Loading...
HomeMy Public PortalAboutORD09343 • • waM ' • AMENDED BILL NO. 75 INTRODUCED BY COUNCILMAN .2 ORDINANCE NO. �� AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI , AUTHORIZING THE MAYOR AND CLERK OF THE CITY TO EXECUTE A CONTRACT WITH REINTJES WATERPROOFING COMPANY, A CORPORATION OF MISSOURI , FOR CLEANING, PATCHING AND COATING OF EXISTING CITY PARKING GARAGE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS: Section 1. The Mayor and Clerk of the City are hereby authorized and directed, for and in the name of the City, to execute a written contract with Reintjes Waterproofing Company, a Missouri Corporation, for cleaning, patching and coating of existing City Parking Garage, for the sum of $173,500. 00. Section 3. A copy of said contract is attached hereto. �f Section 3. This ordinance shall take effect and be in force ( from and after its passage and approval. assed i% � �_ �� Approved ?/ X79 Pre dent of t e Council Mayor lAttest Q4 o C' Clerk jr'i r �2. s 4 s i I t ' A � 11� 1� IBill No. INTRODUCED BY COUNCILMAN i*,��� ,�;• � � ORDINANCE NO. AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, AUTHORIZING THE MAYOR AND CLERK OF THE CITY TO EXECUTE A CONTRACT WITH REINTJES WATERPROOFING COMPANY, A CORPORATION OF MISSOURI, FOR EANING, PATCHING AND COATING OF EXISTING CITY PARKING GARAGE BE IT ORDAINED Y THE CITY COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOL OWS: Section 1. Th Mayor and Clerk of the ty are hereby authorized and direct d, for and in the na a of the City, to look execute a written cont ct with Reintjes aterproofing Company, a Missouri Corporation, ®r cleaning, tching and coating of existing City Parking Gard e, for th sum of $148,000.00. Section 2. A copy of id co ract is attached hereto. Section 3. This ordinan e s all take affect and be in force from and after its passe and approval. Passed App oved i President of the Co u it Mayor Attest iC a� li City erk E 7 r r FORM OF AGREEMENT IkS AGREEMENT made and entered into this — /&X day of 1979, by and between The City of Jefferson, Jefferson City, Missouri , hereinafter called "OWNER" and Reintjes Waterproofing Co. , a Corporation of Missouri , herein- after called "CONTRACTOR". WITNESSETH: THAT for and in consideration of the agreements and undertakings of the parties hereinafter set forth, it is agreed by and between the parties hereto as follows: 1. The Contractor shall furnish all labor, materials and equipment and services and shall perform all operations required to complete the Cleaning, Patching and Coating of Existing City Parking Garage all in strict accordance with the Contract Documents and as described in the specifications entitled "Cleaning, Patching and Coating of Existing City Parking Garage" located at Madison on Capitol Avenue, Jefferson City, Missouri , and in the drawings described in the General Conditions of the Contract attached to the said specifications, all of which were prepared by R. F. Verslues and Associates, Inc. , 705 East McCarty Street, Jefferson City, Missouri , hereinafter called "Engineers". Said speci- fications and drawings are hereby made a part of this Agreement as fully as if attached hereto or set herein. This Contract includes the work as specified under the BASE BID. The Bid Item prices and Alternate No. 1 shall remain as stated in the Proposal for the duration of this Contract. 2. Contractor shall commence work under this Agreement within ten (10) days after receipt by him of a Notice to Proceed and shall fully complete all of the work hereby agreed to be performed in ninety (90) calendar days after receipt of said Notice to Proceed. Failure to complete the work within ninety (90) calendar days from date of Notice to Proceed, the Contractor agrees to ay to the Owner as liquidated damages, the sum of Fifty Dollars ($50.00 for each day thereafter, Sundays and holidays excepted, that the work remains incomplete. 3. The Contractor agrees that he is fully informed regarding all of the conditions affecting the work to be done under this Agreement and as to the labor, materials, equipment and services to be furnished for the completion of the work to be performed hereunder, and agrees that his information was secured by personal investigation and research, and not from any statement or representation of any officer, agent or employee of the Owner. Form of Agreement Ole -2- 4. For Base Bid, Owner shall pay Contractor for the complete performance of the work hereunder to the satisfaction of the Owner, the sum of One Hundred Forty-eight Thousand Dollars and No Cents ($148,000.00). The Contract price set out above is subject to deductions as provided in the Contract Documents and is to be payable upon certification by the Engineer as provided in the Contract Documents, as follows: A. Monthly payments, due on or before the 15th day of each month, of Ninety Percent (90%) of the value of the work performed including materials delivered and suitably stored at the site but not in- corporated in the work, during the preceding calendar month, such value being calculated in proportion to total construction price. B. Final payment of the balance due upon completion of the work, upon the dates specified, to the satisfaction of the Owner, and acceptance thereof by the Owner. The Contract Documents shall consist of the following parts: A. This Agreement. B. 'The General Conditions of the Contract bound with the Specifications hereinafter referred to, copies of which have been signed or initialed by the parties. C. Specifications entitled "Cleaning, Patching and Coating of Existing City Parking Garage" located at Madison on Capitol Avenue, Jefferson City, Missouri , prepared by R. F. Verslues and Associates, Inc. , 705 East McCarty Street, Jefferson City, Missouri , including all modifications thereof incorporated herein before the date hereto, copies of which have been initialed or signed by the parties. D. Contractor's Proposal as accepted by the Owner. E. Prevailing Wage Determination. THIS AGREEMENT, together with the Contract Documents hereinabove described, for the Contract between the parties, and each of them is as fully a part of the Wract as if attached hereto or herein repeated. The Contract Documents are ementary and what is called for by one shall be as binding as if called for by ail. In the event that any provision of any of the component parts of the Form of Agreement ege -3- Contract shall expressly conflict with any part of any other component part, the provisions of the component part first enumerated herein shall govern, unless otherwise specifically stated. IN WITNESS HEREOF, the parties hereto have caused this instrument to be executed, in triplicate, on the day and year above written. THE CITY OF JEFFERSON l By Wor, ity of Jeff rson Re ni tjes Waterproo n Co. ATTEST: Secretary M i.1 REINTJES WATERPROOFING COMPANY 02617 JEFFERSON ST.,P.O.BOX 886 KANSAS CITY,MO.64141•(816)4213870 October 170 1979 Mr. R. F. Verslues & Associates Inc. 705 East McCarty Street Jefferson City, Missouri 65101 Re: Contract for First and Second Level City Parking Garage Jefferson City, Missouri Dear Mr. Verslues: This letter is our request for a change order in the amount of an additional Twenty-Five Thousand Five Hundred Dollars........................$25,500.00, to be added to our contract of $148,000.00, for the work on the first and second levels of the City Parking Garage. The change order is necessary due to the exceedingly poor condition of app- roximately 120500 square feet of concrete on the main level having to be removed and replaced, in lieu of the patching syotem outlined in the contract documents. Furnished herewith are documents of the Scope of Work, marked set of plans, specifications for Sealcrete and our five (5) year warranty which becomes a part of the contract documents upon acceptance of the change order. To wham it may concern, the change order will actually save the City of Jefferson apprcoximtely $200000.000 as in the area of replacement there already was 900 square feet of unit price work at $50.00 per foot. In addition to this savings, by using Sealcrete in lieu of the deck coating specified the Reintjes Waterproofing Company is extending the warranty or defect in workmanship and material with replacement to be at no cost to the owner, an additional four years over the one year called out in the contract. Very truly yours, DATE: j 1 17 17 of REINTJES WATERPROOFING COMPANY ACCEPTED: c/ Samu a Yo rtee Manager SLY/dp w REINTJES WATERPROOFING COMPANY 02817 JEFFERSON ST.,P.O.BOX 888 KANSAS CITY,MO.64141•18181421.3870 Change Order #1 Cleaning, Patching & Coating Jefferson City Parking Garage Scope of Work 1. In lieu of applying "Scotch Clad Deck Coating System" or "Industrial Membrane System" called for in the specifications all coacrete. surfaces will have applied three (3) coats of SEALCRETE and in addition the ready mix concrete used in the 12,500 square foot area on the lower level will have Sealcrete added to the mix per specifications attached. 2. The 12,500 square ft. area noted on the attached plan will have existing concrete, reinforcing steel and deck pans removed. A new concrete deck of 3,600 lb. Hi Early concrete will be installed. Steel reinforcing rods will be installed in strict accordance with original specifications and in addition 6' X 6' - 1010 wire will be installed. The deck area shall have control joints sawed 20' X 25' on centers and then caulked with Pecoras GC 5 sealant. ` 1 1 1 Ir WARRANTY First and Seond Level Repair City Parking Garage Madison at Capitol Jefferson City, Missouri For a period of fine years from the date of substantial completion of the work of Reintjes Waterproofing Company, Inc., herein called "Reintjes" covered hereby or from the date of shipment of any alleged faulty materials or from the date of acceptance of any alleged improper workmanship, whichever occurs first, Reintjes agrees to replace any faulty materials furnished by Reintjes and to repair any improper workmanship performed by Reintjes whether due to Reintjes' negligent acts or omissions or otherwise, to conform to this contract or to any warranty. This warranty is expressly conditioned on Reintjes promptly receiving written notice from Jefferson City, Missouri, herein called "Buyer", of any such defects or any improper workmanship and an opportunity to inspect the same prior to their being disturbed or otherwise moved. The Buyer's exclusive and sole remedy on account of, or in respect of, the furnishing of material or the work performed by Reintjes or both, whether due to Seller's negligent acts or omissions, or otherwise, to conform to this contract, or to any warranty, during said period not to exceed Five (5) years and Reintjes' liability and responsibility thereon, are limited to such repair, replacement or refund, but under no circumstances shall Reintjes' responsibility or liability exceed the amount Reintjes is entitled to receive Ofor performing this wore. Reintjes is not and shall not be liable or responsible for any costs incurred or for any loss or damage occasioned by or resulting from any faulty materials or improper worlananship including any special, direct, indirect, incidental or consequential damages to anyone as a result thereof. This warranty is not applicable until and unless Reintjes has been paid for all work performed. THIS WARRANTY IS EXPRESSLY IN LIEU OF ANY OTHER EXPRESS OR IMPLIED WARRANTIES, INCLUDING ANY IMPLIED WARRANTY OR MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE. REI14TJES WATERPROOFING $OMPANY �/C amuel L. u tee, Manager y SLY/dp CHANGE ORDER REQUEST P : Jefferson City Parking Garage CHANGE ORDER NO. . 2---- __ CONTRACTOR: PROJECT NO. : 79-12E Reintjes Waterproofing Co. CONTRACT DATE: October 1 , 1979 PO Box 856 Ordinance No. 9343 Kansas City, Missouri 64114 You are directed to make the following changes in this Contract: Complete reworking top deck as per plans and specifications. Start date for this Change Order will be agreed upon prior to commencing work. `D Original Contract Sum was 148,000.00 Net change by. previous Change Orders 25,500.00 _! _ The Contract Sum prior to this Chan a Order b 173,500.00 The Contract sum will be (increased3(4eeoeate4) (uachapq") .by this Change Order $ 66,000.00 The new Contract Sum including this Change Order will be $ 239.500.00 The Contract Time will be (increased)(4e6fea6e4i ( ) Sixty 60 Days. T e of Completion as of the date of this Change Order, therefore, is i S days after notice to proceed. R_FVerslues & Assoc. Reinties Waterproofing Co._ City of Jefferson, Missouri AArchi__t__ecct Eng Weer Contractor Owner By BY ''' ' By_ ---- - - --- —_ — Date- /I- 2t- 19 Date Date -- /a.-.a6-=-� ---- - CITY OF JEFFERSON GEORGE HARTSFIELD MAYOR Am MAYOR CITY HALL 240 E.HIGH STREET JEFFERSON CITY,MO.6510, TO: Libby Tihen, City Clerk CITY ADMINISTUTOR HALL CITY HALL FROM: Martin A. Brose f >P.E. Dire r> D.O.T. 240 E.HIGH STREET JEFFERSON CITY,MO.65101 634-2524 DATE: March 16, 1981 CITY CLERK CITY HALL 240 E.HIGH STREET RE: Reintjes Waterproofing, Company JEFFERSON CITY,MO.65101 635-1411 � ,I YAT Y Libby please file the attached information with the 240 E.HI TREET contract documents on the Cleaning, Patching and JEFFERSON CITY,MO.65101 634-2757 Coating work done on the existing Parking Garage MUNICIPAL COURT by Reintjes Waterproofing Company. CITY HALL 240 E.HIGH STREET JEFFERSON CITY,MO.6.5101 Note that the final payment was made to Reintjes 838-4712 on March 12, 1981, and the City of Jefferson received FINANC�L a check from Reintjes in the amount of $296. 75 to 240 E.HIGH STREET pay for the telephone bill and the cleaning of the JEFFERSON CITY,MO.85101 634-4949 offices in the garage. CITY COUNCIL CITY HALL 240 E.HIGH STREET JEFFERSON CITY,MO.65101 636.4712 MEMORIAL AIRPORT CITY HALL ]� J 240 E.HIGH STREET JEFFERSON CITY,MO.85101 J 63$-8668 PUBLIC WORKS 911 E.MIL STREET JEFFERSVTY,MO.65101 634-2455 PLANNING i CODE ENFORCEMENT 911 E.MILLER STREET JEFFERSON CITY,MO.65101 634.2456 FIRE 621 W.HIGH STREET JEFFERSON CITY,MO.65101 638.7311 POLICE 401 MONROE STREET JEFFERSON CITY,MO.65101 634-2626 PARKINO 201 MADISON STREET JEFFERSON CITY,MO.65101 636$136 • •� REINTJES WATERPROOFING COMPANY 03800 SUMMIT,P.O.Box 858 KANSAS CITY,MO.64141-(816)766.2306 • March la, 1981 City of Jefferson Madison at Capital Avenue Jefferson City, rfo. 65101 Refereaces S Year Warranty Cleaning, Patching b Coating 1st, 2nd and Top Leml City Parking Garage Gentle>aens We agree for a period of five years from the data of October 1, 1980 of the work emoted by they above contract to repair any improper wark®aaship or seater l. : This agreement is subject to and conditioned upon our receiving prowt asitt m taatIce fron you of any such defects and "an opportunity to Inspect..this same prior to thraiar being. moved or otherwise distdnrbed. Our responsibility is liasited to alb raeplaceneat and we shall not be held to- sponsibla for any Loss or d&AW varosionaD: by or resulting from such defects. 2=69t an let forth 16-this pariegraph, thane is no other guarantee or warran- ty expressed or iaplield. Yours very truly, REINTJES WATERPROOFING COMPANY el L. Yoartes - Manager . SLYajb *CITY OF JEFFERSON 1 GEORGE HARTSFIELD IT- MAYOR MAYOR CITY HALL 240 E.HIGH STREET TO: Jim Uffman, Finance Director JEFFER60N CITY,MO.65101 636-7451 CITY ADMINISTRATOR FROM: Martin A. Brose, P.E. , Director, D.O.T CITY HALL 240 E.HIGH STREET JEFFERSON CITY,MO.65101 DATE• March 11 1981 634.2524 f CI CLER CITYHALLR RE: Final Payment to Reintjes Waterproofing Co. 240 E.HIGH STREET JEFFERSON CITY,MO.65101 635-1411 I met with City Attorney Chris Graham this morning CITY ATTORNEY to discuss the closing of the cleaning, patching and CITY HA coating project with Reintjes Waterproofing Company 240 E.Hi BEET JEFFERS ITY,MO.65101 on the existing parking garage, 634-2757 MUNICIPAL COURT During our meeting we discussed the five (5) year CITY HALL 240 E.HIGH STREET warranty sent to us by Mr. Samuel Yourtee, General JEFFERSON CITY,MO.65101 636-4712 Manager of Reintjes ; and we feel they have indicated FINANCE they are going to cover the total project under this CITY HALL warranty. 240 E.HIGH STREET JEFFERSON CITE,MO.65101 634-4919 We also discussed the need to continue their preformance CITY COUNCIL bond for another four (4) years and decided this should CITY HALL l 240 E.HIGH STREET not 1�e necessary as any defects In workmanship and JEFFERSON CITY,MO.651o, 064712 material should show up within a years time; and we MEMORIAL AIRPORT feel the city should not have to pay additional money CITY HALL for a guarantee of that type. 240 E.HIGH STREET JEFFERSON CITY,MO.65101 635-6666 We have reviewed this project with Roger Verslues and PUBLIC WORKS he has signed the project off as being completed. There- 911 E.sILLC��ITYRMO.65101 fore, we recommend that final payment be made to Reintjes 634.2455 Waterproofing Company. PLANNING A CODE ENFORCEMENT 911 E.MILLER STREET JEFFERSON CITY,MO.65101 634-2456 FIRE 621 W.HIGH STREET JEFFERSON CITY,MO.65101 636.7311 POLICE 401 MONROE STREET JEFFERSON CITY,MO.65101 634.2626 PARKING 201 MADISON STREET JEFFERSON CITY,MO.65101 636-6136 REINTJES WATERPROOFING COMPANY 113800 SUMMIT,P.O.Box 856 KANSAS CITY,MO.64141-(816)756.2306 February 209 1981 City of Jefferson Madison at Capital Avenue Jefferson City, Mo. 65101 Reference: 5 Year Warranty Cleaning, Patching and Coating City Parking Garage Gentlemen: We agree for aperiod- of five years from the date of October 1, 1980 of the work covered by the above contract to repair any improper, workmanship or material. This agreement is subject to and conditioned upon our receiving prompt written notice from you of any such defects :y and an opportunity to inspect the same prior to their being moved or otherwise disturbed. Our responsibility is limited to such replacement and we shall not be held responsible for any loss or damage occasioned by or resulting from such defects. Except as set forth in this para- graph, there is no. other guarantee or warranty expressed or Implied. Yours very truly, REINTJES WATERPROOFING COMPANY Samuel Le ourtee Manager SZY:jb REINTJES WATERPROOFING COMPANY VOID AFTER RD DAYS March 12 19 8 1010 PFAl. ORDEROF City of Jefferson 296 .25 Q 14 5-1, + 4d 5C� DOLLARS _ TJES WAT RPROOFING COMPANY ' Mercantile Bank - M�RCRn"rI� .-- and Trust _ nn ` -.46— Kansas City,Missouri 64106 BRrK - 01: 10 10•.100 181: 03 5 5 2 iii' • .fit•,(?• •, F4; ,• .- .-R�:�'..'� ,•.T',twJ �i Vii'• �,• I-• •-. .. r .. • .�,•,1.`•i'�l'...♦' •-- ,