Loading...
HomeMy Public PortalAboutORD09801 r i+ BILL NO. 1 INTRODUCED BY COUNCILMAN I, ORDINANCE NO. �Q t� IAN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI , APPROVING A MAJOR CHANGE IN THE SCOPE OF 14ORK FOR THE CONTRACT FOR PROFES- �ISIONAL ENGINEERING SERVICES FOR PREPARATION OF CONSTRUCTION PLANS AND SPECIFICATIONS AND OTHER SERVICES IN CONJUNCTION WITH COLE JUNCTION PUMP STATION AND ASSOCIATED INTERCEPTOR SEWERS. WHEREAS, the City has a contract with Horner & Shifrin, Inc. for professional engineering services for preparation of construction plans and specifications and other services in conjunction with the construction of the Cole Junction Pump Station and Associated Interceptor Sewers ; and, WHEREAS , the contract contains provisions for major changes , to the scope of work pursuant to Article I, Sections C and D; and, WHEREAS, Horner & Shifrin, Inc. has documented the need for a change in the scope of work in the area of odor control, NOW, THEREFORE , BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS : SECTION 1. The Mayor and City Clerk are hereby authorized to execute a change order in the contract with Horner & Shifrin, Inc. to conduct the work in the odor control area described in the attached document. The cost of such work shall not exceed Seven Thousand Dollars ($7 ,000. 00) . ® SECTION 2 . This ordinance shall be in full force and effect from and after its passage and approval. Passec{� � J �' Y Approved 10-.A;k-82' ,f�bsipnt- of the ounci a or ATTEST: City Ctfirk ., AMENDMENT #1 To Contract With Horner & Shifrin for Design of the Gray's Creek/Cole Junction Project ® Ordinance No. 9605 Scope of Additional Services : 1. Conclusion and notification of non-feasibility employing methods outlined in original contract negotiations for odor control in the proposed system, i.e. , air injection. 2. Investigation of alternative methods of odor control to include, but not limited to: a, Chlorination b. Sodium Hydroxide addition c. pH control d. Hydrogen Peroxide addition e. Others Investigations shall include all sample analysis , research, literature reviews and calculations to determine most acceptable method of control. 3. Cost effective analysis , design and detailed specifications of the most acceptable system, to include application, storage, controls, structures and necessary equipment to provide a functional facility. Operational and maintenance considerations shall be included, Estimated Resources Required: Engineer I (Principal) 20 hrs . Engineer III 10 hrs . Engineer IV 120 hrs , Engineering Technician II 40 hrs .