HomeMy Public PortalAbout2.21.24 BOH meeting packetBENNETT ENVIRONMENTAL ASSOCIATES, LLC.
A NATURAL SYSTEMS UTILITIES COMPANY
LICENSED SITE PROFESSIONALS ENVIRONMENTAL SCIENTISTS GEOLOGISTS ENGINEERS
1573 Main Street, Brewster, MA 02631 508-896-1706 Fax 508-896-5109 www.bennett-ea.com
EMERGENCY SPILL RESPONSE WASTE SITE CLEANUP SITE ASSESSMENT PERMITTING SEPTIC DESIGN & INSPECTION
DESIGN BUILD OPERATION & MAINTENANCE WATER SUPPLY DEVELOPMENT WASTEWATER TREATMENT FIELD SERVICES
K47810DA.X.WW.700
February 14, 2024
Amy Von Hone, Health Director
Brewster Board of Health
2198 Main Street
Brewster, MA 02631
RE: AMPHIDROME WASTEWATER TREATMENT PLANT
2022 ANNUAL SUMMARY
Groundwater Discharge Permit # SE 746-1
Pleasant Bay Health and Living Centers: 383 South Orleans Road – Brewster, MA
Dear Ms. Von Hone,
BENNETT ENVIRONMENTAL ASSOCIATES (BEA), LLC., continues to be retained by
Pleasant Bay Nursing and Rehabilitation Center and The Woodlands at Pleasant Bay (collective ly
known as Pleasant Bay Health and Living Centers) since treatment operation began in December
2007. BEA is responsible for the Wastewater Treatment Plant operation and maintenance duties, and
for maintaining compliance with permit requirements, including but not limited to, fulfilling
sampling program requirements and monitoring groundwater quality. The following annual report
has been prepared to summarize the overall treatment plant status and detail the 2023 sampling
results, as well as any treatment operation issues experienced, and modifications made.
During the 2023 operating period, the above referenced facility had no reportable
exceedances. Total nitrogen concentrations were reported at or below 5.0 mg/L in 67% of the
effluent samples collected, with an average total nitrogen concentration of 4.20 mg/L for the 2023
monitoring period. All other parameters subject to permit limitations under SE 746-1 were reported
below their respective limitations throughout 2023. As such, it is evident the treatment plant
continues to provide excellent treatment and operates to design specifications.
Regularly scheduled and routine maintenance of the system, including pumping of tanks,
maintenance of UV components, and inspections of blower components, and other electrical and
mechanical components were performed during the 2023 operating period.
Based on the results of the monthly effluent laboratory analysis, and the regularly scheduled
and routine maintenance performed during the 2023 operating period, it is the opinion of BEA that
the wastewater treatment system servicing Pleasant Bay Health and Living Centers continues to
perform optimally.
PLEASANT BAY / K47810DA.X.WW.700
PAGE 2 OF 2 BREWSTER BOH 2022 ANNUAL SUMMARY
Very Truly Yours,
BENNETT ENVIRONMENTAL ASSOCIATES, LLC.
Joseph Smith Brian R. Fortin
Regional Operations Manager Regional Operations Supervisor
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a
system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and
complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for
knowing violations.
Encl. Influent and Effluent Analysis Charts [BOD, TSS and Total Nitrogen]
Cc: Chris Hannon, Director of Operations, Pleasant Bay Health and Living Centers [via email]
Steve Colarusso, Facility Director, Pleasant Bay Health and Living Centers [via email]
Adam Stern, PE, Natural Systems Utilities [via email]
Pleasant Bay / Woodlands 2022
Year in Review
DATE LOCATION DESCRIPTION
JANUARY • Monthly Tasks
Completed
• Tank pump
outs
• Test auto-dialer operation, calibrate on-site pH meter,
exercise valves and solenoids, flush bicarb feed lines, test
and exercise all thermal overloads in control panels and
blowers, visually inspect and test operation of all
mechanical components in tanks.
• RBO pumped out both Anoxic tanks for a total of 40,000
gallons, skimmed scum in the lift station.
FEBRUARY Monthly Tasks
Completed
Test auto-dialer operation, calibrate on-site pH meter, exercise
valves and solenoids, flush bicarb feed lines, test and exercise
all thermal overloads in control panels and blowers, visually
inspect and test operation of all mechanical components in
tanks.
MARCH Monthly Tasks
Completed
Test auto-dialer operation, calibrate on-site pH meter, exercise
valves and solenoids, flush bicarb feed lines, test and exercise
all thermal overloads in control panels and blowers, visually
inspect and test operation of all mechanical components in
tanks.
APRIL Monthly Tasks
Completed
Test auto-dialer operation, calibrate on-site pH meter, exercise
valves and solenoids, flush bicarb feed lines, test and exercise
all thermal overloads in control panels and blowers, visually
inspect and test operation of all mechanical components in
tanks.
MAY Monthly Tasks
Completed
Test auto-dialer operation, calibrate on-site pH meter, exercise
valves and solenoids, flush bicarb feed lines, test and exercise
all thermal overloads in control panels and blowers, visually
inspect and test operation of all mechanical components in
tanks.
JUNE Monthly Tasks
Completed
Test auto-dialer operation, calibrate on-site pH meter, exercise
valves and solenoids, flush bicarb feed lines, test and exercise
all thermal overloads in control panels and blowers, visually
inspect and test operation of all mechanical components in
tanks.
JULY Monthly Tasks
Completed
Test auto-dialer operation, calibrate on-site pH meter, exercise
valves and solenoids, flush bicarb feed lines, test and exercise
all thermal overloads in control panels and blowers, visually
inspect and test operation of all mechanical components in
tanks.
AUGUST Monthly Tasks
Completed
Test auto-dialer operation, calibrate on-site pH meter, exercise
valves and solenoids, flush bicarb feed lines, test and exercise
all thermal overloads in control panels and blowers, visually
inspect and test operation of all mechanical components in
tanks.
SEPTEMBER Monthly Tasks
Completed
Test auto-dialer operation, calibrate on-site pH meter, exercise
valves and solenoids, flush bicarb feed lines, test and exercise
all thermal overloads in control panels and blowers, visually
inspect and test operation of all mechanical components in
tanks.
OCTOBER Monthly Tasks
Completed
Test auto-dialer operation, calibrate on-site pH meter, exercise
valves and solenoids, flush bicarb feed lines, test and exercise
all thermal overloads in control panels and blowers, visually
inspect and test operation of all mechanical components in
tanks.
NOVEMBER Monthly Tasks
Completed
Test auto-dialer operation, calibrate on-site pH meter, exercise
valves and solenoids, flush bicarb feed lines, test and exercise
all thermal overloads in control panels and blowers, visually
inspect and test operation of all mechanical components in
tanks.
DECEMBER Monthly Tasks
Completed
Test auto-dialer operation, calibrate on-site pH meter, exercise
valves and solenoids, flush bicarb feed lines, test and exercise
all thermal overloads in control panels and blowers, visually
inspect and test operation of all mechanical components in
tanks.
Effluent
Limits 15 mg/L 10 mg/L 10 mg/L 10 mg/L
Month NH3 Oil &
Grease Nitrite Nitrate TKN Total
Nitrogen
Fecal
Coliform
Total
Phosphorus
Ortho
Phosphate Chloride
Influent Effluent Efficiency Influent Effluent Efficiency Influent Influent Effluent Efficiency Effluent Effluent Effluent Effluent Effluent Effluent Effluent Effluent Effluent
January 260 200 23%74 ND 100%0.49 150 ND 100%ND ND 6.40 1.420 7.8 4.09 42
February 360 240 33%85 ND 100%17.50 190 ND 100%ND ND 6.00 0.908 6.9 ND 43
March 300 460 -53%79 ND 100%13.30 120 5.3 100%ND ND 5.30 0.738 6.0 2 3.42 3.26 43
April 340 210 38%73 ND 100%19.70 150 ND 100%ND ND 5.60 1.280 6.9 ND 46
May 340 230 32%63 ND 100%15.30 150 ND 100%ND 0.076 3.20 1.200 4.5 ND 40
June 320 250 22%61 ND 100%2.06 89 2.4 97%ND ND 2.90 0.968 3.9 ND 2.88 1.92 41
July 300 220 27%92 ND 100%14.30 120 ND 100%ND ND 1.50 0.640 2.1 ND 50
August 410 300 27%76 ND 100%17.70 120 ND 100%ND ND 1.90 0.647 2.5 ND 42
September 320 230 28%54 ND 100%11.90 120 3.4 97%ND ND 2.80 0.585 3.4 2 3.00 2.88 55
October 380 260 32%110 ND 100%17.70 170 3.7 98%ND ND 2.70 0.726 3.4 ND 51
November 300 240 20%83 ND 100%16.20 130 ND 100%ND ND 0.90 0.715 1.6 ND 48
December 300 250 17%71 ND 100%0.17 140 ND 100%ND ND 0.43 0.842 1.3 1 3.36 3.36 49
AVERAGE 328 258 20%77 0.0 100%12.19 137 1.2 99%0 0.08 3.30 0.89 4.20 0.76 3.17 2.86 45.8
ND = Non Dectectable
TSS BOD
PLEASANT BAY NURSING HOME & REHABILITATION CENTER
2023 ANNUAL REPORT
30 mg/L30 mg/L
TS