HomeMy Public PortalAboutCPC Packet 011024
Town of Brewster
Community Preservation Committee
2198 Main St., Brewster, MA 02631
cpcmeeting@brewster-ma.gov
(508) 896-3701
COMMUNITY PRESERVATION COMMITTEE MEETING AGENDA
2198 Main Street
January 10, 2024 at 4:00 PM
This meeting will be conducted in person at the time and location identified above. This means that at least a quorum of the
members of the public body will attend the meeting in person and members of the public are welcome to attend in person as
well. As a courtesy only, access to the meeting is also being provided via remote means in accordance with applicable
law. Please note that while an option for remote attendance and/or participation is being provided as a courtesy to the
public, the meeting/hearing will not be suspended or terminated if technological problems interrupt the virtual
broadcast or affect remote attendance or participation, unless otherwise required by law. Members of the public with
particular interest in any specific item on this agenda, which includes an applicant and its representatives, should make pla ns
for in-person vs. virtual attendance accordingly.
Phone: Call (312) 626 6799 or (301) 715-8592. Webinar ID: 837 7728 4808 Passcode: 326439
To request to speak: Press *9 and wait to be recognized.
ZoomWebinar: https://us02web.zoom.us/j/83777284808?pwd=NjB3WldRTGRxb0l0WXhIS1J0Y1NOQT09
Passcode: 326439
To request to speak: Tap Zoom “Raise Hand”, then wait to be recognized.
When required by law or allowed by the Chair, persons wishing to provide public comment or otherwise participate in the
meeting, may do so by accessing the meeting remotely, as noted above. Additionally, the meeting will be broadcast live, in real
time, via Live broadcast (Brewster Government TV Channel 18), Livestream (livestream.brewster-ma.gov), or Video
recording (tv.brewster-ma.gov).
Please note that the CPC may take official action, including votes, on any item on this agenda.
1. Call to Order
2. Declaration of a Quorum
3. Meeting participation statement
4. Recording Statement: As required by the Open Meeting Law we are informing you that the Town
will be video and audio taping as well as broadcasting this public meeting. In addition, if anyone else
intends to either video or audio tape this meeting they are required to inform the chair.
5. Public Announcements and Comment: Members of the public may address the CPC on matters
not on the meeting’s agenda for a maximum of 3-5 minutes at the Chair’s discretion. The CPC
will not reply to statements made or answer questions raised during public comment but may add
items presented to a future agenda.
6. Financial Update
7. Discussion on how to handle cost overages on projects.
8. Discussion and possible vote on funding recommendations for Schoolhouse #3 project addition
funding request from the Brewster Historical Society.
9. Project updates
10. Approval of minutes
11. Matters Not Reasonably Anticipated by the Chair
12. Announcements
13. Next Meeting: January 24th at 4pm
14. Adjournment
Date Posted: Date Revised: Received by Town Clerk:
Community
Preservation
Committee
Sarah Robinson
Chair
Faythe Ellis
Vice Chair
Sharon Marotti
Treasurer
Elizabeth Taylor
Clerk
Roland Bassett, Jr.
Christine Boucher
Bruce Evans
Peggy Jablonski
Paul Ruchinskas
CPC Assistant
Beth Devine
Community Preservation Committee: FY24 Forecast as of 12/6/2023
3,624,053$
1,223,691$
358,153$ 1,581,844$ 0
1,581,844$
Pre FY24 FY24
10%10%10%
Open Space Housing Historical
$ 2,002,817 $ 144,789 $ 301,854 $ 1,174,593 3,624,053.22$
$ 158,184 $ 158,184 $ 158,184 $ 1,107,291 1,581,844.03$
$ 2,161,001 $ 302,973 $ 460,039 $ 1,174,593 $ 1,107,291 5,205,897.25$
Open Space Housing Historical
$ (49,050)
$ (94,400)
$ (46,183)
(79,092)$
Spring 2024 Town Meeting Approved
(70,580)$
107 Main St, Orleans (55,000)$
Juniper Hill, Wellfleet (55,000)$
FORWARD Phase 2 (125,000)$
Accessible Outdoor Furniture (9,670)$
Millstone Road - POAH (507,500)$
Buydown Program - Housing Trust (255,000)$
(1,346,475)$
3,859,422.04$
Total YTD Obligations - fy24 $ (189,633) $ - $ - $ (1,077,750) $ (79,092)
$ 1,971,368 $ 302,973 $ 460,039 $ 96,843 $ 1,028,199 3,859,422.04$
Total net available from all accounts
[5] Allocated funds from the revised funding allocation method voted on at town meeting in the Spring of 2023. New allocation is 70% for Undesignated Fund Balance
FY-24 Estimated Funds available
FY-23 Estimated total balance forwarded [1]:
FY-24 Estimated local tax revenue:
FY-24 Estimated State contribution [2]:
Total FY-24 Estimated funds available:
Undesignated Fund
Balance [4]
Undesignated Fund
Balance [5]
FY-23 Actual Unreserved Fund Balance with Original
Match(4)
FY-24 Estimated revenue
fy24 Estimated Unreserved Fund Balance as of 12/6/23
with Adjustments
FY-24 obligations as of 12/6/23
BBJ Property Bond #1
BBJ Property Bond #2
Bates Property Bond
Administration Expense [3]
Housing Coordinator
[1] Balance forwarded estimated from prior year includes all unallocated funds, including unspent amounts from projects and budgeted administrative and professional
{4{ Balance forwarded for all unallocated funds in the previous "Budgeted for Unreserved Funds" account, which contained funds using the Pre-FY24
allocation method
(2) State Match revenue is projected at 30%
[3] Administrative expenses are limited by law to 5% of the total CPC budget and include primarily payroll costs, legal and other professional
Coalition dues.
BONDS
BONDS
Community Preservation Committee: FY25 Forecast as of 12/20/2023
3,859,422$
1,254,283$
250,857$ 1,505,140$
1,505,140$
Pre FY24 FY24
10%10%10%
Open Space Housing Historical
$ 1,971,368 $ 302,973 $ 460,039 $ 96,843 $ 1,028,199 3,859,422.04$
$ 150,514 $ 150,514 $ 150,514 $ 1,053,598 1,505,140.08$
$ 2,121,882 $ 453,487 $ 610,553 $ 96,843 $ 2,081,797 5,364,562.13$
Open Space/Rec Housing Historical
$ (47,025)
$ (90,800)
$ (44,783)
(75,257)$
Spring Town Meeting Submitted
Housing Coordinator -74589
Cape Housing Institute -20000
Finch Skateboard Park -7500
Schoolhouse #3 -148400
Total YTD Obligations - fy25 $ (190,108) $ - $ (148,400) $ (94,589) $ (75,257)(508,354.00)$
$ 1,931,774 $ 453,487 $ 462,153 $ 2,254 $ 2,006,540 4,856,208.12$
Total net available from all accounts
[5] Allocated funds from the revised funding allocation method voted on at town meeting in the Spring of 2023. New allocation is 70% for Undesignated Fund Balance
{4{ Balance forwarded for all unallocated funds in the previous "Budgeted for Unreserved Funds" account, which contained funds using the Pre-
FY24 allocation method
Administration Expense [3]
FY25 Estimated Unreserved Fund Balance as of 12/6/2023
with Adjustments
[1] Balance forwarded estimated from prior year includes all unallocated funds, including unspent amounts from projects and budgeted administrative and professional
(2) State Match revenue is projected at 20%
[3] Administrative expenses are limited by law to 5% of the total CPC budget and include primarily payroll costs, legal and other professional
Coalition dues.
Bates Property Bond
Undesignated Fund
Balance [4]
Undesignated Fund
Balance [5]
FY-24 Actual Unreserved Fund Balance with Original
Match(4)
FY-25 Estimated revenue distribution
FY-25 Estimated Funds available
FY-25 obligations as of 12/6/23
BBJ Property Bond #1
BBJ Property Bond #2
FY-24 Estimated total balance forwarded [1]:
FY-25 Estimated local tax revenue:
FY-25 Estimated State contribution [2]:
Total FY-24 Estimated funds available:
BONDS
BONDS
Warrant Projects by CPA Category Open Space Housing Historical Recreation
Admin/Undesignate
d (4 categories)Revenue Assumption
FY24 Spring TM approved 305,580$ 9,670$ 79,092$ 1,531,897$
FY24 Fall TM approved 762,500$
FY25 Spring Applications 94,589$ 148,400$ 7,500$ 74653 1,493,052$
FY25 Fall
FY26 Spring
FY26 Fall
FY27 Spring
FY27 Fall
Totals -$ 1,162,669$ 148,400$ 17,170$ 153,745$ 3,024,949$
% of revenue 0%38%5%1%5%
Target %30%30%10%10%20%
Description Notes Open Space Housing Historical Recreation
Unallocated
Reserve - Historic,
Rec, Housing
Unallocated
Reserve - all Admin
Carryover
EOY FY22 1,556,879$ 45,370$ 500,351$ 757,756$
Bond expenseFY23-27 (819,837)$
Net amount (A)737,042$ 45,370$ 500,351$ 757,756$ 2,040,519$
Revenue EOY FY23 50/10/10/25/5 906,595$ 181,319$ 181,319$ 472,422$ 71,535$ 1,813,189$
EOY FY24 30/30/10/10/15/5 543,957$ 543,957$ 181,319$ 181,319$ 271,978$ 76,595$ 1,531,897$
FY25 TAP 30/30/10/10/15/5 459,569$ 459,569$ 153,190$ 153,190$ 229,785$ 74,653$ 1,493,052$
FY26 TAP 30/30/10/10/15/5 447,916$ 447,916$ 149,305$ 149,305$ 223,958$ 76,519$ 1,530,378$
FY27 TAP 30/30/10/10/15/5 459,113$ 459,113$ 153,038$ 153,038$ 229,557$ 78,432$ 1,568,638$
Subtotal (B)2,817,149$ 2,091,874$ 818,171$ 636,852$ 472,422$ 955,277$ 377,733$ 7,937,154$
TOTAL available for projects A + B 3,554,191$ 2,137,244$ 1,318,522$ 636,852$ 1,230,178$ 955,277$ 377,733$ 9,977,673$
36%21%13%6%12%10%4%
Notes:1. Annual Revenue increase estimated at 2.5% - to be updated once actual revenue calculated
2. New Allocation targets applied to begin with FY24 revenue.
4. Open Space debt expense FY23-28 deducted from carryover revenue
5. Therefore, Open Space TAP calculated based on same annual revenue estimate as other categories
TARGET ALLOCATION POLICY TRACKING FY24-FY27 (12/20/23)
BACKGROUND ASSUMPTIONS/ CPC BUDGET PROJECTIONS
Housing Trust 5 Year-Plan FY23-27
12.29.22
FY23 FY24 FY25 FY26 FY27
Carryforward Balance 1,195,879 1,190,879 893,879 714,569 1,053,821
Anticipated Revenues 1,891,900 2,870,580 2,344,461 2,519,557 2,425,927
Appropriations 1,896,900 3,167,580 2,523,771 2,180,304 2,567,196
End Balance 1,190,879 893,879 714,569 1,053,821 912,553
FY23 FY24 FY25 FY26 FY27
Projects:Funding Source
Housing Coordinator CPA- Salary Only 66,900 70,580 74,461 78,557 82,877 Benefits paid by the Town-approx. 35K/ year
Housing Program Asst.BAHT Salary Only -42,000 44,310 46,747 49,318 19 Hours- new non-benefitted position
Rental Assistance CPA 150,000 150,000 150,000
Preservaton of SHI Homes CPA 300,000 200,000
Buy Down Program CPA 300,000 300,000
Housing Production Plan CPA 30,000
212 Yankee Drive BAHT 75,000
Town Development of Other Properties BAHT 500,000 500,000
Outside Applications for Funding BAHT 50,000 50,000 50,000 50,000
Millstone Road Community Housing CPA/BAHT 1,000,000
Legal Expenses CPA/BAHT 5,000 5,000 5,000 5,000 5,000
Housing Rehabilitation-Child Care Vouchers CDBG-Regional Grant 1,300,000 1,500,000 1,700,000 1,700,000 1,700,000 Town is lead community for Dennis, Wellfleet and Brewster
Total Appropriations:1,896,900 3,167,580 2,523,771 2,180,304 2,567,196
Sources
Short Term Rentals Allocation 375,000 400,000 420,000 441,000 463,050 Financial Forecast 5% escalator
CPA Housing Coord. Wages 66,900 70,580 74,461 78,557 82,877
CPA Rental Assistance 150,000 150,000 150,000
CPA for SHI Homes -200,000
Proceeds on Re-sale of SHI Homes 150,000
CPA Buy Down 300,000 300,000
CPA Housing Production Plan 30,000
CPA Millstone Rd. Community Housing 250,000
Grants & Donations
Community Development Block Grant (CDBG)1,300,000 1,500,000 1,700,000 1,700,000 1,700,000
Total Revenues:1,891,900 2,870,580 2,344,461 2,519,557 2,425,927
CPA Rev 216,900 820,580 224,461 378,557 262,877
CPA Exp 516,900 570,580 224,461 378,557 262,877 390,675.00 5 year average
Estimated annual CPA revenue 1,492,304 1,529,612 1,567,852 1,607,048 1,647,225
Target Allocation Policy- Housing 30%447,691 458,884 470,356 482,115 494,167
TAP - Open Space 30%447,691 458,884 470,356 482,115 494,167
TAP - Recreation 10%149,230 152,961 156,785 160,705 164,722
TAP- Historic 10%149,230 152,961 156,785 160,705 164,722
CPA Recommended 20%298,461 305,922 313,570 321,410 329,445
1,492,304 1,529,612 1,567,852 1,607,048 1,647,225
Brewster Community Preservation Committee Application Form
Instructions for
Applicants
Before you begin completing the form:
1.Download and save this document under a new name (for
example Projectname.applicant.pdf)*
2.Open your saved document and provide the requested
information.
3.If you need more room for answers/information, feel free
to include additional pages in your submission.
4.Need help, or have questions? Send an email to
cpcmeeting@brewster-ma.gov and we will respond
quickly.
1
Community Preservation Committee Application rev. 09/15/23
Dear Community Members,
The Brewster Community Preservation Committee (CPC)is accepting Community Preservation Act (CPA)
funding applications for:
1.Acquisition, creation, and preservation of Open Space
2.Acquisition, preservation, rehabilitation, and restoration of Historic Resources
3.Acquisition, creation, preservation, rehabilitation, and restoration of land for Recreational use.
4.Acquisition, creation, preservation, and support of Community Housing.
5.Rehabilitation and restoration of Open Space and Community Housing that have been acquired or
created using monies from the fund.
CPA funds may not be used for maintenance or the use of land for a stadium, gymnasium, or similar structure.
For examples of projects and additional information, go to: www.communitypreservation.org.
Applicants should review the Town of Brewster Community Preservation Plan FY23-27 before submitting an
application. An application form and list of selection criteria are attached.
Applications should be submitted by July 1st for the fall meeting or December 1st for the spring meeting, to
allow sufficient CPC review time for potential presentation to the following Brewster Town Meeting.
Interested parties are urged to submit applications as soon as possible. For further information, please contact
any member of the committee.
Thank you,
Faythe Ellis, Chair
Community Preservation Committee
Faythe Ellis, Chair Historical Commission faythe.ellis@outlook.com
Sarah Robinson, Vice Chair Citizen Representative RobinsonFinancialSolutions@comcast.net
Sharon Marotti, Treasurer Citizen Representative sharonmarotti@gmail.com
Elizabeth G. Taylor, Clerk Planning Board egtfarm@gmail.com
Roland W. Bassett, Jr., Member Recreation Commission
Christine Boucher, Member Brewster Housing Authority cb.bb.boucher@gmail.com
Bruce Evans, Member Conservation Commission nanumetbruce@gmail.com
Peggy Jablonski, Member Citizen Representative pegjab@gmail.com
Paul Ruchinskas, Member Citizen Representative pjruch@comcast.net
2
Community Preservation Committee Application rev. 09/15/23
Town of Brewster Community Preservation Committee
Project Eligibility Criteria
Projects must be eligible for Community Preservation Act (CPA) funding according to the requirements
described in the CPA legislation. These requirements include:
Acquisition, creation, and preservation of Open Space
Acquisition, preservation, rehabilitation, and restoration of Historic Resources. (See Secretary of the
Interior Standards for Treatment of Historic Properties for rehabilitation projects)
Acquisition, creation, preservation, rehabilitation, and restoration of land for Recreational use.
Acquisition, creation, preservation, and support of Community Housing
Rehabilitation and restoration of Open Space and Community Housing that have been acquired or
created using monies from the fund
CPA funds may not be used for maintenance or the use of land for a stadium, gymnasium, or similar structure.
For examples of projects and additional information, go to: www.communitypreservation.org.
Applicants must be able demonstrate a clear need for the use of public funds for their project. The CPC may
recommend grants for the planning phase of projects where sufficient information is included in the application
concerning the sources of funding that will be available after the planning phase is completed.
The Brewster Community Preservation Committee (CPC) encourages applications that address as many of the
following general criteria as possible:
Overall CPA goals listed in Town of Brewster Community Preservation Plan FY23-27
Category specific goals listed in Town of Brewster Community Preservation Plan FY23-27
Contribute to the preservation of Brewster’s unique character
Help implement the Vision Plan and other CPC related town planning documents
Enhance the quality of life for Brewster residents
Serve more than one of the four CPA purposes
Save resources that would otherwise be threatened
Serve a currently under-served Town population
Demonstrate practicality and feasibility, and ability to implement within budget
Demonstrate a positive cost/benefit relationship
Leverage additional public and/or private funds
Preserve, enhance, or better utilize existing Town resources
Receive endorsement by other Town committees and the Brewster public at large
3
Community Preservation Committee Application rev. 09/15/23
APPLICATION FOR COMMUNITY PRESERVATION ACT FUNDING
Date Application Submitted: 7/8/22, amended 1/12/22 and 12/23/23
Name of Project Applicant: The Brewster Historical Society, Inc.
Name of Co-Applicant(s), if applicable:
Name of Contact Person: Sally Gunning
Contact Person’s Mailing Address: PO Box 5, Brewster, MA 02631
Contact Person’s Daytime Phone Number: 774-212-6782
Contact Person’s email Address: president@brewsterhistoricalsociety.org
Proposed Project Name: Schoolhouse #3 Relocation and Renovation
Project Address (or assessor’s parcel ID): 2342 Main St. (moving to 51Drummer Boy Rd.)
Project Synopsis:
The Brewster Historical Society proposes to flake Schoolhouse #3 at 2342 Main St. and move it to their
Windmill Village property at 51 Drummer Boy Rd. They will reassemble and restore the school house as a
schoolhouse and include a cranberry industry display, as this was also part of its history. It will be open to the
public during the usual Windmill Village hours, pending Building Dept. permissions.
PLEASE NOTE: OTHER THAN ITEMS IN BOLD AND AMENDMENTS TO COVER SHEET AND
NUMBERS 1, 6, AND 8, THE APPLICATION REMAINS UNCHANGED.
Category: ☐Open Space x☐Historic Preservation ☐Recreation ☐Community Housing
CPA funding requested $ 148,400 Total Cost of Proposed Project $ 495,600
4
Community Preservation Committee Application rev. 09/15/23
PROJECT DESCRIPTION
Please describe your project, answering all of the following questions in the order presented. Applications
will be considered incomplete if all requested information is not provided. Include supporting materials
(maps, diagrams, photos, etc.). Please number pages of application.
Form fields are provided after each question for your convenience. If you need more room, you may
provide additional information via separate documents/attachments at the end of the document. Please
do not provide any documentation via on-line links, as the committee will not be checking for updates. Be
as concise as possible.
1.Project Description: Describe the proposed project. Is this part of a larger project or an ongoing project?
Schoolhouse #3, located at 2342 Main Street, has existed since the mid-1800's, although it was formerly
located next door. To the best of our knowledge, as buildings have been moved, it is the last remaining of five
primary schoolhouses representing the five school districts in town. Under the more recent ell can be found
the paired "boy-girl" doors associated with the old schoolhouses and illustrated in the attached images. Once
schoolhouse #3 ended its career as a schoolhouse, it was moved next door and used for storage in conjunction
with the cranberry industry. We believe this is when the double barn doors were added. It is our intention to
return the schoolhouse to the original schoolhouse configuration, minus the double doors and ell.
Brewster C onservation Trust was gifted this parcel of and with the stipulation that it be made into a small
park with the buildings on site removed. BHS expressed interest in acquiring and preserving the schoolhouse,
and BCT offered it to the Society. (Letter attached). BHS plans to flake (dismantle) the structure, move it to a
site already marked out at Windmill Village, and reassemble and restore it. It will be curated as a
schoolhouse, with a smaller exhibit about the cranberry industry on site. It will be open to the public in
accordance with Building Dept. rules, either to allow admittance or to allow viewing.
SINCE THE 10/22 AMENDED APPLICATION WAS SUBMITTED, IT WAS LEARNED 51 DRUMMER
BOY ROAD WAS DESIGNATED A SOIL CONSERVANCY AREA. A SITE SURVEY WAS DONE
AND PART OF THE PROPOSED LOCATION WAS WITHIN THAT AREA, SO AN ADJUSTMENT
TO LOCATION WAS MADE AND NEW PLANS DRAWN. BY THE TIME ALL THIS WAS DONE,
PRICES HAD SKYROCKETED TO A DEGREE THAT IT BECAME CLEAR WE COULD NOT
COMPLETE THE PROJECT FOR THE ORIGINAL SUM REQUESTED.
Specifically, the request for additional funds has resulted from:
An increase in labor rates and materials after discovery of soil issues at Windmill Village (it is in
the Conservancy Soil District), and extended delays in securing/ scheduling engineers and
architects.
Extra funds required for additional engineering and related plans to meet building dept.
requirements.
The addition of a period-correct chimney, which was not included in the original plan. Further
research determined that this should be included in project. (As there is no chimney in the present
building, it was not included in original proposal).
5
Community Preservation Committee Application rev. 09/15/23
After additional research and per Eric Dray input, it was determined that additional materials
and labor for the exterior and interior will be needed, (Clapboards, plaster walls, ceilings, and
school related items).
The dramatic increase in material and labor cost over the past year for windows and millwork,
concrete, painting, and electrical.
Learning from past mistakes, we’ve added a 10% contingency cost as well.
2.For Historic Preservation projects: Attach proof of listing on the State Register of Historic Places or a
letter from the Brewster Historical Commission indicating that the resource has been determined to be
significant in the history, archaeology, architecture, or culture of Brewster. Please note that rehabilitation
projects must comply with the Secretary of the Interior Standards for Treatment of Historic Properties.
Additional information and analysis will be needed for projects submitted by churches/religious
organizations to determine if they comply with the SJC’s Caplan vs. Town of Acton decision.
Form B attached
3.CPA Goals/Criteria: Describe how this project accomplishes the goals and objectives of the CPA and the
Town of Brewster Community Preservation Plan FY23-27 (refer to the attached general and issue-specific
criteria and identify which of these apply to the project).
This project accomplishes the goals of preserving historic resources and also complies with the second highest
rating element in Brewster's Vision Plan, that of retaining the town's historic character. This project will also
educate and entertain the public on an aspect of the history of the town that would disappear forever were this
building to be destroyed, as this is the last remaining primary schoolhouse from the five school districts.
4.Community Benefits: What are the community benefits of the projects?
This project will preserve a part of Brewster's past that would be gone forever without this effort to reclaim it.
The community would gain from the educational and entertainment experience of rediscovering how schooling
was done a century and a half ago. Each spring, school groups visit Windmill Village, and we anticipate the
addition of an actual schoolhouse will be momentous. Depending on Building Department regulations, it may
be possible to hold programs in the building.
5.Community Support: What is the nature and level of support for this project? Include letters of support
and any petitions. If this is a funding request for a regional project where Brewster CPA funds will be spent
in another town, include Brewster based letters of support.
Letters of support from Brewster Conservation Trust, the Old King's Highway Historic District, and the Select
Board are attached. The Brewster Historical Commission has informally expressed support for the project.
BHS intends to make this a community project as they did with the Cobb House purchase and renovation, and a
large community fundraising event dedicated strictly to this project is planned. There will likely be more to
follow.
6.Timeline: What is the schedule for project implementation, including a timeline for all milestones? Please
identify any special timing considerations for the project’s implementation. If this is part of a larger project,
is it phased? What is the timeline for the entire project?
6
Community Preservation Committee Application rev. 09/15/23
ASSUMING ADDITIONAL FUNDS ARE SECURED AT THE MAY 2024 TOWN MEETING, THE
SOCIETY HOPES TO FLAKE THE BUILDING AS SOON AS POSSIBLE AFTER THAT, BUT
THERE ARE OTHER MOVING PARTS INVOLVED (BCT PERMITTING, ETC.,) SO WE WOULD
GIVE A RANGE OF SPRING TO FALL 2024 FOR THE FLAKING, AND THE REBUILD WOULD
HOPEFULLY BEGIN IN SPRING 2025, TO BE COMPLETED BY FALL 2025.
7.Credentials: What are the qualifications and relevant experience of those undertaking the project?
Brian Daley Construction has worked on many historic projects in town and in particular on BHS's Cobb House
Museum, the Cobb House Outbuilding, the Harris-Black House, and Higgins Blacksmith Shop. His track record
is proven many times over.
8..Budget/Need for Public Funds: What is the total budget (sources of funds and uses/expenses)for the
project and schedule for expenditure of CPA funds? All sources of funds and expenses must be clearly
identified. For housing development projects, include a budget that includes rents, revenues and cash flows
taking into account financing expense related to loans. Provide the basis for cost estimates whenever possible.
(Note: CPA funds may not be used for maintenance.)
See attached
If this is part of a larger project, what is the budget for the entire project (sources of funds and
expenses/uses)?
Clearly identify what additional funding sources are available, committed, or under consideration and why
public funding would be appropriate. Include copies of commitment letters, if available, and describe any
other attempts to secure funding for this project.
The Brewster Historical Society is planning a major fundraiser for this project.
The Jennison Family Foundation has pledged support for this project.
Provide the most recent audited financial report or if none available, an applicant generated financial report that
includes a balance sheet and operating budget. Town-sponsored projects must demonstrate why the project
cannot be funded through the Department’s or Committee’s budget
See attached
For housing development projects, describe the resident selection process.
9.Maintenance: If ongoing maintenance is required for your project, who will be responsible for maintenance
and how will it be funded?
The property will be maintained by the BHS Building and Grounds Committee, contracting for outside
work where needed. BHS is fortunate to have two licensed contractors with combined forty years
experience on this committee). The Windmill Village maintenance budget will be adjusted to account
for the upkeep on the additional structure.
The Eddy Foundation supports BHS maintenance projects with a yearly grant.
7
Community Preservation Committee Application rev. 09/15/23
The Kelley Foundation and Mass. Cultural Council have frequently supported maintenance/capital
projects.
The Jennison Family Foundation has instructed us to inform any granting committee of their support
for this·project, in keeping with past support of Cobb House and Outbuilding restorations. (See
attached letter of support)
10.Site Control and Appraisal: If the project involves acquisition of real property, provide evidence of site
control (deed, purchase and sale, option, etc.). In addition, provide an appraisal of the property’s value by a state
licensed appraiser using customary appraising techniques. The CPA does not allow funding for acquisitions if
the acquisition price is greater than appraised value.
See attached letter from BCT. Legal and insurance pending.
Town of Brewster Community Preservation Committee
CATEGORY SPECIFIC CRITERIA
(Identify which of the following criteria apply to your project.)
Open Space Proposals
Meets one or more of the Open Space goals listed on page 28-30 of Town of Brewster Community
Preservation Plan FY23-27
Permanently protect important wildlife habitat, including areas of significance for biodiversity,
diversity of geological features and types of vegetation, contain a habitat type that is in danger of
vanishing from Brewster or preserve habitat for threatened or endangered species of plants or animals.
Provide opportunities for passive recreation and environmental education.
Enhance or protect wildlife corridors, promote connectivity of habitat and prevent fragmentation of
habitats.
Provide connections with existing trails or potential trail linkages.
Preserve scenic views or border a scenic road.
Protect drinking water quantity and quality.
Provide flood control/storage.
Preserve important surface water bodies, including wetlands, vernal pools or riparian zones.
Preserve priority parcels in the Town’s Open Space Plan/maximize the amount of open land owned by
the Town of Brewster.
Historical Preservation Proposals
MANDATORY: Must be on the State Register of Historic Places or have a letter from the Brewster
Historical Commission indicating that the resource has been determined to be significant in the history,
archaeology, architecture, or culture of Brewster.
MANDATORY: Project must meet Secretary of the Interior Standards for rehabilitation and/or
restoration of Historic Preservation Properties.
MANDATORY IF REQUEST IS FROM A CHURCH/RELIGIOUS ORGANIZATION:The
project must satisfy the analysis outlined by the SJC’s Caplan vs. Town of Acton decision.
x Meets one or more of the Historical Preservation goals listed on page 36-37 of Town of Brewster
Community Preservation Plan FY23-27
x Protect, preserve, enhance, restore and/or rehabilitate historic, cultural, architectural or archaeological
resources of significance, especially those that are threatened.
8
Community Preservation Committee Application rev. 09/15/23
Protect, preserve, enhance, restore and/or rehabilitate town-owned properties, features or resources of
historical significance.
x Protect, preserve, enhance, restore and/or rehabilitate the historical function of a property or site;
x Demonstrate a public benefit and/or public access, or
x Otherwise provide permanent protection for maintaining the historic resource.
x Project site should not be privately owned unless there is demonstrable public access and benefit.
Brian P. Daley Construction, Inc Brewster Historical Society
PO Box 2117 District 3 SCHOOLHOUSE
Brewster, MA 02631 Brewster Ma, 02631
December 9, 2023
GENERAL SCOPE OF WORK AND COST ESTIMATES AS FOLLOWS:
-Dismantle the existing building (schoolhouse) by hand and salvage all necessary components
including main framework, beams, salvageable sheathing and misc interior woodwork.
-Red Cedar roofing, sidewall shingles, non-salvageable trim and sheathing along with
connecting shed will be removed and disposed of as required.
-Replace windows, doors, roofing, trim and siding with period correct materials.
-This would include true divided light windows, doors, red cedar shingle roof, sidewall cedar
shakes and appropriate trim.
-Building will be erected on a concrete foundation and slab.
-A new wood frame floor system will be installed over concrete slab.
-Finished wood floors will be placed and installed over new frame using the old flooring if
possible (not likely) or will use new wood floors to simulate old style.
-Materials from existing floor system will be used as needed to help in reconstruction of
building as needed.
-All dismantled materials to be stored in watertight containers and relocated to Windmill Village
in preparation for rebuild at proposed site on grounds at Windmill Village in Brewster.
Material and construction cost ESTIMATES:
Note: ** = Hard Cost
**Dismantling cost including labor, equipment, demo fees, safety equipment, and all required
components related to the process of dismantling.
$63,300.00
Transportation and storage fees: (3) 8x20 storage containers.
$5,000.00
Engineering for new foundation and building placement at Windmill Village.
$4,000.00
Architect fees for necessary plans and structural specs for building department approval.
$8,000.00
Engineering and soil testing at new location.
$5,000.0
**Permits, Insurance, legal work and administrative fees:
$ 6,300.00
**Excavation, tree removal, site work, materials needed. Ready for landscaping.
$22,000.00
**Landscape allowance for site to be brought back to its previous natural state.
$5,000.00
**Foundation and flat work.
$36,000.00
**Reconstruction of building including including additional materials that may be needed.
$58,000.00
**Red cedar roof.
$24,000.00
**Clear vertical grain primed clapboard siding material and labor.
$54,000.00
**Windows, doors, exterior trim: Material and labor
$52,000.00
**Floor system including new frame, vapor barrier and finished wood floors.
$20,000.00
**Single flew, non-working used brick exposed chimney: material and labor cost.
$20,000.00
**Install underground electric service, general lighting and outlets temporary power.
$10,000.00
**Exterior and Interior Painting.
$20,000.00
** interior carpentry work for creating an exhibit of the old schoolhouse and the cranberry era.
$10,000.00
**Lower-level interior wall and ceiling boards: Flat edge edge and center bead pine.
Includes allowance for partial plaster on walls and ceilings as may be required.
Material and labor.
$30,000.00 (Added $ 5000 for interior plaster)
10% Hard Cost Contingency Fee
$ 43,060.00
(The Hard Cost Total is $430,600.00)
TOTAL ESTIMATED JOB COST AS DESCRIBED IN THIS ESTIMATE: $ 495,660.00
1
Eric Dray Consulting Schoolhouse #3
Eric E. Dray
Eric Dray Consulting
71 Prentiss Street
Cambridge, MA 02140
508.566.3797 EricEDray@gmail.com
MEMORANDUM
TO: Brewster Community Preservation Committee
FROM: Eric Dray, Preservation Consultant
DATE: November 28, 2023
RE: CPA Application Analysis – Schoolhouse #3, Amended Budget and Scope
The Brewster Historical Society (BHS) has submitted a revised estimate for CPA funds to relocate and
rehabilitate Schoolhouse #3. Prior Memoranda have already confirmed that relocation in this instance is an
appropriate use of CPA funds.
I have been asked to determine which elements of the itemized budget may not be appropriate for CPA
funding. CPA funds may be used for Historic Preservation if they result in the Acquisition, Preservation,
Restoration or Rehabilitation of an historic resource.
In my opinion, the following budget items are not directly connected to the preservation of Schoolhouse #3
within the meaning of the CPA, with annotations/questions as needed:
Construction site safety fencing - $7,000
Portable toilets - $1,800
Insurance and legal fees - $4,500
Landscape allowance - $5,000
Engineering and soil testing - $5,000
I am unclear what the purpose is or how it relates to preservation of Schoolhouse #3.
Lower level wall and ceiling boards - $25,000
It is unclear if the questions and recommendations regarding interior walls made in the 9.25.22
Memorandum have been addressed - see below:
2. Interior Walls
As can also be seen in Photo 1, the east side of the interior wall facing the schoolroom, and parts
of the southwest cloakroom are clad in broad horizontal boards. Barring any additional discoveries,
this cladding may have been the original interior cladding throughout, or at least in those locations.
I have made some preliminary research of 19th century New England schoolhouse interiors. In all
cases, the interior walls were finished. I have seen examples of horizontal and vertical board
cladding, and plaster. Almost always, portions of some walls were finished with expanses of
chalkboard slate, usually hung low for the students.
RECOMMENDATIONS
a. The existing broad horizontal cladding should be retained and reinstalled when the
schoolhouse is relocated.
b. Additional research should be conducted by the applicant to determine what the
appropriate interior cladding should be. It is unclear if the current budget would allow for
residing of all interior walls.
Page 1 of 6
2198 Main Street
Brewster, Massachusetts 02631-1898
(508) 896-3701
FAX (508) 896-8089
January 21, 2023
Sally Gunning, President
Brewster Historical Society
P.O. Box 1146
Brewster, MA 02631
RE: Schoolhouse #3 Relocation and Renovation Award Letter
Dear Ms. Gunning:
I am pleased to inform you that on October 12, 2022, the Brewster Community Preservation Committee
(CPC) voted to recommend that Brewster Town Meeting appropriate the sum of $347,200 to fund the
Brewster Historical Society’s (BHS) $347,200 request to relocate and rehabilitate Schoolhouse #3 (the
“Project”), as described in two documents: July 8, 2022 Application, as amended on October 12, 2022,
and the Schoolhouse #3 Scope of Work dated October 11, 2022. Brewster Town Meeting voted on
November 14, 2022 to approve the use of CPA funds for the Project, and, provided the terms and
conditions described below are met, the funds will be made available to BHS upon execution of, and in
accordance with, the provisions of a Grant Agreement in a form substantially similar to the one attached
hereto as Exhibit A, which agreement shall include the terms and conditions described below.
PROJECT DESCRIPTION: The Project consists of (a) flaking and moving Brewster Schoolhouse #3
(the “Schoolhouse”), currently located at 2342 Main Street, to Windmill Village at 51 Drummer Boy
Road (the “Property”), (b) reassembling and restoring the Schoolhouse to recreate the 19th Century
schoolroom, and (c) including a cranberry history display, as this was also part of its history, among
other uses.
PROJECT ELIGIBILITY: The Project complies with the provisions of the Community Preservation
Act (“CPA”), G.L. c. 44B, §5(b)(2), which provides that CPA funds may be expended “for the
acquisition, creation, preservation and support of historic resources.” The Town is being asked to fund
the dismantling of the Schoolhouse and its reconstruction at a different site, where it will be protected by
the Brewster Historical Society and better preserved. The work to dismantle the Schoolhouse and to re-
construct it can be deemed to constitute the rehabilitation of a historic building, as the work will
constitute an extraordinary repair and make the Schoolhouse more functional for its intended use.
Community Preservation
Committee
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Page 2 of 6
The specifics of the Project are more fully described in the Community Preservation Application dated
July 8, 2022 and amended October 12, 2022 and the Schoolhouse #3 Scope of Work dated October 11,
2022 (the “Scope of Work”).
TERMS AND CONDITIONS: The funds will be made available to the Brewster Historical Society
under the following terms and conditions:
1) All rehabilitation work, plans, methods, and materials must be reviewed and approved by the
CPC or its designee for compliance with the Secretary of Interior’s Standards for The Treatment
of Historical Properties with Guidelines for Preserving, Rehabilitating, Restoring and
Reconstructing Historic Buildings (36 CFR 67), as these may be amended from time to time
(hereinafter the “Standards”) for the prior to the commencement of any element of the
rehabilitation work.
2) Before any work commences, the BHS must provide measured floor plans, elevation drawings
and material specifications for approval by CPC or its designee.
3) All plans, specifications, and documentation submitted by the BHS to the Brewster Building
Department in connection with the relocation and re-construction must, at the same time, also be
submitted to the CPC or its designee for review and approval.
4) All rehabilitation work on the Schoolhouse must comply with the Standards. This requirement
must include:
a. Re-using the existing wood board flooring, as possible, including restoring anteroom
flooring. Install new wood flooring which matches existing in board width.
b. Re-using the existing horizontal board siding where possible on the south wall of the
classroom and northwest walls of anteroom. Install new interior siding to match this
horizontal board siding, and/or other siding material as deemed appropriate and
consistent with the Standards, in consultation with and approval from the CPC or its
Designee.
5) BHS will obtain CPC or its designee approval of any significant changes in height, scale, or
materials from original project plans.
6) BHS is responsible for obtaining all applicable permits and approvals required.
7) The Town, through the CPA funds, shall reimburse BHS for any rehabilitation work expenses
listed in the Scope of Work and incurred on or after November 15, 2022.
8) Requests for reimbursement, including documentation of the expenses incurred, shall be
submitted to Beth Devine, CPC Assistant at bdevine@brewster-ma.gov with a copy to the
project liaison, Sharon Marotti at Sharonmarotti@gmail.com. The CPC reserves the right,
through its designee, to inspect the work prior to approving any funding request.
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Page 3 of 6
9) It is a condition of the grant of CPA funds that BHS grant the Town a historic preservation
restriction (“HPR”) on the Schoolhouse and the portion of the Property on which the
Schoolhouse lies for a minimum period of 99 years on terms reasonably acceptable to the Town
and BHS. 5% of the grant ($17,360) will be withheld until (a) a final Certificate of Occupancy
has been issued by the Project, (b) the CPC or its designee has approved the Work, and (c) the
HPR has been approved by CPC or acceptable to the CPC and has been recorded with the
Registry of Deeds.
10) The BHS shall provide project status reports/updates quarterly to the CPC liaison on the
following dates: February 1, 2023; May 1, 2023; August 1, 2023, November 1, 2023, February
1, 2024, May 1, 2024, August 1, 2024; November 1, 2024, until project completion, at which
time a final report will be due.
12) The Project must be completed no later than two years from the date of this Agreement. The project
term may be extended for good cause shown, but such extension must be in a writing signed by both
parties hereto.
The CPC liaison for this project is Sharon Marotti, Sharonmarotti@gmail.com, and do not hesitate to
contact her with any questions or concerns.
The terms and conditions herein shall be binding on the parties unless and until amended, in writing, by
mutual agreement.
The CPC is pleased to be able to play a role in this historic preservation project.
If the terms of this award are acceptable, please sign via HelloSign. A copy of the fully executed
agreement will be provided to you.
On behalf of the Brewster Community Preservation Committee, thank you, and I remain,
Very truly yours,
Faythe Ellis
Chair- Brewster CPC
cc: Peter Lombardi, Town Manager, Town of Brewster
Mimi Bernardo, Finance Director, Town of Brewster
02 / 04 / 2023
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Page 4 of 6
AGREED AND ACCEPTED BY THE BREWSTER HISTORICAL SOCIETY
___________________________________________
Name: Sally Gunning
Title: President
DATE: ________________________________________ 02 / 04 / 2023
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
EXHIBIT A
[MODEL]
TOWN OF BREWSTER
COMMUNITY PRESERVATION COMMITTEE GRANT AGREEMENT
PROJECT NAME:
GRANT RECIPIENT:
GRANT AGREEMENT #:
PROJECT DESCRIPTION:
PROJECT LOCATION:
DATE OF TOWN MEETING &WARRANT ARTICLE NUMBER:
PROJECT SPONSOR(S) (IF DIFFERENT FROM RECIPIENT):
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Page 2 of 11
This Grant Agreement made this ___day of _______, 20__ by and between the Town of
Brewster, a municipal corporation duly organized under the laws of Massachusetts and having
a usual place of business at 2198 Main Street, Brewster, MA 02631 (hereinafter referred to as
the “TOWN”), acting by and through the Community Preservation Committee (hereinafter
referred to as the “CPC”, and __________ {Recipient} (hereinafter referred to as
the “RECIPIENT”), with an address of ___________________ {Recipient’s Address). The
purpose of this Grant Agreement is to implement the following grant award:
Witnesseth
Whereas, the CPC invited the submission of proposals for grants of funds for purposes
consistent with the Community Preservation Act, G.L. c. 43B; and
Whereas, in response thereto, the Recipient submitted an application for funding, dated
________ for purposes described in the Project Description section of the Project Funding
Application (hereinafter referred to as the “Project”) (the Project Funding Application is attached
as Exhibit A, and incorporated herein), and the CPC reviewed and approved the Project and
recommended that the funding for the Project be approved at Town Meeting; and
Whereas, the Town Meeting thereafter appropriated the funds recommended by the CPC
pursuant to Warrant Article No. ___ on _______ and authorized the CPC and Town
Administrator to enter into a grant agreement with the Recipient for the purposes set forth in the
Project; and
Now, Therefore, the Town and the Recipient agree as follows:
1. Award. Subject to the terms of this Agreement, the Town agrees to award the Recipient
the amount of {spell out in words and numbers} for the Project.
2. Project Funding Application. The Project Funding Application submitted to the CPC, as
may be amended by conditions of the CPC upon award, is incorporated into this Grant
Agreement by reference (Exhibit A).
3. Term. The term of this Grant Award is ______ (_) years from the date of the Town’s
execution of this Grant Agreement (the “Commencement Date”). All of the work
described in this Grant Agreement must be completed no later than __ years after the
Commencement Date (the ”Completion Date”), unless the CPC grants an extension for
good cause shown. Funds not utilized on the Project must be returned to the Community
Preservation Fund {specify fund, if any} and will be made available for future
appropriation to other recipients.
4. Budget: Other Sources of Funding. Prior to the commencement of the Work, the
Recipient must submit a complete project budget that accounts for (1) the expenditure of
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Page 3 of 11
all funds awarded under this Grant Agreement; and (2) the identity and amounts of all
other sources of funding, if necessary, to complete the project as described herein.
Recipient shall not expend any grant funds until such time as it has provided evidence to
the CPC that it has secured sufficient sources of funding to complete the Work and the
CPC has approved the Project Budget. If the CPC determines at any time during the
Project that funds have been spent on goods or services not included in the Project
Budget, or otherwise not authorized under the CPA, the Recipient shall be responsible for
repayment of such funds to the CPA Fund {specify fund, if any}.
5. Disbursement of Funds. The Recipient hereby acknowledges and expressly agrees that all
disbursements of grant funds to the recipient shall be contingent upon satisfaction of the
conditions contained in the Award Letter (a copy of which is attached hereto as Exhibit B
and incorporated herein).
6. Requirements For Release of Funds. The Recipient hereby acknowledges and expressly
agrees that all disbursements of grant funds to the Recipient or to third parties on the
Recipient’s behalf shall comply with the Award Letter.
7. Reports. The Recipient shall provide the CPC with project status reports as required by
the Award Letter. A Project Closeout Report as required by the Award Letter, including
digital photo documentation of the Project where appropriate, is due with 30 days after
the Completion Date. The Project Closeout Report shall be to the satisfaction of the CPC,
which approval shall not be unreasonably withheld.
a. All documents, including but not limited to photographs, videos, etc. submitted to
the CPC shall become the property of the Town of Brewster and shall be available
for use by the Town and available to the public under the Massachusetts Public
Records Law.
8. Project Liaison. The CPC may designate a CPC Project Liaison for the project being
funded by this Grant Agreement. The Project Liaison may be either a municipal
employee, member of the CPC or a consultant retained by the CPC for that purpose. The
Recipient shall cooperate with the Project Liaison, including providing access to the
project site at reasonable times and with reasonable notice. The Project Liaison shall
serve as the agent of the CPC for monitoring project compliance with the terms of this
Grant Agreement and shall periodically report to the CPC regarding the progress of the
project funded by this Grant Agreement and the compliance of the Recipient with the
terms of this Grant Agreement.
9. Records. The Recipient agrees to maintain such records with respect to utilization of the
grant funds and income derived therefrom as are kept in the normal course of business
and such additional records as may be required by the CPC. Said records shall be
available for inspection by the CPC during the Recipients normal business hours. The
CPC shall be entitled to request copies of any record so kept provided said record does
not contain proprietary information of the Recipient.
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Page 4 of 11
10. Deed Restrictions. Pursuant to Massachusetts General Laws Chapter 44B, § 12 every
project that involves the acquisition of any interest in real property with CPA funds shall
be bound by a permanent deed restriction that meets the requirements of M.G.L. c. 184,
limiting the use of the interest to the purpose for which it was acquired. Where applicable
and as required by the Award Letter, Recipient agrees to the imposition of such deed
restriction in a form acceptable to the CPC. {Delete this section if not applicable}
11. Compliance with Laws and Agreement. Recipient understands and agrees that projects
funded through this Award are made pursuant to and must comply with the requirements
of the Community Preservation Act, M.G.L. c. 44B. Recipient also agrees to comply with
all requirements of this Grant Agreement.
12. Permits and Licenses. It is the obligation of Recipient to obtain all permits and licenses
necessary for implementation of the Project. No local permit or license is waived by the
award of this Grant.
13. No Liability of Town. By making this award, the Town does not accept any liability
whatsoever for any acts, omissions or errors associated with the Project. Nothing in this
Grant Agreement shall be construed to render the Town or any elected or appointed
official or employee of the Town, or their successors in office, personally liable for any
obligation under this Grant Agreement. Recipient agrees to indemnify and defend the
Town from all claims, suits or demands, and costs and expenses, including attorney’s fees
resulting from implementation of the Project.
14. No Assignment. This Grant Agreement may not be assigned by Recipient without prior
written agreement by the Town of Brewster.
15. Default and Termination.
a. If the CPC determines that the Recipient has failed to fulfill all obligations set
forth under the terms of this Grant Agreement and so defaulted in said
obligations, the CPC shall so notify the recipient in writing, setting forth the
nature and details of the default.
b. Upon the Recipient’s receipt of said notice of default, the Recipient shall
immediately cease to incur any additional expenses in connection with the Project
funded by this Grant Agreement.
c. The CPC shall hold a public hearing within fourteen (14) days of the date of the
Recipient’s receipt of the notice of default for the purpose of determining whether
this Grant Agreement should be terminated. The Recipient shall have the
opportunity to present evidence and argument at said termination hearing prior to
the CPC voting whether to terminate the Grant Agreement.
d. At the close of the public hearing the CPC shall issue a written decision setting
forth its findings that form the basis of its decision. The CPC may:
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Page 5 of 11
i. vote to reinstate the Grant Agreement without any further condition; or
ii. vote to reinstate the Grant Agreement with additional conditions; or
iii. vote to terminate the Grant Agreement.
e. The CPC shall notify the Recipient in writing of the CPC’s decision relative to
termination of the Grant Agreement.
16. Return of Funds.
a. Upon completion of the Project, any funds granted to the recipient under this
Grant Agreement and not yet expended shall be returned forthwith to the Town
without further expenditure thereof.
b. In the event this Grant Agreement is terminated pursuant to the provisions of
Section 15 hereof, any funds granted to the recipient under this Grant Agreement
and not yet expended shall be returned forthwith to the Town without further
expenditure thereof.
c. If this Grant Agreement is terminated as a result of negligent or intentional acts or
omissions of the Recipient, the Recipient shall be liable to repay to the Town the
entire amount of funding provided under this Agreement, and the Town shall take
such steps as are necessary, including legal action, to recover said funds.
d. In the event the Town is required to take legal action under this Grant Agreement,
the Recipient shall be liable for all of the Town’s costs expended for the
enforcement of this Grant Agreement, including but not limited to reasonable
attorney’s fees and court costs.
17. Notice. Any and all notices, or other communications required or permitted under this
agreement, shall be in writing and delivered in hand or mailed by certified mail, return
receipt requested or by other reputable delivery service to the parties hereto at the
following addresses:
If to the Recipient:
____________________
____________________
____________________
If to the CPC:
Town of Brewster CPC
2198 Main Street
Brewster, MA 02631
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Page 6 of 11
18. Severability. If any term or condition of this Grant Agreement or any application thereof
shall to any extent be held invalid, illegal or unenforceable by a court of competent
jurisdiction, the validity, legality, and enforceability of the remaining terms and
conditions of this Grant Agreement shall not be deemed affected thereby.
19. Governing Law. This Agreement constitutes the entire agreement between the parties
hereto, and may be amended only in writing executed by both the Town of Brewster and
the Recipient. Signatory below acknowledges and avers that he/she has the authority to
execute this Agreement on behalf of the Recipient.
[SIGNATURE PAGES FOLLOW]
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Page 7 of 11
In Witness Whereof the parties have set their hands and seal on the date first written above.
RECIPIENT
{RECIPIENT’S NAME}
___________________________________
BY ITS
TOWN OF BREWSTER
COMMUNITY PRESERVATION COMMITTEE
____________________________________
BY ITS CHAIRPERSON
TOWN OF BREWSTER
___________________________________
BY ITS TOWN ADMINISTRATOR
TOWN OF BREWSTER CERTIFICATION OF AVAILBLE FUNDS
____________________________________
BY ITS FINANCE DIRECTOR
AS TO FORM ONLY
____________________________________
TOWN COUNSEL
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Page 8 of 11
EXHIBIT A
PROJECT FUNDING APPLICATION
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Page 9 of 11
EXHIBIT B
AWARD LETTER
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Page 10 of 11
ATTACHMENT A
CERTIFICATE OF AUTHORITY & LIST OF OFFICERS AND DIRECTORS
GRANT AGREEMENT #:
RECIPIENT:
I hereby certify that I am the Clerk/Secretary of:
_____________________________________________________________________; and that
(Print Name of Corporation)
________________________________________________________________ is the duly
(Print name of Officer who signs the Grant Agreement)
elected _______________________________________________________ of said corporation;
(Print title of Officer who signs the Grant Agreement)
and that on ________________________ at a duly authorized meeting of the Board of Directors
(date of Meeting)
of said Corporation, at which a duly authorized quorum of the Directors were present and acting,
or waived notice, that _________________________________________________
(Print name and title of Officer signing Grant Agreement)
of this corporation be and hereby is authorized to execute contracts and bonds in the name and
on behalf of said corporation, and affix it Corporate Seal thereto, and such execution of any
contract of obligation in this corporation’s name on its behalf, with or without the Corporate
Seal, shall be valid and binding upon this corporation; and that the above vote has not been
amended or rescinded and remains in full force and effect as of the date set forth below.
Attest: ______________________________________________________
(Signature of Clerk/Secretary)
Name: ______________________________________________________
(Printed or typed name of Clerk/Secretary)
Date:
NOTE: THE DATE OF THE VOTE AUTHORIZING OFFICER TO SIGN GRANT AGREEMENT MUST
BE BEFORE THE DATE THE OFFICER ACTUALLY SIGNS THE GRANT AGREEMENT. THIS
CERTIFICATE MUST ALSO BE EXECUTED BEFORE THE OFFICER SIGNS THE GRANT AGREEMENT.
PLEASE ATTACH A LIST OF OFFICER AND DIRECTORS OF THE CORPORATION
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Page 11 of 11
ATTACHMENT B
State Tax Attestation
The Department of Revenue under the provisions of the Revenue Enforcement and
Protection Program has directed the Town to have each provider of goods, services or real estate
receiving $5,000 or more sign the attestation clause below:
Pursuant to M.G.L. Ch. 62C, Sec. 49A, and M.G.L. Ch. 151A, Sec. 19A, I,
____________________________________________, authorized signatory for
_______________________________________________, with a principal place of business
at___________________________________ ________________________________________
do hereby certify under the penalties of perjury that _______________________
________________________________, to my best knowledge and belief, has filed all state
returns and paid all state and Town of Brewster taxes required under law.
The Business Organization Social Security Number or Federal
Identification No. is _________________________________________
Signed under the penalties of perjury this___________________day of
_________________________________ 20________.
______________________________________________________________
Typed or Printed Name and Title of Corporate Officer
This statement should be signed and either a Social Security Number of Federal Identification
Number should be included.
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Attachment 1 – Application
Application dated 7/8/2022 and amended on 10/12/22 for the Schoolhouse #3 Relocation and
Renovation Project on file with the Community Preservation Committee.
Doc ID: 2f6256fca7d6f927ea1cf6016b5bc345903bd767
Brewster CPC BHS Schoolhouse #3 Award Letter
BHS Schoolhouse #...w attachments.pdf
2f6256fca7d6f927ea1cf6016b5bc345903bd767
MM / DD / YYYY
Signed
02 / 02 / 2023
23:14:22 UTC
Sent for signature to Faythe Ellis
(faythe.ellis@outlook.com) and Sally Gunning
(president@brewsterhistoricalsociety.org) from
bdevine@brewster-ma.gov
IP: 73.100.209.115
02 / 04 / 2023
14:08:46 UTC
Viewed by Faythe Ellis (faythe.ellis@outlook.com)
IP: 67.189.244.161
02 / 04 / 2023
14:09:35 UTC
Signed by Faythe Ellis (faythe.ellis@outlook.com)
IP: 67.189.244.161
02 / 04 / 2023
18:35:19 UTC
Viewed by Sally Gunning
(president@brewsterhistoricalsociety.org)
IP: 66.31.195.234
02 / 04 / 2023
18:38:55 UTC
Signed by Sally Gunning
(president@brewsterhistoricalsociety.org)
IP: 66.31.195.234
The document has been completed.02 / 04 / 2023
18:38:55 UTC
Brewster CPC BHS Schoolhouse #3 Award Letter
BHS Schoolhouse #...w attachments.pdf
2f6256fca7d6f927ea1cf6016b5bc345903bd767
MM / DD / YYYY
Signed
Tamsen Martin-Cornell
30 Monument Rd.
Orleans, MA 02653
c 508-241-4265
e cornell.tamsen@gmail.com
Client Name: Brewster Historical Society
Interim Update: 19 December 2023
Due Date: NA
Job Description: ESS Local History Research -Document Scan/Electronic Access Project
Invoice: N/A
$ 0.00
Post software program change and update at the end of August, it was discovered that a
large number of data files did not successfully transfer during the software company’s
migration procedures from our older program.
It was determined that the best course of action would be for BHS ( Lamperti) to go in and
do another manual attachment or “reattachment” of files to data records. Familiarity with
the collection data was the determining factor in this decision. The software company was
prepared to perform another migration/attachment, but the lack of familiarity with
individual records may have resulted in a less than satisfactory result, which may not have
been realized immediately.
This discovery has caused a delay in Cornell’s work on the electronic access portion of the
project, as originally planned. Additionally, both Cornell’s and Lamperti’s planned
“launch” date for “opening” for public access for Nov/Dec 2023, has been affected.
Although it is a disappointment to have to go back and re-do portions of the file
structuring, this is not an unusual situation when working with this type of software
change/update and data migration.
We anticipate completing the additional work by the end of February 2024
and a reschedule for public launch at the beginning of March 2024. We therefore
respectfully request that the committee approve our request for an extension of the
project work until March 15th, 2024. We would invoice for completion at that time.
Sincerely,
Tamsen Cornell, Director
Brewster Historical Society
To Brewster CPC Members
From Faythe Ellis
Re: Link to original Schoolhouse 3 application.
1. Updated Fall 2022 CPC Applications Packet 101722 (laserfiche.com)
Original Schoolhouse 3 application from Brewster Historical Society begins on page 21 of this
link. The BHS has submitted an updated request for additional funds for Spring 2024 TM.
Documentation related to the update request is included on the following pages of this meeting
packet.
Community Preservation Committee
Minutes of December 13, 2023 Page 1 of 3
vd
2198 Main Street
Brewster, Massachusetts 02631-1898
(508) 896-3701
FAX (508) 896-8089
COMMUNITY PRESERVATION COMMITTEE
Hybrid Meeting w In-Person Quorum
Wednesday, December 13, 2023, at 4:00 p.m.
MEETING MINUTES OF DECEMBER 13, 2023
Present: Community Preservation Committee (CPC) – Chair Sarah Robinson, Vice Chair Faythe Ellis,
Treasurer Sharon Marotti, Clerk Elizabeth Taylor, Roland Bassett, Bruce Evans, Peggy Jablonski
(remote attendance)
Absent: Paul Ruchinskas, Christine Boucher
Also Present: Cynthia Bingham, Select Board (remote attendance,) Jill Scalise, Housing Coordinator
Chair Robinson called the meeting to order at 4:00 pm, announced a quorum, and read the Recording
Statement.
This meeting will be conducted in person at the time and location identified above. This means that at least a quorum of the members of
the public body will attend the meeting in person and members of the public are welcome to attend in person as well. As a courtesy only,
access to the meeting is also being provided via remote means in accordance with applicable law. Please note that while an option for
remote attendance and/or participation is being provided as a courtesy to the public, the meeting/hearing will not be suspended or
terminated if technological problems interrupt the virtual broadcast or affect remote attendance or participation, unless otherwise
required by law. Members of the public with particular interest in any specific item on this agenda, which includes an applicant and its
representatives, should make plans for in-person vs. virtual attendance accordingly.
1.Public Announcements and Comment- none
2.Financial Update
Sarah and Faythe met with Mimi Bernardo and the general estimated revenue for 2024 is going to be a
little over $1,581M. It looks as though we will end up with carry over added to $5,205,897 total. Faythe
added that we estimated the State match at 20% this year rather than 30% as in the past year.
3.Intake of applications submitted for Spring 2024 Town Meeting
Donna Kalinick submitted the application for the Housing Coordinator Position. The salary portion
has been funded through the CPA. The funding request is for $74,589. No questions.
Lower Cape Housing Institute: Community Development Partnership submitted the application for
years 8 & 9 of the Lower Cape Housing Institute. It is a continuing education opportunity as evidenced
by the 306 people who have attended the past 7 Housing Institutes, including 45 participants from the
Town of Brewster. Funding request for $20,000 over two years. No questions.
Approved:
VOTE:
Community Preservation Committee
Minutes of December 13, 2023 Page 2 of 3
Nauset Together We Can Prevention Council, Inc. funding request for $7500 for the Finch Skateboard
Park in Orleans for safety upgrades. The Council is a 501c3 whose goal is to develop and implement
solutions to prevent high risk social behaviors in our youth. All funding for the park’s infrastructure
comes from grants and donations. The purpose of this grant is to secure funding for safety upgrades.
Faythe said the other two applications have legal opinions because they are recurring. She suggests we
reach out to town counsel for CPA eligibility on this project. Rollie agreed. Faythe asked Rollie if there
was any other information he would like to see. He answered not at this time but might have at a later
point. Sarah said we will go to legal on this application.
Faythe forwarded a follow-up regarding the Schoolhouse Project. We are working with them to amend
the funding they have and seek additional funding. It does meet CPA requirements. She will confirm
that the new estimate amount is the correct additional amount. There was $10K also approved for
administrative funding. Sarah said the increase of $100,000 is a concern, but all things have gone up.
She would be interested to know what the cost of the additional work they had to do would be. It is just
a huge jump. She would like to know what the drivers of the difference are. Faythe said Paul said there
were permitting expenses and soil testing, etc. Sarah wonders what those amounts were specifically.
Faythe said she would ask for a follow-up memo from Sally Gunning clarifying the amounts and
explanation of the drivers of that change. Elizabeth wonders if this is even high enough. Sarah said it’s
hard to say as inflation is really driving this at this time. Faythe said she would ask them to clarify
contingencies and funding sources.
4.Review and discussion of update Project Listing
Sarah wondered if we could change the format to have those projects already finished to be in a separate
document. Elizabeth said that it would be easy to put them in a separate document. She also thinks the
AHT should be separated out because it’s tracked differently. Also, it seems that if we go to Town
Meeting, the dollars set aside have not been separated. It would be much easier if we list them separately
so we can track the expenses more easily. Faythe said we asked Mimi Bernardo that and she doesn’t
want to separate them out because it gets very confusing very quickly. But she does think they need to
be separated out somehow so we can track spending more easily and clearly. Sarah said going forward,
she thinks the finished projects should be pulled out. Faythe will make separate tabs. Elizabeth will send
her what she has just done by separating out the Housing Trust. Faythe said that sounds good.
5.Project Updates
Jill Scalise addressed the committee – looking at the subsidized housing inventory in Brewster, one of
the homes the Trust was trying to preserve was 212 Yankee Drive – that home is now for sale – in the
process of being rehabbed with new walls, new floors, new septic system, new appliances. It has heat,
there will be inspections and hopefully certificate of occupancy coming next month. Applications are
available at Town Hall, Housing Assistance Corp., and the Ladies Library. The home is for sale for
$237,900. It is an affordable deed restricted home, and it is for first time homebuyers making up to 80%
of area median income. The Trust contracted with the Resource Inc. and Housing Assistance
Corporation to oversee the rehabilitation and the affordable home lottery. It is a lovely home abutting
Stony Brook Elementary School. Jill invited the CPC to come tour the home in January. She and Donna
will set up an afternoon for them to come view the home.
Community Preservation Committee
Minutes of December 13, 2023 Page 3 of 3
6.Approval of Minutes – 8/9/23 & 10/25/23 Public Hearing
Motion to approve the Minutes from August 9, 2023 as written.
MOVED by Roland Bassett. Faythe Ellis second.
Roll Call Vote: Bruce Evans – yes, Elizabeth Taylor – yes, Sharon Marotti – yes, Roland Bassett –
yes, Peggy Jablonski – abstain, Faythe Ellis – abstain, Chair Robinson – yes.
VOTE 5-yes 0-no 2-abstain
Motion to approve the Minutes from October 25, 2023 as written.
MOVED by Roland Bassett. Sharon Marotti second.
Roll Call Vote: Bruce Evans – yes, Elizabeth Taylor – yes, Sharon Marotti – yes, Roland Bassett –
yes, Peggy Jablonski – yes, Faythe Ellis – abstain, Chair Robinson – yes.
VOTE 6-yes 0-no 1-abstain
7.Matters Not Reasonably Anticipated by the Chair- none
8.Announcements
9.Upcoming meeting: December 27th at 4PM
Sarah will be unavailable for the meeting on the 27th and Faythe will Chair.
MOTION made by Elizabeth Taylor to adjourn the meeting at 4:38 pm. Bruce Evans second.
Roll Call Vote: Sharon Marotti – yes, Elizabeth Taylor – yes, Peggy Jablonski – yes, Bruce Evans
– yes, Roland Bassett – yes, Faythe Ellis – yes, Chair Robinson – yes.
VOTE 7-yes 0-no
Respectfully submitted, Beth Devine, Recording Secretary
Packet of additional documents available on website for public review.
Community Preservation Committee
Minutes of December 27, 2023 Page 1 of 4
vd
2198 Main Street
Brewster, Massachusetts 02631-1898
(508) 896-3701
FAX (508) 896-8089
COMMUNITY PRESERVATION COMMITTEE
Hybrid Meeting w In-Person Quorum
Wednesday, December 27, 2023, at 4:00 p.m.
MEETING MINUTES OF DECEMBER 27, 2023
Present: Community Preservation Committee (CPC) – Vice Chair Faythe Ellis, Treasurer Sharon
Marotti, Clerk Elizabeth Taylor, Roland Bassett, Bruce Evans, Peggy Jablonski (remote attendance)
Absent: Chair Sarah Robinson, Christine Boucher
Also Present: Cynthia Bingham, Select Board (remote attendance,)
Vice Chair Ellis called the meeting to order at 4:01 pm, announced a quorum, and read the Recording
Statement.
This meeting will be conducted in person at the time and location identified above. This means that at least a quorum of the members of
the public body will attend the meeting in person and members of the public are welcome to attend in person as well. As a courtesy only,
access to the meeting is also being provided via remote means in accordance with applicable law. Please note that while an option for
remote attendance and/or participation is being provided as a courtesy to the public, the meeting/hearing will not be suspended or
terminated if technological problems interrupt the virtual broadcast or affect remote attendance or participation, unless otherwise
required by law. Members of the public with particular interest in any specific item on this agenda, which includes an applicant and its
representatives, should make plans for in-person vs. virtual attendance accordingly.
1.Public Announcements and Comment- none
2.Financial Update
In the packet, Faythe included the FY25 forecast with plug in numbers, just placeholders for the
applications that have been submitted. For the Housing Coordinator, the amount is $74,589; for Cape
Housing Institute, the amount is $20,000; for the Finch Skateboard Park, $7500; and for Schoolhouse
#3, $148,400. As a companion to that, she included the Target Allocation Policy Tracking sheet where
she plugged in for FY25 those same numbers. Faythe said in the past, we would talk about individual
applications and requests, plug the number in and go to the next. We are approaching a time where it is a
little more complicated than that. She thinks it would be important to talk about this in the next meeting.
Sharon said it might be a good idea to look at the presentations that were done at the Public Hearing and
Historic things coming our way as a starting point to consider what is potentially coming up over the
next couple of years. Paul thinks it feels a little early to be looking that far ahead as this is only year 2 of
our 5-year plan. Peggy thought the other thing to go over looking at in the next couple of years is
revenue. To then have a further discussion for building projects – housing, historic, recreation – if it
comes in above the original estimate, is there a cut off? At what point do we think about this differently?
How do we deal with the contingency factor and when does a project not become viable? Paul said one
way to do that would be to set a maximum award amount – there are other ways of doing that. All the
Approved:
VOTE:
Community Preservation Committee
Minutes of December 27, 2023 Page 2 of 4
State funding does it like that. Faythe said this puts us and the voters in a difficult position. She will
recommend to Sarah that we put this on the agenda for our next meeting and invite Donna Kalinick to
come in as a resource for the conversation. It would be helpful to inform future decisions we are going
to be making for Spring Town Meeting.
3.Discussion and possible vote on completeness, timeliness, and CPA eligibility for funding
requests submitted for CPC recommendation to Spring 2024 Town Meeting
1.Lower Cape Housing Institute – repeat request, this is CPA eligible. Are there any comments
or questions? Paul recused himself from this discussion as he is on the Board of the CDP.
Motion to declare the Lower Cape Housing Institute application as complete, timely, and CPA
eligible.
MOVED by Roland Bassett. Bruce Evans second.
Roll Call Vote: Bruce Evans - yes, Elizabeth Taylor – yes, Sharon Marotti – yes, Roland Bassett –
yes, Peggy Jablonski – yes, Vice Chair Ellis - yes.
VOTE 6-yes 0-no
Faythe will refer this to the Housing Partnership for review.
2.Finch Park project – we have a legal opinion that it is CPA eligible. Any comments?
Paul said looking at the legal opinion, we need to determine that the work is rehabilitative and
not ordinary maintenance.
Motion to declare the Finch Park Project application as complete, timely, CPA eligible, and used
only for rehabilitation.
MOVED by Sharon Marotti. Roland Bassett second.
Roll Call Vote: Bruce Evans - yes, Elizabeth Taylor – yes, Sharon Marotti – yes, Roland Bassett –
yes, Peggy Jablonski – yes, Paul Ruchinskas – yes, Vice Chair Ellis - yes.
VOTE 7-yes 0-no
Faythe will refer this to Recreation for review.
3.Brewster Town Administration submitted the application for the Brewster Housing
Coordinator position.
Motion to declare the Housing Coordinator position application as complete, timely, and CPA
eligible.
MOVED by Roland Bassett. Paul Ruchinskas second.
Roll Call Vote: Bruce Evans - yes, Elizabeth Taylor – yes, Sharon Marotti – yes, Roland Bassett –
yes, Peggy Jablonski – yes, Paul Ruchinskas – yes, Vice Chair Ellis - yes.
VOTE 7-yes 0-no
4.Schoolhouse #3 request – we are treating this as an amendment to the original application. They
are requesting an additional $148,400 for the project. Do we think we want to refer this back to
the historical commission for review or discuss the revised numbers with the committee. Bruce
felt it would be good to review with the committee as the historical commission doesn’t
generally get large project numbers for review. Paul asked if there would be any downside to
Community Preservation Committee
Minutes of December 27, 2023 Page 3 of 4
referring it to the commission? Faythe was not sure what it would add but would ask Eric Dray
to review the revision and join us in our conversation that we would make at Town Meeting.
Sharon asked if this was the only estimate they had for this? Faythe said this is the estimate from
the contractor, but many on their board are retired builders and that is where their expertise is
evaluated from. She doesn’t believe it needs to go back to the Historic Commission.
Motion to declare the Schoolhouse #3 Project additional information as complete, timely, and
CPA eligible.
MOVED by Paul Ruchinskas. Bruce Evans second.
Roll Call Vote: Bruce Evans - yes, Elizabeth Taylor – yes, Sharon Marotti – yes, Roland Bassett –
yes, Peggy Jablonski – yes, Paul Ruchinskas – yes, Vice Chair Ellis - yes.
VOTE 7-yes 0-no
Faythe will refer this to Eric Dray for review.
4.Project Updates
Faythe said the closing for the CC5 Housing project happened last week. It was a scramble to get
all the reviews and signatures done all at the end of last week. As a result of the back-and-forth
emails, Jill is recommending we have a further discussion between herself, Faythe, and others to
come up with a better way to work these regional closings going forward.
Elizabeth heard from Richard Archer about the Crosby Chimney Project. It looks like they have
a preliminary bid of $62,000. Their application was for $67,400, so there is about $5,400 left
over. The way things are going, she is hoping that leeway will cover any problems. Richard
Archer sent it to Eric Dray for review, and she is hoping it won’t see any price increases.
5.Approval of Minutes – 11/29/23
11/29/23- Paul said on page 2 last paragraph – after the clearest way forward… wanted to add: after
further discussion, he agreed to treat it as an amendment to the original award…
Motion to approve the Minutes from November 29, 2023 with that edit.
MOVED by Elizabeth Taylor. Sharon Marotti second.
Roll Call Vote: Bruce Evans - yes, Elizabeth Taylor – yes, Sharon Marotti – yes, Roland Bassett –
yes, Peggy Jablonski – yes, Paul Ruchinskas – yes, Vice Chair Ellis - yes.
VOTE 7-yes 0-no
6.Matters Not Reasonably Anticipated by the Chair
Faythe asked if anyone had seen the Cape Cod Times article on the 26th? It was a front-page
article about a petition put forth for the Brewster Cemetery on Lower Road. They are planning to
submit an application for funding from the CPC to take care of those gravestones. They are
doing this online petition to get letters of support for their application.
Community Preservation Committee
Minutes of December 27, 2023 Page 4 of 4
Faythe said within the past 3 days, there was an interesting editorial in the Boston Glode
regarding their position regarding advocating for changes in the Community Preservation Act.
She will bring it to the next meeting.
7.Announcements - none
8.Upcoming meeting: January 10th at 4PM
MOTION made by Bruce Evans to adjourn the meeting at 4:37 pm. Sharon Marotti second.
Roll Call Vote: Sharon Marotti – yes, Elizabeth Taylor – yes, Bruce Evans – yes, Roland Bassett –
yes, Paul Ruchinskas – yes, Peggy Jablonski – yes, Vice Chair Ellis - yes.
VOTE 7-yes 0-no
Respectfully submitted, Beth Devine, Recording Secretary
Packet of additional documents available on website for public review.