Loading...
HomeMy Public PortalAboutORD07845 f f BILL NO. INTRODUCED BY COUNCILMAN: /1AArN ORDINANCE NO. AN ORDINANCE OF TIME CITY OF JEFFERSON, MISSOURI, AUTHORIZING THE MAYOR -AND CLERK OF THE CITY TO EXECUTE A WRITTEN CONTRACT WITH MID-MISSOURI DISTRIBUTORS, INC. , A CORPORATION, RELATING TO THE PROVISION AND -ERECTION OF A RIGID METAL BUILDING. BE IT ORDAINED BY THE CITY COUNCIL OF .THE CITY OF JEFFERSON, MISSOURI, AS FOLLOWS: Section 1. The Mayor and Clerk of the City are hereby authorized and directed, for and in the name of the city, to execute a written contract with Mid-Missouri Distributors, Inc. , a corporation, relating to the provision and erection of a rigid frame metal building. Section 2. Said contract shall read in words and figures as follows: r C O N T R A C T THIS CONTRACT, made and entered into this dtf*day of 1966, by and between the City of Jefferson, Missouri, a third class city existing under the laws of the State of Missouri, located in Cole County, Missouri, hereinafter termed the "Owner", and Mid-Missouri Distributors, Inc. , a corporation, 1410 Highway 70 West, Columbia, Boone County, Missouri, hereinafter termed the 1111:1161� all " WITNESSETH 1. Contractor hereby agrees to sell and provide to the Owner a rigid frame steel building, including gutters and downspouts, meeting the specifications entitled: "Specifications for Rigid Frame Steel Buildings" attached hereto, marked as Appendix "A", and expressly incorporated by reference herein as fully as if- set out at length verbatim herein, and then provide all labor required to erect same at such location as shall be selected by the Owner upon a concrete foundation to be provided by the Owner. 7 2. Owner shall pay Contractor the sum of $6,648.00 for all materials and labor required to construct the rigid frame steel building hereinabove mentioned. Said amount shall be paid to Contractor upon completion of the work and acceptance of same by the City's Building Commissioner. 3. Contractor shall complete the erection of the building within jffe calendar days from the date of this contract. 4. Owner shall pay to Contractor an additional sum of $66.48 as a contribution to a premium to be paid by Contractor for a Performance Bond to guarantee the performance by Contracror of this contract, and Contractor agrees to provide Owner with the aforementioned performance bond. IN WITNESS WHEREOF, the parties to this agreement have hereunto set their hands and seals this,_ day of Q7cp; , , 1966. CITY OF JEF RSO , MISS I (By) • Mayor Attest: city Clerk MID-MISSOURI DISTRIBUTORS, INC. (BY) Attest: �f SPECIFICATIONS FOR RIGID FRAME STEEL BUILDINGS A. SCOPE OF WORK These specifications cover the material for and the fabrication of steel buildings so designed and constructed as to be weather-tight, easily erected and capable of being dismantled and re-erected. The materials furnished shall include the structural framing, roofing, siding, anchor bolts, doors, windows, hardware, fasteners, caulk and any other com- ponent parts for the metal building only, as specified, including the erection of same if so stated in the proposal. All materials shall be new, unused and free from defects and imperfections and fabricated in a workmanlike manner. The building shall be the design of a manufacturer who is regularly engaged in the fabrication of pre-engineered structures conforming in whole as speci- fied hereafter to the Metal Building Manufacturers Association's "Code of Standard Practices" . case of discrepancy between drawings, proposals and specifications, the provisions of the proposal and specifications shall govern. B. DESCRIPTION The building covered by these specifications is to be a single span, - gabled rigid frame type structure of tapered columns and roof beams. The building shall be 50 '-0" wide and two 24'-0" bays long. it shall be of sufficient height to allow for the installation of 12 '-0" high overhead doors in the sidewall, as shown on sketch. The roof purlin system shall provide continuiry over the interior rigid frame rafters. The wall girt system shall frame into and between the rigid frame . and/or columns. The roof slope shall be not less than one (1) unit nor more than two (2) units rise (vertical) to twelve (12) units run (horizontal) . DESIGN BASIS Steel Construction Manual of American Institute of Steel Construction, current edition, and American Iron and Steel Institute' s "Light Gage Steel Design Manual" of current issue. American Welding Society Code for Arc and Gas Welding,'. dated 1946. -1-