HomeMy Public PortalAboutORD09343 • • waM '
•
AMENDED
BILL NO. 75
INTRODUCED BY COUNCILMAN .2
ORDINANCE NO. ��
AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI , AUTHORIZING THE
MAYOR AND CLERK OF THE CITY TO EXECUTE A CONTRACT WITH REINTJES
WATERPROOFING COMPANY, A CORPORATION OF MISSOURI , FOR CLEANING,
PATCHING AND COATING OF EXISTING CITY PARKING GARAGE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF JEFFERSON,
MISSOURI, AS FOLLOWS:
Section 1. The Mayor and Clerk of the City are hereby
authorized and directed, for and in the name of the City, to
execute a written contract with Reintjes Waterproofing Company,
a Missouri Corporation, for cleaning, patching and coating of
existing City Parking Garage, for the sum of $173,500. 00.
Section 3. A copy of said contract is attached hereto.
�f Section 3. This ordinance shall take effect and be in force
( from and after its passage and approval.
assed i% � �_ �� Approved ?/ X79
Pre dent of t e Council Mayor
lAttest
Q4 o
C' Clerk jr'i
r
�2.
s
4
s
i
I
t
' A �
11�
1�
IBill No.
INTRODUCED BY COUNCILMAN i*,��� ,�;• � �
ORDINANCE NO.
AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, AUTHORIZING THE
MAYOR AND CLERK OF THE CITY TO EXECUTE A CONTRACT WITH REINTJES
WATERPROOFING COMPANY, A CORPORATION OF MISSOURI, FOR EANING,
PATCHING AND COATING OF EXISTING CITY PARKING GARAGE
BE IT ORDAINED Y THE CITY COUNCIL OF THE CITY OF JEFFERSON,
MISSOURI, AS FOL OWS:
Section 1. Th Mayor and Clerk of the ty are hereby
authorized and direct d, for and in the na a of the City, to
look
execute a written cont ct with Reintjes aterproofing Company,
a Missouri Corporation, ®r cleaning, tching and coating of
existing City Parking Gard e, for th sum of $148,000.00.
Section 2. A copy of id co ract is attached hereto.
Section 3. This ordinan e s all take affect and be in
force from and after its passe and approval.
Passed App oved
i
President of the Co u it Mayor
Attest iC
a�
li
City erk
E
7
r
r
FORM OF AGREEMENT
IkS AGREEMENT made and entered into this — /&X day of
1979, by and between The City of Jefferson, Jefferson City, Missouri , hereinafter
called "OWNER" and Reintjes Waterproofing Co. , a Corporation of Missouri , herein-
after called "CONTRACTOR".
WITNESSETH:
THAT for and in consideration of the agreements and undertakings of the parties
hereinafter set forth, it is agreed by and between the parties hereto as follows:
1. The Contractor shall furnish all labor, materials and equipment and
services and shall perform all operations required to complete the
Cleaning, Patching and Coating of Existing City Parking Garage all in
strict accordance with the Contract Documents and as described in the
specifications entitled "Cleaning, Patching and Coating of Existing
City Parking Garage" located at Madison on Capitol Avenue, Jefferson
City, Missouri , and in the drawings described in the General Conditions
of the Contract attached to the said specifications, all of which were
prepared by R. F. Verslues and Associates, Inc. , 705 East McCarty Street,
Jefferson City, Missouri , hereinafter called "Engineers". Said speci-
fications and drawings are hereby made a part of this Agreement as fully
as if attached hereto or set herein. This Contract includes the work
as specified under the BASE BID. The Bid Item prices and Alternate No. 1
shall remain as stated in the Proposal for the duration of this Contract.
2. Contractor shall commence work under this Agreement within ten (10) days
after receipt by him of a Notice to Proceed and shall fully complete all
of the work hereby agreed to be performed in ninety (90) calendar days
after receipt of said Notice to Proceed. Failure to complete the work
within ninety (90) calendar days from date of Notice to Proceed, the
Contractor agrees to ay to the Owner as liquidated damages, the sum of
Fifty Dollars ($50.00 for each day thereafter, Sundays and holidays
excepted, that the work remains incomplete.
3. The Contractor agrees that he is fully informed regarding all of the
conditions affecting the work to be done under this Agreement and as to
the labor, materials, equipment and services to be furnished for the
completion of the work to be performed hereunder, and agrees that his
information was secured by personal investigation and research, and not
from any statement or representation of any officer, agent or employee
of the Owner.
Form of Agreement
Ole -2-
4. For Base Bid, Owner shall pay Contractor for the complete performance
of the work hereunder to the satisfaction of the Owner, the sum of
One Hundred Forty-eight Thousand Dollars and No Cents ($148,000.00).
The Contract price set out above is subject to deductions as provided
in the Contract Documents and is to be payable upon certification by
the Engineer as provided in the Contract Documents, as follows:
A. Monthly payments, due on or before the 15th day of each month, of
Ninety Percent (90%) of the value of the work performed including
materials delivered and suitably stored at the site but not in-
corporated in the work, during the preceding calendar month, such
value being calculated in proportion to total construction price.
B. Final payment of the balance due upon completion of the work, upon
the dates specified, to the satisfaction of the Owner, and acceptance
thereof by the Owner.
The Contract Documents shall consist of the following parts:
A. This Agreement.
B. 'The General Conditions of the Contract bound with the Specifications
hereinafter referred to, copies of which have been signed or initialed
by the parties.
C. Specifications entitled "Cleaning, Patching and Coating of Existing
City Parking Garage" located at Madison on Capitol Avenue, Jefferson
City, Missouri , prepared by R. F. Verslues and Associates, Inc. ,
705 East McCarty Street, Jefferson City, Missouri , including all
modifications thereof incorporated herein before the date hereto,
copies of which have been initialed or signed by the parties.
D. Contractor's Proposal as accepted by the Owner.
E. Prevailing Wage Determination.
THIS AGREEMENT, together with the Contract Documents hereinabove described, for
the Contract between the parties, and each of them is as fully a part of the
Wract as if attached hereto or herein repeated. The Contract Documents are
ementary and what is called for by one shall be as binding as if called for
by ail. In the event that any provision of any of the component parts of the
Form of Agreement
ege -3-
Contract shall expressly conflict with any part of any other component part,
the provisions of the component part first enumerated herein shall govern,
unless otherwise specifically stated.
IN WITNESS HEREOF, the parties hereto have caused this instrument to be
executed, in triplicate, on the day and year above written.
THE CITY OF JEFFERSON
l
By
Wor, ity of Jeff rson
Re ni tjes Waterproo n Co.
ATTEST:
Secretary
M
i.1 REINTJES WATERPROOFING COMPANY 02617 JEFFERSON ST.,P.O.BOX 886
KANSAS CITY,MO.64141•(816)4213870
October 170 1979
Mr. R. F. Verslues & Associates Inc.
705 East McCarty Street
Jefferson City, Missouri 65101
Re: Contract for First and Second
Level City Parking Garage
Jefferson City, Missouri
Dear Mr. Verslues:
This letter is our request for a change order in the amount of an additional
Twenty-Five Thousand Five Hundred Dollars........................$25,500.00,
to be added to our contract of $148,000.00, for the work on the first and
second levels of the City Parking Garage.
The change order is necessary due to the exceedingly poor condition of app-
roximately 120500 square feet of concrete on the main level having to be
removed and replaced, in lieu of the patching syotem outlined in the contract
documents.
Furnished herewith are documents of the Scope of Work, marked set of plans,
specifications for Sealcrete and our five (5) year warranty which becomes
a part of the contract documents upon acceptance of the change order.
To wham it may concern, the change order will actually save the City of
Jefferson apprcoximtely $200000.000 as in the area of replacement there
already was 900 square feet of unit price work at $50.00 per foot. In
addition to this savings, by using Sealcrete in lieu of the deck coating
specified the Reintjes Waterproofing Company is extending the warranty or
defect in workmanship and material with replacement to be at no cost to the
owner, an additional four years over the one year called out in the contract.
Very truly yours,
DATE: j 1 17 17 of REINTJES WATERPROOFING COMPANY
ACCEPTED: c/ Samu a Yo rtee
Manager
SLY/dp
w
REINTJES WATERPROOFING COMPANY 02817 JEFFERSON ST.,P.O.BOX 888
KANSAS CITY,MO.64141•18181421.3870
Change Order #1
Cleaning, Patching & Coating
Jefferson City Parking Garage
Scope of Work
1. In lieu of applying "Scotch Clad Deck Coating System" or "Industrial
Membrane System" called for in the specifications all coacrete. surfaces
will have applied three (3) coats of SEALCRETE and in addition the ready
mix concrete used in the 12,500 square foot area on the lower level will
have Sealcrete added to the mix per specifications attached.
2. The 12,500 square ft. area noted on the attached plan will have existing
concrete, reinforcing steel and deck pans removed. A new concrete
deck of 3,600 lb. Hi Early concrete will be installed. Steel reinforcing
rods will be installed in strict accordance with original specifications
and in addition 6' X 6' - 1010 wire will be installed.
The deck area shall have control joints sawed 20' X 25' on centers and then
caulked with Pecoras GC 5 sealant.
` 1 1
1 Ir
WARRANTY
First and Seond Level Repair
City Parking Garage
Madison at Capitol
Jefferson City, Missouri
For a period of fine years from the date of substantial completion of the
work of Reintjes Waterproofing Company, Inc., herein called "Reintjes" covered
hereby or from the date of shipment of any alleged faulty materials or from the
date of acceptance of any alleged improper workmanship, whichever occurs first,
Reintjes agrees to replace any faulty materials furnished by Reintjes and to repair
any improper workmanship performed by Reintjes whether due to Reintjes' negligent
acts or omissions or otherwise, to conform to this contract or to any warranty.
This warranty is expressly conditioned on Reintjes promptly receiving written
notice from Jefferson City, Missouri, herein called "Buyer", of any such defects
or any improper workmanship and an opportunity to inspect the same prior to their
being disturbed or otherwise moved. The Buyer's exclusive and sole remedy on account
of, or in respect of, the furnishing of material or the work performed by Reintjes
or both, whether due to Seller's negligent acts or omissions, or otherwise, to
conform to this contract, or to any warranty, during said period not to exceed
Five (5) years and Reintjes' liability and responsibility thereon, are limited
to such repair, replacement or refund, but under no circumstances shall Reintjes'
responsibility or liability exceed the amount Reintjes is entitled to receive
Ofor performing this wore. Reintjes is not and shall not be liable or responsible
for any costs incurred or for any loss or damage occasioned by or resulting from
any faulty materials or improper worlananship including any special, direct, indirect,
incidental or consequential damages to anyone as a result thereof. This warranty
is not applicable until and unless Reintjes has been paid for all work performed.
THIS WARRANTY IS EXPRESSLY IN LIEU OF ANY OTHER EXPRESS OR IMPLIED WARRANTIES,
INCLUDING ANY IMPLIED WARRANTY OR MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR
PURPOSE.
REI14TJES WATERPROOFING $OMPANY
�/C
amuel L. u tee,
Manager
y
SLY/dp
CHANGE ORDER REQUEST
P : Jefferson City Parking Garage CHANGE ORDER NO. . 2----
__
CONTRACTOR: PROJECT NO. : 79-12E
Reintjes Waterproofing Co. CONTRACT DATE: October 1 , 1979
PO Box 856 Ordinance No. 9343
Kansas City, Missouri 64114
You are directed to make the following changes in this Contract:
Complete reworking top deck as per plans and specifications.
Start date for this Change Order will be agreed upon prior to commencing work.
`D
Original Contract Sum was 148,000.00
Net change by. previous Change Orders 25,500.00 _! _
The Contract Sum prior to this Chan a Order b 173,500.00
The Contract sum will be (increased3(4eeoeate4)
(uachapq") .by this Change Order $ 66,000.00
The new Contract Sum including this Change Order
will be $ 239.500.00
The Contract Time will be (increased)(4e6fea6e4i
( ) Sixty 60 Days.
T e of Completion as of the date of this Change Order, therefore, is
i S days after notice to proceed.
R_FVerslues & Assoc. Reinties Waterproofing Co._ City of Jefferson, Missouri
AArchi__t__ecct Eng Weer Contractor Owner
By BY ''' ' By_ ---- - - --- —_ —
Date- /I- 2t- 19 Date Date -- /a.-.a6-=-� ---- -
CITY OF JEFFERSON
GEORGE HARTSFIELD
MAYOR
Am
MAYOR
CITY HALL
240 E.HIGH STREET
JEFFERSON CITY,MO.6510, TO: Libby Tihen, City Clerk
CITY ADMINISTUTOR
HALL
CITY HALL FROM: Martin A. Brose f >P.E. Dire r> D.O.T.
240 E.HIGH STREET
JEFFERSON CITY,MO.65101
634-2524 DATE: March 16, 1981
CITY CLERK
CITY HALL
240 E.HIGH STREET RE: Reintjes Waterproofing, Company
JEFFERSON CITY,MO.65101
635-1411
�
,I YAT Y Libby please file the attached information with the
240 E.HI TREET contract documents on the Cleaning, Patching and
JEFFERSON CITY,MO.65101
634-2757 Coating work done on the existing Parking Garage
MUNICIPAL COURT by Reintjes Waterproofing Company.
CITY HALL
240 E.HIGH STREET
JEFFERSON CITY,MO.6.5101 Note that the final payment was made to Reintjes
838-4712
on March 12, 1981, and the City of Jefferson received
FINANC�L a check from Reintjes in the amount of $296. 75 to
240 E.HIGH STREET pay for the telephone bill and the cleaning of the
JEFFERSON CITY,MO.85101
634-4949 offices in the garage.
CITY COUNCIL
CITY HALL
240 E.HIGH STREET
JEFFERSON CITY,MO.65101
636.4712
MEMORIAL AIRPORT
CITY HALL ]� J
240 E.HIGH STREET
JEFFERSON CITY,MO.85101 J
63$-8668
PUBLIC WORKS
911 E.MIL STREET
JEFFERSVTY,MO.65101
634-2455
PLANNING i CODE
ENFORCEMENT
911 E.MILLER STREET
JEFFERSON CITY,MO.65101
634.2456
FIRE
621 W.HIGH STREET
JEFFERSON CITY,MO.65101
638.7311
POLICE
401 MONROE STREET
JEFFERSON CITY,MO.65101
634-2626
PARKINO
201 MADISON STREET
JEFFERSON CITY,MO.65101
636$136
• •� REINTJES WATERPROOFING COMPANY 03800 SUMMIT,P.O.Box 858
KANSAS CITY,MO.64141-(816)766.2306
•
March la, 1981
City of Jefferson
Madison at Capital Avenue
Jefferson City, rfo. 65101
Refereaces S Year Warranty
Cleaning, Patching b Coating
1st, 2nd and Top Leml
City Parking Garage
Gentle>aens
We agree for a period of five years from the data of October 1, 1980 of the
work emoted by they above contract to repair any improper wark®aaship or
seater l. : This agreement is subject to and conditioned upon our receiving
prowt asitt m taatIce fron you of any such defects and "an opportunity to
Inspect..this same prior to thraiar being. moved or otherwise distdnrbed. Our
responsibility is liasited to alb raeplaceneat and we shall not be held to-
sponsibla for any Loss or d&AW varosionaD: by or resulting from such defects.
2=69t an let forth 16-this pariegraph, thane is no other guarantee or warran-
ty expressed or iaplield.
Yours very truly,
REINTJES WATERPROOFING COMPANY
el L. Yoartes
- Manager .
SLYajb
*CITY OF JEFFERSON
1
GEORGE HARTSFIELD IT-
MAYOR
MAYOR
CITY HALL
240 E.HIGH STREET TO: Jim Uffman, Finance Director
JEFFER60N CITY,MO.65101
636-7451
CITY ADMINISTRATOR FROM: Martin A. Brose, P.E. , Director, D.O.T
CITY HALL
240 E.HIGH STREET
JEFFERSON CITY,MO.65101 DATE• March 11 1981
634.2524 f
CI CLER
CITYHALLR RE: Final Payment to Reintjes Waterproofing Co.
240 E.HIGH STREET
JEFFERSON CITY,MO.65101
635-1411 I met with City Attorney Chris Graham this morning
CITY ATTORNEY to discuss the closing of the cleaning, patching and
CITY HA coating project with Reintjes Waterproofing Company
240 E.Hi BEET
JEFFERS ITY,MO.65101 on the existing parking garage,
634-2757
MUNICIPAL COURT During our meeting we discussed the five (5) year
CITY HALL
240 E.HIGH STREET warranty sent to us by Mr. Samuel Yourtee, General
JEFFERSON CITY,MO.65101
636-4712 Manager of Reintjes ; and we feel they have indicated
FINANCE they are going to cover the total project under this
CITY HALL warranty.
240 E.HIGH STREET
JEFFERSON CITE,MO.65101
634-4919
We also discussed the need to continue their preformance
CITY COUNCIL bond for another four (4) years and decided this should
CITY HALL l
240 E.HIGH STREET not 1�e necessary as any defects In workmanship and
JEFFERSON CITY,MO.651o,
064712 material should show up within a years time; and we
MEMORIAL AIRPORT feel the city should not have to pay additional money
CITY HALL for a guarantee of that type.
240 E.HIGH STREET
JEFFERSON CITY,MO.65101
635-6666 We have reviewed this project with Roger Verslues and
PUBLIC WORKS he has signed the project off as being completed. There-
911 E.sILLC��ITYRMO.65101 fore, we recommend that final payment be made to Reintjes
634.2455 Waterproofing Company.
PLANNING A CODE
ENFORCEMENT
911 E.MILLER STREET
JEFFERSON CITY,MO.65101
634-2456
FIRE
621 W.HIGH STREET
JEFFERSON CITY,MO.65101
636.7311
POLICE
401 MONROE STREET
JEFFERSON CITY,MO.65101
634.2626
PARKING
201 MADISON STREET
JEFFERSON CITY,MO.65101
636-6136
REINTJES WATERPROOFING COMPANY 113800 SUMMIT,P.O.Box 856
KANSAS CITY,MO.64141-(816)756.2306
February 209 1981
City of Jefferson
Madison at Capital Avenue
Jefferson City, Mo. 65101
Reference: 5 Year Warranty
Cleaning, Patching and
Coating
City Parking Garage
Gentlemen:
We agree for aperiod- of five years from the date of October 1, 1980
of the work covered by the above contract to repair any improper,
workmanship or material. This agreement is subject to and conditioned
upon our receiving prompt written notice from you of any such defects :y
and an opportunity to inspect the same prior to their being moved or
otherwise disturbed. Our responsibility is limited to such replacement
and we shall not be held responsible for any loss or damage occasioned
by or resulting from such defects. Except as set forth in this para-
graph, there is no. other guarantee or warranty expressed or Implied.
Yours very truly,
REINTJES WATERPROOFING COMPANY
Samuel Le ourtee
Manager
SZY:jb
REINTJES WATERPROOFING COMPANY
VOID AFTER RD DAYS March 12 19 8 1010
PFAl.
ORDEROF City of Jefferson 296 .25
Q 14 5-1, + 4d 5C� DOLLARS
_ TJES WAT RPROOFING COMPANY
' Mercantile Bank - M�RCRn"rI�
.-- and Trust _ nn `
-.46— Kansas City,Missouri 64106 BRrK -
01: 10 10•.100 181: 03 5 5 2 iii'
• .fit•,(?• •,
F4;
,• .- .-R�:�'..'� ,•.T',twJ �i Vii'• �,• I-• •-.
.. r .. • .�,•,1.`•i'�l'...♦' •-- ,