Loading...
HomeMy Public PortalAboutORD09578 i BILL NO, ,lot . INTRODUCED BY COUNCILMAN-R-�---� ! ORDINANCE NO . ` AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI , AUTHORIZING THE MAYOR AND CLERK OF THE CITY TO EXECUTE AN AGREEMENT WITH Groner & Picker Consulting Engineers Jefferson City , Missouri BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLCWS : SECTION 1. The Mayor and Clerk of the City are hereby authorized and directed, for and in. the name of the City, to execute a written agreement with Groner & Picker Consulting Engineers for the renovation of the Geneva Street Pump Station for the sum of $ 1,700.00 _ SECTION 2. A copy of said agreement is attached hereto. SECTION 3. This ordinance shall take effect and be in force from and after its passage and approval. Passed: .v Approved: a- l9-br1 5s�ent of 4)Council �(Jayr �!' Attest: CtyCe r. t . Supplemental Agreement to My of Jefferson Ordinance No. 9432 for Engineering Services by and between The City of Jefferson and Groner & Picker Inc. , Consulting Engineers On this �� of v 1981 , the Engineering Agreement (Jefferson City Ordinance No. 9432, dated une 3, 1980) by and between The City of Jefferson and Groner & Picker, Ii is hereby mutually ammended as follows: 1. Ammend PROJECT definition to include engineering services to modify the Geneva Street lift station. 2. Scope of engineering services to be provided by the CONSULTANT are to include the following anticipated PROJECT tasks. (a) Preliminary Project Development and Facility Inspection. (b) Field layout, and design data verification. (c) Preliminary engineering design. (d) Preliminary Proposal to include concept of modification, proposed equipment and controls, fabrication and modification requirements and approximate cost of improvements. (e) Final design proposal to include the schematic layout of facilities and necessary design data. Final design will incorporate equipment which will have future servicability to other installations. (f) Equipment and Control Coordination with suppliers to include shop drawings, equipment catalogs and operation and maintenance literature. (g) Supervisory and Inspection services related to fabrication and installation of modifications to the PROJECT. (h) Provide start-up services and verification of equipment performance at PROJECT completion. (i) Provide follow-up services and performance inspections for a period of one year from date of start-up. The above CONSULTANTS services shall be performed in an expedious time frame to achieve PROJECT modification without undue delay. 3. Compensation for the change in project definition and scope, in addition to the existing agreed compensation, shall be an additional lump sum total of $1,700.00, One-thousand seven hundred dollars, 4. Payment to CONSULTANT shall be as follows: (a) Final design proposal recommendations 80% (b) Project Start-up and inspection 100% S. CITY services to be provided to Consultant shall include but not necessarily be limited to coordination for access to facilities, providing initial design data, which is to be verified by engineer, to include total static head, length of existing force main, and population equivalents, and existing design and equipment information applicable to the PROJECT. 6. This Supplemental Agreement shall not affect con.flict�ng provisions of the original agreement which shall remain in effect in respect to the original project scope and definition. Non-conflicting provision of the original agreemerit shall remain in effect to this Supplemental agreement as if herein stated. IN WITNESS WHEREOF, The parties hereto have caused this Supplemental Agreement to be executed as of the day and year first above written. CI'T'Y OF JEFFERSON n by '1'.itle��r� GRONER & PICKERp INC. by,—�� Title,