HomeMy Public PortalAboutORD09775 i
�i
BILL N06
INTRODUCED BY COUNCILMAN
4
ORDINANCE N0.
I' AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI , AUTHORIZING AND
,iiDIRECTING THE MAYOR AND CITY CLERK OF SAID CITY TO EXECUTE, ON
(, BEHALF OF THE CITY, A CONTRACT WITH PROPST BUILDERS, INC. TO
;! CONSTRUCT A NEW PARKING FACILITY ON THE RILEY LOT LOCATED ADJACENT
i'1TO THE MAIN PARKING GARAGE, ALSO KNOWN AS LOT #2, LOCATED IN THE
jTWO HUNDRED BLOCK OF CAPITOL AVENUE IN THE CITY OF JEFFERSON,
IlMISSOURI.
•IBE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF JEFFERSON, }
HIMISSOURI AS FOLLOWS:
jSection 1. The Mayor and City Clerk of the City of Jefferson,
Missouri, are hereby authorized and directed, for and in the name
!'
�;of the City, to execute a written contract with Propst Builders,
l
1+ Inc. , relating to professional services for construction of a new
!
(parking facility, as set forth on a copy of said contract documents
Auh !attached hereto and by reference made a part hereof.
1{
Section 2. This Ordinance shall take effect and be in full
I
hforce from and after its passage and approval.
I
(Passed Approved
l
! Pre dent of [-JT6 Council 4ayor
II
i�
(ATTEST
ji
,6WS,
I
City Clerk
i�
�I
I
i
i
w
Fry
AGREEMENT
This Agreement is made as of the IQ day of 1982,
between the Owner. City of Jefferson, Missouri, and the Contractor,
Prost Builders, Inc. , for the construction of the addition to the
Municipal Garage, Capitol Avenue and Madison Street in the City of
Jefferson. The Architect in the project is R. F. Verslues & Associates,
Inc.
The Owner and Contractor agree as set forth below.
ARTICLE I
THE CONTRACT DOCUMENTS. The Contract Documents consist of
this Agreement, the Conditions of the Contract (General, Supplementary
and other Conditions) , the Drawings, the Specifications, all Addenda
issued prior to and all Modifications issued after execution of this
Agreement, the Invitation to Bid, and the Instruction to Bidders.
These form the Contract, and are all as fully a part of the Contract
as if attached to this Agreement or repeated herein. An enumeration of
the Contract Documents appears in Article 7.
ARTICLE II
THE WORK. The Contractor shall perform all the work required
by the Contract Documents for the construction of the addition to the
Municipal Garage, Capitol Avenue and Madison Street, including site
preparation.
ARTICLE III
® TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION. The work
to be performed under this Contract shall be commenced within ten (10)
days of receipt of notice to proceed and, subject to authorized
adjustments, substantial completion shall be achieved not later than
one hundred eighty (180) calendar days thereafter.
ARTICLE IV
CONTRACT SUM. The Owner shall pay the Contractor in current
funds for the performance of the Work, subject to additions and
deductions by Change Order as provided in the Contract Documents,
the Contract Sum of Four Hundred Forty-Six Thousand Six Hundred
Dollars ($446,600.00) .
a � ,
ARTICLE V
PROGRESS PAYMENTS. Progress Payments shall be made as
provided in the Contract Documents.
ARTICLE V1
FINAL PAYMENT. Final Payment, constituting the entire unpaid
balance of the Contract Sum, shall be paid by the Owner to the
Contractor when the work has been completed, the Contract fully
performed, and a final Certificate for Payment has been issued by the
Architect and approved by the Owner.
ARTICLE VII
MISCELLANEOUS PROVISIONS.
7.1. Terms used in this Agreement which are defined in the
Conditions of the Contract shall have the meanings designated in those
Conditions.
7.2. The Contract Documents, which constitute the entire agree-
ment between the Owner and the Contractor, are listed in Article I
and, except for Modifications issued after execution of this Agreement,
are enumerated as follows:
ADDITION TO THE MUNICIPAL GARAGE, CAPITOL AVENUE AND MADISON
STREET (by R.F. Verslues & Associates, Inc. )
Specifications, dated February, 1982 (bound complete)
Instructions to Bidders, and Invitation to Bid
Working Drawings, Sheet 1. of 8, dated December, 1977.
Working Drawings, Sheets 2 through 8, dated February, 1982
Sheets S-1 through S-6 dated February 1982
Sheets M--1 through M-2 dated February 1982
Sheets E-1 through E-2 dated February 1982
Invitation to Bid
Instruction to Bidders
General Conditions AIA Document A201, 1976 Edition
Addendum #1 dated March 15, 1982
Addendum #2 dated March 19, 1982
Addendum #3 dated March 24, 1982
Proposal Form BP-1. through BP-3 (attached) as submitted by
Contractor.
This Agreement is entered into as of the day and year first above
written.
OWNER CONTRACTOR
CITY OF JEFFERSON PROS T B LDE INC.
B y '
Wayor P
ATTEST: ATTEST:
CHANGE ORDER
FORM,
G•701
OWNER'S COPY
if this order is salisiodory, the owner is ARCHITECT'S JOB No. ... 81-11E.
requested to please sign and return Control:• 3
lor's any Arrhited't copies to the Architect. CHANGE ORDER No.
ISSUED DATE-.-- OCtober. 11-,.-,-
AMOUNT (Plus XXKXYJ)0 —1,304-70--,
CONTRACTOR
FOR---j_keSi_ty O_4ef ferson CONNECTION WITH
Addition to Municipal Garage
FOR OWNER_ Department of Transportation; City of Jefferson
YOUR PROPOSAL FOR MAKING THE FOLLOWING, CHANGES HAS BEEN ACCEPTED:
Item #1 :
For extending section of existing retaining wall at alley (approximately
2'-0" tall by 17'-0" long) + $340.00
40 Item 12:
For furnishing reinforcing rods in lieu of steel cables specified in two
locations where steel columns interfere with passage of joist tendons. + $144.70
Item #3:
For using "Ray Lite" 2-coat system in lieu of material specified for deck
treatment. No Change
Item #4:
For furnishing and installing two (2) steel clearance barriers at
entrance and exit of new deck. + $820.00
THE AMOUNT OF THE CONTRACT WILL BE (INCREASED) (,VX9RW)ffX-$ IN THE SUM OF:
One Thousand Three Hundred Four and 70/100 -----------------------
DOLLARS ($1 ,304.70
WITH ;PXUXXMX4)=XXXIK (NO CHANGE) IN THE CONTRACT TIME OF .... .....
R. F. VERSLUES& ASSOCIATES, INC,
OWNER'S APPROVAL ;2M,4p�k�1 � ARCHITECT
[)AT,
1 9,
w
M E M O R A N D U M
TO: Mr. Gary J. Hamburg, City Administrator
FROM: Martin A. Brose, P.E. , Director of T a t' tion
DATE: August 13, 1982
RE: Change Order #1 - Addition to the Municipal Parking Garage
While excavating for the ground floor of the new facility, the
contractor found a section of existing footing on the News Tribune
building which extended above the floor line of the new garage.
This requires modification to the Tribune footing by removing
approximately 1 k Cubic Yards of material off the existing footing.
Based on our rock excavation figures, the enclosed recommended
change order is reasonable. I recommend we give approval to this
change order. Please let me know if you concur.
1�
C b
U
r
AIA
CHANGE ORDER* �
FORM
G•701
® OWNER'S COPY
If this order is satisfactory, the owner is ARCHITECT'S JOB
requested to please sign and return Contrac-
tor's and Architect's copies to the Architect. CHANGE ORDER __-_-.-._�_______.__�
ISSUED DATE.-------_-- 8 7-1_0 —19_$2_
AMOUNT (PlusX>?(14*U) $ l ,72__00___
TO-- CONTRACTOR
FOR—The-C] IN CONNECTION WITH
FOR OWNER_ Department of Trans��ortati on _ City_of Jefferson
YOUR PROPOSAL FOR MAKING THE FOLLOWING CHANGES HAS BEEN ACCEPTED:
Remove section of existing footing on the News Tribune building which extends
above the finished floor line of the new garage. Modity new footing and retainer
wall as shown on attached sketch.
AM
THE AMOUNT OF THE CONTRACT WILL BE (INCREASED) t70 XXR00W) IN THE SUM OF:
0
One.-ThmAnd..__Three_.Hundred-and_Seventy_-two -----�`�V-- DOLLARS ($_.,372.00
WITH (IA$(X60Xf,(`,QWARX (NO CHANGE) IN THE CONTRACT TIME OF .____—___—_—_____�________ —__�._DAYS
OWNER'S APPROVAL .. . /L�!�'_5..�- L S -, _ RCHItECT
iG __ _.. ___.---._-- - ,�
DATE _ -. f� 'r' _ 19.-------- BY_–FT_ - _t:01-,It IC l IT I•t 4t- TH .+M I'It IC�.N ItiL 11 TU T1. 01" Ali C"1! �-T- ^
# s 11aG ,�y,, .�/
x '� �-°-CUR g �� 4
TjTj
�1�a pa Jig 4 �T—A vA,4 .Z J e IA/) Q
i
M E M O R A N D U M
TO: Gary J. Hamburg, City Administrator
FROM: Martin A. Brose, P.E. , Director of Trans ortation
DATE: August 26, 1982
RE: Change Order ##2 - Municipal Parking Garage, Riley Lot
As per our conversation, I have reviewed the attached change
order and recommend its approval. Fifty percent of the cost
for this change order can be attributed to redesign of piers
Al , B1 and B2. The piers were redesigned due to excessive
ground water. The design change consisted of drilling into
the rock approximately eight feet and placing expansive concrete
in the rock socket to increase the allowable bearing pressure.
The actual pier depth versus plan depths were very close. The
additional pier work excavations were due to removal of old
foundation concrete and variation of the rock table to the
bottom of the pier. Roger has detailed information as to pier
work removal at his office.
Item #4 is an increase in cost of the two (2) inch copper water
line due to an error in the scale shown on the plans.
If you have any additional. questions please let me know, otherwise,
forward the change order back to me and I will send the approved
order to Roger.
DEPT. Of
� c• 21532
is'T Y 0" JEFFERSON
F*
G•7p(
C}WKIk
81-11E
2
August 25 Iv82
:. .R xxx,xxxx 15,394-815
I� Prost Builders, Inc. CO NIRACTOR
«;R The City of Jefferson 0.1 C01414:C TION 'KITH
Addition to Municipal Garage
E cr crW,4U .. . Department of Transportation, City of Jefferson
JUK
Item #1 :
For the removal of pier rock and additional lineal footage of
shaft:
20.71 yds. of rock @ $650.00 per yd. + $13,461 .50
31 .19 lin. ft. of shaft @ $70.00 per ft. + 2,183.30
Ah Item #2:
For concrete additive for rock sockets Pier #A1 , Bl and
B2 (Interplast #2) + 73.80
Item #3:
For not hand cleaning three holes (Pier #A1 , Bl and B2) @
$250.00 ea. - 750.00
Item #4:
For adding 55 lin. ft. 2" copper water line + 426.25
114r- AMOUNT Or IHF. CONIRACT WILL BE (INCREASED) (DECREASED) IN THE SUM Cap
Fifteen. Thousand Three..Hundred Ninety-four and 85/100 DXAIARS (4 15,394.85 _)
WITH I(IAXRfsIiAiMXOp(lCkKiCM tNO CHANGE) IN THE CONTRACT IIME: C}r uAYS
U1YNtn J .rNkJJrt /�%r'�����Vi/' Vc ' JZ I
DATE . ..... � _._._....__._. _ ._._. 19—
u•.vll.,rt iu«- AME1W( N rNbl-r,.
CHANGE ORDER
AIA
FORM,
G•701
OWNER'S COPY ARCHITECT'S JOB No.____...___._... ._._...-__-._.---___81-11E
If this order is solisfadory, the owner is
requested to please sign and return Contrac-
tor's anc, Architect's copies to the Architect. CHANGE ORDER
ISSUED DATE_._.-____._December 2.-_.19_42
A11h
AMOUNT (Plus XXX%XX)
CONTRACTOR
FOR__the C_i_t,y_._of_!.!g_ff a r.59 n IN CONNECTION WITH
_--t1je-AdicHition to Municipal
FOR OWNER—.-.--P"-An-tM-qpt-.-Pf-Tr4-q-sportation, City of Jefferson
YOUR PROPOSAL FOR MAKING THE FOLLOWING CHANGES HAS BEEN ACCEPTED:
Furnish labor, material and equipment to install concrete steps
with railing and bumpers, as per drawing
Add $1 ,320.00
,aft
AMh DEC 1932 14 30
IE AMOUNT OF THE CONTRACT WILL BE (INCREASED) 0MUMM IN THE SUM OF:
._._.__0ne.__Thousan.d_.Jhree..Hun.dred...Twenty-.and-no/1-0.0.!!!n--=_n_-_—nr DOLLARS ($
WITH AX=XAWX00=JRAX00 (NO CHANGE) IN THE CONTRACT TIME OF DAYS
QWNER'S APPROVAL Assoc. Inc.
ARCHITECT
DA T E BY........4
col,vm;611 r 1,1411 (lit AlALNICAN 1lJ,,T'T0Tl Of Alif-141TVI:(I.
EXIST. OMWINCk d �7
.Pit 15UTAPMIL -ro, BIL 4-
.O" JR0616.DVJ FIN, n, * $:®"
t VSOViL . Fb.L W1.Gclt G.
I.OGATlam `To 15a DI TUVRIMIRD
sy lzmaw'. : GLEA�I 4` Pl�►"PG1.1 EXIST. CONIC. .. .
ror. PAINTIN C. _.
4
Ild4- PIPE WAI6.
CLd�S6t+ �y6►3 T• @FI�►G.
W� GO►��'�tillt.°PI�. . . NSW 'WALL
. I .
To s�
IE x I'S-r. � N
• pAR K� I�t G � AR A� �?
cN� 000eoe A✓o. ¢
/Z - Z - aZ