails – Some portion of the trails should be ADA sensitive. Realize that not all trials can be paved but some consideration should be given to allow persons with disabilities to view (maybe access) the beach, overlooks, and maybe a leisurely stroll (or with a wheel chair etc.) • I would like to see the use of asphalt paving minimized in roadways and parking areas. Where feasible the use of permeable materials should be used. Consider asphalt limited to the accessible portions of parking areas. • Early on, I heard more talk about possible “revenue-producing” uses/activities—are there any such things in the current plans? If so, could they be identified more clearly? Or- do we value easy access to these facilities for all? Example comments pertaining to the Pond Property (Breakout groups) • Fully support and cheer the walking trails, beach , Audubon programs. Making great use of Brewster existing hike maps • I like the Audubon partnership a lot! • I prefer that we reserve for housing and a package plant. A package plant would take care of wastewater concerns in Zone II and would potentially pick up existing homes on septic within Zone II. Vast majority of parcel would still be preserved open space. Adjacent to 134 with easy access to highway. We should think bigger than just overcoming safe harbor - housing is a crisis across Cape Cod. • Having rented above the long pond site beach on Bessie Cartway, and walking the adjacent woodlands conversation area regularly, I support MA Audubon’s use of the lower portion to protect this important watershed. No housing there. How will the town monitor the use of the beach? I’ve observed many boats throughout the summer coming on the current beach area despite signage. Boaters are using it for swimming, fishing, parties, dog walking currently. • I live close to the Rte 137 entrance to the pond property and could agree to limited year- round housing at the entrance to the pond property only. Any housing further down the road would not support the conservation issues addressed. • I’m against any housing on the Long Pond site given surface and groundwater flows patterns. Septic flows would move towards Long Pond • Should not have housing on Pond Property. We have spent millions to protect these Zone II areas. The adjacent lot was purchased to protect drinking water and this lot should be considered the same. We should look to future needs for a new well and/or a cell tower on this parcel • Do not support reserve for municipal uses - there is a lot of land around the town offices and other municipal buildings for expansion. I believe we should choose the densest housing option with wastewater treatment for affordable housing. Bring our teachers, firefighters etc as well as our sons and daughters back into town • I am pleased that throughout the process the RH team has shown ADA accessible parking for the use of the pond. Thumbs up for that. • I support keeping the access road to the pond gravel to keep the feel of driving into a secluded conservation zone. • It would be nice to provide bike access to the lake beach Example comments pertaining to the Pond Property (Emails) • I support the Town Home proposal because I think it will be the most cost effective to build. I appreciate that the plan preserves the majority of the parcel for Open Space/Recreation/Zone II protection – to me this is an opportunity to demonstrate how advocates for housing and open space can work together. • As to the Long Pond property, I believe very strongly that a fourth option of no housing should be seriously considered. I realize that creating affordable housing to meet state targets is an important objective, but it need not be built in an area that is critical to the town’s water supply. With two environmental organizations as potential partners for this site, I believe that the entire site should be dedicated to conservation. • Providing affordable housing is a Town priority, and I agree with those who suggest the optimum location for it is on the Pond Property. A lovely development of Town Homes would seem ideal there. • We absolutely do not want to see housing constructed here for environmental impact reasons. • Keep section on 137 for housing or future town uses. Build appropriate housing here in the future. The environment can be protected from wastewater issues by building a small treatment center for the neighborhood. • I fully support the position held by BPC and BCT that we should not consider a housing option on the Long Pond property until we have a comprehensive wastewater plan. That area is very important for water quality and potential well locations. • The split of a 10-acre segment reserved for future municipal or affordable housing use and the remaining parcel designated for conservation and nature partnerships (potentially with the BCT and MA Audubon) is excellent. This enables the Town to connect with the previously purchased Robinson conservation property and create a large swatch of conservation land while still allowing the Town to potentially use the corridor next to Rt 137. • Given the choice between reserving the remaining 15% for municipal use or affordable housing I prefer the reservation for municipal use. For a multiple of reasons- Zone II, watershed to Long Pond, preserving a possible town well site, lack of transportation and distance to Brewster/Orleans jobs and amenities, this site is not suited to housing. In addition, the presentation talked about a net zero addition of nitrogen from affordable housing which was explained as calculated by using a reduction in nitrogen from nearby housing to offset the addition of nitrogen at this site. If housing is even placed on this site, it should be in an ecologically sound way that does not add any burden of nitrogen or other contaminants to this site. This may take many years but that should be the standard for placing housing on this site. • I’m concerned, and generally opposed, to siting housing on this property. Our major conservation groups are opposed, and I appreciate their views, as well as concerns about water. The property is a really wonderful woodland, and I’d like to see it devoted to conservation and passive recreation. • Use the 10 acres for housing BUT isolate it more by not putting the road into the pond property right through the middle of the housing rather move the main road into property to one side of the housing project or create a separate entrance like on the Bay property • There are a limited number of parking spaces serving the Pond beach. Will swimming be allowed there? If so, what about lifeguards? Town of Brewster Sea Camps Community Forum 3 November 30, 2023 WELCOME! Orientation (10 min) - Introduction - Where We Left Off Bay Property (35 min) - What We’ve Heard - Refined Plans and Cost Information Pond Property (30 min) - What We’ve Heard - Refined Plans and Cost Information Breakout Rooms Discussions (40 min) Conclusions & Next Steps (5 min) Peter Lombardi Town Manager Madeleine Aronson Reed Hilderbrand Donna Kalinick Assistant Town Manager Today’s Speakers: TODAY’S AGENDA Amanda Bebrin Chair, Bay Property Planning Committee David Vega-Barachowitz WXY Doug Wilcock Chair, Pond Property Planning Committee Elizabeth Randall Reed Hilderbrand TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 2 REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 3 INTRODUCTION Amanda Bebrin- BPPC Chair REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 4 INTRODUCTION Doug Wilcock- PPPC Chair REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 5 REED HILDERBRAND Landscape Architecture and Planning BREWSTER COMMUNITY - Community Members - Select Board - BPPC Committee Members - PPPC Committee Members - Town Staff VHB Engineering Planning Permitting A M FOGARTY Cost EstimationLEC ENVIRONMENTAL Environmental Consultant WXYArchitecture Planning Engagement MASS AUDUBON MEET OUR TEAM WHERE WE ARE IN THE PROCESS TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 6 REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 7 PATH TO DESIGN Community-led Decisions COMMUNITY OUTREACH DISTILLED COMMUNITY FEEDBACK PLANS THAT REFLECT TOWN GOALS & COMMUNITY VALUES CONTINUED PLAN DEVELOPMENT 2 PUBLIC COMMUNITY FORUMS SELECT BOARD MEETINGS GUIDING PRINCIPLES 20+ PPPC MEETINGS 20+ BPPC MEETINGS TOWN VISION PLAN COMMUNITY & COMMITTEE FEEDBACK DESIGN TEAM FACILITATION STAKEHOLDER INPUT SELECT BOARD DIRECTIONOPEN SPACE AND RECREATION PLAN HOUSING PRODUCTION PLAN LOCAL COMPREHENSIVE PLAN COASTAL RESOURCE MANAGEMENT PLAN INTEGRATED WATER RESOURCE MANAGEMENT PLAN 2 SURVEYS REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 8 WHAT WE HEARD Guiding Principles Foster awareness of the sensitive ecologies and demonstrate sustainability Re-use buildings and amenities where feasible Plan for long-term needs of the Town Balance cost with revenue generation Expand opportunities for community use with a focus on wellness, recreation, arts, and education Protect and conserve important natural habitat Contribute to the Town’s affordable housing goals Build upon Brewster’s historic, small- town, and socially inclusive character Build partnerships for activities and stewardship Provide resources for all ages REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 9 Share draft comprehensive plans Provide important Town context regarding housing, a community center, and municipal uses Hear your f eedback WHAT ARE OUR GOALS FOR TODAY? 1 32 REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 10 BAY PROPERTY BAY PROPERTY - OVERALL EXISTING FRAMEWORK ARRIVAL FIELDS SECLUDED ZONE CENTRAL CAMPUS WOODLAND BUFFER COASTAL DUNE CABIN GLADE BEACH POND RESERVE OVERALL PLAN Bay Property 0 200’MILLSTONE ROAD ROUTE 6A SPRUCE HILL PARTIAL REWILD + SEASONAL COMMUNITY USE TENNIS COMMUNITY COMMONS NATURE BASED PROGRAMS NEW TRAILS & ACCESSIBLE PATHS POOL & PICNIC WOODLAND BUFFER HOUSING RESTORE COASTAL DUNE FLEXIBLE SPACE COMMUNITY GARDENS & POLLINATOR MEADOW TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 12 FLEXIBLE SPACE COMMUNITY COMMONS PARTIAL REWILD & SEASONAL COMMUNITY USE RESTORE COASTAL DUNE NATURE BASED PROGRAMS POOL WOODLAND BUFFER SEASONAL WORKFORCE HOUSING AND/OR YEAR-ROUND AFFORDABLE HOUSING COMMUNITY GARDEN NEW TRAILS & ACCESSIBLE PATHS 0 200’ EXISTING PLAN MILLSTONE ROAD ROUTE 6A 17 16 57 40 38 39 42 36 37 56 85 15A6 18 19 55 54 2120 50 5 4 1 2 3 15 7 8 9 22 12 11 35 47 14 13 33 32 10 48 23 70 24 29 30 25 26 46 28 31 49 81 27 60 80 78 77 79 34 52 67 82 83 59 58 72 71 73 74 75 76 4443 63 64 62 61 5368 86 84 66 92 TOTAL BUILDINGS: Existing Buildings 12 COMMUNAL CAMP USES 6 SHOWER HOUSES 9 STAFF CABINS 38 CABINS 25 MAINTENANCE BUILDINGS 1 ADMINISTRATION BUILDING 1 SPRUCE HILL HOUSE TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 13 C O MMUNAL C A M P U S ES CAB I N S SHOWER H O U S E STAFF C A B I N S MAINTE N A N C E SPRUCE HI L L H O U S E ADMIN B U I L D IN G 0 200’ PROPOSED PLAN Building Removal, Re-Use & New Construction MILLSTONE ROAD ROUTE 6A 24 BUILDINGS TO BE REUSED 2 NEWLY CONSTRUCTED BUILDINGS 49 BUILDINGS TO BE REMOVED 19 BUILDINGS POSSIBLY TO BE REUSED (These buildings would remain if used for seasonal workforce housing and maintenance but would be removed if there were to be new affordable housing) •Re-use existing buildings where feasible WHAT WE HEARD: ADMINISTRATION BUILDING ARTS CENTER BOATHOUSE TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 14 COMMUNITY CENTER NATURE CENTER 0 200’ PROPOSED PLAN MILLSTONE ROAD ROUTE 6A 24 BUILDINGS TO BE REUSED 2 NEW BUILDINGS (TO BE CONSTRUCTED) 49 BUILDINGS TO BE REMOVED 19 BUILDINGS POSSIBLY TO BE REUSED (These buildings would remain if used for seasonal workforce housing and maintenance but would be removed if there were to be new affordable housing) •Re-use existing buildings where feasible WHAT WE HEARD: Building Re-Use TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 15 COMMUNITY CENTER NATURE CENTER REUSE PICN I C P A V IL IO N REUSE ADMI N B U I L D IN G REUSE BOA T H O U S E REUSE AR T S C E N T ER R E U SE CABINS FO R C O M M U N IYT USE R E USE SPRUCE H I L L H O U SE REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 16 PROPOSED PLAN Building Uses COMMUNITY USE HOUSING MAINTENANCE ADMINISTRATION BUILDING ARTS CENTER BOATHOUSE COMMUNITY CENTER NATURE CENTER MILLSTONE ROAD ROUTE 6A 0 200’ REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 17 PROPOSED PLAN COMMUNITY USE HOUSING MAINTENANCE •Provide all-age friendly resources •Incorporate the arts and sciences WHAT WE HEARD: Building Uses MILLSTONE ROAD ROUTE 6A 0 200’FLEXI B L E C O MMUNITY U S E S / A R TISTS STUDIOS EVENT S P A C E I NT E R I M REC USES / F U T U R E M U N ICIPAL USESE V ENT SPACE / C O N S E S SIO NSSE A S O N AL MASS AU D U B O N H O USINGCLASSES, E V E N T S , E TC.MAS S A U DUBON NAT U R E C E N TER / OFFICESC O A, REC DEPT, T E E N C EN TER P IC N I C P AVILION C A B I NS A D M I N B UILDING B O A T H OUSE C A B INS A R T S C E NTER N A T U R E CENTER CO M M U N I T Y CENTER REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 18 PROPOSED PLAN Outdoor Recreation MILLSTONE ROAD ROUTE 6A 0 200’ FLEXIBLE OPEN SPACE (ATHLETIC FIELD, EVENTS) COMMUNITY GARDEN TENNIS COURTS SHARED USE PATH POOL PICNIC AREA FITNESS STATIONS PLAYGROUND & PICNIC AREA PICNIC PAVILION PICNIC AREA TRAILS BEACH ACCESS FLEXIBLE GATHERING SPACE •Provide opportunities for passive recreation (trails, picnic areas, etc) •Provide flexible indoor and outdoor gathering spaces WHAT WE HEARD: PICNIC PLAYGROUND & PICNIC AREA FLEXIBLE OPEN SPACE BEACH ACCESS FITNESS STATIONS POOL TENNIS COURTS COMMUNITY GARDEN TRAILS REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 19 PROPOSED PLAN Habitat & Re-wilding MILLSTONE ROAD ROUTE 6A 0 200’ RESTORE COASTAL DUNE TO IMPROVE DUNE STABILITY AND COASTAL RESILIENCY ENHANCE TREE CANOPY TO ABSORB GREENHOUSE GASES, PROVIDE INCREASED HABITAT FOR WILDLIFE, & RESTORE WOODLANDS INTRODUCE POLLINATOR MEADOW TO INCREASE WILDLIFE HABITAT, INCREASE STORMWATER ABSORPTION, & REDUCE REGULAR MAINTENANCE MAINTAIN CLEARING WITHIN WOODANDS APPROX 10ACRE CONSERVATION RESTRICTION 1938 1971 1994 RESTORE COASTAL DUNE ENHANCE WOODLANDS POLLINATOR MEADOW REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 20 PROPOSED PLAN Vehicular circulation and Parking PARKING MILLSTONE ROAD ROUTE 6A 0 200’ BEACH, BOATHOUSE & NATURE CENTER PARKING GROVE ~ 40 SPOTS EXISTING PARKING AREA ~ 46 SPOTS COMMUNITY CABIN GRAVEL PARKING ~ 26 SPOTS ADMIN HOUSE & RECREATION GRAVEL PARKING ~ 44 SPOTS OVERFLOW EVENT PARKING ~ 127 SPOTS NATURE CENTER ADA PARKING 4 SPOTS POOL ADA PARKING 4 SPOTS POOL, ARTS CENTER, COMMUNITY CENTER PARKING GROVES ~ 86 SPOTS COMMUNITY CENTER ADA PARKING 4 SPOTS SECONDARY VEHICULAR PRIMARY TWO WAY VEHICULAR PRIMARY ONE WAY VEHICULAR SECONDARY MAINTENANCE VEHICULAR PRIMARY MAINTENANCE VEHICULAR PUBLIC ENTRANCE SECONDARY ENTRANCE GRAVEL PARKING PARKING WITH PLANTING PLANTING GROVE REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 21 OTHER TRAIL CAMPUS LOOP POND & DUNE WALK FITNESS LOOP PROPOSED PLAN Walking Trails MILLSTONE ROAD ROUTE 6A 0 200’ MEADOW LOOP: 0.3 MILES FITNESS LOOP: 0.2 MILES CONNECTS TO SPRUCE HILL CONNECTS TO SPRUCE HILL CAMPUS LOOP: 1 MILE POND & DUNE WALK: 0.5 MILES MEADOW LOOP CAMPUS L O O P MEADOW L O O P POND & D U N E W A LK FITNESS L O O P REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 22 BIKE PARKING SEPARATED BIKE PATH BIKE PATH SHARED WITH VEHICLES PROPOSED PLAN Bike Circulation MILLSTONE ROAD ROUTE 6A 0 200’CONNECTS TO RAIL TRAIL REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 23 • The Town Meeting Warrant article to purchase the properties included a “Community Center” as a potential use • The 2018 Town Vision Plan identified providing a “community center for all ages for social and recreational activities and include meeting rooms” as a priority goal • The 2023 Local Comprehensive Plan also identified a new multi-generational community center as consistent wit h community values • The Council on Aging facility lacks adequate space for its programming needs, and the condition of the existing historic building creates ADA and maintenance challenges • The Recreation Department also does not have a f acility of its own and uses limited office and meeting space in the Eddy School COMMUNITY CENTER Town Context REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 24 Currently no plans to reuse Eddy Sc hool as a community center: • Town Meeting authorized funding for a Brewster Elementary Sc hool Consolidation Feasibility S tudy in November 2019 • Consolidation Feasibility Study was completed in January 2022 • Brewster School Committee has care, custody, and control of the elementary schools • After careful consideration, Brewster Sc hool Committee voted in October 2022 to table consolidation until the student enrollment has decreased to about 55 children per grade (currently about 65/grade) • Brewster, Orleans, Eastham, and Wellfleet are actively considering submission of grant application to explore f easibility of regionalizing elementary schools COMMUNITY CENTER Town Context Library/reading room Medical exam/treatment rooms Game rooms Large multi-purpose rooms Storage areas Conference/meeting rooms Offices Workspaces Fitness center Walking track Kitchen/cafeteria Indoor Pool Gymnasium Fitness classrooms Sport courts COUNCIL ON AGING REC DEPARTMENT COMMUNITY CENTER Community Feedback - Desired Public Facilities SPACES REQUIRED FOR DESIRED FACILITIES BUILDINGS VIABLE FOR SOME LEVEL OF RE-USE COMMUNITY CENTER • Forum and survey feedback shows t hat, in general, t he community is more interested in reusing t he existing buildings on the Bay Property for a “Community Campus” rather than building a new, purpose-built Community Center. •Some of the most popular community center-type program interests expressed by residents at the forum and in the survey cannot be accommodated wit hin t he existing building footprints and would require extensive and costly building renovation. Community Feedback - Desired Public Facilities 8-LANE SWIMMING POOL 6,275 SF GYM WITH PERFORMANCE SPACE 7,600 SF FITNESS CLASSROOM 1,200 SF OFFICE 130 SF CLASSROOM 1,300 SF FITNESS CENTER 2,000 SF MEDICAL EXAM ROOM 480 SF GAME ROOM 450 SF MEETING ROOM 750 SF COMMUNITY DANCE 900 SF CULINARY WELLNESS PROGRAM 660 SF COMMUNITY KITCHEN 650 SF SENIOR PROFESSIONAL SERVICES 200 SF MULTI-PURPOSE ROOM 1,300 SF SENIOR SOCIAL SERVICE AGENCY 800 SF EXISTING DINING HALL 10,283 SF #31 ART CENTER 2,562 SF #28 ADMINISTRATON BUILDING 4,752 SF #25 INFIRMARY 3,854 SF BOATHOUSE 2,804 SF #23 PAVILION 2,400 SF CABIN APPROX. 600 SF SEASONALLY WINTERIZED NON - WINTERIZED COMMUNITY CENTER SPACES REQUIRED FOR DESIRED FACILITIES APPROXIMATE 34,000 SF TOTAL FOOTPRINT OF POTENTIAL NEW COMMUNITY CENTER • A new community center would have t he potential to accommodate the facilities t he community is interested in. • For comparison, t he Harwich Community Center is 32,000 SF with a 17,000 SF basement. Community Feedback - Desired Public Facilities 8-LANE SWIMMING POOL 6,275 SF GYM WITH PERFORMANCE SPACE 7,600 SF FITNESS CLASSROOM 1,200 SF OFFICE 130 SF CLASSROOM 1,300 SF FITNESS CENTER 2,000 SF MEDICAL EXAM ROOM 480 SF GAME ROOM 450 SF MEETING ROOM 750 SF COMMUNITY DANCE 900 SF CULINARY WELLNESS PROGRAM 660 SF COMMUNITY KITCHEN 650 SF SENIOR PROFESSIONAL SERVICES 200 SF MULTI-PURPOSE ROOM 1,300 SF SENIOR SOCIAL SERVICE AGENCY 800 SF FIRST FLOOR 20,000 SF SECOND FLOOR 14,000 SF COMMUNITY CENTER - REUSE AND RENOVATE TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 28 REUSE DINING HALL PROGRAMS NOT ACCOMMODATED: Fitness Center Walking Track Indoor Pool Gymnasium Sports Court 5,600 SF Flex. Meeting Space 1,000 SF Game Room 1,000 SF Kitchen 2,600 SF Support Spaces REUSE ADMINISTRATION BUILDING 1,000 SF Support Spaces 3,750 SF Offices 10,200 SF Total 4,750 SF Total REUSE ARTS CENTER 5,00 SF Support Spaces 2,060 SF Flex. Meeting Space 2,560 SF Total REUSE DINING HALL REUSE ART CENTER REUSE ADMINISTRATION BUILDING Reuse Community Campus Illustrative Scenario TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 29 New Community Center Illustrative Scenario COMMUNITY CENTER - NEW BUILD NEW COMMUNITY CENTER 6,650 SF Gymnasium 2,230 SF Fitness Center 1,240 SF Fitness Classroom REUSE ADMINISTRATION BUILDING 1,000 SF Support Spaces 3,750 SF Offices 4,750 SF Total REUSE ARTS CENTER 500 SF Support Spaces 2,060 SF Flex. Meeting Space 2,560 SF Total 3,900 SF Flex. Meeting Space 7,000 SF Circulation + Lobby 660 SF Kitchen 4,100 SF COA Programs 33,400 Total 4,100 SF Support Spaces 3,450 SF Teen Area with Game Room NEW COMMUNITY CENTER REUSE ART CENTER REUSE ADMINISTRATION BUILDING Gymnasium Fitness classrooms Sport courts Library/reading room Medical exam/treatment rooms Game rooms * Council on Aging cannot relocate here, only have some satellite programs *Would require land be acquired for a new COA facility to be built elsewhere in town Large multi-purpose room Storage areas Conference/meeting rooms Offices Workspaces Fitness center Walking track Kitchen/cafeteria Indoor Pool Unlikely Maybe Yes (with renovation) COMMUNITY CENTER - REUSE AND RENOVATE No designated COA building COUNCIL ON AGING SHARED REC DEPARTMENT REUSE DINING HALL AS COMMUNITY MEETING & EVENT SPACE PLAYGROUND COMMUNITY CAMPUS FELXIBLE GATHERING SPACE EVENT SPACE / PICNIC PAVILION REC DEPT OFFICES & PROGRAMS STAFF HOUSING AMPHITHEATER PARKING GROVE PICNIC AREA ARTS CENTER TRAIL CONNECTION TO SPRUCE HILL SEASONAL COMMUNITY USE Library/reading room Medical exam/treatment rooms Game rooms Large multi-purpose rooms Storage areas Conference/meeting rooms Offices Workspaces Fitness center Walking track Kitchen/cafeteria Indoor Pool Gymnasium Fitness classrooms Sport courts COMMUNITY CENTER - NEW BUILD Potential to include all desired facilities COUNCIL ON AGING SHARED REC DEPARTMENT REMOVE DINING HALL & REWILD FELXIBLE GATHERING SPACE EVENT SPACE / PICNIC PAVILION INTERIM RECREATION / FUTURE MUNICIPAL STAFF HOUSING AMPHITHEATER NEW COMMUNITY CENTER (INCLUDES COA, REC DEPT, TEEN CENTER) EXPANDED PARKING PICNIC AREA ARTS CENTER TRAIL CONNECTION TO SPRUCE HILL SEASONAL COMMUNITY USE COMMUNITY COMMONS PLAYGROUND REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 32 PRELIMINARY DRAFT PRICINGPRELIMINARY DRAFT PRICING Bay Property Overall (with new Community Center) Total: Approx $41,243,000 before design and contractor fees Approx $66,330,000 after design and contractor fees including: Pricing Breakdown • 10% general conditions • 10% overhead and profit • 1% permitting • 2% bond/insurance • 10% design contingency • 20% design services • 6% escalation allowance Buildings (Total: $32,611,400) - Building removal (40 bldgs): $1,094,700 - Renovate for seasonal workforce housing (10 bldgs): $1,045,500 - Renovate for communal use or staff housing (21 bldgs): $2,311,600 - Renovate Administration Building: $1,262,800 - New Community Center: $24,742,000 - New Nature Center: $1,554,800 - New Restroom Facility: $600,000 Sitework and Recreational Amenities (Total: $3,862,700) - Planting (woodland, dune, meadow): $1,135,600 - Trails: $759,000 - Picnic Areas: $214,200 - Tennis Courts: $461,000 - Community Garden: $249,800 - Fitness Stations: $60,000 - Playground: $726,000 - Athletic Field: $257,100 Site Prep and Infrastructure (Total: $4,768,900) - Site prep and paving removal: $873,500 - Road Improvements: $1,068,600 - Parking Areas and Stormwater Management: $1,127,900 - Utilities: $498,900 - Septic: $1,200,000 REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 33 Add (Total: $5,655,700) - Renovate dining hall: $5,655,700 Remove (Total: $25,527,900) - Community Center: $24,742,000 - Expanded Parking: $498,000 - Remove Dining Hall: $287,900 Community Campus instead of Community Center (Assumes renovated dining hall, no community center and no COA facility) Total: Approx $19,872,000 reduction in cost before design and contractor fees *Does not include cost of land acquisition and/or construction of a new COA facility at a different location Pricing Breakdown PRELIMINARY DRAFT PRICING REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 34 PARTNERSHIPS - BAY PROPERTY Mass Audubon Mass Audubon Partnership includes: Possible programs: - Nature center with administrative of fices - Conservation restriction on approximately 10 acres surrounding existing pond on the northeast corner of the property - Reuse of existing cabins for seasonal workforce housing for 6 Mass Audubon employees - A variety of programming and f ield tr ips - Interpretative signage and nature trails Amount pledged for Bay Property: $2 million REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 35 FINANCING • Any potential new housing would be a public/private partnership where t he ma jority of the costs are borne by a developer • Preliminary f inancing and phasing information will be shared out at t he 4t h community forum in February 2024 once t he draft plans are f inalized • Financing options will include a combination of t he following: - Public/Private Partnerships - Federal, state, and/or other grants - Capital S tabilization Funds - Free Cash - Property revenue generation - Gifts and donations - Short-term non-excluded debt - Long-term debt exclusions • Details about f inancing and phasing will be incorporated into Town’s Capital Improvement Plan after plans for t he properties are approved by Brewster voters • Specific funding requests may be brought back to future Town Meetings for approval through t he Town’s annual capital planning processes HOUSING REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 37 • The Town Warrant article to purchase t he properties approved at Town Meeting included “community housing” as a Potential Town Use for both properties and specifically mentioned “Appropriately scaled community housing near Route 137”as a potential use for t he Pond Property in t he Voter Information • Providing affordable and attainable housing is supported by t he Town Vision Plan, t he Local Comprehensive Plan, and t he Select Board S trategic Plan, and it appears to have widespread conceptual support among the community • If one or both of these properties is not used for affordable year round, deed restricted housing to meet t he State’s 10% Mandate and t he Town’s HPP goals, other properties will need to be purchased by the Town for building affordable housing in the near future • The Select Board has determined housing should be included on at least one of these properties HOUSING Town Context TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 38 • Goal 1: Increase and diversify year-round housing options in Brewster for a range of income levels and housing types • Goal 2: Prevent displacement of current residents and facilitate housing mobility for households looking to move within or into Brewster. • Goal 3: Align development with the principles of the Town’s Local Comprehensive Plan/Vision Plan. This includes balancing housing goals with protection of the natural environment. • Goal 4: Continue to build capacity to produce housing through staffing, funding, regional partnerships, advocacy and education, and relationships with nonprofit and for-profit developers. Housing Goals BREWSTER HOUSING PRODUCTION PLAN 2022-2027 REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 39 HOUSING Community Feedback • Responses to t he forum and survey show t hat most people prefer seasonal workforce housing on the Bay Property. It should be noted that seasonal workforce housing while needed, does not count towards t he 10% Affordable Housing S tate mandate. • Desire for seasonal workforce housing is related to sentiment of re-use TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 40 Bay Property Context BAY PROPERTY BAY PROPERTY: SECLUDED ZONE: THE SECLUDED ZONE IS 18% OF THE BAY PROPERTY 55 ACRES 10 ACRES LONG POND PROPERTY BAY PROPERTY CAPE COD BAY LONG POND SPRUCE HILL PARCEL NICKERSON STATE PARK LONG POND WOODLANDS NAMSKAKET MARSH PUNKHORN PARKLANDS ELLIS LANDING LOWER RD CONSERVATION AREA NO BOTTOM POND SANCTUARY SHEEP POND WOODLANDS BREWSTER WATER SUPPLY LANDS FREEMAN’S FIELDS MILLSTO N E R O A D MA IN S T R E E T / R O U T E 6 A LONG POND R O AD / ROU T E 1 3 7 C A PE C O D RA IL TRAILCAPE COD BAYCAPE COD BAY SECLUDED ZONE BAY HOUSING ANALYSIS TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 41 Previous Building Uses The secluded zone of t he Bay Property currently contains the maintenance area for the entire property and formerly housed the day camp programs. WINTERIZED 8 ROOMS; 4 BEDROOMS NON-WINTERIZED 8 ROOMS SPRUCE HILL HOUSE DORMITORY STAFF CABIN COMMUNAL CAMP USES SHOWER HOUSE MAINTENANCE SPRUCE HILL HOUSE DAY CAMP AREA MAINTENANCE AREA SECLUDED ZONEROUTE 6ABAY HOUSING ANALYSIS TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 42 Proposed Site Relationships SEPARATE ACCESS TO HOUSING DEMO EXISTING STRUCTURES TO CREATE A FOREST BUFFER The forest buffer could separate more public uses of the Bay Property and the more secluded potential housing. FO R E S T B U F F E R FOREST BUFFER FO R E S T B U F F E R POTENTIAL HOUSING DESIGNATED AREA HISTORIC OLD KING HIGHWAY REMOVE VEHICULAR ACCESS DEMOLISH BUILDINGS FOREST BUFFER Scenarios are based on up to 46 units (90 beds). Contemplated year round and seasonal workforce housing in both repurposed structures and new construction. Group or individual parking is considered depending on dwelling type and configuration.ROUTE 6ASECLUDED ZONE Wastewater treatment is still under consideration. BAY HOUSING ANALYSIS TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 43 Matrix REPURPOSE REPURPOSE & NEW BUILD (DEMO)NEW BUILD (DEMO) DETACHED SINGLE UNITS MORE PRESERVATION NEW BUILD NEW BUILD (DEMO) TOWN HOUSES SEASONAL WORKFORCE YEAR-ROUND AFFORDABLE UNIT COUNT PARKING UNIT SIZE SHI BEDS 8 UNITS 2 year-round affordable 6 seasonal workforce 13 TOTAL GROUP 1000 sf year-round affordable 660 sf seasonal workforce 2 UNITS 28 TOTAL BEDS 2 year-round affordable 26 seasonal workforce 32 UNITS 26 year-round affordable 6 seasonal workforce 48 TOTAL GROUP 1000 sf year-round affordable 660 sf seasonal workforce 26 UNITS 76 TOTAL BEDS 52 year-round affordable 24 seasonal workforce 40 UNITS 40 year-round affordable 0 seasonal workforce 60 TOTAL 8 individual, 42 group 450 sf studio, 700 sf one bedroom, 1200 sf detached single family 40 UNITS 48 TOTAL BEDS 48 year-round affordable 0 seasonal workforce 46 UNITS 44 year-round affordable 0 seasonal workforce 68 TOTAL GROUP 1000 sf town homes 46 UNITS 90 TOTAL BEDS 80 year-round affordable 0 seasonal workforce BAY ILLUSTRATIVE HOUSING SCENARIOS TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 44 Repurpose Existing structures are reupurposed as dwelling units with group parking areas. An area of the site remains as maintenance. MAINTENANCE AREA HOUSING ROUTE 6AHISTORIC OLD KING HIGHWAY FOREST BUFFER SEPARATE ACCESS TO HOUSING YEAR-ROUND 2 UNIT; 2 BED ea. 1 UNIT; 4 BED ea. SEASONAL WORKFORCE CAPE COD BAYSECLUDED ZONE UNIT COUNT PARKING UNIT SIZE SHI BEDS 8 UNITS 2 year-round affordable 6 seasonal workforce 13 TOTAL GROUP 1000 sf year-round affordable 660 sf seasonal workforce 2 UNITS 28 TOTAL BEDS 2 year-round affordable 26 seasonal workforce SEASONAL WORKFORCE YEAR-ROUND STUDIO ONE BEDROOM SINGLE-FAMILY MULTI-UNIT COMMUNAL AMENITIES MAINTENANCE REPURPOSE NEW BUILD YEAR-ROUND BAY ILLUSTRATIVE HOUSING SCENARIOS TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 45 BAY ILLUSTRATIVE HOUSING SCENARIOS Re-purpose and New Build (demo) 32 UNITS 26 year-round affordable 6 seasonal workforce 48 TOTAL GROUP 1000 sf year-round affordable 660 sf seasonal workforce 26 UNITS 76 TOTAL BEDS 52 year-round affordable 24 seasonal workforce HOUSING HISTORIC OLD KING HIGHWAY ROUTE 6ASEPARATE ACCESS TO HOUSING FOREST BUFFER MAINTENANCE STRUC- TURES MOVED TO FOREST BUFFER CONSTRUCT MULTI-UNIT TOWN HOUSES Former maintenance buildings are demoed to create additional dwelling units. Brewster Landing, Brewster, MA CAPE COD BAYSECLUDED ZONE UNIT COUNT PARKING UNIT SIZE SHI BEDS MAINTENANCE SEASONAL WORKFORCE YEAR-ROUND STUDIO ONE BEDROOM SINGLE-FAMILY MULTI-UNIT COMMUNAL AMENITIES MAINTENANCE REPURPOSE NEW BUILD YEAR-ROUND TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 46 New Build (demo) Detached Single Units 40 UNITS 40 year-round affordable 0 seasonal workforce 60 TOTAL 8 individual, 42 group 450 sf studio, 700 sf one bedroom, 1200 sf detached single family 40 UNITS 48 TOTAL BEDS 48 year-round affordable 0 seasonal workforce HOUSING Habitat for Humanity Housing, Brewster, MAHISTORIC OLD KING HIGHWAY FOREST BUFFER ROUTE 6ASEPARATE ACCESS TO HOUSING Single family homes and small dwelling units are constructed. No buildings are repurposed for housing.DETACHED SINGLE FAMILY WITH INDIVIDUAL PARKING STUDIO AND ONE BEDROOM DWELLINGS CAPE COD BAYSECLUDED ZONE UNIT COUNT PARKING UNIT SIZE SHI BEDS MAINTENANCE SEASONAL WORKFORCE YEAR-ROUND STUDIO ONE BEDROOM SINGLE-FAMILY MULTI-UNIT COMMUNAL AMENITIES MAINTENANCE REPURPOSE NEW BUILD YEAR-ROUND BAY ILLUSTRATIVE HOUSING SCENARIOS TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 47 New Build (demo) Town Houses 44 UNITS 44 year-round affordable 0 seasonal workforce 66 TOTAL GROUP 1000 sf town homes 44 UNITS 88 TOTAL BEDS 80 year-round affordable 0 seasonal workforce All existing structures are demoed for the construction of town houses. Brewster Woods, Brewster, MA CAPE COD BAYSECLUDED ZONE UNIT COUNT PARKING UNIT SIZE SHI BEDS SEASONAL WORKFORCE YEAR-ROUND STUDIO ONE BEDROOM SINGLE-FAMILY MULTI-UNIT COMMUNAL AMENITIES MAINTENANCE REPURPOSE NEW BUILD YEAR-ROUND HOUSING HISTORIC OLD KING HIGHWAY FOREST BUFFER ROUTE 6ASEPARATE ACCESS TO HOUSING MULTI-UNIT DWELLINGS WITH GROUP PARKING BAY ILLUSTRATIVE HOUSING SCENARIOS TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 48 Matrix REPURPOSE REPURPOSE & NEW BUILD (DEMO)NEW BUILD (DEMO) DETACHED SINGLE UNITS MORE PRESERVATION NEW BUILD NEW BUILD (DEMO) TOWN HOUSES SEASONAL WORKFORCE YEAR-ROUND AFFORDABLE UNIT COUNT PARKING UNIT SIZE SHI BEDS 8 UNITS 2 year-round affordable 6 seasonal workforce 13 TOTAL GROUP 1000 sf year-round affordable 660 sf seasonal workforce 2 UNITS 28 TOTAL BEDS 2 year-round affordable 26 seasonal workforce 32 UNITS 26 year-round affordable 6 seasonal workforce 48 TOTAL GROUP 1000 sf year-round affordable 660 sf seasonal workforce 26 UNITS 76 TOTAL BEDS 52 year-round affordable 24 seasonal workforce 40 UNITS 40 year-round affordable 0 seasonal workforce 60 TOTAL 8 individual, 42 group 450 sf studio, 700 sf one bedroom, 1200 sf detached single family 40 UNITS 48 TOTAL BEDS 48 year-round affordable 0 seasonal workforce 46 UNITS 44 year-round affordable 0 seasonal workforce 68 TOTAL GROUP 1000 sf town homes 46 UNITS 90 TOTAL BEDS 80 year-round affordable 0 seasonal workforce BAY ILLUSTRATIVE HOUSING SCENARIOS REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 49 POND PROPERTY REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 50 • Provide low intensity/use waterfront to respect t he limited capacity of t he property in terms of access, parking, and character • Increase walking trails • Conserve at least 60% of the property CONSENSUS: DIFFERING OPINIONS: WHAT WE HEARD Key Takeaways • Avoid housing development in Zone II • Balance conservation with other uses; accommodate affordable housing • Municipal uses REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 51 PROPOSED PLAN Overall Plan PARKING 8 SPOTS (0.5 MILES FROM BEACH) PARKING 16 SPOTS (0.3 MILES FROM BEACH) EXPANDED TRAILS IMPROVED GRAVEL DRIVE CONSERVATION & NATURE PARTNERSHIPS (MASS AUDUBON & BREWSTER CONSERVATION TRUST) PUBLIC BEACHMASS AUDUBON PROGRAMMING 10 ACRES RESERVE FOR FUTURE MUNICIPAL USES RESERVE FOR HOUSING OR ADA PARKING & DROP OFF ZONE 4 SPOTS (0.1 MILES FROM BEACH) REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 52 PROPOSED PLAN Enlarged Beach Access Area - Small seasonal day camps - Adult nature study workshops - Field trips for Wellfleet Bay camp - Afterschool programs - Guided walks - Kayak trips - Partner with Recreation Department on kids programming Mass Audubon Desired programs: STORAGE / COMMUNITY USE MASS AUDUBON STORAGE, WEATHER SAFE SPACE, OFFICE KAYAK RACKS ADA PARKING AND DROP OFF ZONE (4 SPOTS) ADA ACCESSIBLE BEACH ACCESS (0.1 MILES FROM BEACH) MASS AUDUBON PROGRAMS TRAILS LOW INTENSITY PUBLIC BEACH REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 53 Total Estimate: Approx $1,069,200 before design and contractor fees Approx $1,734,000 after design and contractor fees including: Pricing Breakdown - Building removal (3 bldgs): $22,200 - Building restoration (5 bldg):$44,300 - Trails: $207,700 - Roadway im provements: $748,900 - Parking Areas: $49,100 Pond Property • 10% general conditions • 10% overhead and profit • 1% permitting • 2% bond/insurance • 10% design contingency • 20% design services • 6% escalation allowance PRELIMINARY DRAFT PRICING REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 54 PARTNERSHIPS - POND PROPERTY Mass Audubon Mass Audubon Partnership includes: Possible programs: - Conservation restriction on 56 acres (85% of site), recognizing that the community may support housing or other municipal uses on the remaining 10 acres - Small seasonal day camps - Adult nature study workshops - Field trips for Wellfleet Bay camp - Afterschool programs - Guided walks - Kayak trips - Partner with Recreation Department on kids programming Amount pledged for Pond Property: $1.5 million REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 55 POTENTIAL USES ALONG 137 Planning Scenarios RESERVE FOR AFFORDABLE HOUSING 10 ACRES The Town Warrant article to purchase the properties approved at Town Meeting included the following Potential Town Uses for this property: H ousing development would also include a wastewater treatment plant that would treat other residential properties in the neighborhood • habitat protection • watershed protection • open space • conservation • passive recreation • active recreation • community housing • general municipal purposes 10 ACRES RESERVE FOR FUTURE MUNICIPAL USES REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 56 POTENTIAL USES ALONG 137 Future Municipal Use HABITAT AND WATERSHED PROTECTIONCELL TOWERNEIGHBORHOOD WASTEWATER TREATMENT PLANT UNANTICIPATED USESHOUSING ??? REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 57 LAND USE CONTEXT LEGEND LONG POND PARCEL TOWN OF BREWSTER BREWSTER CONSERVATION TRUST CONSERVATION RESTRICTION EXISTING TRAILS ZONE II WELLHEAD PROTECTION/DCPC Residential communities exist along both sides of Route 137 and surround the northern section of the Long Pond Property. The property is also par tially adjacent to Long Pond Woodlands, a town-owned conservation area. REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 58 WATER QUALITY Regional Watershed • Brewster has an Integrated Water Resource Management Plan which addresses our long-term wastewater needs and plans across the entire community • The primary focus in past decade has been on Pleasant Bay Watershed – Brewster shares a permit with Orleans, Harwich, and Chatham that includes certain nitrogen mitigation requirements over the next 20 years • MA Dept of Environmental Protection issued changes to Title V regulations and implemented new Nitrogen Sensitive Watershed regulations in July 2023 that impact wastewater planning across the Cape • The Pond Property falls within the Herring River Watershed – stormwater runoff from the property flows to Long Pond and eventually to the Herring River in Harwich • Brewster plans to develop a Herring River Watershed Permit by 2030 and expects any new development in this area will require 100% nitrogen offset • The Pond Property is uniquely situated to potentially locate a small wastewater treatment plant that could accommodate new housing buildout and replace traditional septic systems in some adjacent neighborhoods • Introduction of new wastewater treatment plant on the Pond Property would improve overall Long Pond & Herring River water quality Text credit: Town of Brewster Integrated Water Resource Management Plan, Horsley Witten Group REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 59 WATER QUALITY LONG POND PARCEL ZONE II DRINKING WATER PROTECTION AREA DRINKING WATER WELLS !A !A !A !A !A !A UV6A £¤6 UV137 UV124 WELL # 6 WELL #5 WELL # 4 WELL # 1 WELL # 2 WELL # 3 DENNIS HARWICH ORLEANS CHATHAMYARMOUTH / 0 10.5 Miles Date: 1/26/2022 Path: H:\Projects\2011\11109 Brewster Int.Wtr.Res.Mgt Plan\GIS\Maps\Report\Figure 2.mxd Figure 2. Brewster Conservation Lands and Zone II Areas C a p e C o d B a y Pleas antBayCape Cod Bay !A Public Wells Legend Conservation Lands Ponds Brewter Zone II Town of Brewster Other Zone II • Areas that contribute groundwater to the Town’s public drinking water wells are known in Massachusetts as Zone II’s, or wellhead protection areas • A portion of the Long Pond property is on the edge of a Zone II, approximately 1 mile from the nearest Town well off Freemans Way • There are currently about 900 developed residential properties in this Zone II • Introduction of new wastewater treatment plant on the Pond Property could improve overall Zone II water quality Zone II HOUSING REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 61 • The Town Warrant article to purchase t he properties approved at Town Meeting included “community housing” as a Potential Town Use for both properties and specifically mentioned “Appropriately scaled community housing near Route 137” as a potential use for t he Pond Property in t he Voter Inf ormation • Providing affordable and attainable housing is supported by t he Town Vision Plan, t he Local Comprehensive Plan, and t he Select Board S trategic Plan, and it appears to have widespread conceptual support among the community • If one or both of these properties is not used for affordable year round, deed restricted housing to meet t he State’s 10% Mandate and t he Town’s HPP goals, other properties will need to be purchased by the Town for building affordable housing in the near future • The Select Board has determined housing should be included on at least one of these properties HOUSING Town Context TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 62 • Goal 1: Increase and diversify year-round housing options in Brewster for a range of income levels and housing types • Goal 2: Prevent displacement of current residents and facilitate housing mobility for households looking to move within or into Brewster. • Goal 3: Align development with the principles of the Town’s Local Comprehensive Plan/Vision Plan. This includes balancing housing goals with protection of the natural environment. • Goal 4: Continue to build capacity to produce housing through staffing, funding, regional partnerships, advocacy and education, and relationships with nonprofit and for-profit developers. Housing Goals BREWSTER HOUSING PRODUCTION PLAN 2022-2027 REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 63 HOUSING Community Feedback • There was mixed feedback regarding housing on t he Pond Property: • Many feel strongly that new affordable housing should be located on the Pond Property • Many feel that housing does not belong on the Pond Property, mostly due to a sense t hat housing is in conflict wit h conservation goals and with Zone II regulations • Zone II regulations do not preclude t he development of housing and associated infrastructure, however Zone II is intended to protect t he Town’s drinking water TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 64 Pond Property Context LONG POND PROPERTY BAY PROPERTY CAPE COD BAY LONG POND SPRUCE HILL PARCEL NICKERSON STATE PARK LONG POND WOODLANDS NAMSKAKET MARSH PUNKHORN PARKLANDS ELLIS LANDING LOWER RD CONSERVATION AREA NO BOTTOM POND SANCTUARY SHEEP POND WOODLANDS BREWSTER WATER SUPPLY LANDS FREEMAN’S FIELDS MILLSTO N E R O A D MA IN S T R E E T / R O U T E 6 A LONG POND R O AD / ROU T E 1 3 7 C A PE C O D RA IL TRAILPOND PROPERTY CAPE COD BAY LONG POND LONG POND PROPERTY: HOUSING DESIGNATED AREA: THE HOUSING DESIGNATED AREA IS 15% OF THE POND PROPERTY POTENTIAL HOUSING AREA 66 ACRES 10 ACRES POND HOUSING ANALYSIS TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 65 Site Analysis and Principles ENTRANCE BUFFER - 50FT SETBACK *considered setbacks are not an LOT EDGES - 40 FT SETBACK LOT EDGES - 150 FT SETBACK ENTR A N C E D R I V E POTENTIAL DEVELOPMENT ZONE LOW POINT POTENTIAL DEVELOPMENT ZONE POTENTIAL DEVELOPMENT ZONE LOW POINTLONG P O N D R O A D LONG POND POTENTIAL HOUSING AREA The area designated for housing implements forest buffers and Scenarios based on approximately 48 Units (90 beds) Contemplated year round housing with new construction. Group or individual parking is considered depending on dwelling type and configuration. Wastewater requirements are being considered and new package plant may treat other residences in the surrounding area. F O R E S T B U F F E R FOREST B U F F E R FOR E S T B U F F E R FORES T B U F F E R POND HOUSING ANALYSIS TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 66 Matrix DETACHED SINGLE UNITS UNIT COUNT PARKING UNIT SIZE DETACHED SINGLE UNITS TOWN HOMES SHI BEDS PERCENT BUFFER ZONE 88 TOTAL BEDS 44 UNITS 66 GROUP 1000 sf town homes 44 UNITS 59% 32 UNITS 32 TOTAL INDIVIDUAL 1200 sf 32 UNITS 64 TOTAL BEDS 52% 48 UNITS 18 INDIVIDUAL, 45 GROUP 450 sf studio, 700 sf one bedroom, 1200 sf detached single family 48 UNITS 66 TOTAL BEDS 49% *of Housing Designated Area POND ILLUSTRATIVE HOUSING SCENARIOS TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 67 ROUTE 1 3 7 Detached Single Units ENTR A N C E D R I V E LONG P O N D R O A D Habitat for Humanity Housing, Brewster, MA Detached single family housing. LONG POND POTENTIAL HOUSING AREA UNIT COUNT PARKING UNIT SIZE SHI BEDS *of Housing Designated Area 32 UNITS 32 TOTAL INDIVIDUAL 1200 sf 32 UNITS 64 TOTAL BEDS 52%6,800 SF LOT STUDIO ONE BEDROOM SINGLE-FAMILY MULTI-UNIT COMMUNAL AMENITIES PERCENT BUFFER ZONE NEW BUILD YEAR-ROUND POND ILLUSTRATIVE HOUSING SCENARIOS TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 68 48 UNITS 450 sf studio, 700 sf one bedroom, 1200 sf detached single family 48 UNITS 66 TOTAL BEDS 49% Detached Single Units SMALL 450 SF - 700 SF UNITS ACCESSED BY PEDESTRIAN PATHS WITH GROUP PARKING DETACHED SINGLE FAMILY HOUSES WITH INDIVIDUAL PARKING ENTR A N C E D R I V E LONG P O N D R O A D NYS Cabins, Long Island, NY A greater quantity of smaller units and single family housing are considered. LONG POND + UNIT COUNT PARKING UNIT SIZE SHI BEDS 6,800 SF LOT 1,120 SF LOT PERCENT BUFFER ZONE STUDIO ONE BEDROOM SINGLE-FAMILY MULTI-UNIT COMMUNAL AMENITIES NEW BUILD YEAR-ROUND POTENTIAL HOUSING AREA *of Housing Designated Area 18 INDIVIDUAL, 45 GROUP POND ILLUSTRATIVE HOUSING SCENARIOS TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 69 88 TOTAL BEDS 44 UNITS 66 GROUP 1000 sf town homes 44 UNITS 59% Town Homes Brewster Woods, Brewster, MA LONG POND A low density configuration of town houses with group parking. 17,600 SF LOT STUDIO ONE BEDROOM SINGLE-FAMILY MULTI-UNIT COMMUNAL AMENITIES NEW BUILD YEAR-ROUND POTENTIAL HOUSING AREA ENTR A N C E D R I V E LONG P O N D R O A D UNIT COUNT PARKING UNIT SIZE SHI BEDS PERCENT BUFFER ZONE *of Housing Designated Area POND ILLUSTRATIVE HOUSING SCENARIOS TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 70 DETACHED SINGLE UNITS UNIT COUNT PARKING UNIT SIZE DETACHED SINGLE UNITS TOWN HOMES SHI BEDS PERCENT BUFFER ZONE 88 TOTAL BEDS 44 UNITS 66 GROUP 1000 sf town homes 44 UNITS 59% 32 UNITS 32 TOTAL INDIVIDUAL 1200 sf 32 UNITS 64 TOTAL BEDS 52% 48 UNITS 18 INDIVIDUAL, 45 GROUP 450 sf studio, 700 sf one bedroom, 1200 sf detached single family 48 UNITS 66 TOTAL BEDS 49% *of Housing Designated Area Matrix POND ILLUSTRATIVE HOUSING SCENARIOS REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 71 • You will be randomly assigned to a Breakout Room • Each room will include a Facilitator from the Town Staff and a member of the Design Team • Raise your Zoom hand if you have a comment and t he facilitator will call on you • Please keep yourself on mute when you are not speaking • Use the chat to add comments! • After 40 minutes you will be sent back to our main room for closing remarks BREAKOUT ROOMS DISCUSSIONS (40 MINUTES) Have project-related feedback? Send your thoughts to the Design Team! BrewsterSeaCamps@gmail.com The comment period will be open through December 10th. REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 72 NEXT STEPS • Continue to refine comprehensive plans based on community feedback • Share refined comprehensive plans at f inal forum in early 2024 • Outline options for project f inancing and determine phased approach to project implementation REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 73 Thank you! Project Updates https://www.brewster-ma.gov/cape-cod-sea-camps-properties Committee Meetings Bay Property: Twice a month Tuesdays 4-6pm Pond Property: Twice a month Wednesdays 4-6pm Future Forum February 2024, stay tuned for the date! Town Meeting Vote May 2024 Have project-related feedback? Send your thoughts to the Design Team! BrewsterSeaCamps@gmail.com The comment period will be open through December 10th. HOW TO STAY UP TO DATE WITH OUR PLANNING REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 51 PROPOSED PLAN Overall Plan PARKING 8 SPOTS (0.5 MILES FROM BEACH) PARKING 16 SPOTS (0.3 MILES FROM BEACH) EXPANDED TRAILS IMPROVED GRAVEL DRIVE CONSERVATION & NATURE PARTNERSHIPS (MASS AUDUBON & BREWSTER CONSERVATION TRUST) PUBLIC BEACHMASS AUDUBON PROGRAMMING 10 ACRES RESERVE FOR FUTURE MUNICIPAL USES RESERVE FOR HOUSING OR ADA PARKING & DROP OFF ZONE 4 SPOTS (0.1 MILES FROM BEACH) REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA LONG POND POTENTIAL HOUSING AREA POND HOUSING ANALYSIS Pond Property Context LONG POND PROPERTY BAY PROPERTY CAPE COD BAY LONG POND SPRUCE HILL PARCEL NICKERSON STATE PARK LONG POND WOODLANDS NAMSKAKET MARSH PUNKHORN PARKLANDS ELLIS LANDING LOWER RD CONSERVATION AREA NO BOTTOM POND SANCTUARY SHEEP POND WOODLANDS BREWSTER WATER SUPPLY LANDS FREEMAN’S FIELDS MILLSTO N E R O A D M A IN S T R E E T / R O U T E 6 A LONG POND R O AD / ROU T E 1 3 7 C A PE C O D RA IL TRAILPOND PROPERTY CAPE COD BAY LONG POND PROPERTY: HOUSING DESIGNATED AREA: THE AREA DESIGNATED FOR HOUSING IS 15% OF THE LONG POND PROPERTY 66 ACRES 10 ACRES REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA POND HOUSING ANALYSIS Site Analysis and Principles The area designated for housing implements forest buffers and setbacks. Scenarios based on approximately 44 Units (88 beds) within a 10 Acre area of the site. Contemplated year round housing with new construction. Group or individual parking is considered depending on dwelling type and configuration. Septic requirements have been considered with a 1 Acre area designated. ENTRANCE BUFFER - 50FT SETBACK *considered setbacks are not an explicit zoning requirement LOT EDGES - 40 FT SETBACK LOT EDGES - 150 FT SETBACK LOW POINT POTENTIAL DEVELOPMENT ZONE LOW POINT F O R E S T B U F F E R FOREST B U F F E R FOR E S T B U F F E R FORES T B U F F E R WATER TREATMENT AREA OPTION 1 ENTR A N C E D R I V E LONG P O N D R O A D LONG POND POTENTIAL HOUSING AREA WATER TREATMENT AREA OPTION 2 REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 88 TOTAL BEDS 44 UNITS 66 GROUP 1000 sf town homes 44 UNITS 59% POND ILLUSTRATIVE HOUSING SCENARIOS Option 1 Town Homes Brewster Woods, Brewster, MA LONG POND POTENTIAL HOUSING AREA A low density configuration of town houses with group parking. UNIT COUNT PARKING UNIT SIZE SHI BEDS *of Housing Designated Area 17,600 SF LOT PERCENT BUFFER ZONE ENTR A N C E D R I V E LONG P O N D R O A D NEW BUILD YEAR-ROUND STUDIO ONE BEDROOM SINGLE-FAMILY MULTI-UNIT COMMUNAL AMENITIES WATER TREATMENT AREA REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 88 TOTAL BEDS 44 UNITS 66 GROUP 1000 sf town homes 44 UNITS 59% POND ILLUSTRATIVE HOUSING SCENARIOS Option 2 Town Homes Brewster Woods, Brewster, MA LONG POND POTENTIAL HOUSING AREA A low density configuration of town houses with group parking. UNIT COUNT PARKING UNIT SIZE SHI BEDS *of Housing Designated Area 17,600 SF LOT PERCENT BUFFER ZONE ENTR A N C E D R I V E LONG P O N D R O A D NEW BUILD YEAR-ROUND STUDIO ONE BEDROOM SINGLE-FAMILY MULTI-UNIT COMMUNAL AMENITIES WATER TREATMENT AREA REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 54 PARTNERSHIPS - POND PROPERTY Mass Audubon Mass Audubon Partnership includes: Possible programs: - Conservation restriction on 56 acres (85% of site), recognizing that the community may support housing or other municipal uses on the remaining 10 acres - Small seasonal day camps - Adult nature study workshops - Field trips for Wellfleet Bay camp - Afterschool programs - Guided walks - Kayak trips - Partner with Recreation Department on kids programming Amount pledged for Pond Property: $1.5 million Town of Brewster 2198 Main Street Brewster, MA 02631-1898 Phone: (508) 896-3701 www.brewster-ma.gov PPPC 10.18.23 www.brewster-ma.gov Page 1 of 6 Office of: Select Board Town Manager MINUTES OF THE POND PROPERTY PLANNING COMMITTEE Date: October 18, 2023 Time: 4:00pm Place: 2198 Main Street Participants: Chair Doug Wilcock, Cindy Bingham, Kari Hoffmann, Elizabeth Taylor, Tim Hackert, Cindy Baran, Christopher Williams, Jan Crocker, Steve Ferris, Assistant Town Manager Donna Kalinick, Town Manager Peter Lombardi, Mark Nelson Remote Participants: Katie Gregoire (4:20pm), Elizabeth Randall (Reed Hilderbrand), Madeleine Aronson (Reed Hilderbrand), David Vega-Barachowitz (Reed Hilderbrand) In Attendance: Amy Henderson, Tino Kamarck, Jill Scalise, Charlie Sumner, Jon Idman, Paul Anderson, Chris Miller, Peter Johnson Absent: Chris Ellis Call to Order, Declaration of a Quorum, Meeting Participation Statement, and Recording Statement Chair Wilcock called the meeting to order at 4:00pm, declared a quorum and read the meeting and recording statements. Public Announcements and Comment None Review and Discuss Updated Plans for Forum #3- Reed Hilderbrand Ms. Kalinick recapped where the committee stands in the process after a joint meeting with both the Select Board and the Bay Property Planning Committee. The next forum will take place on November 30th at 6pm, this will be a virtual forum. Reed Hilderbrand and their team WXY will present the plan and options that they have been working on following the joint meeting. WXY will present some of the very conceptual possible ways that housing could work on the parcel. Ms. Randall noted the 5 options that were presented for possibilities for the Pond Property. Based on the feedback from the forum, the survey and the joint meeting Reed Hilderbrand has narrowed down the plan to one overall plan that has alternatives for the area of the property along Rt 137:  Housing + Conservation  Housing, Revenue + Conservation  Municipal Use, Conservation + High-Use Public Beach  Conservation + Education  Hybrid Housing, Conservation + Municipal Use The revised guiding principles apply to both properties with many opportunities to reflect the principles for planning for long term needs of the Town, building partnerships for activities and stewardship, fostering awareness of the sensitive ecologies, demonstrating sustainability, opportunities for education, recreation, wellness and programs and protecting and conserving important natural habitat and water resources. There Town of Brewster 2198 Main Street Brewster, MA 02631-1898 Phone: (508) 896-3701 www.brewster-ma.gov PPPC 10.18.23 www.brewster-ma.gov Page 2 of 6 Office of: Select Board Town Manager is an opportunity to contribute to the Town’s Affordable housing goals on both properties and for cost management strategies. Ms. Randall noted that the idea of balancing cost with revenue is still important to the community. Noting minor roadway improvements, beach access and educational opportunities at the tip of the property along the pond. Ms. Aronson reviewed the overall plan for the parcel pointing out the zone reserved for housing or future municipal use, the plan assumes the road would remain the same with some improvements. The road is to remain gravel but widen for emergency access and improvements for stabilization and erosion control. Throughout the property, the trails are connected to existing ones that tie it in to Long Pond Woodlands. Two different parking areas, one with 8 spots and one with 16 spots on the parcel. There is a handicapped drop off zone with parking spots, all outside the wetlands buffer. These would tie into the walking paths to have an accessible route to the beach. The beach, which there was a strong preference for lower use because of the sensitive, limited access beach, would have kayak racks, storage, and seasonal port-a-potties. Ms. Aronson proposes removing all buildings at the beach except one that would remain for storage and community use. The kayak racks are to remain and could add a few more. The zone with education shows the four buildings to remain for storage, office space and weather safe space, also with seasonal port-a- potties. Mr. Vega-Barachowitz presented the housing analysis on the pond parcel. The presentation included:  Refresher of the Housing Production Plan 2022-2027 Housing Needs, Housing Goals, and Housing Implementation Strategies.  The proposal that housing is focused on the 12-acre area near Rt 137 and within this area, looking at a 6-acre zone that is potentially appropriate for development.  The established set of site planning principles which take into consideration buffering housing from public access ways while maintaining forest zones.  The plan is focused on year-round housing, while on the Bay property there is also consideration for seasonal work-force housing.  Septic requirements are being considered as well as new package plants that may be required.  The following three scenarios were reviewed: o Detached Single Units- a greater quantity of smaller units and single-family housing.  48 units/66 total beds, preserves about 50% of the site and 48 units would count toward the Town’s Subsidized Housing Inventory (SHI). o Town Homes- a low density configuration of town houses with group parking.  44 units/88 total beds, preserves 59% of the site and 44 units would count towards SHI. o Detached Single Units  32 units/ 64 total beds, preserves 52% of the site and 32 units would count towards SHI. Mr. Vega-Barachowitz shared that the assumption is that there is sufficient room within the 6 acres to accommodate the septic, it is subject to further study and analysis. Town of Brewster 2198 Main Street Brewster, MA 02631-1898 Phone: (508) 896-3701 www.brewster-ma.gov PPPC 10.18.23 www.brewster-ma.gov Page 3 of 6 Office of: Select Board Town Manager Member Baran raised her concern that through the forum and the survey, there was a strong interest from the community in considering Open Space and water supply protection. She also inquired about proposals for municipal uses. Ms. Randal stated that the plan is to reserve space for future municipal uses, so that the conversation can continue. Members of the committee shared their thoughts and comments on future municipal uses and housing based on the results of the forums and surveys. Ms. Kalinick clarified that the consensus from the joint meeting was to bring forward plans and that she and Mr. Lombardi would communicate with both Mass Audubon and Brewster Conservation Trust. Mass Audubon’s preference is for a nature center to be sited on the Bay parcel for many reasons. While they would like to have programs on both parcels, they will need office space. Mr. Lombardi noted for clarification that future municipal uses are intended to convey that all of the uses that Town Meeting originally approved in terms of potential uses remain on the table, giving the Town long term flexibility. Overview of Water Quality Planning Issues for Pond Property- Mark Nelson, Horsley Witten Mr. Nelson presented on the following topics:  Hydrology of site and the surrounding neighborhoods o Groundwater from at least 99% of the property flows to Long Pond, a small area might flow to Cape Cod Bay in the northeast corner. o The site is in the Herring River watershed and the eastern half is in a Zone II  Zone II drinking water protection area o The housing areas being proposed are within the Zone II area and subject to the Water Quality Review bylaw and State Regulations based on the septic regulations under Title V.  Pleasant Bay watershed o Provided an update on the permit, including the Captains golf course fertilizer reductions and leaching rate study. o The need for innovative/alternative (I/A) septic systems or a neighborhood wastewater treatment plant is still being evaluated.  New DEP regulations and effect on Herring River watershed planning o Groundwater flows to Long Pond and eventually to the Herring River in Harwich, this watershed is subject to new DEP regulations. o Reviewed the Title 5 Changes noting that the Town will submit a Notice of Intent (NOI) to DEP. This NOI will pause the need for septic upgrades in this watershed. o Data suggests that Brewster will only need to manage nitrogen load from development that was built after 2013 or in the future. o Potential solutions were reviewed including septic system upgrades, neighborhood sewer systems, fertilizer and stormwater management and nitrogen trade.  Long Pond water quality o The primary issue is phosphorus as a small increase in concentration can affect water quality. Town of Brewster 2198 Main Street Brewster, MA 02631-1898 Phone: (508) 896-3701 www.brewster-ma.gov PPPC 10.18.23 www.brewster-ma.gov Page 4 of 6 Office of: Select Board Town Manager o Phosphorus concern relates to septic systems within 300ft of the shore. Larger systems can be an issue further away if treatment is not provided. o Nitrogen can also affect a pond if phosphorus levels are high. Wastewater treatment facilities can treat both.  Water Quality Review Bylaw o Currently regulates areas with Zone II and the Pleasant Bay watershed. o Nitrogen loads from development cannot exceed 5mg/L, the State drinking water standard for nitrogen is 10mg/L.  Water Quality Concerns o Lawn fertilizers- phosphorus typically not used in fertilizers, a lawn can be managed without fertilizer. o Road runoff- treatment and infiltration of stormwater managed under Town bylaw, no phosphorus impacts to Long Pond. o Wastewater can be treated to reduce nitrogen to a level that complies with the Water Quality Review bylaw requirements. Phosphorus treatment is also possible. o Depth to groundwater and distance to pond minimizes phosphorus impacts on Long Pond. o Town must offset nitrogen load from buildout under Herring River watershed permit. o I/A systems or a neighborhood treatment facility provide options.  I/A Septic Systems o There are systems currently approved to meet at 19mg/L, which is general use approval. o Shubaels Pond study in Barnstable shows the system can treat below 5 mg/L. Also seeing a drop in nitrogen in groundwater in the neighborhood. This has not yet received general use approval.  Review of treatment facility layout and sizing o For 15,000 gallons a day (about 138 bedrooms), to have a treatment plant need about 3,000 sq. ft. of treatment units/facility with 5,000 sq. ft. leaching area. Most of the treatment units are below ground. o Need an above ground small facility for the control panels and other mechanical needs. Mr. Nelson noted that the wastewater design can be done in a way that is compliant with the Water Quality Review bylaw and though more work is needed to understand, it could be protective of Long Pond and help some of the Herring River watershed issues as well. Member Crocker inquired about lawns and ways to make them more environmentally friendly. Mr. Nelson noted that there are ways to manage the areas to minimize water quality issues and benefit the ecology of the neighborhood in general. Member Hackert shared that no impact landscaping is something to think about as part of a requirement for housing. Member Hackert stated that his takeaway from the presentation and other research is that a housing project could be built with a neutral impact, noting that there are costs issues in terms of design, but the technology exists and could be required as a condition for any type of housing. Town of Brewster 2198 Main Street Brewster, MA 02631-1898 Phone: (508) 896-3701 www.brewster-ma.gov PPPC 10.18.23 www.brewster-ma.gov Page 5 of 6 Office of: Select Board Town Manager Mr. Nelson responded that from a water quality perspective you could manage any proposed housing development to minimize impacts from the lawns, manage the stormwater in an effective way and come up with a wastewater solution that would meet the water quality review bylaw. The next step would be to meet the Herring River requirement and how to offset that, nothing that it doesn’t have to be offset on the same site, it could be offset somewhere else in Brewster’s part of the watershed. There could be benefits of a community system that does more than just the housing on the site, though it is too early to say if it is the most cost-effective overall. Member Baran clarified that while she can maybe agree with the nitrogen phosphorus, she can’t agree that there would be no impact from an IA system or treatment facility as they don’t treat VOCs, PFAs, emerging contaminants, and pharmaceuticals, a lot of things that people put down sinks and other things. She stated that it is not fair to say there is no impact, as there will definitely be an impact if there is housing or any development on the property. Mr. Nelson noted that Ms. Baran makes a good point about some of the emerging contaminants and some other things that are put in the wastewater systems, in what goes down the drain. He notes that some things are treated depending on the technology that is used, and this would need to be considered in the design. Adding that some things breakdown with the bacteria that is naturally occurring in the soil, but not everything does that. The distance to the ponds is a positive rather than a negative in that regard. Member Hackert noted that nothing is perfect, and we do the best that we can, meeting the standards we want to mee and recognizing that we may have to deal with issues in the future as we recognize them, and technology becomes available. Member Hoffmann inquired about the cost benefits of including something on the property that would treat the effluence of the surrounding properties. Mr. Nelson stated that this is something that should be looked at moving forward. Mr. Lombardi added that additional acreage would be needed for a package plant. Regarding the Herring River Watershed the Town needs to be focused on future buildout, which is different than the position we are in with the Pleasant Bay Watershed. In submitting the NOI to DEP for the Herring River Watershed, the Town will have a 5-year window to develop the plan, and then 20 years to implement the plan. The permit allows for adaptive management strategies, Mr. Lombardi noted that these are conversation and policy decisions to come. Short Term Uses of Property Updates a. Guided walk report update: October 28, 2023- this walk is currently full, members of the subcommittee will meet to look at an alternate route to incorporate more of the property. The group is looking forward to trying to schedule one more in November. Jan Crocker has put together a mobility tour on November 17th at 11am partnering with the Council on Aging. FYIs No discussion Town of Brewster 2198 Main Street Brewster, MA 02631-1898 Phone: (508) 896-3701 www.brewster-ma.gov PPPC 10.18.23 www.brewster-ma.gov Page 6 of 6 Office of: Select Board Town Manager Approval of Minutes from September 20 and October 4, 2023 Member Baran had a suggested addition to the September 20th minutes. The amendment will be reviewed at the next meeting. Member Hoffmann noted a clarification on page 6 and member Taylor noted that she was in attendance but was not listed on the meeting minutes for October 4, 2023. Member Bingham moved the minutes from October 4, 2023, as amended. Member Hoffmann seconded the motion. A roll call vote was taken. Member Bingham-yes, Member Hoffmann-yes, Member Taylor-yes, Member Hackert-abs, Member Baran-yes, Member Williams-yes, Member Crocker-abs, Member Ferris-yes, Member Gregoire -yes, Chair Wilcock-yes. The vote was 8-Yes, 2-Abs, 0-No. Matters Not Reasonably Anticipated by the Chair None Next Meetings November 15, 2023 Adjournment Member Bingham moved to adjourn at 5:54pm. Member Hoffmann seconded the motion. A roll call vote was taken. Member Bingham-yes, Member Hoffmann-yes, Member Taylor-yes, Member Hackert-yes, Member Baran-yes, Member Williams-yes, Member Crocker-yes, Member Ferris-yes, Member Gregoire -yes, Chair Wilcock-yes. The vote was 10-Yes, 0-No. Respectfully submitted by Erika Mawn, Executive Assistant to Town Administration Approved on: Town of Brewster 2198 Main Street Brewster, MA 02631-1898 Phone: (508) 896-3701 www.brewster-ma.gov PPPC 11.15.23 www.brewster-ma.gov Page 1 of 5 Office of: Select Board Town Manager MINUTES OF THE POND PROPERTY PLANNING COMMITTEE Date: November 15, 2023 Time: 4:00pm Place: 2198 Main Street Participants: Chair Doug Wilcock, Cynthia Baran, Kari Hoffmann, Jan Crocker, Tim Hackert, Cindy Bingham, Elizabeth Taylor, Steve Ferris (left at 5:16pm), Assistant Town Manager Donna Kalinick, Ann Schiffenhaus Remote Participants: Katie Gregorie, Mike Gradone, Anne Weirich, Tino Kamarck, Elizabeth Randall (Reed Hilderbrand), Madeleine Aronson (Reed Hilderbrand) In Attendance: Melissa Lowe (Mass Audubon), Amy Henderson (BCT), Peter Johnson, Susan Bridges Absent: Chris Ellis, Chris Williams Call to Order, Declaration of a Quorum, Meeting Participation Statement, and Recording Statement Chair Wilcock called the meeting to order at 4:00pm, declared a quorum and read the meeting and recording statements. Public Announcements and Comment None Review and Discuss Updated Plans, Pricing and Forum #3- Reed Hilderbrand Ms. Randall presented an updated look at the structure and outline of the public forum on November 30th, including preliminary pricing information. Some of the key items reviewed included:  Review of where the Town is in the process: Phase 3, the Comprehensive Planning process  Overview of Community Forum #3 Agenda o Orientation- introduction and where we left off o Bay Property- what we have heard, the refined plans and cost information o Partnerships o Pond Property- what we have heard, the refined plans and cost information o Breakout Room Discussions- 6 different discussions with a member of the design team and Town staff facilitator o Conclusions & Next Steps Ms. Kalinick reviewed the assignments for Committee members, sharing that at least one member will be available in the breakout room discussions to help answer questions from the public. Ms. Randall added that the role of the committee member is to be able to answer questions specific to the process that the committees have conducted. In general, the design team members will be responding to a majority of the questions related to the plan. Committee members are participating as panelists, not as attendees and are asked to refrain from advocating personal opinions.  Current Proposed Plan- which reflects an update as a result of feedback that ensures enough space is in reserve for future uses where a septic/wastewater treatment is necessary. There is still interest in Town of Brewster 2198 Main Street Brewster, MA 02631-1898 Phone: (508) 896-3701 www.brewster-ma.gov PPPC 11.15.23 www.brewster-ma.gov Page 2 of 5 Office of: Select Board Town Manager aligning conservation restrictions and keeping it continuous with Long Pond Woodlands. Reed Hilderbrand is still in the early planning stages and is in the process of getting more information about Mass Audubon programming.  Review of possible future Municipal uses based on the Town warrant article to purchase the properties approved at Town Meeting. Member Hackert commented that in the area marked “Conservation and Nature Partnerships” he believes that it should include “and Compatible Future Municipal Uses” based on discussions in previous meetings of the committee regarding conservation restrictions. Important to recognize that we are being flexible in terms of compatible future uses. Ms. Randall responded that understanding the expectations and limitations of a conservation restriction is important. Member Baran asked the following questions: 1. At the last meeting, there were two options presented, one for housing only and one for other municipal uses, thought this was the plan to present two options? 2. Doesn’t recall requesting the reserved area be expanded? What is the additional acreage? Ms. Randall responded that the area is 15 acres and the housing studies that were prepared by WXY will be shared as part of the forum. The idea is to be clear that there are two options for the same zone, one for housing and the other option would be to reserve the area for future use, which is to be determined. Ms. Randall noted that the feedback received about the housing studies was that they did not accommodate for septic/wastewater treatment that would be needed. The additional area would account for septic/wastewater and buffer zones without having fully designed what this would look like. Member Hackert understands that the forum would not present two separate plans, but an either/or scenario for the same location. He also noted that at a previous meeting, it was expressed that the conservation restrictions that have been signed by the town in other circumstances were too restrictive and that the Town needed to be aware of doing something more flexible. Member Hackert believes that adding “and Compatible Future Municipal Uses” reflects both the concern of the Town that a conservation restriction should be flexible to accommodate other compatible uses and reflects the sense that predominate use of the areas will be conservation and nature. Ms. Hoffmann clarified that with a conservation restriction, even though there is input of what the ideal conservation restriction might look like, the ultimate decision would be made by the Select Board. Chair Wilcock expressed his concern in introducing the additional area as it is extremely important to be clear on how it may be used as there had been previous discussion about a wastewater treatment plant. Ms. Kalinick shared that the committee is not seeing the full presentation as it is still being worked on and that there will be information from Mark Nelson’s presentation included to help with the potential/future wastewater treatment plant. Town of Brewster 2198 Main Street Brewster, MA 02631-1898 Phone: (508) 896-3701 www.brewster-ma.gov PPPC 11.15.23 www.brewster-ma.gov Page 3 of 5 Office of: Select Board Town Manager Member Baran moved that the Committee recommend that Reed Hilderbrand include a second separate option on a site plan for the reserve area that includes only municipal uses in the reserve area near 137 that are consistent with aquifer protection and that will not impair water quality or degrade water quality resources that will degrade water quality at the property. Member Taylor second. Point of discussion by Member Hoffmann, she expressed that she does not want to lead participants in the forum down any one particular path. By having one plan with a label that clearly includes “or”, it gives residents the choice between the two options. Members Bingham and Ferris agree and do not feel that two different maps are needed if it can be made clear that there is a choice. A roll call vote was taken. Member Bingham-no, Member Hoffmann-no, Member Taylor-no, Member Hackert-no, Member Baran-yes, Member Crocker-no, Member Ferris-no, Member Gregoire -no, Chair Wilcock-no. The vote was 1-Yes, 8-No. Chair Wilcock commented that at the October 18th meeting the committee was provided with a presentation of appropriately scaled housing, relatively to figure out the amount sewage that would be generated. Mark Nelson talked about the treatment plant, one of the outcomes was that we can have the housing and can have if not no impact on water quality, that we could have an improvement in water quality depending on how we tie into the Herring River Watershed plans and how we deal with property in Zone II. Chair Wilcock believes this is an extremely important point, there are people supportive of housing, but have legitimate concerns of putting housing in Zone II, about housing in the River Herring Watershed. Requires a clear explanation on how this tradeoff can be accomplished. Ms. Randall explained that the same housing presentation will be shared at the forum, which will include Mark Nelson’s key takeaways to provide residents context and so that they can be relatively informed. Ms. Kalinick shared that the Cape Cod Sea Camps project page on the website will be updated and will have materials for residents to review. Member Hackert shared his opinion on the support for housing, noting that residential is permitted in Zone II, as an “as of right”. Adding that in terms of the wastewater treatment, his sense is that the treatment could be good and help with wastewater in that area. Member Baran clarified that the by-right under the water quality protection bylaw has a limit, as of yet, there is one IA system that may meet it in a pilot study. Noting that this has not been shown seasonally and is preliminary information. Member Baran stated that there isn’t quite the technology as of yet. She asked that the potential to put a water supply location on the property be added back to the plans, as it needs to be explored. Ms. Randal reviewed the preliminary pricing which provides a sense of the total cost of the plan, excluding housing or other development within the 15 acres:  Total Estimate: $949,400 before markups and $1.6M after markups, breakdown includes: Town of Brewster 2198 Main Street Brewster, MA 02631-1898 Phone: (508) 896-3701 www.brewster-ma.gov PPPC 11.15.23 www.brewster-ma.gov Page 4 of 5 Office of: Select Board Town Manager o $7,400 for removing three buildings o $44K to restore five buildings (to bring back to an occupiable level) o $205K for trails o $644K for roadway improvements o $49K for parking areas It was noted that the wooden docks will be stored somewhere else for an interim period and the Town will retain them, since there is no longer a Chapter 91 license associated with the property. Chair Wilcock inquired about a walkway from the handicapped parking to the beach. Ms. Aronson noted that it would be a dense grated gravel material. In closing, Ms. Randall shared that she appreciates all the comments, and that the Reed Hilderbrand team is trying to thread the needle and respond to what they think they are hearing. They look forward to hearing from the community and are hopeful to get insightful, engaging and thoughtful comments from the community. Overview of Housing Needs on Cape Cod and Brewster Ann Schiffenhaus from Housing Assistance Corporation shared a presentation on Housing to Protect Cape Cod, some of the key slides included:  Programs & Services o Prevention- outreach to homeless individuals and shelter homeless families; there are 4 family shelters o Stabilization includes rental and mortgage assistance vouchers, financial assistance programs, weatherization, and repair of homes o Empowerment includes consumer financial education, home lotteries, building of affordable housing, engaging, educating, and empowering housing advocates.  The Power of Home and what a home means to people  Current Situation includes no availability, no housing diversity and high prices  Review of Brewster median home price ($775K), Brewster median household income ($88K) and current Brewster real estate listings. At the median household income, people cannot afford the median home price.  Renting/Buyer power of the workforce and the number of Brewster employers looking for staff  Coalition of partners to create “Housing to Protect Cape Cod”, more information can be found at housingtoprotectcapecod.org Mrs. Schiffenhaus noted that the waiting list for affordable rentals is currently 3 years long, the Cape needs to start thinking about ways to create more diversity in housing. There are opportunities to think about the future and keep a town vibrant and diverse. Short Term Uses of Property Updates a. Guided walk report update: October 28, 2023 Town of Brewster 2198 Main Street Brewster, MA 02631-1898 Phone: (508) 896-3701 www.brewster-ma.gov PPPC 11.15.23 www.brewster-ma.gov Page 5 of 5 Office of: Select Board Town Manager Member Baran shared that this was a very successful walk and is looking forward to scheduling more in the early Spring. b. Town plans for spring tour day Ms. Kalinick shared that we recognize the limited number of people that can access the property. Town Administration is in the initial stages of looking at a Saturday in early April and another day during the week to hold tours of the property. Since transportation is a key piece, thinking of having people park at the golf course and use COA vans to bring them to the property. The Town would use a registration system for the events. This would be more of a self-guided tour with committee members, liaisons and Town staff available on site. FYIs No discussion Approval of Minutes from October 18, 2023 and September 20, 2023 Member Bingham moved to approve the amended meeting minutes from September 20, 2023. Member Hoffmann seconded the motion. A roll call vote was taken. Member Bingham-yes, Member Hoffmann-yes, Member Taylor-yes, Member Hackert-abs, Member Baran-yes, Member Crocker-yes, Member Gregoire -yes, Chair Wilcock-yes. The vote was 7-Yes, 0-No, 1-Abs. Member Hackert requested a grammar correction on page 2 and additional details about the conversation and comments that were made during the meeting on page 4. Matters Not Reasonably Anticipated by the Chair None Questions from the Media None Next Meetings Virtual Forum #3 November 30, 2023, at 6pm, January 10th, January 24th or 31st Adjournment Member Hackert moved to adjourn at 5:26pm. Member Hoffmann seconded the motion. A roll call vote was taken. Member Bingham-yes, Member Hoffmann-yes, Member Taylor-yes, Member Hackert-yes, Member Baran-yes, Member Crocker-yes, Member Gregoire -yes, Chair Wilcock-yes. The vote was 8-Yes, 0-No. Respectfully submitted by Erika Mawn, Executive Assistant to Town Administration Approved on: