Loading...
HomeMy Public PortalAboutORD09820 BILL NO. Cod.-SI INTRODUCED BY COUNCILMAN 1�c' C� tJy I� p ORDINANCE N0. f, AN ORDINANCE OF THE CITY OF JEFFERSON, MISSOURI, AUTHORIZING i, THE MAYOR AND THE CLERK OF THE CITY OF JEFFERSON TO EXECUTE i AN AUTHORIZATION FOR ENGINEERING SERVICES WITH BURNS AND _. MCDONNELL, RELATING TO THE JEFFERSON CITY RESOURCE RECOVERY (t FEASIBILITY STUDY. I! BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF JEFFERSON, �j MISSOURI, AS FOLLOWS: f ff1 SECTION 1. The Mayor and the Clerk of the City are hereby ii authorized and directed to execute Authorization No. 2 for +i Engineering Services with Burns and McDonnell for the Jefferson j! City Resource Recovery Feasibility Study. !!± SECTION 2. Said authorization shall read in words and l; figures substantially as set forth in Exhibit "A" attached hereto and made a part hereof as though fully set forth herein. i �i SECTION 3. This ordinance shall be in full force and effect from and after its passage and approval. 1 1; Passed' 2� Approved � -- i es t of t iec " uncil a r i f ® ATTEST : jCit Ce i �j i� Exhibit "A" CITY OF JEFFERSON CITY, MISSOURI AUTHORIZATION NO. 2 For PROFESSIONAL ENGINEERING SERVICES To BURNS & McDONNELL ENGINEERING COMPANY, INC. Kansas City, Missouri In accordance with the agreement for PROFESSIONAL ENGINEERING SERVICES dated October 7, 1981 , between City of Jefferson City, Missouri (hereinafter called OWNER) and Burns & McDonnell Engineering Company, Inc. (hereinafter called ENGINEER), OWNER hereby authorizes ENGINEER to proceed with the following services: I. SCOPE The Scope of Services to be provided by ENGINEER, in connection with this Authorization is as follows: 1 . Provide clarification and answer questions regarding the energy from Solid Waste Feasibility Study for Jefferson City, Missouri. Specifically, questions regarding cost of land, net annual costs (revenue) , inflation assumptions, operation and maintenance costs for the proposed new conventional boiler plant, and more detailed description of the conventional boiler plant including the steam and condensate lines will be provided. 2. Recalculate the economic analysis of the resource recovery project based upon a natural gas annual escalation rate agreed upon by the OWNER, the State of Missouri's Division of Design and Construction and the ENGINEER. 3. Calculate the break-even point with oil as the fuel using published efficiency rates for oil and with natural gas as the fuel using published efficiency rates for natural gas. 4. Review the "Report on the Energy Use Analysis and Energy Management Program for Missouri State Correction Institutions," prepared by C. J. R. McClure and Associates, Inc. , dated August 15, 1981 and prepare a written report of comments addressing potential costs and disadvantages apparently not considered in the energy conservation study relative to the Missouri State Penitentiary. 5. Calculate the 15 years savings to the State resulting from purchase of new electric chillers to replace the existing steam-driven chillers that are approximately 5 years old. 1 6. Travel to Jefferson City twice to meet with the OWNER and the State of Missouri to discuss the previously prepared Energy from Solid Waste PBAU2.JEF 1 Feasibility Study Report and the additional work included under this authorization. OWNER will provide, in connection with this Authorization, the following: 1. Assist ENGINEER by placing at his disposal all available information pertinent to the assignment including reports, maps, and any other data relative thereto. 2. Designate a person to act as OWNER'S representative with respect to the services to be performed under this agreement. 3. Examine all reports, sketches, estimates, and other documents presented by ENGINEER and render in writing decisions thereto within a reasonable time so as to not delay services of ENGINEER. 4. Assist ENGINEER (where needed) in obtaining data, information and services from others. II. TIME OF SERVICE ENGINEER will proceed with providing the services set forth herein within five days of this Authorization. PBAU2.JEF 2 III. COMPENSATION OWNER shall compensate ENGINEER for providing the services set forth herein in accordance with the terms of the existing agreement. Direct labor costs shall be paid at the rate of $1£3/hr for Senior Engineering Staff, $14/hr for Junior Engineering Staff, and $6/hr for Clerical Staff. The total fee for these services shall not exceed $6,000. AUTHORIZATION BY: CITY OF JEFFERSON, MISSOURI B Mayo Date ATTEST: City 1h er)c ACCEPTED BY: BURNS & McDONNELL ENGINEERING COMPANY, INC. BY ATTEST: -3- M � RECEIVED Barns & McDonnell AUG 2 5 1982 ENGINEERS-ARCHITECTS-CONSULTANTS PLANNING & CUDE ENFORCEMENT August 24, 1982 Mr. Thomas H. Benton, Director Planning and Code Enforcement City of Jefferson 911 East Miller Street Jefferson City M 65101 Dear Mr. Benton: We have received and signed the City's executed Authorization No. 2 for professional engineering services dated August 17, 1982. We appreciate this opportunity to continue our association in providing engineering services to Jefferson City. Our project number 81-121-4-002 has been assigned to this new project. We propose to name Robert M. Robinson, with whom you are familiar, as AML Project Manager on this assignment. Again, on behalf of Burns & McDonnell, I wish to thank you for the continued utilization of our services. Sincerel yours, Paul L. dre S. P.E. Vice P esident Robert M. Robinson, P.E. Project Manager. PLA/RMR/skb 4800 EAST 63rd STREET,PO.BOX 173,KANSAS CITY,MISSOURI 54141 • TEL:816.333.4375 TWX:910.771.3059