Loading...
HomeMy Public PortalAbout2.21.24 BOH meeting packetBENNETT ENVIRONMENTAL ASSOCIATES, LLC. A NATURAL SYSTEMS UTILITIES COMPANY LICENSED SITE PROFESSIONALS ENVIRONMENTAL SCIENTISTS GEOLOGISTS ENGINEERS 1573 Main Street, Brewster, MA 02631 508-896-1706 Fax 508-896-5109 www.bennett-ea.com EMERGENCY SPILL RESPONSE WASTE SITE CLEANUP SITE ASSESSMENT PERMITTING SEPTIC DESIGN & INSPECTION DESIGN BUILD OPERATION & MAINTENANCE WATER SUPPLY DEVELOPMENT WASTEWATER TREATMENT FIELD SERVICES K47810DA.X.WW.700 February 14, 2024 Amy Von Hone, Health Director Brewster Board of Health 2198 Main Street Brewster, MA 02631 RE: AMPHIDROME WASTEWATER TREATMENT PLANT 2022 ANNUAL SUMMARY Groundwater Discharge Permit # SE 746-1 Pleasant Bay Health and Living Centers: 383 South Orleans Road – Brewster, MA Dear Ms. Von Hone, BENNETT ENVIRONMENTAL ASSOCIATES (BEA), LLC., continues to be retained by Pleasant Bay Nursing and Rehabilitation Center and The Woodlands at Pleasant Bay (collective ly known as Pleasant Bay Health and Living Centers) since treatment operation began in December 2007. BEA is responsible for the Wastewater Treatment Plant operation and maintenance duties, and for maintaining compliance with permit requirements, including but not limited to, fulfilling sampling program requirements and monitoring groundwater quality. The following annual report has been prepared to summarize the overall treatment plant status and detail the 2023 sampling results, as well as any treatment operation issues experienced, and modifications made. During the 2023 operating period, the above referenced facility had no reportable exceedances. Total nitrogen concentrations were reported at or below 5.0 mg/L in 67% of the effluent samples collected, with an average total nitrogen concentration of 4.20 mg/L for the 2023 monitoring period. All other parameters subject to permit limitations under SE 746-1 were reported below their respective limitations throughout 2023. As such, it is evident the treatment plant continues to provide excellent treatment and operates to design specifications. Regularly scheduled and routine maintenance of the system, including pumping of tanks, maintenance of UV components, and inspections of blower components, and other electrical and mechanical components were performed during the 2023 operating period. Based on the results of the monthly effluent laboratory analysis, and the regularly scheduled and routine maintenance performed during the 2023 operating period, it is the opinion of BEA that the wastewater treatment system servicing Pleasant Bay Health and Living Centers continues to perform optimally. PLEASANT BAY / K47810DA.X.WW.700 PAGE 2 OF 2 BREWSTER BOH 2022 ANNUAL SUMMARY Very Truly Yours, BENNETT ENVIRONMENTAL ASSOCIATES, LLC. Joseph Smith Brian R. Fortin Regional Operations Manager Regional Operations Supervisor I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Encl. Influent and Effluent Analysis Charts [BOD, TSS and Total Nitrogen] Cc: Chris Hannon, Director of Operations, Pleasant Bay Health and Living Centers [via email] Steve Colarusso, Facility Director, Pleasant Bay Health and Living Centers [via email] Adam Stern, PE, Natural Systems Utilities [via email] Pleasant Bay / Woodlands 2022 Year in Review DATE LOCATION DESCRIPTION JANUARY • Monthly Tasks Completed • Tank pump outs • Test auto-dialer operation, calibrate on-site pH meter, exercise valves and solenoids, flush bicarb feed lines, test and exercise all thermal overloads in control panels and blowers, visually inspect and test operation of all mechanical components in tanks. • RBO pumped out both Anoxic tanks for a total of 40,000 gallons, skimmed scum in the lift station. FEBRUARY Monthly Tasks Completed Test auto-dialer operation, calibrate on-site pH meter, exercise valves and solenoids, flush bicarb feed lines, test and exercise all thermal overloads in control panels and blowers, visually inspect and test operation of all mechanical components in tanks. MARCH Monthly Tasks Completed Test auto-dialer operation, calibrate on-site pH meter, exercise valves and solenoids, flush bicarb feed lines, test and exercise all thermal overloads in control panels and blowers, visually inspect and test operation of all mechanical components in tanks. APRIL Monthly Tasks Completed Test auto-dialer operation, calibrate on-site pH meter, exercise valves and solenoids, flush bicarb feed lines, test and exercise all thermal overloads in control panels and blowers, visually inspect and test operation of all mechanical components in tanks. MAY Monthly Tasks Completed Test auto-dialer operation, calibrate on-site pH meter, exercise valves and solenoids, flush bicarb feed lines, test and exercise all thermal overloads in control panels and blowers, visually inspect and test operation of all mechanical components in tanks. JUNE Monthly Tasks Completed Test auto-dialer operation, calibrate on-site pH meter, exercise valves and solenoids, flush bicarb feed lines, test and exercise all thermal overloads in control panels and blowers, visually inspect and test operation of all mechanical components in tanks. JULY Monthly Tasks Completed Test auto-dialer operation, calibrate on-site pH meter, exercise valves and solenoids, flush bicarb feed lines, test and exercise all thermal overloads in control panels and blowers, visually inspect and test operation of all mechanical components in tanks. AUGUST Monthly Tasks Completed Test auto-dialer operation, calibrate on-site pH meter, exercise valves and solenoids, flush bicarb feed lines, test and exercise all thermal overloads in control panels and blowers, visually inspect and test operation of all mechanical components in tanks. SEPTEMBER Monthly Tasks Completed Test auto-dialer operation, calibrate on-site pH meter, exercise valves and solenoids, flush bicarb feed lines, test and exercise all thermal overloads in control panels and blowers, visually inspect and test operation of all mechanical components in tanks. OCTOBER Monthly Tasks Completed Test auto-dialer operation, calibrate on-site pH meter, exercise valves and solenoids, flush bicarb feed lines, test and exercise all thermal overloads in control panels and blowers, visually inspect and test operation of all mechanical components in tanks. NOVEMBER Monthly Tasks Completed Test auto-dialer operation, calibrate on-site pH meter, exercise valves and solenoids, flush bicarb feed lines, test and exercise all thermal overloads in control panels and blowers, visually inspect and test operation of all mechanical components in tanks. DECEMBER Monthly Tasks Completed Test auto-dialer operation, calibrate on-site pH meter, exercise valves and solenoids, flush bicarb feed lines, test and exercise all thermal overloads in control panels and blowers, visually inspect and test operation of all mechanical components in tanks. Effluent Limits 15 mg/L 10 mg/L 10 mg/L 10 mg/L Month NH3 Oil & Grease Nitrite Nitrate TKN Total Nitrogen Fecal Coliform Total Phosphorus Ortho Phosphate Chloride Influent Effluent Efficiency Influent Effluent Efficiency Influent Influent Effluent Efficiency Effluent Effluent Effluent Effluent Effluent Effluent Effluent Effluent Effluent January 260 200 23%74 ND 100%0.49 150 ND 100%ND ND 6.40 1.420 7.8 4.09 42 February 360 240 33%85 ND 100%17.50 190 ND 100%ND ND 6.00 0.908 6.9 ND 43 March 300 460 -53%79 ND 100%13.30 120 5.3 100%ND ND 5.30 0.738 6.0 2 3.42 3.26 43 April 340 210 38%73 ND 100%19.70 150 ND 100%ND ND 5.60 1.280 6.9 ND 46 May 340 230 32%63 ND 100%15.30 150 ND 100%ND 0.076 3.20 1.200 4.5 ND 40 June 320 250 22%61 ND 100%2.06 89 2.4 97%ND ND 2.90 0.968 3.9 ND 2.88 1.92 41 July 300 220 27%92 ND 100%14.30 120 ND 100%ND ND 1.50 0.640 2.1 ND 50 August 410 300 27%76 ND 100%17.70 120 ND 100%ND ND 1.90 0.647 2.5 ND 42 September 320 230 28%54 ND 100%11.90 120 3.4 97%ND ND 2.80 0.585 3.4 2 3.00 2.88 55 October 380 260 32%110 ND 100%17.70 170 3.7 98%ND ND 2.70 0.726 3.4 ND 51 November 300 240 20%83 ND 100%16.20 130 ND 100%ND ND 0.90 0.715 1.6 ND 48 December 300 250 17%71 ND 100%0.17 140 ND 100%ND ND 0.43 0.842 1.3 1 3.36 3.36 49 AVERAGE 328 258 20%77 0.0 100%12.19 137 1.2 99%0 0.08 3.30 0.89 4.20 0.76 3.17 2.86 45.8 ND = Non Dectectable TSS BOD PLEASANT BAY NURSING HOME & REHABILITATION CENTER 2023 ANNUAL REPORT 30 mg/L30 mg/L TS