HomeMy Public PortalAboutBPPC Packet_1.9.2024Town of Brewster
2198 Main St., Brewster, MA 02631
bppc@brewster-ma.gov
(508) 896-3701
Bay Property Planning Committee Meeting Agenda
2198 Main Street, Brewster, MA 02631
January 9, 2024 at 4:00 PM
This meeting will be conducted in person at the time and location identified above. This means that at least a quorum of
the members of the public body will attend the meeting in person and members of the public are welcome to attend in
person as well. As a courtesy only, access to the meeting is also being provided via remote means in accordance
with applicable law. Please note that while an option for remote attendance and/or participation is being provided
as a courtesy to the public, the meeting/hearing will not be suspended or terminated if technological problems
interrupt the virtual broadcast or affect remote attendance or participation, unless otherwise required by law.
Members of the public with particular interest in any specific item on this agenda, which includes an applicant and its
representatives, should make plans for in-person vs. virtual attendance accordingly.
Members of the public who wish to access the meeting may do so in the following manner:
Please click the link below to join the webinar:
https://us02web.zoom.us/j/84863561303?pwd=bjhQazV3Y0NaN0dESk1LUmxmbGJCdz09
Passcode: 893744
US: +1 312 626 6799 or +1 929 436 2866 Webinar ID: 848 6356 1303 Passcode: 893744
When required by law or allowed by the Chair, persons wishing to provide public comment or otherwise participate in the
meeting, may do so by accessing the meeting remotely, as noted above. Additionally, the meeting will be broadcast live,
in real time, via Live broadcast (Brewster Government TV Channel 18), Livestream (livestream.brewster-
ma.gov), or Video recording (tv.brewster-ma.gov).
Please note that the Committee may take official action, including votes, on any item on this agenda.
Members:
Amanda Bebrin,
Chair
(At Large)
Katie Miller Jacobus,
Vice Chair
(At Large)
Karl Fryzel,
Clerk
(At Large)
Mary Chaffee,
Select Board
David Whitney,
Select Board
Patricia Hughes,
Natural Resources
Commission
Peter Johnson,
At Large
Caroline McCarley,
At Large
Clare O’Connor-
Rice, At Large
John Phillips,
At Large
Tom Wingard,
Recreation
Commission
Town Staff:
Peter Lombardi,
Town Manager
1.Call to Order
2.Declaration of a Quorum
3.Meeting Participation Statement
4.Recording Statement: As required by the Open Meeting Law we are informing you that the Town will be
video and audio taping as well as broadcasting this public meeting. In addition, if anyone else intends to either
video or audio tape this meeting they are required to inform the Chair.
5.Public Announcements and Comment: Members of the public may address the Committee on matters
not on the meeting’s agenda for a maximum of 3-5 minutes at the Chair’s discretion. The Committee will not reply to
statements made or answer questions raised during public comment but may add items presented to a future
agenda.
6.Review and Discuss Key Takeaways from Forum #3 & Public Comment – Reed
Hilderbrand
7.Review and Discuss Updated Bay Property Plan & Remaining Policy Decisions – Reed
Hilderbrand
8.Review and Discuss Town Partnership with Mass Audubon
9.Update on Shooting Range Remediation
10.Review Upcoming Approved Interim Uses and Vote on Proposed New Interim Uses
11.Vote on Meeting Minutes: November 14 and December 18, 2023
12.Discuss Future Meeting Agenda Items
13.Next Meetings: January 23 (Joint with Select Board and Pond Property Planning
Committee) and February 6, 2024
14.Matters Not Reasonably Anticipated by the Chair
15.FYIs
16.Adjournment
Date Posted:Date Revised:Received by Town Clerk:
01/05/2024
Reed Hilderbrand LLC
Landscape Architecture
130 Bishop Allen Drive
Cambridge, MA 02139
MEMORANDUM
ISSUE DATE POND AND BAY PROPERTIES COMPREHENSIVE PLANNING:
FORUM #3: KEY TAKEAWAYS AND ITEMS FOR CLARIFICATION
The Design Team has carefully considered and reviewed the feedback from the
Community Forum #3 Breakout Groups and email feedback provided during the
comment period. The range of opinions provided through the Breakout Groups and
through emailed feedback were very similar in terms of opinions and ideas expressed.
We received 116 emails, and while this number is much smaller than the number of
survey respondents previously received, the emailed feedback was thorough,
thoughtfully addressed different elements of the plans, and seemed representative of
the community. There was one string of emails that seemed to arrive in response to a
Brewster Conservation Trust email that encouraged feedback in opposition to housing
on the Pond Property. Overall, in both emails and breakout groups, there was support
and excitement for the plans. There were a few proposed plan elements that elicited
mixed feedback and some areas where residents sought clarification. The below Key
Takeaways summarize this feedback.
Feedback pertaining to both Properties
•There was excitement about the Mass Audubon partnership but there was also a
desire to better understand the relationship with the Town. Questions included:
o Would there be membership costs to residents and would the area
always be accessible to the public?
o Would the town receive revenue from Mass Audubon?
o How much purview/ownership will Mass Audubon have over the
portion of the site they occupy?
•There was confusion around a wastewater treatment plant, including what it is
and how it works, who it would serve, what it would look like, and concerns
about odor.
•Cost was a concern, especially for the Community Center. Some felt it was just
too much money, many felt they needed to know the dollar amount of impact on
their taxes, and many wanted more information on how phasing might help
manage costs.
•For those who supported housing, there was often a preference noted for denser
housing options like townhouses.
•The majority of residents supported housing on at least one of the properties, but
there was mixed feedback on which property was preferred.
Bay Property Feedback
•There were mixed feelings about the Community Center. Some expressed full
support and excitement, while others were more unsure due to the high cost, the
perceived impact of a new large community center on the character of the
property, and uncertainty about whether this is really needed in the community.
•There was interest in how a community campus and a community center might
be phased.
January 3, 2024
TO
Bay and Pond Property
Planning Committees
Town of Brewster Select
Board
COPIES TO
Peter Lombardi, Town
Manager
Donna Kalinick, Assistant
Town Manager
MUNICIPALITY
Town of Brewster
FROM
Reed Hilderbrand
PROJECT
Town of Brewster Sea
Camps
• There were continued questions about if the Eddy School may eventually
become available for a Community Center, and the sentiment that this is a
better option.
• There was a good amount of support for housing on the Bay Property both for
year-round affordable housing and an option combined with seasonal
workforce, but interest in learning more about the ownership structure.
• Overall, there was strong support for landscape amenities including trails, artist
cabins, pool and beach access, and a playground.
• While there was support for both the pollinator meadow and community
gardens, there were also questions about if the community gardens would look
tidy enough in the current location in the viewshed from 6A, and if the open
lawn space would provide enough flexibility for events including space for the
Pan Mass Challenge gathering.
• There was mixed feedback on the tennis courts. While some support the courts,
others were unsure they would be fully utilized.
• There was concern about traffic impacts on Route 6A and relating to the
intersection at Millstone Rd.
• Many felt that new parking and trails should be permeable where possible.
• There was a desire to consider revenue generation.
Pond Property Feedback
• There was strong support for landscape amenities at the Pond Property
including trails, public beach access, and the Mass Audubon partnership.
• There was mixed support for housing. Those who did support it felt very strongly
in favor, while others were mixed with some favoring conservation. Some would
like to avoid housing development in the Zone II area and are concerned about
impacting the town’s drinking water supply and the watershed to Long Pond,
while others feel housing can be balanced with conservation and that a
wastewater treatment plant can address water quality concerns. There was a
desire to understand whether or not housing would impact water quality if a
wastewater treatment plant were introduced.
• There was interest in better understanding the timeline for “future.”
• Limited opinions were provided about reserving for future municipal uses, other
than confusion around wastewater treatment.
• There was support for improving vehicular, pedestrian, bike and ADA
accessibility.
Example comments pertaining to both Properties (Breakout groups)
• Very excited to have Mass Audubon here!
• Does the Mass Audubon partnership place any recreational usage restrictions?
• Will the Audubon property be freely accessible, or will we have to pay?
• What would the wastewater plans be for housing on the Bay property? We heard about a
package treatment plant for the Pond property housing proposal. Would a similar facility
be considered here?
• [Interested in] more details about the water treatment plans incorporated into the
development plans
• It seems that most of the affordable housing being proposed is quite small. If we want
families with children to stay in or move into town, are these dwellings of adequate size?
• I'd like to say that I think year-round housing should be the primary goal for housing on
the properties. Perhaps, since this would be town-owned housing, Brewster could do
something similar to what Chatham's Housing Authority is doing with their MCI homes.
Example comments pertaining to both Properties (Emails)
• The partnership with Mass Audubon sounds like a good idea on the surface. I would be
interested in learning more about the agreements – what are details regarding concessions
being made to Audubon by the Town? What access to Audubon activities at the two sites
will be given to Brewster residents? What sort of fee structures will be put in place by Mass
Audubon? What will the Town be paying for and will the Town be receiving any of the fees
collected for their programs?
• Any affordable housing should maximize undeveloped land. Cluster housing is not only
energy efficient, but leaves space for trees, pollinator gardens, and recreation. Town
houses and/or two-story apartment or condo housing in an attractive configuration should
be considered.
• I'd like to focus on housing recommendations for the Bay and Long Pond properties. I
support emphasis on the high end of the year-round housing provided. If not the highest
density, then possibly combine some townhouse and some single to achieve a higher
density.
• My biggest concern is that Brewster needs a comprehensive wastewater plan before
moving ahead with any housing projects. I assume that all of the building options on the
Bay property depend on construction of a neighborhood sewage treatment plant.
Example comments pertaining to the Bay Property (Breakout groups)
• Could Brewster partner with another organization to defray the cost of building and
maintaining a community center?
• Who’s going to pay for the $66 million? My taxes are already unaffordable!
• Could the new community center be built at a later date?
• I think we need a new community center with COA and Recreation Facilities, like
Harwich…
• The community center although more expensive now seems to be more advantageous
financially in the long term
• It seems as though the Eddy School might serve some broader community needs in the
future. How many years does the School Committee project before they expect to
reconsider consolidation?
• Prefer Campus-style community facilities and restoration of specifically of the historic
Admin bldg. and Dining Hall in deference to sensitivity to the Sea Camps history and the
many people with historic attachment to this property. Also, I feel this would allow for
incremental additions.
• Seasonal housing would better leverage existing structures but needs to be reimbursed to
the Town of Brewster. For example, Ocean Edge would pay Brewster per unit per
resident.
• Prefer concept 4 - all desperately needed year-round housing and developer pays
• If we are to build more housing on these properties, the Bay property would be the best
location, as it is more central to transport and work and the Bay property is already
developed. We should focus on the most efficient and dense options Town Houses or
Condos) wherever we do it.
• I’m so happy to see a playground included on the Sea Camps property and hope it will be
designed to fit into the existing buildings. There is a great need for a covered area for
playgroups for families with preschool children, so I hope the open pavilion stays.
• I like the pollinator meadow in the front and don't think we should be constrained by
historic camp use per se.
• I love the pond woods
• I love the walking paths around the property. And connecting the paths to Spruce hill also.
• The careful planning and balance of activities and uses for the property is impressive.
• Thinking more about community gardens, if they are up front and can be seen from the
road, they might not be attractive in the winter. Might not be best place…
• Tennis courts at Stonybrook are in big demand for pickleball; having dedicated tennis
courts at this site would relieve the congestion tremendously
• What is the impact of additional traffic on 6A /Millstone due to additional housing and
community use of the property?
• Please have a traffic planner look at the intersections. Very dangerous on the Cape!
• Will there be an opportunity to generate revenue through user group fees (private camps,
other programs)?
• Is it likely any revenue would be generated to offset costs of a community center - for
example from the sale of the existing COA or fees for certain activities on the campus?
Example comments pertaining to the Bay Property (Emails)
• I also want to express my support for a centralized newly built community center on the
Bay property as opposed to the decentralized option. The current senior center building is
woefully inadequate for the needs of our expanding senior population, and that has been
the case for the 20 years that we lived full time in Brewster.
• The cost of a brand new community center is simply too costly. I am in support of using
existing buildings in Brewster to meet our recreation and meeting space needs. I suggest a
strong hard look at consolidating Eddy and Stony Brook.
• $66M is an expense that the Town of Brewster should not undertake. With the recent
significant expenditures of the Cape Cod Tech School and Nauset Regional, the taxpayers
should not be asked to fund another undertaking that the Town cannot afford.
• Don't nibble around the edges. Go for the community center and the housing right up
front. Affordable housing is my #1 priority, the community center is #2. I'm a year-round
resident, and I feel strongly about doing what we can to help with the housing crisis; I also
believe that a community center will help us further the building of community here in
Brewster. Gathering places, be they the kitchen tables in affordable housing units or the
all-purpose rooms of a community center, are important for the emotional health and
social wellbeing of all Brewster-ites -- whether they realize it or not.
• I would explore as many Public/Private ventures that make sense and are in keeping with
public sentiment. This again could help reduce overall development costs. I would lean
towards developing more housing on the site.
• We can learn from Harwich. Their community center is the center of community life – and
it produces revenue by renting space to about 150 community groups.
• I would prefer a phased development of a community center.
• I strongly believe that the secluded section of the Bay property is the perfect place for
siting affordable housing. That site is about equidistant from shopping centers in
Brewster and Orleans, and I presume the occupants would have transportation available.
I believe any housing for seasonal workers should be much closer to the center of
Brewster, where the jobs are likely to be found
• Not in favor to build housing on the Bay property. Property should be used primarily for
recreation and for residents enjoyment. I.E. Community center, pickle ball courts, nature
trails and other activities. You will destroy the character of the town by placing housing at
the bay property.
• My concern is the traffic conundrum posed by this location on the parcel and its proximity
to Millstone Road/6A intersection
• Why more tennis courts? Don’t we have enough already?
• As a neighborhood resident I see major traffic issues at the corner of Millstone and 6a.
That corner is already a problem in the summer months. Traffic needs to be addressed!!!
• I support the Pollinator Meadow but oppose the Community Gardens.
• I love the idea of demonstrating sustainability thru native plants and pollinator meadows.
I’d like to see those woven throughout the bay property, rather than the huge front-facing
arrival fields area. Leaving some of that front area open allows for town events such as the
Brewster in Bloom craft fair and Da Hedge, as well as parking for such events.
• As an occasional cyclist I'm curious about the connection to Millstone. Will cyclists and
pedestrians have a traffic control light to stop 6A traffic (as I believe they do near Fort
Hill)? Will the Millstone renovation create a dedicated bike lane from 6A to CCRT?
• I support recycling a few of the cabins to artist workshops, provided that occupants pay
rent equal to the town's costs.
• Where parking is being added consider the use of permeable pavers rather than asphalt. A
portion of the Ocean Edge parking lot to the southwest of the mansion is permeable pavers
filled with earth and grass. The result is green space aesthetically that can be parked upon.
• It’d be great to have a full-size outdoor sports court, basketball court.
• Walking Trails – Some portion of the trails should be ADA sensitive. Realize that not all
trials can be paved but some consideration should be given to allow persons with
disabilities to view (maybe access) the beach, overlooks, and maybe a leisurely stroll (or
with a wheel chair etc.)
• I would like to see the use of asphalt paving minimized in roadways and parking areas.
Where feasible the use of permeable materials should be used. Consider asphalt limited
to the accessible portions of parking areas.
• Early on, I heard more talk about possible “revenue-producing” uses/activities—are there
any such things in the current plans? If so, could they be identified more clearly? Or- do
we value easy access to these facilities for all?
Example comments pertaining to the Pond Property (Breakout groups)
• Fully support and cheer the walking trails, beach , Audubon programs. Making great use of
Brewster existing hike maps
• I like the Audubon partnership a lot!
• I prefer that we reserve for housing and a package plant. A package plant would take care
of wastewater concerns in Zone II and would potentially pick up existing homes on septic
within Zone II. Vast majority of parcel would still be preserved open space. Adjacent to 134
with easy access to highway. We should think bigger than just overcoming safe harbor -
housing is a crisis across Cape Cod.
• Having rented above the long pond site beach on Bessie Cartway, and walking the
adjacent woodlands conversation area regularly, I support MA Audubon’s use of the lower
portion to protect this important watershed. No housing there. How will the town monitor
the use of the beach? I’ve observed many boats throughout the summer coming on the
current beach area despite signage. Boaters are using it for swimming, fishing, parties, dog
walking currently.
• I live close to the Rte 137 entrance to the pond property and could agree to limited year-
round housing at the entrance to the pond property only. Any housing further down the
road would not support the conservation issues addressed.
• I’m against any housing on the Long Pond site given surface and groundwater flows
patterns. Septic flows would move towards Long Pond
• Should not have housing on Pond Property. We have spent millions to protect these Zone
II areas. The adjacent lot was purchased to protect drinking water and this lot should be
considered the same. We should look to future needs for a new well and/or a cell tower on
this parcel
• Do not support reserve for municipal uses - there is a lot of land around the town offices
and other municipal buildings for expansion. I believe we should choose the densest
housing option with wastewater treatment for affordable housing. Bring our teachers,
firefighters etc as well as our sons and daughters back into town
• I am pleased that throughout the process the RH team has shown ADA accessible parking
for the use of the pond. Thumbs up for that.
• I support keeping the access road to the pond gravel to keep the feel of driving into a
secluded conservation zone.
• It would be nice to provide bike access to the lake beach
Example comments pertaining to the Pond Property (Emails)
• I support the Town Home proposal because I think it will be the most cost effective to
build. I appreciate that the plan preserves the majority of the parcel for Open
Space/Recreation/Zone II protection – to me this is an opportunity to demonstrate how
advocates for housing and open space can work together.
• As to the Long Pond property, I believe very strongly that a fourth option of no housing
should be seriously considered. I realize that creating affordable housing to meet state
targets is an important objective, but it need not be built in an area that is critical to the
town’s water supply. With two environmental organizations as potential partners for this
site, I believe that the entire site should be dedicated to conservation.
• Providing affordable housing is a Town priority, and I agree with those who suggest the
optimum location for it is on the Pond Property. A lovely development of Town Homes
would seem ideal there.
• We absolutely do not want to see housing constructed here for environmental impact
reasons.
• Keep section on 137 for housing or future town uses. Build appropriate housing here in the
future. The environment can be protected from wastewater issues by building a small
treatment center for the neighborhood.
• I fully support the position held by BPC and BCT that we should not consider a housing
option on the Long Pond property until we have a comprehensive wastewater plan. That
area is very important for water quality and potential well locations.
• The split of a 10-acre segment reserved for future municipal or affordable housing use and
the remaining parcel designated for conservation and nature partnerships (potentially
with the BCT and MA Audubon) is excellent. This enables the Town to connect with the
previously purchased Robinson conservation property and create a large swatch of
conservation land while still allowing the Town to potentially use the corridor next to Rt
137.
• Given the choice between reserving the remaining 15% for municipal use or affordable
housing I prefer the reservation for municipal use. For a multiple of reasons- Zone II,
watershed to Long Pond, preserving a possible town well site, lack of transportation and
distance to Brewster/Orleans jobs and amenities, this site is not suited to housing. In
addition, the presentation talked about a net zero addition of nitrogen from affordable
housing which was explained as calculated by using a reduction in nitrogen from nearby
housing to offset the addition of nitrogen at this site. If housing is even placed on this site,
it should be in an ecologically sound way that does not add any burden of nitrogen or other
contaminants to this site. This may take many years but that should be the standard for
placing housing on this site.
• I’m concerned, and generally opposed, to siting housing on this property. Our major
conservation groups are opposed, and I appreciate their views, as well as concerns about
water. The property is a really wonderful woodland, and I’d like to see it devoted to
conservation and passive recreation.
• Use the 10 acres for housing BUT isolate it more by not putting the road into
the pond property right through the middle of the housing rather move the main road into
property to one side of the housing project or create a separate entrance like on the Bay
property
• There are a limited number of parking spaces serving the Pond beach. Will swimming be
allowed there? If so, what about lifeguards?
Town of Brewster Sea Camps
Community Forum 3
November 30, 2023
WELCOME!
Orientation (10 min)
- Introduction
- Where We Left Off
Bay Property (35 min)
- What We’ve Heard
- Refined Plans and Cost Information
Pond Property (30 min)
- What We’ve Heard
- Refined Plans and Cost Information
Breakout Rooms Discussions (40 min)
Conclusions & Next Steps (5 min)
Peter Lombardi
Town Manager
Madeleine Aronson
Reed Hilderbrand
Donna Kalinick
Assistant Town Manager
Today’s Speakers:
TODAY’S AGENDA
Amanda Bebrin
Chair, Bay Property
Planning Committee
David Vega-Barachowitz
WXY
Doug Wilcock
Chair, Pond Property
Planning Committee
Elizabeth Randall
Reed Hilderbrand
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 2
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 3
INTRODUCTION
Amanda Bebrin- BPPC Chair
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 4
INTRODUCTION
Doug Wilcock- PPPC Chair
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 5
REED
HILDERBRAND
Landscape Architecture
and Planning
BREWSTER
COMMUNITY
- Community Members
- Select Board
- BPPC Committee Members
- PPPC Committee Members
- Town Staff
VHB
Engineering
Planning
Permitting
A M FOGARTY
Cost EstimationLEC
ENVIRONMENTAL
Environmental
Consultant
WXYArchitecture Planning Engagement
MASS
AUDUBON
MEET OUR TEAM
WHERE WE ARE IN THE PROCESS
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 6
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 7
PATH TO DESIGN
Community-led Decisions
COMMUNITY OUTREACH DISTILLED
COMMUNITY
FEEDBACK
PLANS THAT REFLECT
TOWN GOALS &
COMMUNITY VALUES
CONTINUED
PLAN
DEVELOPMENT
2 PUBLIC COMMUNITY FORUMS
SELECT BOARD MEETINGS
GUIDING
PRINCIPLES
20+ PPPC MEETINGS 20+ BPPC MEETINGS
TOWN VISION PLAN
COMMUNITY
& COMMITTEE
FEEDBACK
DESIGN TEAM
FACILITATION
STAKEHOLDER
INPUT
SELECT BOARD
DIRECTIONOPEN SPACE AND RECREATION PLAN
HOUSING PRODUCTION PLAN
LOCAL COMPREHENSIVE PLAN
COASTAL RESOURCE MANAGEMENT PLAN
INTEGRATED WATER RESOURCE MANAGEMENT PLAN
2 SURVEYS
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 8
WHAT WE HEARD
Guiding Principles
Foster awareness of the sensitive
ecologies and demonstrate
sustainability
Re-use buildings and
amenities where feasible
Plan for long-term
needs of the Town
Balance cost with
revenue generation
Expand opportunities for community
use with a focus on wellness,
recreation, arts, and education
Protect and conserve
important natural habitat
Contribute to the Town’s
affordable housing goals
Build upon Brewster’s historic, small-
town, and socially inclusive character
Build partnerships for
activities and stewardship
Provide resources
for all ages
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 9
Share draft
comprehensive plans
Provide important
Town context
regarding housing,
a community
center, and
municipal uses
Hear your f eedback
WHAT ARE OUR GOALS FOR TODAY?
1 32
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 10
BAY PROPERTY
BAY PROPERTY - OVERALL EXISTING FRAMEWORK
ARRIVAL FIELDS SECLUDED ZONE
CENTRAL CAMPUS WOODLAND BUFFER
COASTAL DUNE CABIN GLADE
BEACH POND RESERVE
OVERALL PLAN
Bay Property
0 200’MILLSTONE
ROAD
ROUTE 6A
SPRUCE HILL
PARTIAL
REWILD +
SEASONAL
COMMUNITY USE
TENNIS
COMMUNITY
COMMONS
NATURE
BASED
PROGRAMS
NEW
TRAILS &
ACCESSIBLE
PATHS
POOL
&
PICNIC
WOODLAND
BUFFER
HOUSING
RESTORE
COASTAL
DUNE
FLEXIBLE
SPACE
COMMUNITY
GARDENS
&
POLLINATOR
MEADOW
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 12
FLEXIBLE SPACE
COMMUNITY COMMONS
PARTIAL REWILD &
SEASONAL COMMUNITY USE
RESTORE COASTAL DUNE
NATURE BASED PROGRAMS
POOL
WOODLAND BUFFER
SEASONAL WORKFORCE
HOUSING
AND/OR
YEAR-ROUND AFFORDABLE
HOUSING
COMMUNITY GARDEN
NEW TRAILS & ACCESSIBLE PATHS
0 200’
EXISTING PLAN
MILLSTONE
ROAD
ROUTE 6A
17
16
57
40 38
39
42
36
37
56 85
15A6
18
19
55
54
2120
50
5
4
1
2
3
15
7
8
9
22
12
11
35
47
14 13
33
32
10
48
23
70
24
29
30
25
26
46
28
31
49 81
27 60
80
78
77
79
34
52
67
82
83 59
58
72
71 73
74
75 76
4443
63
64
62 61
5368
86 84
66
92 TOTAL BUILDINGS:
Existing Buildings
12 COMMUNAL CAMP USES
6 SHOWER HOUSES
9 STAFF CABINS
38 CABINS
25 MAINTENANCE BUILDINGS
1 ADMINISTRATION BUILDING
1 SPRUCE HILL HOUSE
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 13
C
O
MMUNAL C A M P U S ES CAB I N S
SHOWER H O U S E
STAFF C A B I N S
MAINTE N A N C E
SPRUCE HI L L H O U S E ADMIN B U I L D IN G
0 200’
PROPOSED PLAN
Building Removal, Re-Use
& New Construction
MILLSTONE
ROAD
ROUTE 6A
24 BUILDINGS TO BE REUSED
2 NEWLY CONSTRUCTED BUILDINGS
49 BUILDINGS TO BE REMOVED
19 BUILDINGS POSSIBLY TO BE REUSED
(These buildings would remain if used for seasonal
workforce housing and maintenance but would
be removed if there were to be new affordable
housing)
•Re-use existing buildings where
feasible
WHAT WE HEARD:
ADMINISTRATION
BUILDING
ARTS
CENTER
BOATHOUSE
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 14
COMMUNITY
CENTER
NATURE
CENTER
0 200’
PROPOSED PLAN
MILLSTONE
ROAD
ROUTE 6A
24 BUILDINGS TO BE REUSED
2 NEW BUILDINGS (TO BE CONSTRUCTED)
49 BUILDINGS TO BE REMOVED
19 BUILDINGS POSSIBLY TO BE REUSED
(These buildings would remain if used for seasonal
workforce housing and maintenance but would
be removed if there were to be new affordable
housing)
•Re-use existing buildings where
feasible
WHAT WE HEARD:
Building Re-Use
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 15
COMMUNITY
CENTER
NATURE
CENTER
REUSE PICN I C P A V IL IO N
REUSE ADMI N B U I L D IN G
REUSE BOA T H O U S E REUSE AR T S C E N T ER
R
E
U
SE CABINS FO R C O M M U N IYT USE
R
E
USE SPRUCE H I L L H O U SE
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 16
PROPOSED PLAN
Building Uses
COMMUNITY USE
HOUSING
MAINTENANCE
ADMINISTRATION
BUILDING
ARTS
CENTER
BOATHOUSE
COMMUNITY
CENTER
NATURE
CENTER
MILLSTONE
ROAD
ROUTE 6A
0 200’
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 17
PROPOSED PLAN
COMMUNITY USE
HOUSING
MAINTENANCE
•Provide all-age friendly resources
•Incorporate the arts and sciences
WHAT WE HEARD:
Building Uses
MILLSTONE
ROAD
ROUTE 6A
0 200’FLEXI
B
L
E C
O
MMUNITY U S E S / A R TISTS STUDIOS EVENT S P A C E
I
NT
E
R
I
M REC USES / F U T U R E M U N ICIPAL USESE
V
ENT SPACE / C O N S E S SIO NSSE
A
S
O
N
AL MASS AU D U B O N H O USINGCLASSES, E V E N T S , E TC.MAS
S
A
U
DUBON NAT U R E C E N TER / OFFICESC
O
A, REC DEPT, T E E N C EN TER P IC N I C P AVILION C A B I NS
A D M I N B UILDING B O A T H OUSE
C A B INS
A R T S C E NTER N A T U R E CENTER
CO M M U N I T Y CENTER
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 18
PROPOSED PLAN
Outdoor Recreation
MILLSTONE
ROAD
ROUTE 6A
0 200’
FLEXIBLE
OPEN SPACE
(ATHLETIC
FIELD, EVENTS)
COMMUNITY
GARDEN
TENNIS
COURTS
SHARED
USE PATH
POOL
PICNIC AREA
FITNESS
STATIONS
PLAYGROUND
& PICNIC
AREA
PICNIC
PAVILION
PICNIC AREA
TRAILS
BEACH
ACCESS
FLEXIBLE
GATHERING
SPACE
•Provide opportunities for passive recreation (trails, picnic areas, etc) •Provide flexible indoor and outdoor gathering spaces
WHAT WE HEARD:
PICNIC
PLAYGROUND & PICNIC AREA
FLEXIBLE OPEN SPACE
BEACH ACCESS
FITNESS STATIONS
POOL
TENNIS COURTS
COMMUNITY GARDEN
TRAILS
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 19
PROPOSED PLAN
Habitat & Re-wilding
MILLSTONE
ROAD
ROUTE 6A
0 200’
RESTORE COASTAL
DUNE TO IMPROVE
DUNE STABILITY AND
COASTAL RESILIENCY
ENHANCE TREE CANOPY
TO ABSORB GREENHOUSE
GASES, PROVIDE
INCREASED HABITAT FOR
WILDLIFE, & RESTORE
WOODLANDS
INTRODUCE POLLINATOR
MEADOW TO INCREASE
WILDLIFE HABITAT,
INCREASE STORMWATER
ABSORPTION, & REDUCE
REGULAR MAINTENANCE
MAINTAIN CLEARING
WITHIN WOODANDS
APPROX 10ACRE
CONSERVATION
RESTRICTION
1938
1971
1994
RESTORE COASTAL DUNE
ENHANCE WOODLANDS
POLLINATOR MEADOW
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 20
PROPOSED PLAN
Vehicular circulation
and Parking
PARKING
MILLSTONE
ROAD
ROUTE 6A
0 200’
BEACH,
BOATHOUSE &
NATURE CENTER
PARKING GROVE
~ 40 SPOTS
EXISTING
PARKING AREA
~ 46 SPOTS
COMMUNITY
CABIN GRAVEL
PARKING
~ 26 SPOTS
ADMIN HOUSE
& RECREATION
GRAVEL PARKING
~ 44 SPOTS
OVERFLOW EVENT
PARKING
~ 127 SPOTS
NATURE CENTER
ADA PARKING
4 SPOTS
POOL ADA
PARKING
4 SPOTS
POOL, ARTS CENTER,
COMMUNITY
CENTER PARKING
GROVES
~ 86 SPOTS
COMMUNITY
CENTER
ADA PARKING
4 SPOTS
SECONDARY VEHICULAR
PRIMARY TWO WAY VEHICULAR
PRIMARY ONE WAY VEHICULAR
SECONDARY MAINTENANCE VEHICULAR
PRIMARY MAINTENANCE VEHICULAR
PUBLIC
ENTRANCE
SECONDARY
ENTRANCE
GRAVEL PARKING
PARKING WITH PLANTING
PLANTING GROVE
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 21
OTHER TRAIL
CAMPUS LOOP
POND & DUNE WALK
FITNESS LOOP
PROPOSED PLAN
Walking Trails
MILLSTONE
ROAD
ROUTE 6A
0 200’
MEADOW LOOP:
0.3 MILES
FITNESS
LOOP:
0.2 MILES
CONNECTS
TO SPRUCE
HILL
CONNECTS
TO SPRUCE
HILL
CAMPUS LOOP:
1 MILE
POND & DUNE
WALK:
0.5 MILES
MEADOW LOOP
CAMPUS L O O P
MEADOW L O O P
POND & D U N E W A LK
FITNESS L O O P
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 22
BIKE PARKING
SEPARATED BIKE PATH
BIKE PATH SHARED WITH VEHICLES
PROPOSED PLAN
Bike Circulation MILLSTONE
ROAD
ROUTE 6A
0 200’CONNECTS TO RAIL TRAIL
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 23
• The Town Meeting Warrant article to purchase the properties included a “Community
Center” as a potential use
• The 2018 Town Vision Plan identified providing a “community center for all ages for
social and recreational activities and include meeting rooms” as a priority goal
• The 2023 Local Comprehensive Plan also identified a new multi-generational
community center as consistent wit h community values
• The Council on Aging facility lacks adequate space for its programming needs, and
the condition of the existing historic building creates ADA and maintenance challenges
• The Recreation Department also does not have a f acility of its own and uses limited
office and meeting space in the Eddy School
COMMUNITY CENTER
Town Context
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 24
Currently no plans to reuse Eddy Sc hool as a community center:
• Town Meeting authorized funding for a Brewster Elementary Sc hool
Consolidation Feasibility S tudy in November 2019
• Consolidation Feasibility Study was completed in January 2022
• Brewster School Committee has care, custody, and control of the elementary
schools
• After careful consideration, Brewster Sc hool Committee voted in October 2022
to table consolidation until the student enrollment has decreased to about 55
children per grade (currently about 65/grade)
• Brewster, Orleans, Eastham, and Wellfleet are actively considering submission of
grant application to explore f easibility of regionalizing elementary schools
COMMUNITY CENTER
Town Context
Library/reading room
Medical exam/treatment rooms
Game rooms
Large multi-purpose rooms
Storage areas
Conference/meeting rooms
Offices
Workspaces
Fitness center
Walking track
Kitchen/cafeteria
Indoor Pool
Gymnasium
Fitness classrooms
Sport courts
COUNCIL ON AGING REC DEPARTMENT
COMMUNITY CENTER
Community Feedback - Desired Public Facilities
SPACES REQUIRED FOR DESIRED FACILITIES BUILDINGS VIABLE FOR SOME LEVEL OF RE-USE
COMMUNITY CENTER
• Forum and survey feedback shows t hat, in general, t he community is more interested in reusing t he existing
buildings on the Bay Property for a “Community Campus” rather than building a new, purpose-built Community
Center.
•Some of the most popular community center-type program interests expressed by residents at the forum and
in the survey cannot be accommodated wit hin t he existing building footprints and would require extensive and
costly building renovation.
Community Feedback - Desired Public Facilities
8-LANE SWIMMING POOL
6,275 SF
GYM WITH PERFORMANCE SPACE
7,600 SF
FITNESS CLASSROOM
1,200 SF
OFFICE
130 SF
CLASSROOM
1,300 SF
FITNESS CENTER
2,000 SF
MEDICAL EXAM ROOM
480 SF
GAME ROOM
450 SF
MEETING ROOM
750 SF
COMMUNITY DANCE
900 SF
CULINARY WELLNESS
PROGRAM
660 SF
COMMUNITY KITCHEN
650 SF
SENIOR PROFESSIONAL SERVICES
200 SF
MULTI-PURPOSE ROOM
1,300 SF
SENIOR SOCIAL
SERVICE AGENCY
800 SF
EXISTING DINING HALL
10,283 SF
#31 ART CENTER
2,562 SF
#28 ADMINISTRATON BUILDING
4,752 SF
#25 INFIRMARY
3,854 SF
BOATHOUSE
2,804 SF #23 PAVILION
2,400 SF
CABIN
APPROX. 600 SF
SEASONALLY
WINTERIZED
NON - WINTERIZED
COMMUNITY CENTER
SPACES REQUIRED FOR DESIRED FACILITIES APPROXIMATE 34,000 SF TOTAL FOOTPRINT OF
POTENTIAL NEW COMMUNITY CENTER
• A new community center would have t he potential to accommodate the facilities t he community is interested in.
• For comparison, t he Harwich Community Center is 32,000 SF with a 17,000 SF basement.
Community Feedback - Desired Public Facilities
8-LANE SWIMMING POOL
6,275 SF
GYM WITH PERFORMANCE SPACE
7,600 SF
FITNESS CLASSROOM
1,200 SF
OFFICE
130 SF
CLASSROOM
1,300 SF
FITNESS CENTER
2,000 SF
MEDICAL EXAM ROOM
480 SF
GAME ROOM
450 SF
MEETING ROOM
750 SF
COMMUNITY DANCE
900 SF
CULINARY WELLNESS
PROGRAM
660 SF
COMMUNITY KITCHEN
650 SF
SENIOR PROFESSIONAL SERVICES
200 SF
MULTI-PURPOSE ROOM
1,300 SF
SENIOR SOCIAL
SERVICE AGENCY
800 SF
FIRST FLOOR
20,000 SF
SECOND FLOOR
14,000 SF
COMMUNITY CENTER - REUSE AND RENOVATE
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 28
REUSE DINING HALL
PROGRAMS NOT ACCOMMODATED:
Fitness Center
Walking Track
Indoor Pool
Gymnasium
Sports Court
5,600 SF Flex. Meeting Space
1,000 SF Game Room
1,000 SF Kitchen
2,600 SF Support Spaces
REUSE ADMINISTRATION BUILDING
1,000 SF Support Spaces
3,750 SF Offices
10,200 SF Total
4,750 SF Total
REUSE ARTS CENTER
5,00 SF Support Spaces
2,060 SF Flex. Meeting Space
2,560 SF Total
REUSE DINING HALL
REUSE ART CENTER
REUSE ADMINISTRATION BUILDING
Reuse Community Campus Illustrative Scenario
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 29
New Community Center Illustrative Scenario
COMMUNITY CENTER - NEW BUILD
NEW COMMUNITY CENTER
6,650 SF Gymnasium
2,230 SF Fitness Center
1,240 SF Fitness Classroom
REUSE ADMINISTRATION BUILDING
1,000 SF Support Spaces
3,750 SF Offices
4,750 SF Total
REUSE ARTS CENTER
500 SF Support Spaces
2,060 SF Flex. Meeting Space
2,560 SF Total
3,900 SF Flex. Meeting Space
7,000 SF Circulation + Lobby
660 SF Kitchen
4,100 SF COA Programs
33,400 Total
4,100 SF Support Spaces
3,450 SF Teen Area with Game Room
NEW COMMUNITY CENTER
REUSE ART CENTER
REUSE ADMINISTRATION BUILDING
Gymnasium
Fitness classrooms
Sport courts
Library/reading room
Medical exam/treatment rooms
Game rooms
* Council on Aging cannot
relocate here, only have some
satellite programs
*Would require land be
acquired for a new COA
facility to be built elsewhere
in town
Large multi-purpose room
Storage areas
Conference/meeting rooms
Offices
Workspaces
Fitness center
Walking track
Kitchen/cafeteria
Indoor Pool
Unlikely
Maybe
Yes (with renovation)
COMMUNITY CENTER - REUSE AND RENOVATE
No designated COA building
COUNCIL ON AGING SHARED REC DEPARTMENT
REUSE DINING
HALL AS
COMMUNITY
MEETING &
EVENT SPACE
PLAYGROUND
COMMUNITY
CAMPUS
FELXIBLE
GATHERING
SPACE
EVENT SPACE
/ PICNIC
PAVILION
REC DEPT
OFFICES &
PROGRAMS
STAFF HOUSING
AMPHITHEATER
PARKING GROVE
PICNIC AREA
ARTS CENTER
TRAIL CONNECTION
TO SPRUCE HILL
SEASONAL
COMMUNITY USE
Library/reading room
Medical exam/treatment rooms
Game rooms
Large multi-purpose rooms
Storage areas
Conference/meeting rooms
Offices
Workspaces
Fitness center
Walking track
Kitchen/cafeteria
Indoor Pool
Gymnasium
Fitness classrooms
Sport courts
COMMUNITY CENTER - NEW BUILD
Potential to include all desired facilities
COUNCIL ON AGING SHARED REC DEPARTMENT
REMOVE DINING
HALL & REWILD
FELXIBLE
GATHERING SPACE
EVENT SPACE /
PICNIC PAVILION
INTERIM
RECREATION /
FUTURE MUNICIPAL
STAFF HOUSING
AMPHITHEATER
NEW COMMUNITY
CENTER (INCLUDES
COA, REC DEPT,
TEEN CENTER)
EXPANDED
PARKING
PICNIC AREA
ARTS CENTER
TRAIL CONNECTION
TO SPRUCE HILL
SEASONAL
COMMUNITY USE
COMMUNITY
COMMONS
PLAYGROUND
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 32
PRELIMINARY DRAFT PRICINGPRELIMINARY DRAFT PRICING
Bay Property Overall
(with new Community Center)
Total:
Approx $41,243,000 before design
and contractor fees
Approx $66,330,000 after design
and contractor fees including:
Pricing Breakdown
• 10% general conditions
• 10% overhead and profit
• 1% permitting
• 2% bond/insurance
• 10% design contingency
• 20% design services
• 6% escalation allowance
Buildings (Total: $32,611,400)
- Building removal (40 bldgs): $1,094,700
- Renovate for seasonal workforce housing (10 bldgs): $1,045,500
- Renovate for communal use or staff housing (21 bldgs): $2,311,600
- Renovate Administration Building: $1,262,800
- New Community Center: $24,742,000
- New Nature Center: $1,554,800
- New Restroom Facility: $600,000
Sitework and Recreational Amenities (Total: $3,862,700)
- Planting (woodland, dune, meadow): $1,135,600
- Trails: $759,000
- Picnic Areas: $214,200
- Tennis Courts: $461,000
- Community Garden: $249,800
- Fitness Stations: $60,000
- Playground: $726,000
- Athletic Field: $257,100
Site Prep and Infrastructure (Total: $4,768,900)
- Site prep and paving removal: $873,500
- Road Improvements: $1,068,600
- Parking Areas and Stormwater Management: $1,127,900
- Utilities: $498,900
- Septic: $1,200,000
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 33
Add (Total: $5,655,700)
- Renovate dining hall: $5,655,700
Remove (Total: $25,527,900)
- Community Center: $24,742,000
- Expanded Parking: $498,000
- Remove Dining Hall: $287,900
Community Campus instead
of Community Center (Assumes
renovated dining hall, no community
center and no COA facility)
Total:
Approx $19,872,000 reduction in
cost before design and contractor
fees
*Does not include cost of land
acquisition and/or construction of
a new COA facility at a different
location
Pricing Breakdown
PRELIMINARY DRAFT PRICING
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 34
PARTNERSHIPS - BAY PROPERTY
Mass Audubon
Mass Audubon
Partnership includes:
Possible programs:
- Nature center with administrative of fices
- Conservation restriction on approximately 10 acres surrounding
existing pond on the northeast corner of the property
- Reuse of existing cabins for seasonal workforce housing for 6
Mass Audubon employees
- A variety of programming and f ield tr ips
- Interpretative signage and nature trails
Amount pledged for Bay Property: $2 million
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 35
FINANCING
• Any potential new housing would be a public/private partnership where t he ma jority of
the costs are borne by a developer
• Preliminary f inancing and phasing information will be shared out at t he 4t h community
forum in February 2024 once t he draft plans are f inalized
• Financing options will include a combination of t he following:
- Public/Private Partnerships
- Federal, state, and/or other grants
- Capital S tabilization Funds
- Free Cash
- Property revenue generation
- Gifts and donations
- Short-term non-excluded debt
- Long-term debt exclusions
• Details about f inancing and phasing will be incorporated into Town’s Capital
Improvement Plan after plans for t he properties are approved by Brewster voters
• Specific funding requests may be brought back to future Town Meetings for approval
through t he Town’s annual capital planning processes
HOUSING
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 37
• The Town Warrant article to purchase t he properties approved at Town Meeting
included “community housing” as a Potential Town Use for both properties and
specifically mentioned “Appropriately scaled community housing near Route 137”as a
potential use for t he Pond Property in t he Voter Information
• Providing affordable and attainable housing is supported by t he Town Vision Plan, t he
Local Comprehensive Plan, and t he Select Board S trategic Plan, and it appears to have
widespread conceptual support among the community
• If one or both of these properties is not used for affordable year round, deed
restricted housing to meet t he State’s 10% Mandate and t he Town’s HPP goals,
other properties will need to be purchased by the Town for building affordable
housing in the near future
• The Select Board has determined housing should be included on at least one of these
properties
HOUSING
Town Context
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 38
• Goal 1: Increase and diversify year-round housing options in Brewster for a range of
income levels and housing types
• Goal 2: Prevent displacement of current residents and facilitate housing mobility for
households looking to move within or into Brewster.
• Goal 3: Align development with the principles of the Town’s Local Comprehensive
Plan/Vision Plan. This includes balancing housing goals with protection of the natural
environment.
• Goal 4: Continue to build capacity to produce housing through staffing, funding, regional
partnerships, advocacy and education, and relationships with nonprofit and for-profit
developers.
Housing Goals
BREWSTER HOUSING PRODUCTION PLAN 2022-2027
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 39
HOUSING
Community Feedback
• Responses to t he forum and survey show t hat most people prefer seasonal workforce
housing on the Bay Property. It should be noted that seasonal workforce housing while
needed, does not count towards t he 10% Affordable Housing S tate mandate.
• Desire for seasonal workforce housing is related to sentiment of re-use
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 40
Bay Property Context
BAY PROPERTY
BAY PROPERTY:
SECLUDED ZONE:
THE SECLUDED ZONE IS 18% OF THE BAY PROPERTY
55 ACRES
10 ACRES
LONG POND PROPERTY
BAY PROPERTY
CAPE COD BAY
LONG POND
SPRUCE HILL PARCEL
NICKERSON STATE PARK
LONG POND WOODLANDS
NAMSKAKET MARSH
PUNKHORN PARKLANDS
ELLIS LANDING
LOWER RD CONSERVATION AREA
NO BOTTOM POND SANCTUARY
SHEEP POND WOODLANDS
BREWSTER WATER SUPPLY LANDS
FREEMAN’S FIELDS
MILLSTO N E R O A D
MA IN S T R E E T / R O U T E 6 A
LONG POND R
O
AD / ROU T E 1 3 7
C A PE C O D RA IL TRAILCAPE COD BAYCAPE COD BAY
SECLUDED
ZONE
BAY HOUSING ANALYSIS
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 41
Previous Building Uses
The secluded zone of t he
Bay Property currently
contains the maintenance
area for the entire
property and formerly
housed the day camp
programs.
WINTERIZED
8 ROOMS; 4 BEDROOMS
NON-WINTERIZED
8 ROOMS
SPRUCE HILL HOUSE
DORMITORY
STAFF CABIN
COMMUNAL CAMP USES
SHOWER HOUSE
MAINTENANCE
SPRUCE HILL HOUSE
DAY CAMP AREA
MAINTENANCE AREA
SECLUDED
ZONEROUTE 6ABAY HOUSING ANALYSIS
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 42
Proposed Site Relationships
SEPARATE ACCESS TO
HOUSING
DEMO EXISTING
STRUCTURES TO CREATE A
FOREST BUFFER
The forest buffer could
separate more public
uses of the Bay Property
and the more secluded
potential housing. FO
R
E
S
T
B
U
F
F
E
R
FOREST BUFFER FO
R
E
S
T
B
U
F
F
E
R
POTENTIAL HOUSING
DESIGNATED AREA
HISTORIC OLD KING HIGHWAY REMOVE VEHICULAR ACCESS
DEMOLISH BUILDINGS
FOREST BUFFER
Scenarios are based on
up to 46 units (90 beds).
Contemplated year round
and seasonal workforce
housing in both
repurposed structures
and new construction.
Group or individual
parking is considered
depending on dwelling
type and configuration.ROUTE 6ASECLUDED
ZONE
Wastewater treatment is
still under consideration.
BAY HOUSING ANALYSIS
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 43
Matrix
REPURPOSE REPURPOSE &
NEW BUILD (DEMO)NEW BUILD (DEMO)
DETACHED SINGLE UNITS
MORE PRESERVATION NEW BUILD
NEW BUILD (DEMO)
TOWN HOUSES
SEASONAL WORKFORCE
YEAR-ROUND AFFORDABLE
UNIT COUNT
PARKING
UNIT SIZE
SHI
BEDS
8 UNITS
2 year-round affordable
6 seasonal workforce
13 TOTAL GROUP
1000 sf year-round affordable
660 sf seasonal workforce
2 UNITS
28 TOTAL BEDS
2 year-round affordable
26 seasonal workforce
32 UNITS
26 year-round affordable
6 seasonal workforce
48 TOTAL GROUP
1000 sf year-round affordable
660 sf seasonal workforce
26 UNITS
76 TOTAL BEDS
52 year-round affordable
24 seasonal workforce
40 UNITS
40 year-round affordable
0 seasonal workforce
60 TOTAL
8 individual, 42 group
450 sf studio, 700 sf one bedroom,
1200 sf detached single family
40 UNITS
48 TOTAL BEDS
48 year-round affordable
0 seasonal workforce
46 UNITS
44 year-round affordable
0 seasonal workforce
68 TOTAL GROUP
1000 sf town homes
46 UNITS
90 TOTAL BEDS
80 year-round affordable
0 seasonal workforce
BAY ILLUSTRATIVE HOUSING SCENARIOS
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 44
Repurpose
Existing structures are
reupurposed as dwelling
units with group parking
areas. An area of the site
remains as maintenance.
MAINTENANCE AREA
HOUSING
ROUTE 6AHISTORIC OLD KING HIGHWAY FOREST BUFFER
SEPARATE ACCESS TO
HOUSING
YEAR-ROUND
2 UNIT; 2 BED ea.
1 UNIT; 4 BED ea.
SEASONAL WORKFORCE
CAPE COD BAYSECLUDED
ZONE
UNIT COUNT
PARKING
UNIT SIZE
SHI
BEDS
8 UNITS
2 year-round affordable
6 seasonal workforce
13 TOTAL GROUP
1000 sf year-round affordable
660 sf seasonal workforce
2 UNITS
28 TOTAL BEDS
2 year-round affordable
26 seasonal workforce
SEASONAL WORKFORCE
YEAR-ROUND
STUDIO
ONE BEDROOM
SINGLE-FAMILY
MULTI-UNIT
COMMUNAL AMENITIES
MAINTENANCE
REPURPOSE
NEW BUILD YEAR-ROUND
BAY ILLUSTRATIVE HOUSING SCENARIOS
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 45
BAY ILLUSTRATIVE HOUSING SCENARIOS
Re-purpose and New Build (demo)
32 UNITS
26 year-round affordable
6 seasonal workforce
48 TOTAL GROUP
1000 sf year-round affordable
660 sf seasonal workforce
26 UNITS
76 TOTAL BEDS
52 year-round affordable
24 seasonal workforce
HOUSING
HISTORIC OLD KING HIGHWAY ROUTE 6ASEPARATE ACCESS TO
HOUSING
FOREST BUFFER
MAINTENANCE STRUC-
TURES MOVED TO FOREST
BUFFER
CONSTRUCT MULTI-UNIT
TOWN HOUSES
Former maintenance
buildings are demoed
to create additional
dwelling units.
Brewster Landing, Brewster, MA CAPE COD BAYSECLUDED
ZONE
UNIT COUNT
PARKING
UNIT SIZE
SHI
BEDS
MAINTENANCE
SEASONAL WORKFORCE
YEAR-ROUND
STUDIO
ONE BEDROOM
SINGLE-FAMILY
MULTI-UNIT
COMMUNAL AMENITIES
MAINTENANCE
REPURPOSE
NEW BUILD YEAR-ROUND
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 46
New Build (demo) Detached Single Units
40 UNITS
40 year-round affordable
0 seasonal workforce
60 TOTAL
8 individual, 42 group
450 sf studio, 700 sf one bedroom,
1200 sf detached single family
40 UNITS
48 TOTAL BEDS
48 year-round affordable
0 seasonal workforce
HOUSING
Habitat for Humanity Housing, Brewster, MAHISTORIC OLD KING HIGHWAY FOREST BUFFER ROUTE 6ASEPARATE ACCESS TO
HOUSING
Single family homes and
small dwelling units are
constructed. No buildings
are repurposed for
housing.DETACHED SINGLE FAMILY
WITH INDIVIDUAL PARKING
STUDIO AND ONE BEDROOM
DWELLINGS CAPE COD BAYSECLUDED
ZONE
UNIT COUNT
PARKING
UNIT SIZE
SHI
BEDS
MAINTENANCE
SEASONAL WORKFORCE
YEAR-ROUND
STUDIO
ONE BEDROOM
SINGLE-FAMILY
MULTI-UNIT
COMMUNAL AMENITIES
MAINTENANCE
REPURPOSE
NEW BUILD YEAR-ROUND
BAY ILLUSTRATIVE HOUSING SCENARIOS
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 47
New Build (demo) Town Houses
44 UNITS
44 year-round affordable
0 seasonal workforce
66 TOTAL GROUP
1000 sf town homes
44 UNITS
88 TOTAL BEDS
80 year-round affordable
0 seasonal workforce
All existing structures
are demoed for the
construction of town
houses.
Brewster Woods, Brewster, MA CAPE COD BAYSECLUDED
ZONE
UNIT COUNT
PARKING
UNIT SIZE
SHI
BEDS
SEASONAL WORKFORCE
YEAR-ROUND
STUDIO
ONE BEDROOM
SINGLE-FAMILY
MULTI-UNIT
COMMUNAL AMENITIES
MAINTENANCE
REPURPOSE
NEW BUILD YEAR-ROUND
HOUSING
HISTORIC OLD KING HIGHWAY FOREST BUFFER ROUTE 6ASEPARATE ACCESS TO
HOUSING
MULTI-UNIT DWELLINGS WITH
GROUP PARKING
BAY ILLUSTRATIVE HOUSING SCENARIOS
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 48
Matrix
REPURPOSE REPURPOSE &
NEW BUILD (DEMO)NEW BUILD (DEMO)
DETACHED SINGLE UNITS
MORE PRESERVATION NEW BUILD
NEW BUILD (DEMO)
TOWN HOUSES
SEASONAL WORKFORCE
YEAR-ROUND AFFORDABLE
UNIT COUNT
PARKING
UNIT SIZE
SHI
BEDS
8 UNITS
2 year-round affordable
6 seasonal workforce
13 TOTAL GROUP
1000 sf year-round affordable
660 sf seasonal workforce
2 UNITS
28 TOTAL BEDS
2 year-round affordable
26 seasonal workforce
32 UNITS
26 year-round affordable
6 seasonal workforce
48 TOTAL GROUP
1000 sf year-round affordable
660 sf seasonal workforce
26 UNITS
76 TOTAL BEDS
52 year-round affordable
24 seasonal workforce
40 UNITS
40 year-round affordable
0 seasonal workforce
60 TOTAL
8 individual, 42 group
450 sf studio, 700 sf one bedroom,
1200 sf detached single family
40 UNITS
48 TOTAL BEDS
48 year-round affordable
0 seasonal workforce
46 UNITS
44 year-round affordable
0 seasonal workforce
68 TOTAL GROUP
1000 sf town homes
46 UNITS
90 TOTAL BEDS
80 year-round affordable
0 seasonal workforce
BAY ILLUSTRATIVE HOUSING SCENARIOS
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 49
POND PROPERTY
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 50
• Provide low intensity/use waterfront to respect t he limited capacity of t he property in terms of access,
parking, and character
• Increase walking trails
• Conserve at least 60% of the property
CONSENSUS:
DIFFERING OPINIONS:
WHAT WE HEARD
Key Takeaways
• Avoid housing development in Zone II
• Balance conservation with other uses; accommodate affordable housing
• Municipal uses
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 51
PROPOSED PLAN
Overall Plan
PARKING
8 SPOTS
(0.5 MILES FROM BEACH)
PARKING
16 SPOTS
(0.3 MILES FROM BEACH)
EXPANDED TRAILS
IMPROVED
GRAVEL DRIVE
CONSERVATION
& NATURE
PARTNERSHIPS
(MASS AUDUBON
& BREWSTER
CONSERVATION TRUST)
PUBLIC BEACHMASS AUDUBON
PROGRAMMING
10 ACRES
RESERVE FOR
FUTURE
MUNICIPAL USES
RESERVE FOR
HOUSING
OR
ADA PARKING &
DROP OFF ZONE
4 SPOTS
(0.1 MILES FROM BEACH)
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 52
PROPOSED PLAN
Enlarged Beach Access Area
- Small seasonal day camps
- Adult nature study workshops
- Field trips for Wellfleet Bay camp
- Afterschool programs
- Guided walks
- Kayak trips
- Partner with Recreation Department
on kids programming
Mass Audubon Desired programs:
STORAGE / COMMUNITY USE
MASS AUDUBON
STORAGE,
WEATHER SAFE
SPACE, OFFICE
KAYAK RACKS
ADA PARKING AND DROP
OFF ZONE (4 SPOTS)
ADA ACCESSIBLE BEACH
ACCESS (0.1 MILES FROM
BEACH)
MASS AUDUBON PROGRAMS
TRAILS
LOW INTENSITY PUBLIC BEACH
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 53
Total Estimate:
Approx $1,069,200 before design
and contractor fees
Approx $1,734,000 after design
and contractor fees including:
Pricing Breakdown
- Building removal (3 bldgs): $22,200
- Building restoration (5 bldg):$44,300
- Trails: $207,700
- Roadway im provements: $748,900
- Parking Areas: $49,100
Pond Property
• 10% general conditions
• 10% overhead and profit
• 1% permitting
• 2% bond/insurance
• 10% design contingency
• 20% design services
• 6% escalation allowance
PRELIMINARY DRAFT PRICING
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 54
PARTNERSHIPS - POND PROPERTY
Mass Audubon
Mass Audubon
Partnership includes:
Possible programs:
- Conservation restriction on 56 acres (85% of site), recognizing
that the community may support housing or other municipal uses
on the remaining 10 acres
- Small seasonal day camps
- Adult nature study workshops
- Field trips for Wellfleet Bay camp
- Afterschool programs
- Guided walks
- Kayak trips
- Partner with Recreation Department on kids programming
Amount pledged for Pond Property: $1.5 million
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 55
POTENTIAL USES ALONG 137
Planning Scenarios
RESERVE FOR
AFFORDABLE
HOUSING
10 ACRES
The Town Warrant article to purchase the properties approved at
Town Meeting included the following Potential Town Uses for this
property:
H ousing development would also include a wastewater treatment
plant that would treat other residential properties in the
neighborhood
• habitat protection
• watershed protection
• open space
• conservation
• passive recreation
• active recreation
• community housing
• general municipal purposes
10 ACRES
RESERVE FOR
FUTURE
MUNICIPAL USES
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 56
POTENTIAL USES ALONG 137
Future Municipal Use
HABITAT AND WATERSHED PROTECTIONCELL TOWERNEIGHBORHOOD WASTEWATER
TREATMENT PLANT
UNANTICIPATED USESHOUSING
???
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 57
LAND USE CONTEXT
LEGEND
LONG POND PARCEL
TOWN OF BREWSTER
BREWSTER CONSERVATION TRUST
CONSERVATION RESTRICTION
EXISTING TRAILS
ZONE II WELLHEAD PROTECTION/DCPC
Residential communities exist along both
sides of Route 137 and surround the northern
section of the Long Pond Property.
The property is also par tially adjacent to Long
Pond Woodlands, a town-owned conservation
area.
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 58
WATER QUALITY
Regional Watershed
• Brewster has an Integrated Water Resource
Management Plan which addresses our long-term
wastewater needs and plans across the entire community
• The primary focus in past decade has been on Pleasant
Bay Watershed – Brewster shares a permit with Orleans,
Harwich, and Chatham that includes certain nitrogen
mitigation requirements over the next 20 years
• MA Dept of Environmental Protection issued changes
to Title V regulations and implemented new Nitrogen
Sensitive Watershed regulations in July 2023 that impact
wastewater planning across the Cape
• The Pond Property falls within the Herring River
Watershed – stormwater runoff from the property flows
to Long Pond and eventually to the Herring River in
Harwich
• Brewster plans to develop a Herring River Watershed
Permit by 2030 and expects any new development in this
area will require 100% nitrogen offset
• The Pond Property is uniquely situated to potentially
locate a small wastewater treatment plant that
could accommodate new housing buildout and
replace traditional septic systems in some adjacent
neighborhoods
• Introduction of new wastewater treatment plant on the
Pond Property would improve overall Long Pond &
Herring River water quality
Text credit: Town of Brewster Integrated Water Resource Management Plan, Horsley Witten Group
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 59
WATER QUALITY
LONG POND PARCEL
ZONE II DRINKING WATER
PROTECTION AREA
DRINKING WATER WELLS
!A
!A !A
!A
!A
!A
UV6A
£¤6
UV137
UV124
WELL # 6
WELL #5
WELL # 4
WELL # 1
WELL # 2
WELL # 3
DENNIS
HARWICH
ORLEANS
CHATHAMYARMOUTH
/
0 10.5
Miles
Date: 1/26/2022
Path: H:\Projects\2011\11109 Brewster Int.Wtr.Res.Mgt Plan\GIS\Maps\Report\Figure 2.mxd
Figure 2. Brewster
Conservation Lands and
Zone II Areas
C a p
e
C o d B a y
Pleas antBayCape Cod Bay
!A Public Wells
Legend
Conservation Lands
Ponds
Brewter Zone II
Town of Brewster
Other Zone II
• Areas that contribute groundwater to the Town’s public
drinking water wells are known in Massachusetts as
Zone II’s, or wellhead protection areas
• A portion of the Long Pond property is on the edge of
a Zone II, approximately 1 mile from the nearest Town
well off Freemans Way
• There are currently about 900 developed residential
properties in this Zone II
• Introduction of new wastewater treatment plant on the
Pond Property could improve overall Zone II water
quality
Zone II
HOUSING
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 61
• The Town Warrant article to purchase t he properties approved at Town Meeting
included “community housing” as a Potential Town Use for both properties and
specifically mentioned “Appropriately scaled community housing near Route
137” as a potential use for t he Pond Property in t he Voter Inf ormation
• Providing affordable and attainable housing is supported by t he Town Vision Plan, t he
Local Comprehensive Plan, and t he Select Board S trategic Plan, and it appears to have
widespread conceptual support among the community
• If one or both of these properties is not used for affordable year round, deed
restricted housing to meet t he State’s 10% Mandate and t he Town’s HPP goals,
other properties will need to be purchased by the Town for building affordable
housing in the near future
• The Select Board has determined housing should be included on at least one of these
properties
HOUSING
Town Context
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 62
• Goal 1: Increase and diversify year-round housing options in Brewster for a range of
income levels and housing types
• Goal 2: Prevent displacement of current residents and facilitate housing mobility for
households looking to move within or into Brewster.
• Goal 3: Align development with the principles of the Town’s Local Comprehensive
Plan/Vision Plan. This includes balancing housing goals with protection of the natural
environment.
• Goal 4: Continue to build capacity to produce housing through staffing, funding, regional
partnerships, advocacy and education, and relationships with nonprofit and for-profit
developers.
Housing Goals
BREWSTER HOUSING PRODUCTION PLAN 2022-2027
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 63
HOUSING
Community Feedback
• There was mixed feedback regarding housing on t he Pond Property:
• Many feel strongly that new affordable housing should be located
on the Pond Property
• Many feel that housing does not belong on the Pond Property,
mostly due to a sense t hat housing is in conflict wit h conservation
goals and with Zone II regulations
• Zone II regulations do not preclude t he development of housing and associated
infrastructure, however Zone II is intended to protect t he Town’s drinking water
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 64
Pond Property Context
LONG POND PROPERTY
BAY PROPERTY
CAPE COD BAY
LONG POND
SPRUCE HILL PARCEL
NICKERSON STATE PARK
LONG POND WOODLANDS
NAMSKAKET MARSH
PUNKHORN PARKLANDS
ELLIS LANDING
LOWER RD CONSERVATION AREA
NO BOTTOM POND SANCTUARY
SHEEP POND WOODLANDS
BREWSTER WATER SUPPLY LANDS
FREEMAN’S FIELDS
MILLSTO N E R O A D
MA IN S T R E E T / R O U T E 6 A
LONG POND R
O
AD / ROU T E 1 3 7
C A PE C O D RA IL TRAILPOND PROPERTY
CAPE COD BAY
LONG POND
LONG POND PROPERTY:
HOUSING DESIGNATED AREA:
THE HOUSING DESIGNATED AREA IS 15% OF THE POND PROPERTY
POTENTIAL
HOUSING
AREA
66 ACRES
10 ACRES
POND HOUSING ANALYSIS
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 65
Site Analysis and Principles
ENTRANCE BUFFER -
50FT SETBACK
*considered setbacks are
not an
LOT EDGES -
40 FT SETBACK
LOT EDGES -
150 FT SETBACK
ENTR
A
N
C
E
D
R
I
V
E
POTENTIAL
DEVELOPMENT
ZONE
LOW POINT
POTENTIAL
DEVELOPMENT
ZONE
POTENTIAL
DEVELOPMENT
ZONE
LOW POINTLONG P
O
N
D
R
O
A
D
LONG
POND
POTENTIAL
HOUSING AREA
The area designated
for housing implements
forest buffers and
Scenarios based on
approximately 48 Units
(90 beds)
Contemplated year
round housing with new
construction.
Group or individual
parking is considered
depending on dwelling
type and configuration.
Wastewater requirements
are being considered
and new package
plant may treat other
residences in the
surrounding area.
F
O
R
E
S
T
B
U
F
F
E
R
FOREST B
U
F
F
E
R
FOR
E
S
T
B
U
F
F
E
R
FORES
T
B
U
F
F
E
R
POND HOUSING ANALYSIS
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 66
Matrix
DETACHED SINGLE UNITS
UNIT COUNT
PARKING
UNIT SIZE
DETACHED SINGLE UNITS TOWN HOMES
SHI
BEDS
PERCENT
BUFFER ZONE
88 TOTAL BEDS
44 UNITS
66 GROUP
1000 sf town homes
44 UNITS
59%
32 UNITS
32 TOTAL INDIVIDUAL
1200 sf
32 UNITS
64 TOTAL BEDS
52%
48 UNITS
18 INDIVIDUAL, 45 GROUP
450 sf studio, 700 sf one bedroom,
1200 sf detached single family
48 UNITS
66 TOTAL BEDS
49%
*of Housing
Designated Area
POND ILLUSTRATIVE HOUSING SCENARIOS
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 67
ROUTE 1
3
7
Detached Single Units
ENTR
A
N
C
E
D
R
I
V
E
LONG P
O
N
D
R
O
A
D
Habitat for Humanity Housing, Brewster, MA
Detached single family
housing.
LONG
POND
POTENTIAL
HOUSING AREA
UNIT COUNT
PARKING
UNIT SIZE
SHI
BEDS
*of Housing
Designated Area
32 UNITS
32 TOTAL INDIVIDUAL
1200 sf
32 UNITS
64 TOTAL BEDS
52%6,800 SF LOT
STUDIO
ONE BEDROOM
SINGLE-FAMILY
MULTI-UNIT
COMMUNAL AMENITIES
PERCENT
BUFFER ZONE
NEW BUILD YEAR-ROUND
POND ILLUSTRATIVE HOUSING SCENARIOS
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 68
48 UNITS
450 sf studio, 700 sf one bedroom,
1200 sf detached single family
48 UNITS
66 TOTAL BEDS
49%
Detached Single Units
SMALL 450 SF - 700 SF UNITS
ACCESSED BY
PEDESTRIAN PATHS WITH
GROUP PARKING
DETACHED SINGLE FAMILY
HOUSES WITH INDIVIDUAL
PARKING
ENTR
A
N
C
E
D
R
I
V
E
LONG P
O
N
D
R
O
A
D
NYS Cabins, Long Island, NY
A greater quantity of smaller
units and single family
housing are considered.
LONG
POND
+
UNIT COUNT
PARKING
UNIT SIZE
SHI
BEDS
6,800 SF LOT
1,120 SF LOT
PERCENT
BUFFER ZONE
STUDIO
ONE BEDROOM
SINGLE-FAMILY
MULTI-UNIT
COMMUNAL AMENITIES
NEW BUILD YEAR-ROUND
POTENTIAL
HOUSING AREA
*of Housing
Designated Area
18 INDIVIDUAL, 45 GROUP
POND ILLUSTRATIVE HOUSING SCENARIOS
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 69
88 TOTAL BEDS
44 UNITS
66 GROUP
1000 sf town homes
44 UNITS
59%
Town Homes
Brewster Woods, Brewster, MA
LONG
POND
A low density configuration
of town houses with group
parking.
17,600 SF LOT
STUDIO
ONE BEDROOM
SINGLE-FAMILY
MULTI-UNIT
COMMUNAL AMENITIES
NEW BUILD YEAR-ROUND
POTENTIAL
HOUSING AREA
ENTR
A
N
C
E
D
R
I
V
E
LONG P
O
N
D
R
O
A
D
UNIT COUNT
PARKING
UNIT SIZE
SHI
BEDS
PERCENT
BUFFER ZONE
*of Housing
Designated Area
POND ILLUSTRATIVE HOUSING SCENARIOS
TOWN OF BREWSTER SEA CAMPS, BREWSTER MA REED HILDERBRAND 70
DETACHED SINGLE UNITS
UNIT COUNT
PARKING
UNIT SIZE
DETACHED SINGLE UNITS TOWN HOMES
SHI
BEDS
PERCENT
BUFFER ZONE
88 TOTAL BEDS
44 UNITS
66 GROUP
1000 sf town homes
44 UNITS
59%
32 UNITS
32 TOTAL INDIVIDUAL
1200 sf
32 UNITS
64 TOTAL BEDS
52%
48 UNITS
18 INDIVIDUAL, 45 GROUP
450 sf studio, 700 sf one bedroom,
1200 sf detached single family
48 UNITS
66 TOTAL BEDS
49%
*of Housing
Designated Area
Matrix
POND ILLUSTRATIVE HOUSING SCENARIOS
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 71
• You will be randomly assigned to a Breakout Room
• Each room will include a Facilitator from the Town
Staff and a member of the Design Team
• Raise your Zoom hand if you have a comment and t he
facilitator will call on you
• Please keep yourself on mute when you are not
speaking
• Use the chat to add comments!
• After 40 minutes you will be sent back to our main
room for closing remarks
BREAKOUT ROOMS DISCUSSIONS (40 MINUTES)
Have project-related feedback?
Send your thoughts to the Design Team!
BrewsterSeaCamps@gmail.com
The comment period will be open through December 10th.
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 72
NEXT STEPS
• Continue to refine comprehensive plans based on community feedback
• Share refined comprehensive plans at f inal forum in early 2024
• Outline options for project f inancing and determine phased approach to project
implementation
REED HILDERBRANDTOWN OF BREWSTER SEA CAMPS, BREWSTER MA 73
Thank you!
Project Updates
https://www.brewster-ma.gov/cape-cod-sea-camps-properties
Committee Meetings
Bay Property: Twice a month Tuesdays 4-6pm
Pond Property: Twice a month Wednesdays 4-6pm
Future Forum
February 2024, stay tuned for the date!
Town Meeting Vote
May 2024
Have project-related feedback?
Send your thoughts to the Design Team!
BrewsterSeaCamps@gmail.com
The comment period will be open through December 10th.
HOW TO STAY UP TO DATE WITH OUR PLANNING
Former .22 Caliber Shooting Range
3057 Main Street, Brewster, MA 02631
Cr
Enter the name of the Project Lead in cell B3. Enter the Project Start date in cell E3. Pooject Start: label is in cell C3.Th
e
Dis DISPLAY WEEK 1
Cel
ls 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3Thi
s
ro TASK DURATION PROGRESS START END M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
BID DUE 1 100%11/29/23 11/29/23
NOTICE OF AWARD 1 100%12/4/23 12/4/23
CONTRACT EXECUTION 1 100%12/5/23 12/5/23
NOTICE TO PROCEED 1 100%1/2/24 1/2/24
Pre-Construction Meeting 1 0%1/4/24 1/4/24
Submittals & Disposal Facility Review/Approval 19 0%1/8/24 1/26/24
Mobilization 1 0%2/5/24 2/5/24
Building Demolition & C&D Removal 4 0%2/6/24 2/9/24
Soil Excavation & Removal 4 0%2/12/24 2/15/24
Site Restoration & Demobilization 1 0%2/16/24 2/16/24
Substantial Completion (March 2, 2024)1 0%3/2/24 3/2/24Th
is
ro
Mon, 1/1/2024
Jan 1, 2024 Jan 8, 2024 Jan 15, 2024 Jan 22, 2024 Feb 19, 2024Jan 29, 2024 Feb 5, 2024 Feb 12, 2024 Feb 26, 2024
BRIGHTER HORIZONS ENVIRONMENTAL CORPORATION UPDATED: 1/4/2024
Archive d: Friday, January 5, 2024 4:03:31 PM
From: Elton Cutler
Se nt: Wed, 6 Dec 2023 17:35:46 +0000Authentication
To: Peter Lombardi
Cc: Amanda Bebrin
Subje ct: FW: COA - 50th Anniversary
Se nsitivity: Normal
Hi Pete r,
Yes - I sent a request on 12/4 to BPPC emai l (see below), after aski ng Amanda of what she felt they nee ded to get it on their agenda, I believe she said, i t will be on January’s meeti ng
agenda.
Let me know if I ne ed to do something else.
Thank you,
E
From: Elton Cutler
Sent: Monday, December 4, 2023 10:40 AM
To: bppc <bppc@brewster-ma.gov>
Subject: COA - 50th Annive rsary
Dear BPPC Board Members,
The Brewster COA wi ll be turni ng 50 years ol d on June 10, 2024
We are a pl anning a Town-Wide 50th Celebration (1974 – 2024).
At thi s time, we are requesting to have the cel ebrati on on the Bay Property (Sea Camps).
On Saturday, June 8th from 10:00 AM to 2:00 PM
Parking – lower/front field for parking area
Tent – upper field ne xt to Admin. Building (50’ x 140’ tent)
The Brewster Historical Society woul d like to use the Arts Center Building to display over 400 sli de i mages of Brewster’s past. We wil l also be displ aying a living legacy of Brewste r Elders
under the tent.
Music-Food-Fun- and Games on the grass with the Recreation Department.
This is an age -friendly event, and all Brewster Resi dents are wel come to attend.
We are not sure of attendance numbers possibly 150 to 300 folks to attend this event.
Thank you,
Elton
Elton R. Cutler, Director
Brewster Council on Aging
1673 Main Street I Brewster, MA 02631
508-896-2737 I ecutler@brewster-ma.gov
“Life is simply better when there's community!”
This electronic message is confidential and intended for the named recipient(s) only. If you received this message in error, please contact the sender and delete the copy you received. When responding, please be advised that the Office
of the Secretary of State has determined that e-mail is a public record. Thank you.
Town of Brewster
2198 Main Street
Brewster, MA 02631-1898
Phone: (508) 896-3701
Fax: (508) 896-8089
BPPC 11.14.2023 www.brewster-ma.gov Page 1 of 5
MINUTES OF THE BAY PROPERTY PLANNING COMMITTEE MEETING
DATE: November 14, 2023
TIME: 4:00 PM
PLACE: Hybrid Participation – Zoom/2198 Main Street, Brewster, MA
PARTICIPANTS: Town Manager Peter Lombardi, Chair Amanda Bebrin, Selectperson Mary Chaffee,
Selectperson David Whitney, Karl Fryzel, Katie Jacobus, Caroline McCarley, Thomas Wingard, Patricia Hughes,
Peter Johnson, John Phillips (remote), Clare O’Connor-Rice; Liaisons/Representatives: Jan Crocker, Bill
Meehan, Kathleen Walker, Sharon Tennstedt, Gary Christen; Town Staff: Mike Gradone (Recreation
Department Director), Griffin Ryder (DPW Director); Reed Hilderbrand Consultants: Elizabeth Randall,
Madeleine Aronson
Call to Order, Declaration of a Quorum, Meeting Participation Statement and Recording Statement:
Amanda Bebrin called the meeting to order at 4:00 pm. Ms. Bebrin read the meeting participation and
recording statements. Ms. Bebrin announced all members of the committee who were present, a quorum
was declared. There were no public announcements or comments.
Public Announcements and Comments
None
Review and Discuss Updated Plans, Pricing and Forum #3 – Reed Hilderbrand
Elizbeth Randall shared an update on the current plans that the Town and Reed Hilderbrand are planning on
sharing at the next community forum. Ms. Randall shared her screen and identified the current phase of the
process – comprehensive planning. The agenda for the third community forum was then reviewed – an 8-
minute orientation, 40 minutes discussing the bay property, 5 minutes on partnerships, 30 minutes
discussing the pond property, and then 30 minutes of breakout room discussions. Conclusions and next steps
will form the final 5-minute portion of the forum.
Selectperson Chaffee said that the work of Reed Hilderbrand continues to be impressive and of a high level.
Selectperson Chaffee expressed concerns with the design structure and purpose – breakout rooms should
not be done because residents who simply want to watch cannot, in addition to the fact that there is an
increased risk of technical difficulties. Selectperson Chaffee said that a Q&A session might be more
appropriate. Town Manager Peter Lombardi responded that there is a lot of information to convey to
residents, and it is important for them to have an opportunity for discussion, particularly given the number
of people who are expected to attend. Mr. Lombardi added that the individual breakout sessions will all be
recorded.
Town of Brewster
2198 Main Street
Brewster, MA 02631-1898
Phone: (508) 896-3701
Fax: (508) 896-8089
BPPC 11.14.2023 www.brewster-ma.gov Page 2 of 5
Karl Fryzel asked if it would make any sense to have some period of Q&A prior to the breakout sessions. Mr.
Lombardi responded that logistically this might be challenging given the large number of attendees. Ms.
Randall agreed that this would be too unwieldy.
Ms. Randall said that the presentation of the plan will be explained within the context of where the last
forum finished. It will show the framework for the individual neighborhoods. Building reuse will also be
discussed – the fact that only a limited number of buildings are viable for reuse. Parking and circulation will
also be discussed, in addition to pricing. Mr. Lombardi briefly outlined a number of parts of the plans that
have been adjusted since the last version that was shown to the committee.
Peter Johnson said he was pleased to see how the plan was evolving, with the exception of the community
garden, which he felt should be removed from the plans – he does not feel as though this is an appropriate
location for a new community garden, which the Town needs. Pat Hughes asked if the pollinator garden
reduces the ability for vehicles to park on the grass. Ms. Aronson responded that there are 120 spots of
overflow parking currently in the plans – if the Town needs to mow the meadow to create more parking for a
major event, then this can be done. Clare O’Connor-Rice said that the question of mowing a pollinator
garden would put the Town in an awkward position, and she also believes that the bay property is not an
appropriate location for a community garden.
Selectperson Chaffee said that the use of the word “private entrance” on the plans should be changed. In
terms of the overall plan, she is opposed to locating a community garden in this area. Selectperson Chaffee
said that there is no obvious demand from the public for such an amenity. Community gardens are functional
and messy, and they are not a good fit for the Sea Camps. Furthermore, she mentioned that the tennis
courts should be considered a possible amenity to be phased in at some point, if indeed they should even be
at that location.
Mr. Fryzel asked to hear from the consultants on the community gardens, in light of the opposition from
some committee members. Ms. Aronson responded that among the guiding principles were strong support
for demonstrating sustainability and restoration of ecological function. The current large expanse of lawn
serves no ecological function, and both a pollinator meadow and community gardens would increase the
health and habitat of the area. Both have the potential to be aesthetically attractive. Community gardens
also provide an activity for all ages. It is important to remember that these are general concepts and not
final. In terms of tennis, the proposed location makes sense – it is close to existing parking on a flat space in a
clearing that would require minimum grading. Mr. Fryzel noted that he would like it emphasized during the
forum the different amenities that would be available to residents in a community center as opposed to a
community campus.
Katie Jacobus asked if some portion of the arrival fields could be landscaped to continue to facilitate hosting
large events. Ms. Jacobus also noted she was concerned that the community gardens would have an
exclusive use by the people the lots are assigned to, which is in contrast to the inclusive nature of the rest of
Town of Brewster
2198 Main Street
Brewster, MA 02631-1898
Phone: (508) 896-3701
Fax: (508) 896-8089
BPPC 11.14.2023 www.brewster-ma.gov Page 3 of 5
the property. Caroline McCarley said that the introduction of tennis courts on the bay property seems
reasonable if the plan is for additional pickleball courts at the Stony Brook location.
Ms. O’Connor-Rice said that the gate currently at the entrance might need to be moved in order to allow
residents from other Towns to access certain areas of the property. Mr. Lombardi said that there needs to be
a conversation about the future of the gate and the gatehouse at the property. The committee needs to
make this decision about this before the fourth forum.
Janet Crocker said that young people are interested in pollinator gardens and the holistic uses of land. It will
be important to get more opinions from younger people about the future use of the property. Ms. Crocker
also said that it is important to remember that the lawn on the property has not always been a lawn.
Selectperson Chaffee said that the current lawn is not manicured, but is a tough and functional Cape Cod
lawn. It currently provides a lot of use flexibility, and with the likely future construction of a community
center, the ability to accommodate additional parking on the property will be very important.
Ms. Jacobus asked Mr. Gradone to provide his analysis of the current demand for tennis in Brewster, both in
terms of adults and youth programming. Mr. Gradone responded that there are roughly 50 people in the
senior tennis group, who fill 3-4 courts during their playing slot times. Other than that, the courts are
generally not full. The Town also runs in-house programs and works with USTA to run some programming in
the spring. Mr. Lombardi added that the Recreation Department will likely be based out of the bay property
in the future, due to the amenities that currently exist there.
Mr. Fryzel said it was important to focus on the desired amenities on the property, and not to fixate on their
location. Mr. Lombardi and Ms. Randall responded that there is a rationale behind where these amenities
are located on the current plans, and swapping their locations is not particularly straightforward at this
point.
Ms. Randall displayed the preliminary draft pricing for the current plans. The total cost is $34,204,000 before
markups, and $53,000,000 after markups – this pricing includes a community center. Ms. Randall then
displayed the preliminary draft pricing of a community campus instead of a community center, which is
$16,914,000 before markups. Mr. Lombardi added that this scenario would not be able to facilitate the same
kinds of activities as a community center.
Thomas Wingard noted that there are a lot of variables in terms of septic and water, and it is important to
include a number for this at the next forum. Mr. Lombardi responded that this estimated number will be
shared at the next forum. Ms. McCarley noted her surprise that the figure provided for renovation costs was
not larger given that it includes the administration building. Selectperson Chaffee asked if the pricing listed
for the new nature center has been discussed with Mass Audubon. Mr. Lombardi responded that this
information has been shared with Mass Audubon.
Town of Brewster
2198 Main Street
Brewster, MA 02631-1898
Phone: (508) 896-3701
Fax: (508) 896-8089
BPPC 11.14.2023 www.brewster-ma.gov Page 4 of 5
Selectperson Chaffee again raised her concern with the inclusion of the community gardens on the plans –
she does not believe that there is adequate justification for moving forward with this proposed amenity on
the plans. Selectperson Chaffee moved to remove the community gardens from the proposed design to be
presented at the next forum. Pat Hughes seconded the motion for discussion. Ms. Bebrin said that she
believes there are specific audiences for everything that is on the plan, and she is concerned that removing
the gardens because there is a specific set of people who will be using it could potentially lead to other uses
being removed from the plans, such as housing. Mr. Fryzel asked if it was the case that the assignment of
these community garden spots is set forever, or if it will rotate. Mr. Lombardi responded that this has not yet
been decided. Mr. Johnson said that there should be a community garden in town, and that voting to
remove community gardens from these plans does not mean that there will not be a new community garden
created in another location. A roll call vote was taken. Clare O’Connor-Rice – yes, Selectperson Whitney – no,
Pat Hughes – no, Karl Fryzel – no, Caroline McCarley – no, Katie Jacobus – no, Thomas Wingard – yes,
Amanda Bebrin – no, John Phillips – yes, Peter Johnson – yes, Mary Chaffee - yes. The motion failed.
Ms. Jacobus said that she felt the number of buildings to be renovated (32), seems a little high in the context
of re-use potential. Ms. Randall responded that there was a little discrepancy in terms of the numbers, but
this will be straightened out. Ms. Jacobus also said it was important to explain the proposed size of the
community center relative to the site and the Harwich Community Center. Mr. Fryzel stated that the cost of
renovating the administration building should be separated from the other buildings at the next forum.
Ms. Bebrin thanked Ms. Randall and her Reed Hilderbrand colleagues for their work on these materials.
Review Upcoming Approved Interim Uses and Vote on Proposed New Interim Uses
Ms. O’Connor-Rice noted that, last year, a wreath decorating event was held by the Cultural Council in
partnership with the Recreation Department. This year, it is planned to take place on Sunday December 3 at
the Arts Center on the Bay Property from 1pm-4pm.
Ms. Hughes moved to approve holiday wreath decorating at the Arts Center on Sunday December 3 from
1pm-4pm. Ms. Jacobus second. A roll call vote was taken. Clare O’Connor-Rice – yes, Selectperson Whitney –
yes, Pat Hughes – yes, Karl Fryzel – yes, Caroline McCarley – yes, Katie Jacobus – yes, Thomas Wingard – yes,
Amanda Bebrin – yes, John Phillips – yes, Peter Johnson – yes, Mary Chaffee - yes.
Vote on Meeting Minutes: October 17, 2023
Ms. O’Connor-Rice moved to approve the meeting minutes from October 17, 2023. Ms. Hughes second. A
roll call vote was taken. Clare O’Connor-Rice – yes, Selectperson Whitney – yes, Pat Hughes – yes, Karl Fryzel
– yes, Caroline McCarley – yes, Katie Jacobus – yes, Thomas Wingard – yes, Amanda Bebrin – yes, John
Phillips – yes, Peter Johnson – yes, Mary Chaffee - yes.
Discuss Future Meeting Agenda Items
Mr. Fryzel asked when the committee would meet to discuss the results of the upcoming forum. Mr.
Lombardi responded that the committee would meet on Tuesday, January 9 to discuss this. The meeting on
Town of Brewster
2198 Main Street
Brewster, MA 02631-1898
Phone: (508) 896-3701
Fax: (508) 896-8089
BPPC 11.14.2023 www.brewster-ma.gov Page 5 of 5
December 18 will concern the community pool. Thursday, February 8 is tentatively penciled in for the final
community forum.
Next Meetings
December 18, 2023 (Joint with Select Board and Recreation Commission).
Matters Not Reasonably Anticipated by the Chair:
None
FYIs
Mr. Gradone thanked committee members for approving the activities that took place at the bay property
over the fall – Run Club and Outdoor Club were huge successes. Also, Mr. Gradone attended the last
Bikeways Committee meeting, and he expects they will come before the committee at some point to request
approval to hold Bikefest on the bay property.
Bill Meehan said that he has not been receiving packet materials, and asked if this could be rectified so he
could share the materials with the Finance Committee. Mr. Lombardi said he would look into this.
Adjournment
Mr. Fryzel moved to adjourn at 5.37 pm. Ms. Jacobus second. A roll call vote was taken. Clare O’Connor-Rice
– yes, Selectperson Whitney – yes, Pat Hughes – yes, Karl Fryzel – yes, Caroline McCarley – yes, Katie Jacobus
– yes, Thomas Wingard – yes, Amanda Bebrin – yes, John Phillips – yes, Peter Johnson – yes, Mary Chaffee -
yes.
Respectfully submitted by Conor Kenny, Project Manager
Approved: __________________ Signed: _________________________________________
Accompanying Documents in Packet: Agenda, Presentation Slides, Drummer Boy Comparison, Flyer Community Forum 3, Board
Community Forum 3, Community Forum 3 Assignments, Wreath Making, 10.17.23 Minutes Draft, PPPC Meeting Slides
Town of Brewster
2198 Main Street
Brewster, MA 02631-1898
Phone: (508) 896-3701
Fax: (508) 896-8089
BPPC 12.18.2023 www.brewster-ma.gov Page 1 of 3
MINUTES OF THE BAY PROPERTY PLANNING COMMITTEE MEETING (JOINT WITH SELECT BOARD)
DATE: December 18, 2023
TIME: 5:30 PM
PLACE: Hybrid Participation – Zoom/2198 Main Street, Brewster, MA
PARTICIPANTS: Selectperson Chaffee, Selectperson Hoffmann, Selectperson Whitney, Selectperson Bingham,
Town Manager Peter Lombardi, Mike Gradone (Recreation Director), Bay Property Planning Committee and
Recreation Commission Members: Amanda Bebrin, Katie Jacobus, Kary Fryzel, Caroline McCarley, Tom
Wingard, Roland Bassett
Call to Order, Declaration of a Quorum
Bay Property Planning Committee Chair Amanda Bebrin called the meeting to order at 6:25pm, declared a
quorum and completed a roll call.
Debrief on Summer 2023 Brewster Community Pool & Discuss Recommendations for Summer 2024- Joint
Meeting with Bay Property Planning Committee & Recreation Commission (Select Board FY24-25 Strategic
Plan Goal SC-1)
Mr. Lombardi stated that the Town set realistic expectations on opening a community pool and tried our
best to keep things simple in the first year to be able to build on success. Throughout the season we
gathered data and acknowledged the complications and constraints that the Town was faced with. The Town
had a fantastic season with great programming for our residents. Previously data was shared about year one,
looking at lessons learned and receiving feedback for improvements.
Recreation Director, Mike Gradone provided a recap of the 2023 Season and provided the following
recommendations for 2024:
Pool Opening and Closing dates: June 15, 2024 – August 18, 2024 (extending the season by at least
one week). The Town is unable to keep the season longer due to staffing constraints as most
lifeguards leave in mid-August.
Hours of Operation: 7 days a week from 6am – 6pm (continue with closure on Wednesday mornings
for chlorine treatment).
New offer of private pool rentals on Friday and Saturday evenings from 6pm – 8pm.
Eligibility to continue for Brewster residents only and include:
o Allow non-resident Town/School employees to purchase passes (similar benefit currently in
place for beach, shellfish, and Recycling center permits)
Programing will be similar to the 2023 season, with the following additions:
o Start lap swim one hour earlier
o Expand swim lesson classes and options to almost double for 2024 and remove pool
membership requirement for swim lesson participants
o Add more water aerobics classes
Town of Brewster
2198 Main Street
Brewster, MA 02631-1898
Phone: (508) 896-3701
Fax: (508) 896-8089
BPPC 12.18.2023 www.brewster-ma.gov Page 2 of 3
Mr. Lombardi reviewed that Town Meeting last fall approved a new revolving fund to manage pool revenues
and expenses with $200K for startup costs and $250K for the pool parking lot. The 2023 expenses included:
Estimated operating expenses was $125K, actual operating expenses was $100,676 (does not include
gatekeepers who have been funded through American Rescue Plan Act funds which will not continue
forever and will eventually come online).
A part-time administrative assistant was hired at the Recreation Department, the peak season costs
are incorporated in the actual expenses. Ultimately will be a cost that the Town will have to account
for.
Year 1 start-up expenses were estimated at $75K, actual expenses were $69,351.
Balance of $29,972 in start-up funds which has now been allocated to cover offseason capital.
Of the $250K for the parking lot project, less than $70K was used due to Department of Public Works
in house services, $150K of the funds have been reappropriated to the Millstone Road Improvement
project. We have a balance of $32,258.
Mr. Lombardi then reviewed the 2023 pool revenues which came in at a little over $113K in total revenues,
with the largest percentage of pool memberships purchased were family memberships. The remainder were
evenly split over the other four categories (individuals, individuals +1, seniors, and seniors +1). We sold over
350 guest passes, we originally worried about hitting the 100-swimmer threshold, but quickly realized we
would have capacity to allow for more guests. We allowed residents to purchase up to 20 guest passes and
didn’t run into any issues. The Town held four drop-in days, these were not as well attended as anticipated,
as we sold about 180 passes. The Town will have a little over $100K in the pool revolving fund for next year.
Mr. Lombardi stated that for the 2024 season, the Town recommends keeping the same fee structure and
increasing the maximum number of guests passes to 25 per membership. Registration for next year will be
through the MyRec online platform managed by the Recreation Department. We suggest a $250 fee for
private pool rentals for a two-hour period.
In closing Mr. Lombardi thanked those involved in making the 2023 season a success, the Town received
consistent positive feedback from residents about the facility, programs, and staff.
Members of the Bay Property Planning Committee had the opportunity to share their feedback:
Member Fryzel inquired about private party rentals and the limitations and responsibilities. Mr.
Gradone responded that the details are still being worked out, but the fee will cover the operating
expenses.
Member Jacobus is in favor of rentals for potential revenue and asked about lifeguard training if that
would also bring in additional revenue. Mr. Gradone shared that eventually there could be a regional
program that might bring in revenue from other Towns, but as of now the training is for Brewster
staff.
Town of Brewster
2198 Main Street
Brewster, MA 02631-1898
Phone: (508) 896-3701
Fax: (508) 896-8089
BPPC 12.18.2023 www.brewster-ma.gov Page 3 of 3
Recreation Commission member Chris Ellis asked to consider early morning open swim time for families with
young children who are up early, and member Enochty asked to consider swim lessons for children with
special needs.
Adjournment
Bay Property Planning Committee member Fryzel motioned to adjourn; member Jacobus seconded the
motion. A roll call vote was taken. Member Jacobus- yes, member Fryzel- yes, member Chaffee-yes, member
Whitney-yes, member McCarley-yes, member O’Conor Rice-yes, Wingard-yes, Chair Bebrin-yes. The vote
was 8-Yes, 0-No.
Respectfully submitted by Conor Kenny, Project Manager
Approved: __________________ Signed: _________________________________________
Accompanying Documents in Packet: Agenda, Brewster Community Pool Information