HomeMy Public PortalAbout2003-22 Approving a bid to Construct a Bus ShelterRESOLUTION NO. 2003-22
A CAPITAL PROJECT AUTHORIZING RESOLUTION OF
THE VILLAGE COUNCIL OF THE VILLAGE OF KEY
BISCAYNE, FLORIDA; APPROVING A BID TO
CONSTRUCT A BUS SHELTER NEAR THE CURRENT STOP
AT CRANDON BOULEVARD NORTH OF OCEAN DRIVE;
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the Council authorized the Village Manager to solicit bids to construct a bus
shelter near the current bus stop on Crandon Boulevard and Ocean Lane Drive based on plans
prepared by the architect, Eduardo Muhina; and
WHEREAS, the project was advertised and three (3) construction companies attended a pre -
bid meeting; and
WHEREAS, Island Construction Group Inc. submitted a bid to construct the project.
NOW, THEREFORE BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE
VILLAGE OF KEY BISCAYNE, FLORIDA AS FOLLOWS:
Section 1. That the Village Council approves the attached Proposal submitted by Island
Construction Group Inc. and dated April 30, 2003.
Section 2. That the Village Manager is directed to enter into an Agreement with Island
Construction Group Inc. to construct the bus shelter.
Section 3. That the Village Manager and Village Attorney are hereby directed to
implement this Resolution.
Section 4. Funding for the project will be the Miami -Dade County Peoples
Transportation Plan (one half (%2) penny sales tax).
Section 5. This resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED this 24th day of June , 2003.
M 6164,ta
MAYOR ROBERT OLDAKOWSKI
AT
io 6"
NCHiTA H. ALVAREZ, CMC, VILLAGE CLERK
APPROVED AS T FORM AND LEGAL SUFFICIENCY:
VILLAGE A
PROPOSAL
FOR THE VILLAGE OF KEY BISCAYNE
BUS SHELTER AT NORTHERLY LIMITS OF THE VILLAGE
CRANDON BOULEVARD RIGHT OF WAY
PRESENTED BY 276-A/A clvz7wc ; -i v 6, v 2-41/C. (hereinafter called
"BIDDER"), organized and existing under the Laws of the State of Florida, doing business
as 7'i',( ,r7i v c4 -r , / e. (corporation, Partnership, or Individual as
applicable) submitted on this 7d day of i , i 6 2003, to the VILLAGE OF KEY
BISCAYNE (hereinafter called the "OWNER").
The undersigned, as Bidder (herein used in the masculine singular, irrespective of actual
gender and number) hereby declares that he is the only person interested in this Proposal
and that it is in every respect fair, and it submitted in good faith and without collusion or
fraud.
The bidder further declares that he has satisfied himself fully relative to all matters and
conditions with respect to the work to which this Proposal pertains.
The selected contractor shall submit all permit applications within 10 calendar days after
receipt of the Notice to Proceed. Construction work shall commence within 10 days of the
issuance of all permits. All work shall be substantially completed within 90 days from the
receipt of the Notice to Proceed.
The Bidder proposed and agrees, if this Proposal should be accepted, to execute all
appropriate Contract Documents (including a contract in a form approved by the Village
Attorney) for the purpose of establishing a formal contractual relationship between him and
the Village of Key Biscayne, Florida.
The Bidder, in compliance with Instructions to Bidders for the Crandon Boulevard Bus
Shelter project, and having examined the drawings and specifications with related
documents and the site of the proposed work, and being familiar with all of the conditions
surrounding the construction of the proposed project including the availability of materials
and labor, hereby proposes to fumish all labor, materials, and supplies and to construct the
project in accordance with the Contract Documents, within the time set forth herein, and at
the prices stated below. These prices are to cover all expenses, including permit fees,
incurred in performing the work required under the contract documents, of which this
proposal is a part. Permit fee information has been provided by the Project Architect.
1
The Contractor shall commence the work to be performed as described herein on the date
to be specified in a written Notice to Proceed and shall fully complete all Work hereunder
within 90 calendar days from receipt of the Notice to Proceed. For and after each day in
excess thereof until final completion, liquidated damages may be assessed against
Contractor at a rate of $200.00 per day. In the event that the progress of the Work is not
maintained on schedule by the Contractor in accordance with the Schedule of Work
provided by Owner or in the event the work is not completed within the time above
specified, the Owner may take actions and enforce the rights granted to it by the General
Conditions, Supplementary Conditions and Contract.
Contractor shall apply for and accept progress payments in accordance with the Contract
for Construction and General Conditions.
If this Proposal is accepted, the Contractor agrees to supply Certificates of Workmen's
Compensation and Liability Insurance at the time the Contract is signed.
This Proposal will remain in effect and will not be withdrawn by the Contractor for a period of
sixty (60) days from the scheduled dosing time of receipt of bids The Bidder agrees that
Owner shall have the right to retain this bid for a period of sixty (60) days from the date of
receiving bids and guarantees the amount or amounts set forth herein to be firm for the
same sixty (60) day period.
The Bidder acknowledges that price alone is not the sole consideration for the Village's
award of the contract.
By submission and execution of this Bid Form, the Bidder agrees to indemnify and hold
harmless the Owner, Architect, Architect's Consultants, Agents and employees of any of
them from and against claims, damages, losses, and expenses, including but not limited to
attorneys fees, arising out of the Bidder's submission of his/her bid or Village's action on
such bid. The Bidder acknowledges that the Architect shall be free to advise the Owner on
the selection of the contractor in any manner and holds said Owner and Architect harmless
for any decision arising out of any such advice. The Bidder acknowledges that the Owner,
the Architect, Architect's Agents, Architects Consultant, and employees of any of them shall
have no liability resulting from this bid process and that the Owner is not obligated in any
way to pursue the project. The Bidder acknowledges that the Owner is free to select any or
no Bidder as the successful bidder and that the bidder holds the Owner, the Architect,
Architect's Consultants, Agents and employees of any of them harmless regarding that
decision of selection.
2
PRESENTED BY:
Bidder 17vc
Address: 3?cr C,Viq ivt -aiJ /J'/ vtl ' d.
Telephone Number. .70,r 2d' %- I 7
Fax Number ler Yea/ 7/07
CeII Number Jeer 7741 • Q'7 / 7
E Mail Address:
Signature of Contra
Authorized Rep
THE SUM TOTAL OF THE BID:
t7/),i Phut Therlyv4 PoiMoviiv4 A7,0,
Dollars and Cents ($ )
Ase'r\ - a ,I"'6'. C $
/
cRANpost 5ouLevARD
Mw4100U11
_—Il144{.1royalty
{ tY
Irk' NW CONC. MAb
MI'11A{.?f1rN 31134- %r
PANCIAT
4V.r /au 111aoduwc
Otir IDOST.IA7elt4x
sir 070PlIRIC4
eve odSG RIOWALK
w -r csu ..
SIEENUINVI
110141.01Ir
FRONT.ELEVATION
LEFT ELEVATION
0.b.Tecy.n1E T M.. b« d y owl.d@o. Dist d...h0 aa.p....sn PSC. Oar.. ee..y ..q•rr . •4 01 Lour se coyw.e. ho. ry ow..w:o, or 1=P"o..al dw.s.g b .d.ya .e e.vArow q .rdit..ey6gwr Ce.wet.e s w-aw per w• wetry Ard+seet pewr to ON d..gw u.ae 04000 m approved aw: j.
Dodos. r. N prepay of Ya A.d &mcl aH .r. qw. « Ue.... to Me ~r - Y.s prevail to eedpws ca.dtrdelf.. er i.. .044 drerbae o. W. drag.. one ek..Yya. Copy a smowdreb.aa. AtoMyy by *V. .4he.t r..r+u.n . i.iuw, 01.e ardlt.41. I. .w4tw. at CIW t... C w WI4.d W1w or M.4N.
SECOND OPTION
NOM
MOE 101111121
Mgt
a
Ai?
RR�
err 4'
Ala
FIESBITAllON
A-1 .0